This is a Performance Work Statement (PWS) for a services contract with the U.S. Fish and Wildlife Service (USFWS) to acquire high-resolution digital orthophotography, topographic and bathymetric LiDAR data, and field survey services for Bitter Lake National Wildlife Refuge and surrounding areas in Roswell, New Mexico. The project encompasses approximately 40 square miles and is intended to support analysis and design for construction repairs to waterbird/waterfowl and threatened and endangered species habitat damaged during an August 2022 flood event.

The contract consists of five primary tasks: (1) develop a Project Plan and Contractor Quality Control Plan (CQCP) within 10 days of notice to proceed; (2) establish survey ground control with a minimum of six primary control points published on the NGS Online Positioning User Service in NAD83 (NSRS 2011) and North American Vertical Datum 1988 (NAVD88) using New Mexico surveying standards; (3) conduct aerial topographic and bathymetric LiDAR surveys with green wavelength laser capability, 8 points per square meter ground density, 4 points per square meter bathymetric density, and QL1 accuracy standards, with LiDAR collection completed November 2026 through February 2027; (4) perform detailed field surveys of 20 water control structures following New Mexico topographic surveying standards; and (5) acquire 3-inch resolution 4-band digital imagery for orthophotography with full analytical aerotriangulation and radiometric adjustment. All deliverables must conform to USGS 3DEP LiDAR Base Specifications 2022 revision A, USGS National Hydrography Dataset standards, and Federal Geographic Data Committee (FGDC) metadata requirements. The government will award a firm-fixed-price contract, with the contractor responsible for all personnel, equipment, facilities, and materials. The contract manager must be a registered professional engineer or surveyor with verifiable geospatial data development experience. The contractor must maintain operations from sunrise to sunset, seven days per week, and attend post-award conferences and periodic progress meetings at no additional cost to the government.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Bitter Lake National Wildlife Refuge Topographic and Bathymetric LiDAR

PART 1: GENERAL INFORMATION

1. GENERAL:

This is a services contract to provide US Fish and Wildlife Service (USFWS) high resolution digital orthophotography, topographic and bathymetric Light Detection and Ranging (LiDAR) acquisition and processing, with topographic, planimetric, and the database development, for approximately 40 square miles including the U.S. Fish and Wildlife Service (USFWS) Bitter Lake National Wildlife Refuge (NWR) and surrounding areas, located in Roswell, Chaves County, New Mexico. The project also includes field survey for data collection of hydraulically significant infrastructure and for establishing aerial survey control with the potential for permanent control monumentation in select locations.

The LiDAR data will be processed by the Contractor to prepare a refined and detailed point cloud dataset and digital elevation model (DEM). Contracted work will generally focus on gathering topographic data to support future analyses and design for construction to repair damages to waterbird/waterfowl and threatened and endangered species (T&E) habitat from the August 2022 flood.

The Contractor should provide a written proposal outlining methods and approaches they intend or may use to meet the objectives described below.

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

1.1 Description of Services/Introduction:

The services required will include providing accurate aerial topographic and bathymetric LiDAR and imagery of Bitter Lake NWR as well as field survey. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personnel services necessary to perform the duties as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in outlined in this document and follow the specifications in USGS 3DEP LiDAR Base Specifications 2022 rev. A (USGS LBS) and USGS standard for National Hydrography Dataset.

1.2 Background:

Bitter Lake NWR was established in 1937 as a refuge and breeding ground for migratory birds and other wildlife, and the protection of threatened and endangered species. It is recognized as a Globally Important Area, offering vital habitat for over 350 species of birds, including many species of shorebirds, ducks, snow geese, and lesser sandhill cranes. Bitter Lake NWR is home to 11 threatened and endangered species, with all but one is dependent on the unique hydrological features and wetland habitats. There are 3 fish species, 3 wetland plant species, a crustacean, 3 aquatic snails, and a butterfly.

Six of these federally-listed species have critical habitat designated on the refuge. In addition, the refuge has five species that are state-listed as threatened or endangered.

https://www.usgs.gov/ngp-standards-and-specifications/lidar-base-specification-online https://www.usgs.gov/ngp-standards-and-specifications/lidar-base-specification-online https://www.usgs.gov/ngp-standards-and-specifications/hydrography-standards-and-specifications

The refuge plays a crucial role in the conservation of wetlands in southwestern desert where the Chihuahuan Desert meets the Southern Plains. The refuge supports a unique hydrological mixture that includes approximately 1,200 acres of wetlands, more than 70 sinkholes, moist-soil units, riverine habitats, ciénegas, an alkaline playa lake (Bitter Lake), and fresh to brackish springs. Bitter Lake NWR is a National Natural Landmark and Research Natural Site designated by the National Park Service, and is a Ramsar International Wetland of Importance. Vegetation in the area is mainly composed of saltgrass, four-wing saltbush, alkali sacaton, creosote bush, iodine bush, salt cedar, and mesquite. Terrain is variable from flat grasslands to sloping terrain to red bluffs composed of gypsum, limestone, clay and sand.

