This document outlines performance requirements and standards for architectural and engineering services to support construction activities for Building 2815 at the Delaware Army National Guard under solicitation number W50S6X-23-R-0003. Key requirements include providing draft responses to industry questions, conducting code and criteria reviews, providing construction inspection and testing services, attending coordination meetings and distributing minutes, maintaining project records, reviewing contractor schedules and submittals, and evaluating payment applications. Performance is evaluated on metrics such as timeliness, accuracy, and adherence to specifications. The architectural and engineering firm will be rated on an overall performance scale of exceptional, very good, satisfactory, marginal, or unacceptable.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| JA Sole Source_Redacted.pdf | ||
| Combo - Type C- SAM.pdf | ||
| PWS of Type C - Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary
| Performance | Objective | Performance | Standard | Acceptable |
| Quality | Level | Surveillance | Method | Documentation |
Error! Reference source not found.
Prepared draft responses to industry questions and any addenda needed to correct missing, unclear, or contradictory requirements required for construction.
Pass/Fail
100% Inspection of draft responses to industry questions and any addenda to drawings and specifications provided.
Provide a copy of the COR’s evaluations and technical review(s) of responses, addenda, and the results to the SPM module.
Error! Reference source not found.
Code and Criteria Review submittal contains correct documents, appropriate quantities, and appropriate formats; the submittal has been received by the recipients specified in the SOW.
Pass/Fail 100% Inspection of submittal receipt by recipients specified in the SOW.
Confirm that submittal has been received by all recipients specified in SOW to the SPM module.
Error! Reference source not found.
The A-E firm provides construction inspection and testing services during construction activities.
Pass/Fail Periodic Sampling of A-E firm performance of services by Para. 3.8 of the ANG ETL.
Provide COR’s evaluations and results of technical reviews conducted to the SPM module.
Error! Reference source not found.
A-E firm provided appropriate personnel to attend or chair coordination meetings and provided an adequate level of participation.
When required by the KO the A-E firm recorded and distributed meeting minutes as required.
Pass/Fail 100% Inspection of attendance roster and Coordination Meeting Minutes.
Provide a copy of minutes to the PCF Cabinet. For unsuccessful efforts, provide COR’s evaluations and results of Coordination Meeting minutes reviews to the SPM module.
Error! Reference source not found.
A-E firm adequately maintained records during construction activities.
Pass/Fail 100% Inspection of records.
Provide copies of documents, correspondence, site conference reports, and records to the PCF Cabinet. For unsuccessful efforts, provide COR’s evaluations and results of reviews to the SPM module.
Error! Reference source not found.
A-E firm provided adequate review and evaluation of construction contractor’s schedule, schedule of values, and submittals schedule;
makes recommendation for acceptance or approval.
Pass/Fail 100% Inspection of A-E firm’s reviews.
Provide A-E firm’s recommendations to the PCF Cabinet. For unsuccessful efforts, provide COR’s evaluations and results of evaluations to the SPM module.
Error! Reference source not found.
A-E firm provided technical review of construction contractor’s shop drawings, product data, samples, etc.
within the time constraints specified in the construction contract; makes recommendation for acceptance or approval.
Pass/Fail 100% Inspection of A-E firm’s reviews.
Provide A-E firm’s recommendations for shop drawings to the PCF Cabinet, and for shop drawings, according to the procedure established for the project. For unsuccessful efforts, provide COR’s evaluations and results to the SPM module.
Performance Requirements Summary
| Performance | Objective | Performance | Standard | Acceptable |
| Quality | Level | Surveillance | Method | Documentation |
Error! Reference source not found.
A-E firm provided timely consultation and advice to interpret/clarify the intent of plans and specifications and provided a timely response to questions.
Additionally, when conducting reviews of proposed change requests, the A-E firm provided recommendation for acceptance or rejection.
Pass/Fail 100% Inspection of A-E firm’s reviews.
Provide A-E firm’s clarifications, reviews, and recommendations to the PCF Cabinet. For unsuccessful efforts, provide COR’s evaluations and results to the SPM module.
Error! Reference source not found.Error! Reference source not found.
A-E firm provided timely reviews of payment applications and provided recommendation for rejection, change, or approval of payment applications.
Pass/Fail 100% Inspection of A-E firm’s reviews.
For unsuccessful efforts, provide a copy of the COR’s evaluations and results to the SPM module.
Error! Reference source not found.
Generally characterize the A-E firm’s overall performance for the reporting period.
See Table 4 Review of overall performance.
Document COR’s evaluations and results using the SPM module’s
| Smart Form (see Error! | Reference | ||
| source | not | found., Error! | |
| Reference | source | not | found.). |
Rating Definition
Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions.
The contractor’s proposed actions appear only marginally effective or were not fully implemented.