This document is Addendum No. 3 issued by the City of Pendleton for the UAS Flex Hangar 3 Project 2025, dated March 28, 2025, with a bid opening scheduled for April 3, 2025 at 2:00 p.m. The addendum modifies the project plans and specifications and consists of eight substantive changes affecting various construction elements. Key modifications include allowances for metal stud framing design to reference SSMA span tables for sizing; permission to use fiberglass insulation in lieu of mineral fiber for sound insulation if thickness adjustments maintain equivalent sound absorption properties; additions to the approved subcontractor list in Section 13122; revisions to data outlet specifications requiring CAT 6 cables and conduit; specification of an oil-water separator model (Striem os-35 with clean sweep coalescing material or approved equal); addition of wall type 7 symbol to the north wall of Mech 300; clarification that mezzanine structures may be provided as integral with the metal building shell or as separate structures at the bidder's option; and notes clarifying that wall type 7 terminates at interior faces of exterior metal siding and roofing metal. The addendum emphasizes that these bid drawings are diagrammatic and do not limit structural system options, with bidders responsible for providing detailed structural drawings and calculations. All bidders must acknowledge receipt and acceptance of this addendum by signing and submitting it with their proposal; bids submitted without signed acknowledgment may be deemed informal.

The addendum contains no information regarding pricing, set-asides, incumbents, funding requirements, or contract terms, as it functions solely as a technical modification document to the project specifications and drawings. All changes are binding modifications that offset only the specific portions of plans and specifications mentioned, with the remainder of the contract documents remaining in full force and effect. It is the responsibility of all bidders to ensure compliance with the addendum requirements.

View the file

Other files

File Type Posted
ITB to Sell Surplus Spring Chinook Salmon 2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 3

CITY OF PENDLETON

UAS Flex Hangar 3 Project 2025

March 28, 2025

Bid Opening Date: April 3, 2025@ 2:00 p.m.

TO ALL PLANHOLDERS:

This Addendum provides changes to the plans (drawings) and specifications for the UAS Flex Hangar 3 Project 2025. This Addendum shall be included in the Proposal and, when closing the Contract, will be a part thereof. Any changes made by this Addendum to said plans (drawings) and specifications offset only the portion of the plans (drawings), words or paragraphs specifically mentioned herein, and the balance of the plans (drawings) and/or specifications remain in full force.

It is the responsibility of all bidders to conform to this addendum.

This Addendum consists of 2 pages, with no attachments.

All bidders shall acknowledge receipt and acceptance of this Addendum by signing the space below and submitting it with the Proposal. Bids submitted without signing for the Addendum may be considered informal.

1) Specification Section 09500, 1.06, D. Add sentence: "Metal stud framing design may reference SSMA span tables for sizing, as a submittal."

2) Specifications Section 09500, 2.05. Add sentence: "For sound insulation, fiberglas insulation may be used in lieu of mineral fiber as long as thickness is adjusted to provide similar sound absorption properties."

3) Section 13122, 2.1: Add "13. Columbia River Steel & Construction, Inc. 14. Equipment Roundup Manufacturing - for stand-alone mezzanines."

4) Specification Section 16001, 1.1, C., 5: Revise to read: "Data Outlets as shown to be provided with conduit (where concealed). Provide CAT 6 cables from data outlet to Mezzanine Server Area Patch Panel (see A 1.1 Note 2)."

5) Drawing A 1.0: Add note: "16. Oil-water separator to be Striem os-35 with clean sweep coalescing material, or approved equal."

6) Drawing A 1.1: Add wall type 7 symbol to the north wall of Mech 300.

7) Drawing A2.1: Add "Notes: 1) Mezzanine structure can be provided as integral with the metal building shell structure, or can be provided as a separate mezzanine structure, at bidders option. The required loads for the mezzanine are listed in specification Section 13122. In either case these bid drawings are provided to show the size and location of the mezzanine, but are not structural drawings, and do not limit the structural system options to be used by the bidder. The bidder's structural engineers shall provide the detailed structural drawings and calculations needed for the structural building permit review.

8) Drawing A3.0: Add "General Notes: 1) Wall Types 1, 2, & 4 shows a joist floor structural

Addendum No. 3 - UAS Flex Hangar 3 Project Page 1 of 2 3-28-2025 system, however this drawing is diagrammatic only, and the mezzanine structure is bidder designed per the loads of Specification Section 13122. The bidder may use any structural system they prefer for the mezzanine floor as long as the building architectural spaces are provided as shown on the plans. If the mezzanine floor structure is not constructed of closely spaced joists as the primary structure then floor insulation is not required and gyp is not required on the bottom surface. Delete the words "scheduled joists" from these three wall types. 2) Wall Type 7 terminates at the inside face of the exterior metal siding and at the inside face of the roofing metal.

CITY OF PENDLETON

Timothy M. Simons, PE, PLS Community Development Director City of Pendleton 500 SW Dorion Avenue Pendleton, OR 97801

BIDDER'S ACKNOWLEDGMENT:

Company Name (please print)

Bidder's Name (please print)

Signature

Title

Address

City, State

Addendum No. 3 - UAS Flex Hangar 3 Project Page 2 of 2 3-28-2025

Keri Standley Rectangle

Keri Standley Rectangle

File details come from the government source that posted it. Updated .