Bitter Lake NWR consists of three tracts; the North Tract north of highway US 70 is 12,269 acres, Middle Tract is 11,279 acres, and the South Tract is 1,186 acres. The North Tract contains the Salt Creek Wilderness Area, the Middle Tract is where the refuge Visitor Center, auto tour loop and wetland units are located, and the South Tract is the refuge farmland with the capability of flood irrigation with 3 wells. The project area will include all three tracts, as shown on Attachment 1.

In August 2022, a large flood event occurred on the Pecos River where 8-11” of rain fell in northern Chaves County then flowed into the Pecos River basin. USGS gage 08386000 on the Pecos River near Acme, NM along the US 70 bridge showed a peak river height of 17.4 feet. Bank height is 10 feet and flood stage is 13 feet. Spatial analysis provided by National Weather Service indicated that the widest extent of the flooding was at least 1.74 miles wide, which occurred on Bitter Lake NWR and Bureau of Land Management (BLM) Overflow Wetlands to the south of Acme, NM.

During the normal low flow timeframe in the summer, the Pecos River typically flows at 40 cubic feet per second (cfs). Seasonal block releases on the Pecos River move 1,000 cfs of water from Sumner Dam to Brantley Dam and down through Texas. During the August 2022 flood event, the Pecos River flow was estimated to be over 20,000 cfs.

The flood caused damage to refuge wetland units and infrastructure, scouring approximately 28 miles of wetland levees, roads, and firebreaks; and damaging water control structures and a submersible pump.

The levees range from 40- to 100-foot-wide bases to 20- to 30-foot-wide tops.

1.3 Objectives

This Statement of Objectives (SOO) defines requirements for Contractor to complete the following goals:

1. Project Plan and Contractor Quality Control Plan (CQCP)

2. Survey Ground Control

3. Aerial Topographic and Bathymetric LiDAR Survey

4. Detailed Field Survey

5. Aerial Imagery and Orthophotography

1.4 Scope:

Task 1: Project Plan and Contractor Quality Control Plan (CQCP)

The Contractor shall base their proposal on the entire area presented in Attachment 1. A detailed project plan must be submitted for approval within 10 days of receiving notice to proceed and prior to any data acquisition activities. This detailed project plan shall include descriptions of project quality control processes and shall include the CQCP.

The CQCP shall contain the following elements:

• Description of project purpose and objectives including products and services produced under this contract

• Schedule (data acquisition, data processing, data delivery).

• Project personnel with title and contact information of the project and field operation manager(s)

• Review plan with qualifications of assigned personnel and independent technical reviewers

• Quality control procedures and guidelines to be followed throughout the project

• Detailed level of scheduling sufficient to identify all major tasks including those that control the flow of work.

• Consultation plan for coordination with refuge point of contact for all tasks

• LiDAR/Photogrammetric flight plans in GIS and graphic format

• Base station location drawing(s) with supporting National Geodetic Survey (NGS) control information in GIS and graphic format

• LiDAR collection parameters (flying height, Scan FOV full angle, pulse rate, scanner frequency, side-lap percentage, point density etc.)

• Description of internal verification quality control processes

• Data validation methodology using National Standard for Spatial Data Accuracy (NSSDA) vertical and horizontal accuracy requirements of orthophotography, LiDAR elevation products, and derivative elevation products.

• Plan for complete Federal Geographic Data Committee (FGDC) compliant metadata for each deliverable with associated metadata.

The CQCP shall provide and maintain an effective quality control program that will assure all services required by this contract are performed and provided in a manner that meets professional quality standards. All documents shall be technically reviewed by competent, independent reviewers, as identified in the CQCP. Performance of independent technical review (ITR) should not be accomplished by the same element that produced the product. Errors and deficiencies in the documents shall be corrected prior to making submittals to the Government.

