About this file

Performance Bond Summary

This is a Performance Bond document related to the Covered Walkway Phase 2 project at Destin-Fort Walton Beach Airport in Okaloosa County, Florida. The performance bond serves as a surety instrument to guarantee the contractor's obligation to perform the work in accordance with the contract documents and specifications. The bond protects the County of Okaloosa, Florida (the obligee) by ensuring that the contractor will complete all work required under the base bid scope, which includes installation of canopy structures in Parking Lot B, main terminal slip-resistant coating, signage, PA/CCTV upgrades, Wi-Fi booster nodes, rehabilitation of lighting and public announcement systems, and landscaping. The base bid scope of work has an anticipated completion timeline of 200 calendar days to achieve Substantial Completion, with potential extensions if bid alternates are awarded according to the construction and safety phasing plan as detailed in the Issued for Bid Plans.

The performance bond establishes financial assurance and legal obligation requirements for the selected contractor, binding both the principal (contractor) and the surety company to the County. Standard performance bond conditions typically require the contractor to maintain bonding throughout the contract term and any extension periods related to awarded alternates. The bond amount and specific terms would be detailed within the complete bond documentation and tied to the total contract value as determined through the competitive bidding process for this airport infrastructure project.

View the file

Other files

File Type Posted
3-VPS-Covered_Walkway-Phase_2-100%_Plans.pdf PDF
ITB_AP_09-27_Draft_Contract.docx DOCX document
Bid_Bond_.pdf PDF
Payment_Bond_.pdf PDF
0-VPS-Covered_Walkway_100%_Tech_Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR (name and address):

SURETY (name and address of principal place of business):

OWNER (name and address): Okaloosa Board of County Commissioners 1250 N. Eglin Parkway Shalimar, FL 32579

CONSTRUCTION CONTRACT

Effective Date of the Agreement:________________________ Amount:____________________________________________ Description (name and location): Covered Walkway Phase 2

BOND

Bond Number: ______________________________________

Date (not earlier than the Effective Date of the Agreement of the Construction Contract): _____________ Amount:____________________________________________

Modifications to this Bond Form: None See Paragraph 16

Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Payment Bond to be duly executed by an authorized officer, agent, or representative.

CONTRACTOR AS PRINCIPAL SURETY

_____________________________________(seal) _______________________________________ (seal)

Contractor’s Name and Corporate Seal Surety’s Name and Corporate Seal

By: __________________________________ By: ____________________________________

Signature Signature (attach power of attorney)

Print Name Print Name

Title Title

Attest: _______________________________ Attest:__________________________________

Signature Signature

Title Title

Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable.

DOCUMENT - PERFOMANCE BOND

1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner for the performance of the Construction

Contract, which is incorporated herein by reference.

2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this

Bond, except when applicable to participate in a conference as provided in Paragraph 3.

3. If there is no Owner Default under the Construction

Contract, the Surety’s obligation under this Bond shall arise after:

3.1 The Owner first provides notice to the Contractor and

the Surety that the Owner is considering declaring a Contractor

Default. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor, and Surety to discuss the Contractor’s performance. If the Owner does not request a conference, the Surety may, within five (5) business days after receipt of the Owner’s notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend.

Unless the Owner agrees otherwise, any conference requested under this Paragraph 3.1 shall be held within ten (10) business days of the Surety’s receipt of the Owner’s notice. If the Owner, the

Contractor, and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner’s right, if any, subsequently to declare a Contractor Default;

3.2 The Owner declares a Contractor Default, terminates the

Construction Contract and notifies the Surety; and

3.3 The Owner has agreed to pay the Balance of the Contract

Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Construction

Contract.

4. Failure on the part of the Owner to comply with the notice requirement in Paragraph 3.1 shall not constitute a failure to comply with a condition precedent to the Surety’s obligations, or release the Surety from its obligations, except to the extent the

Surety demonstrates actual prejudice.

5. When the Owner has satisfied the conditions of

Paragraph 3, the Surety shall promptly and at the Surety’s expense take one of the following actions:

5.1 Arrange for the Contractor, with the consent of the

Owner, to perform and complete the Construction Contract;

5.2 Undertake to perform and complete the Construction

Contract itself, through its agents or independent contractors;

5.3 Obtain bids or negotiated proposals from qualified

contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and a contractor selected with the Owners concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the

Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the

Contractor Default; or

5.4 Waive its right to perform and complete, arrange for

completion, or obtain a new contractor, and with reasonable promptness under the circumstances:

5.4.1 After investigation, determine the amount for which it

may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner; or

5.4.2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial.

6. If the Surety does not proceed as provided in Paragraph

5 with reasonable promptness, the Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety demanding that the

Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Paragraph 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner.

7. If the Surety elects to act under Paragraph 5.1, 5.2, or

5.3, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction

Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction

Contract. Subject to the commitment by the Owner to pay the

Balance of the Contract Price, the Surety is obligated, without duplication for:

7.1 the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract;

7.2 additional legal, design professional, and delay costs resulting from the Contractor’s Default, and resulting from the actions or failure to act of the Surety under Paragraph 5; and

7.3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor.

8. If the Surety elects to act under Paragraph 5.1, 5.3, or

5.4, the Surety’s liability is limited to the amount of this Bond.

9. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the

Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors, and assigns.

10. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders, and other obligations.

11. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after a declaration of Contractor

Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum periods of limitations available to sureties as a defense in the jurisdiction of the suit shall be applicable.

12. Notice to the Surety, the Owner, or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears.

13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this

Bond shall be construed as a statutory bond and not as a common law bond.

14. Definitions

14.1 Balance of the Contract Price: The total amount payable

by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made including allowance for the Contractor for any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the

Contractor under the Construction Contract.

14.2 Construction Contract: The agreement between the

Owner and Contractor identified on the cover page, including all

Contract Documents and changes made to the agreement and the

Contract Documents.

14.3 Contractor Default: Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material term of the Construction Contract.

14.4 Owner Default: Failure of the Owner, which has not been

remedied or waived, to pay the Contractor as required under the

Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract.

14.5 Contract Documents: All the documents that comprise

the agreement between the Owner and Contractor.

15. If this Bond is issued for an agreement between a contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.

16. Modifications to this Bond are as follows:

END OF DOCUMENT – PERFORMANCE BOND