Pendleton 2025 SOQ - Municipal Engineering Design and Construction Management Services - Addendum 1.pdf
PDF 93 KB Posted
- Solicitation number
- S-KN0040-00013794
- Issued by
- Union County, Oregon
About this file
This document is Addendum No. 1 for the City of Pendleton's 2025 Statement of Qualifications (SOQ) for Municipal Engineering Design and Construction Management Services, issued on May 7, 2025. The addendum provides clarifications to the original bid documents, specifically addressing two key points: resumes are excluded from the 20-page maximum submission limit and can be included in the appendix (limited to one page per individual), and front/rear covers and separation sheets do not count toward the page limit. The closing date for proposals remains June 18, 2025, at 2:00 pm, and all proposers are required to acknowledge receipt of this addendum by completing and signing the provided acknowledgment section.
The addendum is signed by Jeff Brown, Public Works Director, and provides guidance to potential proposers on document preparation and submission requirements. It reinforces the original solicitation's requirements while offering some flexibility in document formatting, which may help proposers present their qualifications more comprehensively within the established page constraints. The document maintains the professional tone and procedural strictness typical of municipal procurement processes, ensuring that all potential respondents have clear, uniform guidelines for their submissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pendleton 2025 SOQ - Municipal Engineering Design and Construction Management Services~1.pdf | ||
| Vegetables Assorted~14.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
CITY OF PENDLETON
Pendleton 2025 SOQ - Municipal Engineering Design and Construction Management Services
Issued: May 7, 2025
Closing Date: June 18, 2025 @2:00 pm
TO ALL PLANHOLDERS:
This Addendum provides the following clarifications/corrections to the Bid Documents and Contract for the above-referenced Project. All proposals shall acknowledge receipt and acceptance of this
Addendum by completing the spaces, signing where indicated below and submitting it with the
Proposal. Proposals submitted without signing for the Addendum may be considered informal.
Addendum - Statement of Qualifications (SOQ) Clarifications
1. Resumes:
Resumes are excluded from the 20-page maximum and may be included in the appendix. Please limit resumes to one page per individual.
2. Covers and Separation Sheets:
Front and rear covers, as well as separation sheets, are permitted at the discretion of the proposer and do not count toward the 20-page limit.
PROPOSAL ACKNOWLEDGMENT:
Company Name (please print)
Name (please print)
Signature
Title
Address
City, State
J , lie Works Director
5 orion A venue
Pen eton, OR 97801
Addendum No. 1 - Pendleton 2025 SOQ - Municipal Engineering Design and Construction Management Services
File details come from the government source that posted it. Updated .