PERFORMANCE WORK STATEMENT_8 Dec 2025.pdf

PDF 993 KB Posted

Attached to
Recompete OWF Troop Feeding Services
Solicitation number
FA480326Q0011
Issued by

About this file

This Performance Work Statement (PWS) describes a troop feeding contract for the 5th Operational Weather Flight (OWF) at Shaw Air Force Base, SC. The contract will provide boxed meals during Unit Training Assembly (UTA) weekends, with a minimum of 20 meals per meal period (breakfast, lunch, and dinner) across Friday and Saturday, excluding Sunday dinner. The contractor will be responsible for preparing and delivering varied meal options including sandwiches, salads, hot entrees like hamburgers and BBQ chicken, along with drinks and sides, to the 28th Operational Weather Squadron's Pavilion.

The contract is structured as a fixed firm-price agreement with a 12-month base year and two 6-month option periods. Specific requirements include providing a menu 7 days prior to each UTA, packaging meals for secure transport, delivering meals at precise times (0630-0645 for breakfast, 1045-1100 for lunch, 1715-1730 for dinner), and preparing food in accordance with FDA guidelines and Shaw AFB public health safety standards. The contractor must also report labor hours to the Air Force's Contractor Manpower Reporting Application (CMRA) and comply with all applicable regulations and local policies.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Troop Feeding for Unit Training Assemblies 8 Dec 2025

Part 1

General Information

1. GENERAL: This is a non-personnel services contract to provide Troop Feeding for Unit Training Assemblies.

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Troop Feeding for Unit Training Assemblies as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: Due to the Shaw AFB, SC dining facility as well as the Flight Kitchen closing for repairs, members of the 5th Operational Weather Flight (OWF) will not have any options to procure subsistence when in an Inactive Duty Training (IDT) status. Per the PIM 24-007 Troop Feeding for Unit Training Assemblies (UTA), a troop feeding contract is required.

1.3 Objectives: Per the PIM 24-007 Troop Feeding for Unit Training Assemblies, a troop feeding contract is required.

1.4 Scope: At a minimum 20 Boxed Meals will be provided to members of the 5th OWF during UTAs for breakfast, lunch, and dinner. Services include providing a hot boxed meal for dinner on Friday and Saturday during UTA weekends. Vendor will confirm total number of meals needed and menu 5-7 days prior to the start of the UTA weekend.

1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months with two (2) 6-month option periods. The Period of Performance reads as follows:

12 months from award of contract with two (2) 6-month option periods

1.6 General Information

1.6.1 Quality Control The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum, the contractor shall develop quality control procedures that address the areas identified in Technical Exhibit 1, Performance Requirement Summary. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The Quality Control Plan is to be delivered within 30 days after contract award, three copies of a comprehensive written QCP shall be submitted to the Contracting Officer (CO) and Contracting Officer Representative (COR) within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.2 Quality Assurance: The Government shall monitor and evaluate the Contractor’s performance to ensure services are received IAW requirements set forth in this PWS. The method of surveillance will be spelled out in the Governments’ Quality Assurance Surveillance Plan. The COR will periodically inspect by watching actual task performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, or otherwise inspecting the task or its result to determine whether or not the performance meets the standards contained in this PWS. The COR may also inspect tasks not specifically mentioned in the Services Summary. The COR will document the results of the surveillance and this documentation will become the official Air Force (AF) record of the Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide a report to the CO for action concerning the Contractor. The Contractor shall respond to the CO within ten (10) calendar days of receipt. The surveillance results shall be maintained as past performance information of the Contractor’s overall compliance with contract terms and conditions. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer immediately.

The COR will be identified by separate letter. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.3 Recognized Holidays: The contractor is not required to work on any of the following holidays.

New Year’s Day Columbus Day Martin Luther King Jr.’s Birthday Veteran’s Day President’s Day Thanksgiving Day Memorial Day Christmas Day Independence Day Labor Day

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0630 – 0730, 1100 – 1200, 1730 – 1830 Friday thru Sunday during Unit Training Assembly (UTA) weekends. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Base Closure: The Government will notify the contractor of anticipated closure of the facility due to inclement weather or any other authorized closure. In the event of an unplanned closure of the facility the contractor will be notified using the contact information provided. The Contractor is not authorized to bill the Government for those hours unless the Contractor can perform productive duties from an alternate worksite. Work scheduled but not accomplished because of base closure, will be accomplished as soon as possible after reopening the base.