The Contractor shall include in the CQCP a time-scaled bar chart or critical path method (CPM) schedule showing the sequence of events involved with carrying out the project tasks within the specific period of service. This shall be a detailed level of scheduling sufficient to identify all major tasks including those that control the flow of work. The bar chart of schedule shall include review and correction periods for each submitted item. This should be a forward planning, as well as a project monitoring tool. The bar chart or schedule reflects calendar days and not dates for each activity. When a modification to this contract occurs, the Contractor shall submit a revised bar chart or schedule reflecting the change within seven calendar days of receipt of the change. The Contractor shall include the CQCP the discipline-specific checklists to be used during the preparation of each submittal. These completed checklists shall be submitted at each submittal phase as part of the project documentation.

The CQCP shall be implemented by an assigned person within the Contractor’s organization. The assigned person shall assure that all tasks on the project have been coordinated. This individual shall be a person who has verifiable geospatial data development experience and is a registered professional (engineer or surveyor). The Contractor shall notify the Project Manager, in writing, of the name of the individual and the name of an alternate person assigned to the position.

The Contracting Officer (CO) or their designee will notify the Contractor in writing of CQCP acceptance.

After acceptance any changes proposed by the Contractor are subject to the acceptance of the CO or their designee.

The Contractor shall prepare a Project Plan and Contractor Quality Control Plan (CQCP) as defined in this task.

Task 2: Survey Ground Control

Task 2 will include setting survey ground control to support topographic and bathymetric LiDAR acquisition.

Coordinate Reference System. Project coordinate reference system (CRS) LiDAR/Photogrammetric data and all related or derived data and products shall be processed and delivered in a single CRS recognized and published by the latest National Spatial Reference System (NSRS) officially released by NOAA:

Datum: NAD83 (NSRS 2011) Projection: New Mexico East (FIPS 3001) Units: US Survey Feet Vertical Datum: North American Vertical Datum of 1988 (NAVD88) Geoid Model: Geoid 18 EPSG Code(s): 6531

Primary Control Points. New primary ground control shall be established and published on NGS Online Positioning User Service (OPUS). A minimum of six (6) control points in the middle and south tracts shall be established according to the New Mexico Administrative Code Title 12, Chapter 8, Part 2 Minimum Standards for Surveying in New Mexico. Additional project control may be established as needed.

Primary control points should be published in the NOAA/NGS National Spatial Reference System (NSRS) and shall be established for the project according to the following specifications:

• All surveys conducted under this task option shall be referenced to NGS control monument or Continuously Operating Reference Station (CORS) in the NSRS using appropriate surveying methodologies.

• Required control shall conform to Standards and Specifications for Geodetic Control Networks (1984), Federal Geodetic Control Committee (FGCC). Primary control monuments established with GPS shall meet or exceed requirements of the New Mexico Administrative Code Title 12, Chapter 8, Part 2 Minimum Standards for Surveying in New Mexico using the appropriate latest geoid model and shall be monumented to maintain stability.

• Primary control shall be established in a stable location in the vicinity of each areas of interest included on Attachment 1 that will remain usable for subsequent surveying and construction layout.

• Contractor shall provide survey control report including control network adjustment report, RTK vector processing, static GPS reduction report, and other reports showing the established control meets specifications.

• All field notes shall be recorded in standard permanent bound field books and shall be included in the final submittal showing pertinent data on crews, instrument setups, and control points.

Temporary and permanent ground control set in the field shall have location ties and elevations established and shown in the field notes and drawings. Descriptions of all temporary and permanent benchmarks shall be included in the field notes and drawings.

• Sound geodetic principles should be applied when establishing new stations and shall include the appropriate supporting documentation such as processing reports, minimally and constrained 3-D least squares adjustment, pictures of the station, etc.

• Propagation of secondary control via Real Time Kinematic (RTK) GNSS will be tied to primary control.

The following is a summary of the deliverable products for Task 2.

Control Survey Deliverable Products - The contractor will deliver all ground control and check point survey data requested in the SOW including:

Ground control and Check points

• Survey control report in PDF format including processing documentation and all control station data sheets with photos for primary and secondary control.

• All surveyed control points shall be included in Microsoft (MS) Excel and ESRI format containing point number, XYZ fields. Point, Northing, Easting, Elevation, Description in .CSV format is preferred.

• Digital pictures to also be provided for each control and check point surveyed. Include corresponding landcover non-vegetated / vegetated classification at point.

Standard permanent bound field books, or digital raw data equivalent, shall be included in the final submittal.

