Pembina Repairs_Attachment B.pdf

PDF 19 MB Posted

Attached to
Pembina Levee Sheet Pile Repairs Federal contract opportunity
Solicitation number
W912ES24Q0123
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This document is an attachment related to a federal contract opportunity for the removal of existing sheet piling along the Pembina River in Pembina, North Dakota. The contract requires accessing the project area, cutting or pulling existing sheet piling at ground surface, disposing of excess sheet piling, and site restoration in disturbed areas. The solicitation number is W912ES24Q0123, and the contracting agency is the Department of the Army Corps of Engineers Engineering District St Paul. The work is expected to be performed under a Defense contract. No additional details regarding pricing, response dates, award dates, or set asides are provided in this attachment.

View the file

Other files for this federal contract opportunity

Other files attached to Pembina Levee Sheet Pile Repairs, newest first.
File Type Posted
Pembina Repairs_Attachment D_Part3.pdf PDF
Pembina Repairs_Attachment D_Part2.pdf PDF
Pembina Repairs_Attachment D_Part1.pdf PDF
Pembina Repairs_Attachment E.pdf PDF
Pembina Repairs_Attachment C.pdf PDF
Pembina Repairs_Attachment A.pdf PDF
Solicitation_Pembina Sheet Pile Removal_W912ES24Q0123.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B - Site Photos (March 2024)

Figure 1 - Access over levee from S Cavalier St and W Renville St, looking NE.

Figure 2 - Levee access, from top of levee looking SW toward S Cavalier St and W Renville St.

Figure 3 - Access corridor, from top of levee looking NNE along floodwall.

Figure 4 - Sheet pile to be removed. From top bank looking E.

Figure 5 - General overview of ou*all area. From south bank of discharge looking NNE.

Figure 6 - Sheet pile to be removed. From south bank of discharge looking E.

Figure 7 - Access area/work limits. From south bank of discharge looking WNW toward floodwall.

Figure 8 - Access area/work limits. From north bank of discharge looking SSW.

Figure 9 - Sheet pile to be removed. From north bank of discharge looking SSW.

File details come from the government source that posted it. Updated .