RFI Questions answered.docx
DOCX document 15 KB Posted
- Solicitation number
- 12405B22Q0221
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Davis Bacon Wage Determination.pdf | ||
| 12405B22Q0221.pdf | ||
| IMG_0131.JPG | JPG image | |
| IMG_0134.JPG | JPG image | |
| Wage Determination.pdf | ||
| IMG_0136.JPG | JPG image | |
| IMG_0137.JPG | JPG image | |
| New AHU for Greenhouse Drawings2.pdf | ||
| Clauses and Provisions.docx | DOCX document | |
| IMG_0132.JPG | JPG image | |
| IMG_0135.JPG | JPG image | |
| Performance_Work_Statement _ AC for Fourth Bay.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please see list of RFI Questions below for the above referenced project:
1. Can structural drawings and specifications with piling layout and piling details be made available?
No
1. Foundation and piling for the new HVAC unit will be installed per the existing foundation design. No new engineered drawings or design will be required of the contractor. Please confirm.
The foundation will be the same, however after further review we have decided to use four, 2-7/8” Helical pier piles 20’ long.
1. During the pre-bid site visit, a sewer access was found in the proposed location for the new 30 ton packaged air unit.
2. Are underground drawings available which detail the underground sanitary sewer lines and all other underground features in the area?
No
2. For the alternate location on the west side of the greenhouse, are underground drawings available which detail all underground features in the area?
No
1. It is assumed the existing electrical panel has sufficient space and electrical capacity for the installation of the new packaged HVAC unit. Please confirm.
Yes, confirmed
1. Contractor will wire controls from new HVAC unit to MicroGrow controller. Per statement of work, USDA personnel or others will connect wiring to controller and perform any needed configuration. Please confirm.
All control wiring must be installed and connected to the MicroGrow controller. This will be included in your cost.
1. Can wiring diagrams for the HVAC controls of the existing packaged HVAC units be provided?
1. Will the contractor be required to provide as-built construction redlines?
Yes, they will be provided when needed.
1. Potential routing to power the new packaged HVAC unit will exit the west side of the existing head house addition and then proceed southward and underground to the new unit. Are underground drawings along the west side of head the house addition, greenhouse #2 and greenhouse #4 available?
No
1. Are any additional electrical drawings and panel schedules for the existing head house addition, greenhouses, and packaged HVAC units available?
No
1. The existing package HVAC units are Trane; the basis of design for the existing, scheduled units found on the drawings is Daikin. During bid walk it was mentioned HVAC units which are technically equal are acceptable. Please confirm.
It was also mentioned that our preference was the Trane unit since the other three units are Trane units. It is easier to maintain one brand rather than two.
1. Is grounding required for the new HVAC unit? If so, does an existing underground grounding grid exist? Are there existing grounding drawings available for the area?
An electrical equipment grounding conductor is required. An underground grounding grid does not exist.
1. Lightning protection is not required. Please confirm.
Lightning protection is not required.