Task 3: Aerial Topographic and Bathymetric LiDAR Survey.

Refer to Attachment 1 for area and square mile coverage. USFWS will furnish GIS shapefiles depicting the project area. The Refuge Point of Contact will select the preferred flight windows to best accommodate a balance between low water conditions and minimum vegetation coverage (see Acquisition Window and Constraints section below).

LiDAR Data Acquisition. LiDAR sensor shall have a green range wavelength laser capable of topographic and bathymetric LiDAR. Bathymetric data must be collected aerially due to project area restrictions.

Portions of Refuge water features have vegetation growth. While the collection timing will be selected with these conditions in mind, the collection plan must include methodology considerations to improve capture potential. LiDAR sensor shall be an approved fully calibrated system capable collecting pulse data with:

• Multiple echoes per pulse with a minimum of first, last, and one intermediate return.

• Intensity (LiDAR pulse signal strength) values recorded for each return signal.

• Ground sample density shall be eight (8) points per square meter or better.

• Bathymetric LiDAR sample density shall be four (4) points per square meter or better.

Sensor Calibration. LiDAR system calibration shall be up-to-date to meet and exceed project accuracies and requirements including:

• Full calibration reports available if requested.

• Bore site calibrations performed at the beginning and end of the project and as needed during data collection.

• Alternative calibration methods may only be used upon review and acceptance by the Project

Manager prior to data acquisition.

Acquisition Window and Constraints. Acquisition shall occur during mutually agreeable conditions and after field survey control targets have been placed. The LiDAR collection must be completed in November 2026 – February 2027 with the actual flight time selected by the Refuge based on site conditions. Areas of significance include Bitter Creek which is impacted by algae growth and regularly covered with tumbleweeds. As these will impact the bathymetric LiDAR collection, the Refuge will clear Bitter Creek prior to collection. The flight must occur within two weeks of clearing to limit the impacts of vegetation. Aerial LiDAR acquisition will occur with close coordination between the Contractor, Project Manager, and Refuge Point of Contact.

• Rain, snow, fog, smoke or similar environmental conditions shall be avoided.

• Project AOI(s) shall be fully and sufficiently covered with no data voids or data holidays (i.e. gaps between flightlines).

• Data voids in the bare earth not caused by classification of geographic features shall conform to

USGS LBS standards.

LiDAR Data Format. To provide for maximum interoperability among both CAD and GIS software platforms, LiDAR point cloud data shall be delivered in LAS files utilizing the most current LAS specification version at initiation of contract including the following information:

• Populate all LAS header information including year, month, and day to represent the final deliverable generated LAS date.

• Point cloud projection information must be specified using appropriate GeoTIFF tags.

Classification. No points shall be deleted from the LAS file and classification codes will follow the ASPRS Standard LiDAR Point Classes conforming to the USGS LBS minimum data classification scheme standard with U.S. Army Corps of Engineers (USACE) Joint Airborne Lidar Bathymetry Technical Center of Expertise (JALBTCX) classes for bathymetry:

1 Processed, but unclassified 2 Bare earth ground 3 Low vegetation 4 Medium vegetation 5 High vegetation

6 Buildings, other man-made structures 7 Low noise (low or high; manually identified, if necessary) 9 Water (topographic sensor)

17 Bridge deck 18 Water (topographic sensor) 20 High noise (high manually identified, if necessary) 21 Ignored ground (typically breakline proximity) 22 Snow (if present and identifiable) 40 Bathymetric Point, Submerged Topography (e.g., seafloor or riverbed)

Water Surface (sea/river/lake surface from bathymetric or topographic-bathymetric lidar; distinct from Point Class 9, which is used in topographic-only lidar and only designates “water,” not “water surface”)

Derived water surface (synthetic water surface location used in computing refraction at water surface)

Submerged object, not otherwise specified (e.g., wreck, rock, submerged piling)

44 IHO S-57 object, not otherwise specified

No-bottom-found (bathymetric lidar point for which no detectable bottom return was received)

64 Submerged Aquatic Vegetation

Denotes bathymetric bottom temporal changes from varying lifts, not utilized in bathymetric point class

• Special attention must be applied to the classification process due to the geographic nature of the project area. Dense vegetation data voids must also be minimized by the automatic removal process and “over smoothing” due to aggressive classification must be avoided.

• The collection plan should be made to minimize voids in bathymetric LiDAR.

• Point classification is to be consistent across the entire project.

• Hydrology Characteristics. Bathymetric LiDAR will be collected with intention to penetrate water and clearly represent natural and built drainage systems.

