PE21143_Addendum_1.pdf
PDF 310 KB Posted
- Attached to
- Millen Well #5 (PE21143)
- Solicitation number
- PE-68250-NONST-2024-000000005
- Issued by
- Jefferson County, Georgia
About this file
This document is an Addendum to a bid solicitation for the Parker Engineering Project Number PE21143, Millen Well #5 for the City of Millen, Georgia, which is funded by an EDA Investment No. 04-01-07759. The addendum modifies the original bid requirements by replacing the specified generator, generator pad, and automatic transfer switch with a Nema 3R Manual Transfer Switch. The bid also includes other well and water system improvements such as limestone drilling, pumps, piping, chemical feed systems, fencing, SCADA, and site work. The bids are due by the date specified in the bid form, and the project is to be substantially completed within 150 consecutive calendar days and fully completed within 180 consecutive calendar days from the notice to proceed.
The bid form provides a detailed list of bid items and quantities with unit prices. Bidders are allowed to submit substitutions for certain items prior to the bid opening. The total base bid amount is provided, and an alternate bid item for the manual transfer switch is included. Bid security in the form of a 5% bid bond is required, and the successful bidder will be required to execute the contract and provide performance and payment bonds within 15 days of the notice of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00100_Advertisement to Bid_Millen Well.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NUMBER 1
February 26th, 2024
Project: Parker Engineering Project Number: PE21143
Millen Well #5 City of Millen EDA Investment No. 04-01-07759
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY INSERTING ITS NUMBER IN
YOUR BID FORM – SECTION 00400. FAILURE TO DO SO MAY SUBJECT BONA FIDE
BIDDERS TO DISQUALIFICATION. THIS ADDENDUM FORMS A PART OF THE
BIDDING DOCUMENTS WHICH ARE HERBY MODIFIED IN THE FOLLOWING
RESPECTS:
I. CONSTRUCTION SPECIFICATIONS
A. Replace Section 00400 Bid Form with attached Section 00400 Bid Form (2/26/24).
This item removes the generator, generator pad, automatic transfer switch, and replaces them with the following:
Substitution Item Specification: (1)- Nema 3R Manual Transfer Switch. Provide exterior mounted Nema 3R. 24"W X24"T X12" W Powder Coated Carbon Steel Enclosure with 5-400A cam-lock power connectors. Test Manual Transfer Switch, and ALL power connections for proper operation and rotation with the existing 100KW Portable Generator currently owned by City of Millen.
END ADDENDUM #1
City of Millen - Millen Well #5
PART I. GENERAL
1.1
CITY OF MILLEN
MILLEN WELL #5
1.2 CONTRACT IDENTIFICATION AND NUMBER
EDA Award #: 04-01-07759
1.3 THIS BID IS SUBMITTED TO:
CITY OF MILLEN
Jeff Brantley 919 College Avenue Millen, GA 30442
(478) 982-6100
1.4 THIS BID IS SUBMITTED FROM:
Bidder:
Address:
Phone:
1.5
A.
BID FORM (2/26/24)
PROJECT IDENTIFICATION
Parker Engineering, LLC Project No. PE21143
BASIS OF BIDS
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with Owner in the form included in the Contract documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.
Parker Engineering, LLC Proj. No. PE21143
00400-1
B.
C.
1.
2.
3.
4.
Bidder has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged):
Bidder has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in Paragraph 4.2 of the General Conditions, and accepts the determination set forth in Paragraph 6 of the Supplementary Conditions of the extent of the technical data contained in such reports and drawings upon which Bidder is entitled to review
Bidder has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies (in addition to or to supplement those referred to in (3.) above) which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance or furnishing of the Work as Bidder considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports or similar information or data are or will be required by Bidder for such purposes.
In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:
Date
Bidder has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work.
Addendum Number
Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the day of Bid opening. Bidder will sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen (15) days after the date of Owner's Notice of Award.
Parker Engineering, LLC
00400-2
5.
6.
7.
8.
9.
D.
1.6
The Contractor is directed to Section 1025 "Measurement and Payment" for the methods and limits for payments to the Contractor for the pay items listed below:
BID SCHEDULE Millen Well #5
Bidder has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect of said Underground Facilities are or will be required by Bidder in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3 of the General Conditions.
Bidder will complete the Work in accordance with the Contract Documents for the following prices(s) listed in the BID SCHEDULE.
Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work on time.
Bidder has given Engineer written notice of all conflicts, errors, or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Bidder.
Bidder agrees to commence work under this Agreement on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the work within 180 consecutive calendar days from the "Notice to Proceed" date.
This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with an agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
Bidder has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents.
