This is a Special Inspections Tables document for the Portland International Airport Terminal and Concourses Wayfinding Signage project located in Portland, Oregon. The document, prepared by Jay Ostlund in August 2026, establishes comprehensive special inspection and quality control requirements for structural steel work associated with the wayfinding signage and moving walkways installation. The project is identified as PDX 2026-512 and includes detailed inspection protocols for structural steel components, welding operations, bolted connections, anchor installations, and material verifications. Special inspections must be performed by approved accredited independent agencies meeting ASTM E329 requirements, with inspectors qualified according to AWS D1.1 standards for welding and approved by the building official.
The document specifies inspection requirements across multiple categories including continuous and periodic observation frequencies for various structural steel operations. Material verification requirements mandate manufacturer's certified test reports for structural steel components, weld filler metals, high-strength bolts, nuts, washers, and anchor bolts. Quality assurance requirements are specified per AISC 360 and 341 standards, with quality control to be provided by the fabricator, erector, or responsible contractor. Special inspectors must furnish inspection reports to the building official, structural engineer, architect, contractor, and owner, and submit a final report confirming work compliance with approved construction documents and correction of any noted discrepancies. Contractor quality control is required for all inspection items marked as observed or performed, with detailed documentation requirements for welding procedure specifications, welder qualification cards, and fastener assembly verification testing.
View the file
Other files
Show 40 more
Latest 50 of 248 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10 DOCUMENT (D): INDICATES CONTRACTOR AND SPECIAL INSPECTOR TO PROVIDE DOCUMENTATION IN ACCORDANCE WITH AISC 341.
RBS - REDUCED BEAM SECTION
MT - MAGNETIC PARTICLE TESTING
C.J.P. - COMPLETE JOINT PENETRATION
NDT - NON-DESTRUCTIVE TESTING
9 TESTING ABBREVIATIONS:
● SPECIAL INSPECTOR SHALL PROVIDE DOCUMENTATION AT THE END OF ANCHOR INSTALLATIONS STATING THAT THE ANCHORS WERE INSPECTED
PER APPROVED ANCHOR EVALUATION REPORT.
● INSPECTION REPORTS SHALL IDENTIFY NAMES OF INSTALLERS.
8 SPECIAL INSPECTION OF MECHANICAL POST INSTALLED ANCHORS SHALL BE IN STRICT CONFORMANCE WITH THE ICC REPORT AND MANUFACTURER'S INSTALLATION REQUIREMENTS. ANCHOR INSTALLERS SHALL BE QUALIFIED AS REQUIRED BY JURISDICTION REQUIREMENTS.
7 PERFORM INSPECTION PRIOR TO FINAL ACCEPTANCE OF THE ITEM FOR TEN WELDS TO BE MADE BY A GIVEN WELDER, WITH THE WELDER DEMONSTRATING UNDERSTANDING OF REQUIREMENTS AND POSSESSION OF SKILLS AND TOOLS TO VERIFY THESE ITEMS, THE PERFORM DESIGNATION OF THIS TASK SHALL BE REDUCED TO OBSERVE, AND THE WELDER SHALL PERFORM THIS TASK. SHOULD THE INSPECTOR DETERMINE THAT THE WELDER HAS DISCONTINUED PERFORMANCE OF THIS TASK, THE TASK SHALL BE RETURNED TO PERFORM UNTIL SUCH TIME AS THE INSPECTOR HAS RE-ESTABLISHED ADEQUATE ASSURANCE THAT THE WELDER WILL PERFORM THE INSPECTION TASKS LISTED.
PERFORM : INSPECTIONS SHALL BE PERFORMED PRIOR TO THE FINAL ACCEPTANCE OF THE ITEM.
OBSERVE : OBSERVE THESE FUNCTIONS ON A RANDOM, DAILY BASIS. OPERATIONS NEED NOT BE DELAYED PENDING OBSERVATIONS.
PERIODIC : THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR IS BEING PERFORMED AND AT THE COMPLETION OF THE WORK.
CONTINUOUS : THE FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN
THE AREA WHERE THE WORK IS BEING PERFORMED.
6 INSPECTION TYPES:
5 QUALITY ASSURANCE (QA) IS REQUIRED FOR STRUCTURAL STEEL ITEMS PER AISC 360 AND 341 UNLESS SPECIFICALLY NOTED OTHERWISE. QUALITY CONTROL (QC) TO BE PROVIDED BY THE FABRICATOR, ERECTOR OR OTHER RESPONSIBLE CONTRACTOR AS APPLICABLE. CONTRACTOR AND SPECIAL INSPECTOR TO DOCUMENT QUALITY CONTROL AS REQUIRED IN AISC 360 SECTION N3 AND AISC 341 SECTION J2.
4. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE BUILDING OFFICIAL, STRUCTURAL ENGINEER, ARCHITECT, CONTRACTOR, AND OWNER. THE SPECIAL INSPECTION AGENCY SHALL SUBMIT A FINAL REPORT STATING THAT THE WORK REQUIRING SPECIAL INSPECTION WAS INSPECTED AND IS IN CONFORMANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THAT ALL DISCREPANCIES
NOTED IN THE INSPECTION REPORTS HAVE BEEN CORRECTED.
3. THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN THE INSPECTION REPORTS.
2. SPECIAL INSPECTIONS AND ASSOCIATED TESTING SHALL BE PERFORMED BY AN APPROVED ACCREDITED INDEPENDENT AGENCY MEETING THE REQUIREMENTS OF ASTM E329 (MATERIALS). THE INSPECTION AND TESTING AGENCY SHALL FURNISH TO THE STRUCTURAL ENGINEER ARCHITECT A COPY OF THEIR SCOPE OF ACCREDITATION. SPECIAL INSPECTORS SHALL BE APPROVED BY THE BUILDING OFFICIAL. WELDING INSPECTORS SHALL
BE QUALIFIED PER SECTION 6.1.4.1(1) OF AWS D1.1.