Relative Accuracy. The relative (point-to-point) accuracy shall meet within swath (intraswath) and overlapping swath (interswath) criteria established in the USGS LBS for topographic LiDAR for QL1 and bathymetric LiDAR equivalent for QL1.

LiDAR Check Points & Absolute Accuracy Testing. The contractor shall collect LiDAR check points in open terrain, vegetated areas, and water features according to project size criteria of the ASPRS Positional Accuracy Standards for Digital Geospatial Data with the following technical considerations for check point selection:

• Independent LiDAR check points not used in calibration shall be randomly selected throughout the project with consideration of access / right-of entry constraints. Points shall not be taken on slopes greater than 10%. Cross-sections in water features will be at locations proposed by the contractor and approved by the Refuge Point of Contact in writing.

• Absolute accuracy shall be assessed on both point cloud and bare-earth DEM data with tested accuracy for Non-Vegetated Accuracy (NVA) values meeting or exceeding meet the 10 cm RMSE requirement. (see USGS LBS)

• Any differences outside the absolute accuracy requirements will be discussed and resolved by the Contractor.

• Reporting shall be published in project level metadata.

LiDAR Resolution / Density. Spatial Distribution and Regularity testing for regularity of point pattern and density throughout the dataset will be assessed using a regular 1 by 1 meter grid laid over the dataset to ensure that at least 90% of the cells in the grid contain the requisite number of points per square meter (ppsm).

Additional Hydro- Breakline Specifications. FWS requires hydro- breakline collection following USGS LBS with the following minimum collection size criteria:

• Lakes / ponds to be collected at 0.2 acre.

• Islands within streams-river channels shall be collected at 0.2 acre.

• All collected hydro-breaklines to be delivered in ESRI shapefile format with 3D geometry and elevation attribution.

Tile index. The contractor shall propose for approval a project data tiling scheme with the following nominal considerations depending upon data density:

• The data should be broken up into as few files as possible.

• Tile size should be 3,000 foot x 3,000 foot.

• Each auxiliary product shall have the similar naming structure.

• Tiling developed for LiDAR should apply to other product deliveries requiring tiling such as orthoimagery.

The following is a summary of the deliverable products for task 3.

LiDAR Deliverable Products - The contractor will deliver all LiDAR and derivative surface products as listed:

• Index - One (1) flight line index and one (1) tile index will be provided in project CRS as an ESRI feature class. Flight dates will be included in the attribute table. Tile Index will record tile names in attribute table.

• Classified Point Cloud in SOW coordinate system - One (1) digital copy of each tile containing all LiDAR point cloud points classified according to SOW requirements including return number in LAS format version 1.4. LAS file must also have flight information and flight acquisition date and projection information defined. Files to be broken up into approved tile scheme. Also include project metadata.

• Classified Point Cloud in UTM coordinates and meters - One (1) digital copy of each tile containing all LiDAR point cloud points classified according to SOW requirements including return number in LAS format version 1.4. LAS file must also have flight information and flight acquisition date and projection information defined. Files to be broken up into approved tile scheme. Also include project metadata.

• Vertical Accuracy Report - RMSE error report in MS Excel format reported using American Society of Photogrammetry and Remote Sensing (ASPRS) Guidelines.

• DEM – Digital Elevation Model (DEM) in SOW coordinate system, GeoTIFF 32-bit floating point, decimal feet format with CRS defined projection / coordinates, 1-ft posting, suitable for 1.0’ (foot) contour generation. Provide tiles, mosaic of project area for the north tract, and mosaic of the project area including the middle and south tracts.

• DEM – Digital Elevation Model (DEM) in UTM coordinates and meters, GeoTIFF 32-bit floating point. Provide tiles, mosaic of project area for the north tract, and mosaic of the project area including the middle and south tracts.

• Collected hydro-breaklines will be incorporated into this deliverable.

• NDVI – Normalized Difference Vegetation Index to at least USGS Landsat specifications.

Bathymetric DEM - Digital Elevation Model (DEM) of water features in GeoTIFF 32-bit floating point, decimal feet format with CRS defined projection / coordinates, 1-ft posting, suitable for 1.0’ (foot) contour generation.

• Hydro-Flattened Breaklines - One (1) ESRI geodatabase of hydro-flattened breaklines collected on or used in support of the project is required. Breaklines will be delivered as PolylineZ and PolygonZ feature classes, as appropriate to the type of feature represented and the methodology defined in the SOW data schema.

