Performance_Work_Statement _ AC for Fourth Bay.docx
DOCX document 53 KB Posted
- Solicitation number
- 12405B22Q0221
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Questions answered.docx | DOCX document | |
| Davis Bacon Wage Determination.pdf | ||
| 12405B22Q0221.pdf | ||
| IMG_0131.JPG | JPG image | |
| IMG_0134.JPG | JPG image | |
| Wage Determination.pdf | ||
| IMG_0136.JPG | JPG image | |
| IMG_0137.JPG | JPG image | |
| New AHU for Greenhouse Drawings2.pdf | ||
| Clauses and Provisions.docx | DOCX document | |
| IMG_0132.JPG | JPG image | |
| IMG_0135.JPG | JPG image |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Performance Work Statement
Contents
| Project Title | 3 |
| General Information | 3 |
| 1.0 Background and Purpose | 3 |
| 2.0 Definitions | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Deliverable / Schedule | 3 |
| 5.0 Government Furnished | 4 |
| 6.0 Travel | 4 |
| 7.0 Contractor’s Key Personnel | 4 |
| 8.0 Security Requirements | 4 |
| 9.0 Data Rights | 4 |
| 10.0 Section 508 - Electronic and Information Technology Standards | 4 |
| 11.0 Performance Requirement Measures | 4 |
| Attachment | 5 |
Project Title Install A/C for the fourth bay in the Greenhouse for cooling and heating
General Information
1.0 Background and Purpose
Install A/C for the 4th bay in the New Greenhouse where corn will be grown year around. The optimum temperature should be 80-85 degrees F. Outside temp in summer will be around 105 deg F and in cooler months it can dip to low 30s deg F.
2.0 Definitions
N/A
Contractor Requirements
3.0 Technical Requirements / Tasks
The AC should maintain temp from 78-80 degrees F for the fourth bay (700 sq ft) in the greenhouse for successfully growing corn year around. The following specifications apply:
The packaged A/C Unit should be 2-speed belt-driven with cooling capacity of at least 290,000 Btu (using refrigerant R-410-A) and gas heating with at least 320,000 Btu. The AC should be powered by volts/Ph/HZ - 208/3/60. The whole unit should be mounted on a weather proof slab (14” x 14”) and mounted on vibration -free galvanized steel frame. Ducts should be extended into bay -4 for uniform dispersal of cold/hot air. Control mechanisms are available at the Headhouse (MicroGrow control)
All components should be American-made and compliant to industry standards.
4.0 Deliverable / Schedule
All written deliverables shall be phrased in layperson language.
· AC should be procured installed within 60-90 days from the date of acceptance of the contract.
· AC will be controlled by the MicroGrow controller in the headhouse. For technical reasons, this will be handled separately.
· Reporting Requirements: The contractor is required to provide written progress reports {biweekly} for the period of installation and completion {not beyond 90 days).
Key Deliverables
| Item No. |
| Deliverable |
| Objective |
| Due |
| 1 |
| Procure and Install AC for the 4th bay in the New Greenhouse |
| For growing corn year around. See statement of work |
| No later than 60 business days after contract award |
| 2 |
| Bi-Weekly Status Report |
| Report documenting tasks & issues weekly. |
| Weekly, every Friday, by 3:00 PM EDST until the contract expires |
5.0 Government Furnished
Access to government site will be provided. The contract awardee will be working with Ponchartrain Partners – in house contractors who maintain the building, greenhouse and the surroundings.
6.0 Travel
N/A
7.0 Contractor’s Key Personnel
Not known until the contract is awarded
8.0 Security Requirements
Register with the Administrative Office for access to the greenhouse. Inform The Research Leader Dr. Rajasekaran in advance of the commencement of work.
9.0 Data Rights
N/A
10.0 Section 508 - Electronic and Information Technology Standards N/A
11.0 Performance Requirement Measures
| Performance Objective |
| Required Task or Deliverable |
| Performance Standard |
| Method of Surveillance |
| Positive/Negative Incentive |
% for NOT meeting the Task
| Install an AC for the fourth bay and the duct work. |
| When connected to the controller board in the headhouse, the AC should perform without shaking, flaws and should maintain a temperature of 78-80 degrees F. Outside temp will be around 105 F in summer and can dip into low 30s in winter |
| The controller board will be set up to operate the AC and will allow a difference of 2-3 degrees F from the set temperature. |
| The MicroGrow controller will be operated by the users in the FFS Unit and also by the building Engineer. |
| Should be under warranty for at least one year. Extension is also preferred.. |
Insert Performance Requirement Measures Here
Attachment None. For the AC specs please see PWS. Additional information can be provided by the building engineer or by Dr. K. Rajasekaran image1.png