This document is an attachment related to a federal contract opportunity for the removal of existing sheet piling along the Pembina River in Pembina, North Dakota. The contract requires accessing the project area, cutting or pulling existing sheet piling at ground surface, disposing of excess sheet piling, and site restoration in disturbed areas. The solicitation number is W912ES24Q0123, and the contracting agency is the Department of the Army Corps of Engineers Engineering District St Paul. The work is expected to be performed under a Defense contract. No additional details regarding pricing, response dates, award dates, or set asides are provided in this attachment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pembina Repairs_Attachment D_Part3.pdf | ||
| Pembina Repairs_Attachment D_Part2.pdf | ||
| Pembina Repairs_Attachment D_Part1.pdf | ||
| Pembina Repairs_Attachment E.pdf | ||
| Pembina Repairs_Attachment C.pdf | ||
| Pembina Repairs_Attachment A.pdf | ||
| Solicitation_Pembina Sheet Pile Removal_W912ES24Q0123.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B - Site Photos (March 2024)
Figure 1 - Access over levee from S Cavalier St and W Renville St, looking NE.
Figure 2 - Levee access, from top of levee looking SW toward S Cavalier St and W Renville St.
Figure 3 - Access corridor, from top of levee looking NNE along floodwall.
Figure 4 - Sheet pile to be removed. From top bank looking E.
Figure 5 - General overview of ou*all area. From south bank of discharge looking NNE.
Figure 6 - Sheet pile to be removed. From south bank of discharge looking E.
Figure 7 - Access area/work limits. From south bank of discharge looking WNW toward floodwall.
Figure 8 - Access area/work limits. From north bank of discharge looking SSW.
Figure 9 - Sheet pile to be removed. From north bank of discharge looking SSW.