About this file

This document is a Scope of Services for the Pen Hollow Landslide Survey Engineering project, which is being conducted on behalf of the Virginia Energy agency. The selected A/E (Architect/Engineering) firm shall provide a complete survey and aerial photograph of the project site located in Pound, VA. The scope covers the establishment of surveying control stations, topographic surveying, and aerial photography in two phases. Phase 1 involves site investigations, establishing permanent surveying control points, and creating a topographic map with 2-foot contours. Phase 2 involves providing the final survey and orthographic images to Virginia Energy within 30 days after contract issuance. The project area is approximately 18 acres.

The pricing, funding requirements, and other contractual terms are not explicitly stated in the scope. However, it is clear that Virginia Energy is the agency overseeing this project, which is located within Wise County, Virginia.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PEN HOLLOW LANDSLIDE SURVEY

ENGINEERING SCOPE OF SERVICES

The selected A/E shall furnish all expertise, labor, and resources for a complete survey and aerial photograph for the Pen Hollow Landslide Survey located in Coeburn, VA. The project is located at 9447 Pen Hollow Road, on St. Rt. 637 (Pen Hollow Rd.) on the Right Fork of Bold Camp in Pound, Virginia. Coordinates for the project site in degrees, minutes, and seconds are 37˚ 04’ 46.5” N and 082˚ 33’ 45.2” W. Project area mapping is comprised of a section of the Pound VA USGS 7.5 Minute Quadrangle Map. The project is in the Mullins Fork Problem Area, VA-0043 in Southwest Virginia.

Surveying control, topographic surveying and aerial photography proposed for this project may include (but not limited to) the following phases and tasks.

Phase 1 – Surveying Control stations and Site Reconnaissance - (15 Days)

• Site investigations and establishing permanent surveying control points to be used to create a topographic map of the project area. The surveying control points shall encompass the project site and be installed as permanent stations and a list of the points with the Northing, Easting and Elevation supplied to the Agency. Surveying control shall be in NAD83 State Plane feet Virginia South coordinate system. The topographic map shall have 2 foot contours with 10 foot index contours. The orthographic imagery shall be in NAD83 State Plane feet Virginia South coordinate system. Site Reconnaissance will identify key features of the project such as disposal area, pipes, utilities, water meters, fire hydrants and ditches to be included on the topographic survey.

• Work Product: Map delineating the survey control stations to be utilized for use in the topographic map and orthographic imagery to VIRGINIA ENERGY.

Phase 2 – Final (Final Survey and Orthographic Images) – (15 Days)

• Work Product: Final Survey and Orthographic Images to VIRGINIA ENERGY incorporating changes from Phase I.

A. The A/E shall provide, at minimum, the following to the Agency within the time schedule outlined in the A/E’s proposal or as negotiated in the final contract:

1. The Topographic Survey which includes labeling of all features such as ditches, utilities and pipes in electronic format.

2. The Orthographic Image in electronic format.

3. One set of drawings in AutoCAD format.

B. The A/E shall submit a Phase I plan within 15 days and a Final Product (Phase

II) within 30 days after issuance of the contract unless otherwise allowed by the Agency.

The area shown in cyan is approximately 18 acres.