This is a Performance Work Statement (PWS) for wastewater discharge sampling services at VA Boston Healthcare System (VABHS), which operates three medical centers in West Roxbury, Jamaica Plain, and Brockton, Massachusetts. The Department of Veterans Affairs seeks a contractor to perform semi-annual and quarterly wastewater sampling at discharge points governed by the Massachusetts Water Resource Authority (MWRA) permits for West Roxbury and Jamaica Plain facilities, and the City of Brockton permit for the Brockton facility. The contractor must employ MWRA-approved sampling technicians and submit all samples to a MADEP-certified or NELAP-accredited laboratory, with results reported electronically through the MWRA's Pretreatment Information Management System Web Self-Monitoring Report for Jamaica Plain and West Roxbury, and directly to VABHS for Brockton. Specific sampling locations and frequencies are defined by permit requirements: Jamaica Plain requires seven semi-annual samples (one composite, six grab samples); West Roxbury requires seven semi-annual samples (three composite, four grab samples); and Brockton requires one quarterly composite/grab sample at the outfall manhole on West Chestnut Street.

The base performance period runs from June 1, 2026 through May 31, 2027, with four option years extending through May 31, 2031. Work must be performed between 8:00 a.m. and 4:30 p.m. Monday through Friday, excluding federal holidays, with the contracting officer retaining the right to reschedule access with 48 hours' notice. The contractor must hold appropriate MWRA certification and comply with VABHS safety policies, VA directives, and OSHA regulations. If discharge permits expire and are reissued with modified testing parameters or locations, or if a Notice of Violation occurs requiring additional sampling, the contractor must provide a cost estimate within five business days. The contractor is responsible for providing personal protective equipment to employees as required by OSHA and maintaining chain of custody documentation for all samples collected.

View the file

Other files

File Type Posted
36C24126Q0331.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

1. Background:

1.1. VA Boston Healthcare System (VABHS) consists of three primary medical centers located in West Roxbury, Jamaica Plain and Brockton. West Roxbury and Jamaica plain fall under the Massachusetts Water Resource Authority (MWRA) authority for wastewater discharge and have permits accordingly. Brockton falls under Brockton Water & Sewer likewise and has a discharge permit from the City of Brockton.

2. Scope of Work:

2.1. Contractor shall provide wastewater discharge sampling for VABHS according to each facility wastewater discharge permit. Where a permit listed has expired, sampling will continue under the expired permit until a new one has been issued to VABHS.

2.1.1. VABHS – West Roxbury 1400 VFW Parkway, West Roxbury, MA 02130 - MWRA Permit #:56005702

2.1.2. VABHS – Brockton 940 Belmont Street, Brockton, MA 02301 - City of Brockton Permit #: N-940-020518

2.1.3. VABHS – Jamaica Plain 150 South Huntington Avenue, Jamaica Plain, MA 02130 - MWRA Permit #:51005733

3. Period of Performance:

3.1. Base Year: 06/01/2026 through 05/31/2027

3.2. Option Year 1: 06/01/2027 through 05/31/2028

3.3. Option Year 2: 06/01/2028 through 05/31/2029

3.4. Option Year 3: 06/01/2029 through 05/31/2030

3.5. Option Year 4: 06/01/2030 through 05/31/2031

4. Certification Requirements:

4.1. Industry Standards.

4.2. MWRA Certification

5. Specific Tasks:

5.1. Area(s) to be Serviced:

5.1.1. Jamaica Plain-MWRA Discharge Permit #51005733

See attached facility permit for sampling pollutant parameters and methods.