1.6.6 Place of Performance: The work to be performed under this contract will be performed at contractor’s location and delivered to customer.

1.6.7 Type of Contract: The government will award a Fixed Firm Price contract.

1.6.8 SECURITY REQUIREMENTS.

1.6.8.1. Pass and Identification Items: The Contractor shall comply with all requirements and procedures in accordance with (IAW) Air Force Federal Acquisition Regulations System (AFFARS) 5352.242-9000, Contractor Access to Air Force Installations. The Contractor shall ensure the pass and identification items required for contract performance are obtained for employees. All contractor employees shall undergo a background check conducted by 20th Security Forces Squadron prior to issuance of base access credentials. Until 1 Oct 2020 Shaw AFB will accept identification cards or driver's licenses from all states and Territories except ones marked "NOT VALID FOR FEDERAL IDENTIFICATION or FERERAL LIMITS MAY APPLY or any other words to that effect." Effective 1 Oct 2020 only REAL ID identification cards or driver's licenses will be accepted. For a full list of REAL ID Act and compliant and non-complaint states, please visit https://www.dhs.gov/current-status-states-territories. Contact 20th Security Forces Squadron for alternative forms of acceptable identification to conduct background checks. All documentation shall be submitted for base passes or base identification per Base Security Requirements. Contractor personnel shall obtain and wear specific Contractor base passes. Contractor personnel who have personal Department of Defense (DoD) retiree or dependent identification cards (ID), shall not use those personal ID cards for base access when performing contract work. All Contractor personnel who operate a vehicle in performance of this contract shall possess a valid driver’s license, current registration and insurance. Failure to turn in a base credential when requested can result in a non-recommend from Security Forces for future base access. The Contractor is responsible for employee inability to obtain base access required for contract performance. The contractor will be responsible for ensuring their employees are added to the Security Forces Entry Authorization List (EAL) to facilitate their servicing within the flight line perimeter.

1.6.8.2 Background Checks. All Contractor employees shall submit to a criminal background check accomplished by Shaw Air Force Base Security Forces prior to the employee being issued base access credentials. Each Contractor personnel must submit their Social Security Number, Date of Birth, and Driver's License state and number (if applicable). Failure to submit required information can result in denial or delay of issuance of credentials. Background checks are only good for the company that requested them. Processing background checks takes, at a minimum, 7-10 days from time of submission.

1.6.8.3 Retrieving Identification Media. The Contractor shall retrieve all identification media from employees who depart for any reason before the contract expires; e.g. terminated for cause, retirement, etc.

1.6.8.4 Traffic Laws. The Contractor and its employees shall comply with base traffic regulations.

1.6.8.5 Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on Shaw AFB SC.

1.6.8.6 For Official Use Only (FOUO). The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

1.6.8.7 Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

1.6.8.8. Photography Restrictions. No one is authorized to take any pictures or video recordings of Air Force operational aircraft or restricted areas without the approval of 20 FW/CVN regardless of location while on Shaw AFB. This includes, but is not limited to, photographs taken from personal electronic devices such as blackberries, iPADs, iPODs, cell phones, or any other devices with digital recording capabilities. Any Contractor requiring pictures or videotape of Shaw's restricted/controlled areas to support their contract must request and possess written authorization prior entering the area. Written authorization letters to photograph or video the flightline must be signed by one of the following: 20 Maintenance Group Commander or Deputy; Aircraft Maintenance Squadron Commander; a Fighter Squadron Top 3, Director of Operations, or Commander; 20 Operations Group Commander or Deputy; 20 Operations Support Squadron Commander or Director of Operations; or 20 FW/CVN. Written authorization letters to photograph or video MQ-9 operational areas must be signed by the 50 ATKS or 25 ATKG commander. Written authorization letters to photograph or video the Missile Defense Agency area must be signed by the 609 ACOMS commander.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal

Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government. Other topics may include (as applicable): opportunities to improve the contract, any modifications required of the contract, unsatisfactory performance inspections results, and valid customer complaints against each performance objective observed, and the results of corrective and preventive action measures. The Contractor will also notify the CO in writing, of work being requested or performed, if any, that the Contractor considers over and above the requirements of the contract. Appropriate action shall be taken to resolve outstanding issues. The Government will provide the Base Environmental Plan at this meeting. The minutes of these meetings will be documented in writing, signed by the CO and any other signatures as deemed appropriate, and distributed to the COR functional area and the Contractor. Should the Contractor not concur with the minutes, the Contractor will set out in writing to the CO any areas of non-concurrence. These meetings shall be held as needed, but not less than bi-annually after the contract is awarded. There will also be an initial meeting to take place 30 days after the contract has been awarded.

1.6.10 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0600 – 0730, 1030 – 1200, 1700 – 1830 Friday thru Sunday during Unit Training Assembly (UTA) weekends except Federal holidays or when the government facility is closed for administrative reasons.

1.6.11 Identification of Contractor Employees: Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should identify personnel easily and quickly for reasons of safety and personal protection. Contractor personnel shall display distinguishing badges or other visible identification. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.12 STANDARDS: The Government is authorized to restrict employment under this contract of any Contractor personnel or prospective Contractor personnel, who is identified as a potential threat to the health, safety, security, general well-being, or the operational mission of the installation (to include annexes such as Poinsett and Wateree) and its population. A determination may also remove Contractor personnel for, but is not limited to, incidents involving most immediately identifiable types of misconduct or delinquency such as: disorderly conduct, use of abusive or offensive language, intimidation by words or actions, fighting, participation in disruptive activities which interferes with the normal operations or brings discredit to the Government, theft, vandalism, sexual harassment, or any criminal actions. This also includes selling, consuming, or being under the influence of intoxicants, drugs, or substances which produce similar effects while in or on Federally-controlled property. Contractor personnel shall only smoke and/or use tobacco products in designated and approved smoking/tobacco use areas. If the CO directs removal of Contractor personnel for violating the above provisions, the Contractor shall immediately remove the individual(s) at no cost to the Government. Removal of employees for misconduct does not alleviate the Contractor from providing services. Per Shaw AFB Plan 31- 101, the installation commander has authority to debar any individual from the installation who commits a crime or offense prejudicial to good order and discipline. All disputes to the CO’s decision must be filed within ten (10) days of the decision to the Base Operations Support Flight Chief. The removed Contractor personnel may not resume work unless/until a decision is made by the Government CO overturning the removal decision.

1.6.13 SUBCONTRACTOR COMPLIANCE: The Contractor shall be responsible for ensuring Subcontractors satisfy the requirements set forth in the contract. The Contractor shall include a provision in all subcontracts to require Subcontractor compliance with terms and conditions of this contract.

1.6.14 EMPLOYING GOVERNMENT PERSONNEL: The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest.

Further, the Contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval in accordance with DODD 5500.7R, Joint Ethics Regulation. In addition, the Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Industrial Labor Relations Activities. All questions of “conflict of interest” shall be referred to the CO. The Contractor is cautioned that off duty active military personnel hired under this contract are always subject to Permanent Change of Station (PCS), change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the Contractor's ability to perform. Their absence at any time shall not constitute an excuse for nonperformance under this contract.

1.6.15 COMPLIANCE WITH LABOR LAWS: The Contractor shall comply with all applicable laws pertaining to wages, worker’s compensation, equal opportunity, Service Contract Act, and so forth, as implemented by Air Force directives and required by law.

1.6.16 Continuation of Essential Contractor Services: This requirement is not considered mission essential, and services will be suspended during a declared emergency. Contractor personnel will not be required or expected to perform maintenance in such an event as a hurricane or when travel is deemed “unsafe” by local authorities.

