RFI Questions answered.docx

DOCX document 15 KB Posted

Attached to
Install 30 ton A/C for the fourth bay in the Greenhouse
Solicitation number
12405B22Q0221
Issued by

View the file

Other files

File Type Posted
Davis Bacon Wage Determination.pdf PDF
12405B22Q0221.pdf PDF
IMG_0131.JPG JPG image
IMG_0134.JPG JPG image
Wage Determination.pdf PDF
IMG_0136.JPG JPG image
IMG_0137.JPG JPG image
New AHU for Greenhouse Drawings2.pdf PDF
Clauses and Provisions.docx DOCX document
IMG_0132.JPG JPG image
IMG_0135.JPG JPG image
Performance_Work_Statement _ AC for Fourth Bay.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please see list of RFI Questions below for the above referenced project:

1. Can structural drawings and specifications with piling layout and piling details be made available?

No

1. Foundation and piling for the new HVAC unit will be installed per the existing foundation design. No new engineered drawings or design will be required of the contractor. Please confirm.

The foundation will be the same, however after further review we have decided to use four, 2-7/8” Helical pier piles 20’ long.

1. During the pre-bid site visit, a sewer access was found in the proposed location for the new 30 ton packaged air unit.

2. Are underground drawings available which detail the underground sanitary sewer lines and all other underground features in the area?

No

2. For the alternate location on the west side of the greenhouse, are underground drawings available which detail all underground features in the area?

No

1. It is assumed the existing electrical panel has sufficient space and electrical capacity for the installation of the new packaged HVAC unit. Please confirm.

Yes, confirmed

1. Contractor will wire controls from new HVAC unit to MicroGrow controller. Per statement of work, USDA personnel or others will connect wiring to controller and perform any needed configuration. Please confirm.

All control wiring must be installed and connected to the MicroGrow controller. This will be included in your cost.

1. Can wiring diagrams for the HVAC controls of the existing packaged HVAC units be provided?

1. Will the contractor be required to provide as-built construction redlines?

Yes, they will be provided when needed.

1. Potential routing to power the new packaged HVAC unit will exit the west side of the existing head house addition and then proceed southward and underground to the new unit. Are underground drawings along the west side of head the house addition, greenhouse #2 and greenhouse #4 available?

No

1. Are any additional electrical drawings and panel schedules for the existing head house addition, greenhouses, and packaged HVAC units available?

No

1. The existing package HVAC units are Trane; the basis of design for the existing, scheduled units found on the drawings is Daikin. During bid walk it was mentioned HVAC units which are technically equal are acceptable. Please confirm.

It was also mentioned that our preference was the Trane unit since the other three units are Trane units. It is easier to maintain one brand rather than two.

1. Is grounding required for the new HVAC unit? If so, does an existing underground grounding grid exist? Are there existing grounding drawings available for the area?

An electrical equipment grounding conductor is required. An underground grounding grid does not exist.

1. Lightning protection is not required. Please confirm.

Lightning protection is not required.