Parker Engineering, LLC
00400-3
BASE BID
Item No. Units Description
Unit Price Bid Total for Item
1 Millen Well #5
a. LS $ $ Dollars & Cents Dollars & Cents
b. LS $ $ Dollars & Cents Dollars & Cents
c. VF $ $ Dollars & Cents Dollars & Cents
d. VF $ $
Dollars & Cents Dollars & Cents
e. LS $ $
Dollars & Cents Dollars & Cents
f. VF $ $ Dollars & Cents Dollars & Cents
g. LS $ $ Dollars & Cents Dollars & Cents
h. 1 LS $ $ Dollars & Cents Dollars & Cents
i. 1 LS $ $ Dollars & Cents Dollars & Cents
Electrical Equipment and Installation for Wellhouse and Chemical Feed Building. Includes controls, lighting, power distribution, heating, ventilation, conduit, wire, panels, transformers, disconnects, meter sets, starters, surge protector, & UFD
Generator and pad, automatic transfer switch
1 25'x15' Well House
Limestone Drilling (drilling 11 3/4" hole into limestone layer until well yeild is provided)
Pump, Shaft, and 100 HP Motor
Est.
Qty.
180 8" Sch 40 Steel Discharge Pipe
Drill 8" Test Hole
18" Outside Surface Casing, Sch 40 PVC, Drilling, & Grout
360 12" Sch 40 Steel Inner Casing (drilling from bottom of surface pipe to 5' into limestone, 12" steel casing, and concrete grout)
Parker Engineering, LLC
00400-4
j. LF $ $ Dollars & Cents Dollars & Cents
k. EA $ $ Dollars & Cents Dollars & Cents
l. LS $ $ Dollars & Cents Dollars & Cents
m. LS $ $ Dollars & Cents Dollars & Cents
n. LS $ $ Dollars & Cents Dollars & Cents
o. LS $ $ Dollars & Cents Dollars & Cents
p. LS $ $ Dollars & Cents Dollars & Cents
q. LS $ $ Dollars & Cents Dollars & Cents
r. EA $ $ Dollars & Cents Dollars & Cents
s. LS $ $ Dollars & Cents Dollars & Cents
TOTAL BASE BID IN THE AMOUNT OF:
1 Grading Complete
1 Site and Wellhouse Piping, fittings, valves, meters, tees, and reducers.
(8")
2 10' Gate
1 Chlorine System
1 EDA Sign
1 Fluoride System
Phosphate System
Erosion Control and Grassing
165 6' Fence w/ Barbed Wire
Price in Words
Dollars & Cents
1 SCADA System
Parker Engineering, LLC
00400-5
ALTERNATE BID #1 - MANUAL TRANSFER SWITCH
1i-S. LS $ $
Dollars & Cents Dollars & Cents
1.7
It is not necessary that the Bidder offer Substitutions.
1.
2.
3.
1.8
A.
B.
C.
1.
2.
1 Manual Transper Switch, enclosure, connecters, ect, and testing of manual transfer switch.
The following item shall be a substitute for Bid item 1i which is listed in the Base Bid above.
Manufacturer:
SUBSTITUTIONS
Bidder agrees that the Work will be substantially complete after the date when the Contract Times commence to run as provided in paragraph 2.3 of the General Conditions and ready for final payment in accordance with paragraph 14.8 of the General Conditions within the following number of consecutive calendar days after the date when the Contract Times commence to Run:
The following documents are attached to and made a condition of this Bid:
Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.
Sections 00470, 00475, 00476, 00478, 00481.
Adjustment in Base Bid Price
In accordance with the Instructions to Bidders and Part 5 of the Supplementary Conditions, the Contractor offers the following items as substitutions with the contract prices adjusted accordingly. No requests for substitutions will be accepted after the Bid Opening.
Note:
Substitute
Name of Equipment:
Name of Equipment:
BID DATA (BASE BID)
Manufacturer: $
Required Bid Security in the form of 5% of the Total Bid Price.
DeductAdd
Manufacturer:
Equipment and Manufacturer
Substantial Completion: One Hundred Fifty (150) Consecutive Calendar Days Contract Completion: One Hundred Eighty (180) Consecutive Calendar Days
Name of Equipment:
Parker Engineering, LLC
00400-6
D.
E.
F.
SUBMITTED on: , 20___
ADDRESS:
BIDDER:
Parker Engineering, LLC
Communications concerning this Bid shall be addressed to:
The undersigned further agrees that in case of failure on his part to execute the said contract and provide the required Bonds within fifteen (15) consecutive calendar days after written notice being given of the award of the contract, the bid bond accompanying this bid, and the monies payable thereon may be paid into the funds of the Owner as liquidated damages for such failure, otherwise, the bid bond accompanying this proposal shall be returned to the undersigned.
END OF SECTION
BY:
TITLE:
PHONE:
Seal: (if bid by a Corporation)
SIGNATURE:
Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions or Instructions.
ATTN: Wesley Parker, P.E.
Statesboro, Georgia 30458 36 Courtland Street, Suite B
Parker Engineering, LLC
00400-7
| END ADDENDUM #1 |