Inspections and/or maintenance actions due during this time will be completed as soon as the condition warranting the delay is lifted. This maintenance will not be withheld until the next service interval and contractor personnel are expected to perform the maintenance that was to be performed prior to the delay within 5 days.

1.6.17 Records: The Contractor shall be responsible for creating, maintaining, and disposing of only those Government required records that are specifically cited in this PWS. If requested by the Government, the Contractor shall provide the original record or a reproducible copy of any such record within five working days of receipt of the request.

1.6.18 Purchase of Recycled Products: The Contractor shall comply with the DoD Green Procurement Program for Recovered Materials.

1.6.19 Publications: The Contractor shall ensure compliance with all applicable publications, regulations, and operating instructions related to the tasks set forth in this PWS. The Contractor is required to acquire and abide by the latest version of all publications. See Part 6 for a list of applicable publications.

1.6.20 Safety Requirements: The Contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements and applicable Department of Labor, Department of Defense and Air Force safety standards.

The Contractor shall provide a verbal report to the CO as soon as possible following an occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of the required Accident Investigation Report to the CO within five (5) calendar days of each occurrence. The Accident Investigation Report shall be prepared and submitted IAW AFI 91-204.

1.6.20.1 Mishaps: In the event of an accident/mishap, the Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the CO.

1.6.20.2 Investigations: If the Government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist Government personnel in the conduct of investigation until the investigation is completed.

1.7. Environmental Management System, Executive Summary For Contractors (All PWS):

1.7.1. Introduction. In accordance with Air Force Instruction 32-7001, Environmental Management, Shaw Air Force Base (SAFB) has implemented an ISO 14001 based Environmental Management System (EMS). The goal of the EMS is to improve the core business processes of SAFB, as they relate to the environment, seeking to improve and enhance performance in support of the overall mission. The EMS supports a transition from a compliance driven program to one that focuses pollution prevention efforts on managing both environmental and mission risks.

1.7.2. Environmental Policy. Central to the SAFB EMS is the base environmental policy set by Wing Leadership.

The policy establishes fence-to-fence applicability to include all 20th Fighter Wing organizations, all tenants, and contractors conducting business on SAFB property. It further extends applicability to the areas under SAFB control at Wateree Recreational Area and the Poinsett Electronic Combat Range. As indicated in the policy, SAFB leadership is committed to continual improvement, pollution prevention, regulatory compliance, the conservation of natural resources, and the integration of environmental awareness into day-to-day operations.

Through such commitments, SAFB is able to set environmental objectives and targets with focus on enhancing the mission through environmental management.

1.7.3. What is EMS? An EMS is that part of an overall management system that includes organizational structure, planning activities, responsibilities, practices, procedures, processes, and resources for developing, implementing, achieving, reviewing, and maintaining the environmental program and achieving environmental goals based on continual-improvement. The EMS is intended to help SAFB balance its mission with maintaining regulatory compliance and developing sustainability strategies to secure this base’s ability to support current and future mission requirements.

1.7.4. Significant Aspects. An aspect is any interaction with the environment caused by activities on SAFB.

Through the EMS, these aspects have been systematically inventoried and evaluated based on the following ranking criteria.

Relative financial cost Risk to the environment Risk of regulatory non-compliance Potential mission degradation Community Concerns

These criteria are scored and weighted for each aspect as recommended by Wing Leadership to establish those environmental aspects deemed most critical to address.

1.7.5. What is My Role? As a contractor performing work on SAFB property you must understand that any activities that directly or indirectly impact the environment, especially the significant aspects listed above, must be communicated with the 20th Civil Engineer Squadron, and the greatest precaution should be taken to avoid negative impacts in these areas. Think of EMS the same way you think about safety. Just as you are aware of all safety hazards associated with your job, you must also be aware of all environmental impacts associated with your job and mitigate those to the extent possible.

To find out more about the SAFB EMS or to discuss potential impacts of contracted activities, contact the 20th Civil Engineer Squadron at 803.895.9987.

1.7.6. 20th Fighter Wing Commander Memorandum on Shaw AFB Commitment to Environmental Protection:

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. UNIT TRAINING ASSEMBILY. The specific days the Contractor provides services in accordance with the contract.