Sample Location
Frequency
Type
0103
Semi-Annual
Composite
0104
Semi-Annual
Grab
0105
Semi-Annual
Grab
0107
Semi-Annual
Grab
0108
Semi-Annual
Grab
0109
Semi-Annual
Grab
0201
Semi-Annual
Grab

5.1.2. West Roxbury-MWRA Discharge Permit #56005702

Sample Location
Frequency
Type
0101
Semi-Annual
Composite
0102
Semi-Annual
Composite
0103
Semi-Annual
Composite
0104
Semi-Annual
Grab
0105
Semi-Annual
Grab
0206
Semi-Annual
Grab
0207
Semi-Annual
Grab

5.1.3. Brockton-Brockton Water & Sewer Permit #

Sample Location
Frequency
Type
Outfall manhole at W. Chestnut St. Entrance
Quarterly
Composite/Grab (see permit)

5.2. Schedule:

5.2.1. All work to be performed after normal operating hours between the hours of 8:00 am – 4:30 pm Monday through Friday. NOTE: The CO, COR, & Facilities reserves the right to limit, or otherwise reschedule access to the site to allow for meetings and/or other previously unscheduled events. Forty-eight (48) hours’ notice will be given to the contractor for all unscheduled events.

5.2.2. Federal Holidays: Contractor shall not be required to perform services on Holidays.

New Year’s Day
1 January
M L King’s Birthday
3rd Mon. in January
President’s Day
3rd Mon. in February
Memorial Day
Last Mon. in May
Independence Day
4 July
Labor Day
1st Mon. in September
Columbus Day
2nd Mon. in October
Thanksgiving Day
4th Thurs. in November
Veterans Day
11 November
Christmas Day
25 December

5.2.3. When one of the holidays falls on Sunday, the following Monday shall be observed as a legal holiday by U.S. Government Agencies. When a holiday falls on a Saturday, the preceding Friday shall be observed as a legal holiday. Also included would be any other day specifically declared by the President of the United States to be a national holiday.

5.3. Tasks:

5.3.1. Waste water Sampling/Analysis:

5.3.1.1. All samplings must be conducted by an MWRA approved sampling technician and in accordance with each discharge permit specifications.

5.3.1.2. The COR will contact the Contractor to coordinate a schedule of all sampling activities. All samples must be collected and submitted within the period of time specified by each facility discharge permit.

5.3.1.3. Contractor must provide name and location of the MADEP certified or NELAP accredited laboratory that will be utilized for sampling analysis. All samples collected for Jamaica Plain and West Roxbury must be submitted electronically through the Pretreatment Information Management System Web Self-Monitoring Report (Web SMR). The Contractor shall also provide VABHS with an electronic copy of the analytical report/chain of custody. The Contractor will also provide VABHS with an electronic of the analytical report/chain of custody for samples collected at the Brockton facility.

5.3.1.4. In the event that a discharge permit expires and a new one is issued with different testing parameters or additional testing locations, the Contractor shall provide VABHS with a cost estimate for the new sampling services. Cost estimate will be required within five (5) business days.

5.3.2. Additional Sampling:

5.3.2.1. In the event that VABHS receives a Notice of Violation (NOV) for discharge results outside permit limits, the contractor shall provide VABHS with a cost estimate for sampling services outlined in the NOV. Cost estimate will be required within five (5) business days.

6. Safety:

6.1. The contractor shall abide by all VABHS safety policies, VA directives, and OSHA regulations and shall discontinue work in case of emergency or adverse reactions to chemicals or fumes by patients/staff.

6.2. The contractor shall suspend work anytime it interferes with normal or emergency facilities operations and notify the COR.

6.3. The contractor shall safeguard and store all tools and equipment.

6.4. The contractor shall place physical barriers and warning signage so as to prohibit unauthorized access to area in which work is being performed.

6.5. All contractor equipment must be operated by employees trained in the proper use of the equipment.

6.6. All contractor employees shall be trained in the use and potential hazards of all floor care chemicals.

6.7. If personal protective equipment is required throughout any aspect of this contract, the contractor is required to provide it for all employees in accordance with OSHA regulations.

6.8. The A&A requirements do not apply, and that a Security Accreditation Package is not required

7. Reporting:

7.1. The COR will be the focal Points of Contact.