• Contours - Contours designated at 1.0’ intervals with 1.0’ contours designated as intermediate and every 5th contour interval as index contours. Contours will be delivered with 3D geometry as a separate feature class within the same geodatabase containing breaklines.

Task 4: Detailed Field Survey.

The Contractor shall collect detailed field survey of twenty (20) water control structures identified in Attachment 1. These field surveys will support engineering analysis and design efforts. Surveying shall be completed following standards of the Minimum Standards for Surveying in New Mexico – Topographic surveying, referenced in the New Mexico Administrative Code Title 12, Chapter 8, Part 2, Section 11.

Guidelines for identified field survey sites include:

• Field surveys shall include spot shots taken at 50± foot or closer intervals along banks and toes of ditches, drains, berms, levees, and any other hydrologic/hydraulic linear feature found. Detail shall be sufficient to clearly define controlling breakline features to support hydrologic/hydraulic analysis.

• Field surveys shall include all hydraulicly significant attributes, but not limited to, pipe crossings, bridges, culverts, flow meters, and siphons. A representative channel cross section both upstream and downstream of each structure shall be surveyed. Survey cross sections shall be no more than 10 feet from the existing upstream and downstream faces of the structure. Cross section shall include both right and left top of banks and left and right toe of slope.

• Bridges are to include bottom width, top width, number of bridge spans, piers (diameter, height, width, and number if present), construction material, length, relative top of road cover, low chord, guard rails (if present), and any other hydraulically pertinent characteristic necessary that can be used as required input for a hydraulic modeling analysis.

• Pipe crossing abutments are to include pipe crossing abutments, pipe diameter, low chord of pipe, pipe material, piers (diameter, height, width, and number if present), construction.

• material, and any other hydraulically pertinent characteristic necessary that can be used as required input for a hydraulic modeling analysis.

• Culverts shall include culvert inlet and outlet, headwall configurations to include inlet and outlet inverts and soffits, construction materials, pipe diameter, pipe material, and any other hydraulically pertinent characteristic necessary that can be used as required input for a hydraulic modeling analysis.

The following is a summary of the deliverable products for Task 4.

Deliverable Products - The contractor will deliver small topographic surveys per USGS AutoCAD and topographic survey standards:

Individual Field Survey Locations - GIS Files: One (1) ESRI SDSFIE/NHD compliant Geodatabase (.mdb/.gdb).CAD Files: One (1) plan view drawing with comprehensive planimetric and utility locate.

information shall be provided in AutoCAD Civil 3D (DWG).

• Planimetric data will be separate from the contour & breakline files but can be stored within the same Geodatabase (.gdb) and DWG files.

• CAD Files: For each surveyed location, one DTM file generated if terrain was and AutoCAD Civil

3D (DWG).

Task 5: Aerial Imagery and Orthophotography.

Refer to Attachment 1 for area and square mile coverage. USFWS will furnish GIS shapefiles depicting the project area.

Image Data Acquisition. Contractor shall provide for acquisition of 3-inch high resolution 4-band digital imagery over the project AOI (see Attachment 1) designed for orthoimagery: An index of captured frames shall be furnished digitally for all acquired photography. A single mosaic of the imagery shall also be provided.

Capture Conditions. Acquisition shall occur during mutually agreeable conditions and after survey control targets have been placed. Acquisition will occur with close coordination between the Contractor and the Project Manager.

• Atmospheric Conditions: Free of cloud cover, cloud shadows, snow, smoke and visible haze.

All aerial control monuments shall be left in place and undisturbed for future use if needed and only removed with approval of the USFWS Project Manager.

Analytical Aerotriangulation (AT). Contractor will develop a fully analytical aerotriangulation (AT) adjustment solution including aerial GPS control, aerial imagery, ABGPS/IMU in accordance with the following:

• Final adjusted AT solution must reference the project CRS.

• An AT digital report will be prepared and submitted to the USFWS Project Manager. The aerial triangulation process and specifications report should document the photogrammetric methodology and results for the refined orientations of the project aerial photography.

Orthorectification and Radiometric Adjustment. Contractor shall orthorectify imagery in accordance with the following:

• Orthorectification surface will be the bare earth lidar surface product developed from the classified LiDAR point cloud data.

• Orthophotos will be radiometrically processed to ensure tone, contrast and color balance.