2.1.13. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.14. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFFARS Air Force Federal Acquisition Regulation Supplement AFI Air Force Instruction CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative ACOT Alternate Contracting Officer's Representative COTS Commercial-Off-the-Shelf DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 CO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OWF Operational Weather Flight PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan TE Technical Exhibit UTA Unit Training Assembly

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

Security Police: The Government will provide general on-base security police service. Use the following numbers as needed:

Security-Police and Fire Protection: Call phone number 911.

Security Police Crime Stop Numbers: Crime Stop Number is 803-895-3669/3670.

Emergency Medical Service: The Government will provide emergency medical treatment for Contractor personnel while they are performing duties associated with this contract. The Contractor shall reimburse the Government for the cost of medical treatment and patient transportation at the current inpatient or outpatient treatment rate as appropriate.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. Materials: The Contractor shall provide boxed meal containers, plasticware (i.e. utensils), napkins, and bottled drinks with each meal.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The contractor shall provide services for breakfast, lunch, and dinner meals to members of the 5 OWF during UTA weekends.

5.2. Menu. The Contractor shall provide a list of menu options for upcoming UTA at least 7 days prior to service, allowing members of the 5th OWF to make selections (if possible) and review for possible allergies.

Types of Meal Options:

Breakfast Lunch Dinner Bagel, cream cheese, fruit, granola Sandwich, salad, fruit, chips Hamburger, fries, salad, veggie Breakfast sandwich, fruit, yogurt Sandwich, salad, fruit, chips BBQ chicken, salad, veggie, pasta Oatmeal, fruit, granola Wrap, pasta, fruit, protein bar Spaghetti, meatballs, salad, rolls Drinks Drinks Caesar salad w/ chicken, rolls Lasagna, salad, veggie, rolls Sandwich, fruit, chips, granola Drinks

Types of Drinks (served at every meal):

Coffee w/ creamer, OJ Bottled water, Bottled Gatorade Bottled water, Bottled Gatorade

Types of Fruit, Pasta, Sandwiches, Veggies:

Apple, banana, grapes, pineapple, watermelon

Ham/cheese, Turkey/cheese, Club, Deli

Green beans, potatoes, sweet potatoes, broccoli, asparagus

Apple, banana, grapes, pineapple, watermelon

Pasta salad, Mac & cheese, Fettuccine alfredo

Pasta salad, Mac & cheese, Fettuccine alfredo

Ham/cheese, Turkey/cheese, Club, Deli

Apple, banana, grapes, pineapple, watermelon

5.3. Preparation and Packaging. The Contractor shall prepare and package boxed meals that can be safely and securely transported to members of the 5 OWF.

5.4. Delivery. The Contractor shall deliver meals to the 28th Operational Weather Squadron’s Pavilion, located at 905 Patrol Rd, Shaw AFB, SC 29152.

5.5. Days and Times. The Contractor shall provide meals for the following times: breakfast 0630 – 0645, lunch 1045 – 1100, and dinner 1715 – 1730. The Contractor shall provide these meals on Friday, Saturday and Sunday during Unit Training Assembly (UTA) weekends (*Exception – NO dinner will be needed on Sunday of the UTA weekend).

5.6. CONTRACTOR MANAGEMENT REPORTING (CMR): The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to complete all required data fields at the Air Force CMRA link http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government Fiscal Year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

Food must be prepared in accordance with all FDA guidelines and must be prepared in accordance with and must meet Shaw AFB public health safety guidelines.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 1 – Services Summary. Food must be prepared in accordance with and must meet Shaw AFB public health safety guidelines.

7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule: The Contractor shall provide a list of menu options for upcoming UTA at least 7 days prior to service, allowing members of the 5th OWF to make selections (if possible) and review for possible allergies

7.3 Attachment 3/Technical Exhibit 3 – Estimated Workload Data: It is expected to have 20 meals provided at breakfast, lunch and dinner. However, the exact number will be determined the week leading into the UTA weekend based off the number of participants that will be at the UTA. An FY26 UTA Schedule will be provided.

File details come from the government source that posted it. Updated .