NSSDA Accuracy Testing. LiDAR check points shall also be used for orthophoto National Standards for Spatial Data Accuracy (NSSDA) reporting including:

• A report (in MS Excel format, see ASPRS Positional Accuracy Standards for Digital Geospatial Data) will be prepared with testing results for orthoimagery.

• Checkpoint surveys shall utilize or tie into the project primary control monuments and used to control aerial acquisition to eliminate the possibility of discrepancies between different control stations.

• Photo ID points may be used in lieu of artificial targets provided that a reasonably large angle of intersection exists to positively identify a point. Examples include sidewalk intersections, corner of concrete slabs, existing paint markings on asphalt, driveway corners or other well- defined features.

The following is a summary of the deliverable products for Task 5.

Orthophotography Deliverable Products - The Contractor will deliver all aerial imagery and derivative orthophotography products as listed:

• Index – One (1) flight line/ tile index provided as an ESRI shapefile.

• Orthophoto Tiles – One (1) digital copy of each 3-inch GSD, 4-band ortho tile in GeoTIFF (8-bit) format, delivered in approved tiling scheme (3000ft x 3000ft) with any void pixels rendered in white.

• NSSDA Report – RMSE error report in MS Excel format according to National Standards for Spatial Data Accuracy (NSSDA); assessed and reported using American Society of Photogrammetry and Remote Sensing (ASPRS) Guidelines.

• Compressed Mosaic(s) – One (1) compressed overall digital orthophoto mosaic in ECW Image Format, Generation 3 of the entire area provided at a 20:1 compression ratio. Any void pixels shall be rendered in white.

• AT Report – AT report in PDF format signed by the responsible triangulation team member summarizing the AT.

1.5 Period of Performance:

The period of performance for this project shall be determined based on the proposed schedule and actual contract award date. All works shall be completed within the agreed upon scheduled timeframe.

Any request or justification for change shall be made to the designated Contracting Officer (CO) in writing and must be approved by the CO.

1.6 General Information:

Refuge access roads are of earthen material and need to be considered in weather conditions. Repair may be needed. All equipment storage and environmental concerns will be addressed during project meetings. Options for site access and all equipment storage and environmental concerns will be addressed during project meetings.

1.6.1 Quality Control:

The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is how they assure themselves that their work complies with the requirement of the contract.

1.6.2 Quality Assurance:

The government shall evaluate the contractor’s performance under this contract in accordance with this Performance Work Statement. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Data Rights:

Documents and materials are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.4 Recognized Holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Indigenous Peoples Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.6.5 Hours of Operation:

The Contractor is responsible for conducting business, at all hours, of sunrise to sunset, Sunday through Saturday. The Contractor shall not perform on site on federal holidays unless authorized by the Contracting Officer and coordinated with the Point of Contact (POC). The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.6 Place of Performance:

The work to be performed under this contract will be performed at Bitter Lake NWR. The project site and Bitter Lake NWR headquarters are located approximately 7 miles from Roswell, NM. The nearest basic facilities are located in Roswell, NM.

1.6.7 Type of Contract:

The government will award a firm-fixed price.

1.6.8 Security Requirements:

Vehicle access onto the refuge is restricted to refuge personnel. Contractors will be provided a key or a combination lock to the refuge padlock to allow access for this project. Initial access to the site will be arranged by refuge personnel.

1.6.9 Special Qualifications:

Contractor is expected to have expertise in LiDAR, orthophotography, and field survey data collection to support hydrologic and hydraulic analyses and designs to USGS standards.

Demonstrate technical expertise and experience in the following areas:

• LiDAR data collection, field data collection, and orthophotography

• Advanced spatial data methods to integrate multiple data collections into a single dataset.

• Feature extraction or terrain modeling

• Integration of multi–source data (e.g., LiDAR, GPS, Bathymetry, GIS).

• Bathymetric LiDAR capabilities

The Contractor shall, without additional expense to the Service, be responsible for obtaining any licenses and permits in a timely fashion, and for complying with any applicable State and Federal laws, codes, and regulations in connection with prosecution of the work.

1.6.10 Post Award Conference/Periodic Progress Meetings:

The Contractor agrees to attend any post award meetings with collaborators to discuss the project work, refine methods, and clarify projected contractual accomplishments. The Contractor also agrees to attend a post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

Project meetings shall be conducted periodically to enable orderly review during the progress of the work and to provide systematic resolution of problems. The Contractor’s representative and other responsibility employees shall attend and participate in these meetings. The Contractor’s representative shall have the authority to commit the Contractors to activities under the Contract. Progress meetings can be held at or near the Project Site. Progress meetings may be conducted via video conference call.

A Kick-Off Meeting shall be held before the Contractor begins any work on the project. The Contractor shall ensure attendance by an individual authorized to sign the Contract, its Project Manager, superintendent, and major subcontractors. The Kick-Off meeting will be conducted via video conference call and/or in person.

1.6.11 Contracting Officer Representative (COR):

The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.12 Key Personnel:

The following personnel are considered key personnel by the government contract manager/Alternate contract manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m.

to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are: The contract manager/alternate contract manager shall be a person who has verifiable engineering design experience and is a registered professional (engineer or surveyor).

1.6.13 Identification of Contractor Employees:

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

Contractor personnel are not required to obtain and wear badges in the performance of this service.

1.6.14 Contractor Travel:

Contractor will be responsible for all travel cost and scheduling of travel.

1.6.15 Other Direct Costs:

Not Applicable.

1.6.16 Organizational Conflict of Interest:

Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2: DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR

A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER

A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER’S REPRESENTATIVE (COR)

An employee of the U.S. Government appointed by the contracting officer to represent the government on site. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE

A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE

Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL

Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY

Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE

The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY CONTROL

All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.10. SUBCONTRACTOR

One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.11. WORKDAY

The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK

Monday through Friday, unless specified otherwise.

PART 3: GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services:

The Government will provide key personnel during the full term of the contract for collaboration, questions or need for clarification.

3.2. Facilities:

The Government will not provide and facilities for this contract.

3.3. Utilities:

The Government will not provide any utilities for this contract.

3.4. Equipment:

The Government will not provide any equipment for this contract.

3.5. Materials:

The Government will not provide any materials for this contract.

PART 4: CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General:

The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this PWS.

4.2 Secret Facility Clearance:

Not applicable.

4.3 Materials:

The Contractor shall furnish all materials, supplies, and equipment necessary to meet the requirements under this PWS.

4.4 Equipment:

The Contractor shall furnish all supplies, and equipment necessary to meet the requirements under this

PWS.

PART 5: SPECIFIC TASKS

5. SPECIFIC TASK:

The Contractor shall meet the objectives and tasks identified above.

PART 6: APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

The Contractor must abide by all applicable Federal and State regulations and laws applicable to this project.

PART 7: ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. PROJECT MAPS:

See Attachment 4.

PART 1: GENERAL INFORMATION
1. GENERAL:
1.1 Description of Services/Introduction:
1.2 Background:
1.3 Objectives
1.4 Scope:
Task 1: Project Plan and Contractor Quality Control Plan (CQCP)
Task 2: Survey Ground Control
Standard permanent bound field books, or digital raw data equivalent, shall be included in the final submittal.
Task 3: Aerial Topographic and Bathymetric LiDAR Survey.
Task 4: Detailed Field Survey.
Task 5: Aerial Imagery and Orthophotography.
1.5 Period of Performance:
1.6 General Information:
1.6.1 Quality Control:
1.6.2 Quality Assurance:
1.6.3 Data Rights:
1.6.4 Recognized Holidays:
1.6.5 Hours of Operation:
1.6.6 Place of Performance:
1.6.7 Type of Contract:
1.6.8 Security Requirements:
1.6.9 Special Qualifications:
1.6.10 Post Award Conference/Periodic Progress Meetings:
1.6.11 Contracting Officer Representative (COR):
1.6.12 Key Personnel:
1.6.13 Identification of Contractor Employees:
1.6.14 Contractor Travel:
1.6.15 Other Direct Costs:
1.6.16 Organizational Conflict of Interest:
PART 2: DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR
2.1.2. CONTRACTING OFFICER
2.1.3. CONTRACTING OFFICER’S REPRESENTATIVE (COR)
2.1.4. DEFECTIVE SERVICE
2.1.5. DELIVERABLE
2.1.6. KEY PERSONNEL
2.1.7. PHYSICAL SECURITY
2.1.8. QUALITY ASSURANCE
2.1.9. QUALITY CONTROL
2.1.10. SUBCONTRACTOR
2.1.11. WORKDAY
2.1.12. WORK WEEK
PART 3: GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
PART 4: CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General:
4.2 Secret Facility Clearance:
4.3 Materials:
4.4 Equipment:
PART 5: SPECIFIC TASKS
5. SPECIFIC TASK:
PART 6: APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
PART 7: ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. PROJECT MAPS:

File details come from the government source that posted it. Updated .