1. SPECIAL INSPECTIONS SHALL CONFORM TO SECTION 1705 OF THE 2025 OSSC, CONTRACT DOCUMENTS AND APPROVED SUBMITTALS. REFER TO
SPECIAL INSPECTION AND TESTING TABLES FOR PROJECT REQUIREMENTS.
STATEMENT OF SPECIAL INSPECTION NOTES:
SUBMITTALS TO THE BUILDING OFFICIAL 1704.5 X
CERTIFICATES OF COMPLIANCE, REPORTS OF PRE-
CONSTRUCTION TESTS, OR REPORTS OF MATERIAL
PROPERTIES SHALL BE SUBMITTED TO THE BUILDING
OFFICIAL.
DEFERRED SUBMITTALS X
SPECIAL INSPECTION REQUIREMENTS FOR DEFERRED
SUBMITTAL ITEMS, INCLUDING REQUIREMENTS FOR
DESIGNATED SEISMIC SYSTEMS IN ACCORDANCE WITH
OSSC SECTION 1705.13.4 IF APPLICABLE, TO BE SPECIFIED
BY THE SYSTEM ENGINEER AND INCLUDED WITH
DEFERRED SUBMITTAL DOCUMENTS.
FABRICATORS 1705.11 1704.2.5
SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL
LOAD-BEARING MEMBERS AND ASSEMBLIES FABRICATED
ON THE PREMISES OF A FABRICATOR'S SHOP, SPECIAL
INSPECTIONS SHALL BE PERFORMED DURING
FABRICATION. PERFORMING SPECIAL INSPECTIONS IS NOT
REQUIRED, WHERE FABRICATOR HAS BEEN APPROVED AS
AN APPROVED FABRICATOR, PER SECTION 1704.2.5.1.
CONTINUOUS PERIODIC
SYSTEM OR MATERIAL
OSSC CODE
REFERENCE
CODE OR
STANDARD
REFERENCE
FREQUENCY (NOTE 6)
REMARKS
GENERAL - SPECIAL INSPECTIONS
DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED
CONNECTIONS
1705.2.1.2
TABLE 1705.2
AISC 360
TABLE N5.6-3
X
INSPECTION TASKS AFTER BOLTING
FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH
THE RCSC SPECIFICATION, PROGRESSING SYSTEMATICALLY
FROM THE MOST RIGID POINT TOWARD THE FREE EDGES
X
FASTENER COMPONENT NOT TURNED BY THE WRENCH
PREVENTED FROM ROTATING
X
JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO
THE PRETENSIONING OPERATION
X
FASTENER ASSEMBLIES PLACED IN ALL HOLES AND
WASHERS AND NUTS ARE POSITIONED AS REQUIRED
1705.2.1.2
TABLE 1705.2-2
AISC 360
TABLE N5.6-2
AISC M2.5
RCSC SPECIFICATION
FOR STRUCTURAL
JOINTS USING ASTM
A325 OR A490 BOLTS
SECTION 9
X
INSPECTION TASKS DURING BOLTING
PROTECTED STORAGE PROVIDED FOR BOLTS, NUTS,
WASHERS AND OTHER FASTENER COMPONENTS
X
PRE-INSTALLATION VERIFICATION TESTING BY
INSTALLATION PERSONNEL OBSERVED AND DOCUMENTED
FOR FASTENER ASSEMBLIES AND METHODS USED
X
CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE
FAYING SURFACE CONDITION AND HOLE PREPARATION, IF
SPECIFIED, MEET APPLICABLE REQUIREMENTS
X
CORRECT BOLTING PROCEDURE SELECTED FOR JOINT
DETAIL
X
CORRECT FASTENERS SELECTED FOR THE JOINT DETAIL
(GRADE, TYPE, BOLT LENGTH, IF THREADS ARE TO BE
EXCLUDED FROM THE SHEAR PLANE)
X
FASTENERS MARKED IN ACCORDANCE WITH ASTM
REQUIREMENTS
X
MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR
FASTENER MATERIALS
1705.2.1.2
TABLE 1705.2
AISC 360
TABLE N5.6-1
AISC 360 M2.5
X
INSPECTION TASKS PRIOR TO BOLTING
PRETENSIONED AND SLIP-CRITICAL JOINTS USING TURN-OF-
THE-NUT METHOD WITHOUT MATCHMARKING OR
CALIBRATED WRENCH METHOD
X ALL CONNECTIONS VISUALLY INSPECTED
PRETENSIONED AND SLIP-CRITICAL JOINTS USING TURN-OF-
THE-NUT METHOD WITH MATCHMARKING, DIRECT TENSION
INDICATOR METHOD, OR TWIST-OFF TYPE TENSION
CONTROL BOLT METHOD
X
ALL CONNECTIONS VISUALLY INSPECTED. CONNECTIONS
USING DIRECT TENSION INDICATORS, ALL BOLTS SHALL
BE INSPECTED AFTER SNUGGING AND AFTER
PRETENSIONING
SNUG-TIGHT BOLT INSTALLATION
1705.2.1
TABLE 1705.2-1
TABLE 1705.2-2
AISC 360 M2.5
AISC 360 N5.6
RCSC SPECIFICATION
FOR STRUCTURAL
JOINTS USING ASTM
A325 OR A490 BOLTS
SECTION 9
AISC 360 SECTION
M2.5
X
ALL CONNECTIONS VISUALLY INSPECTED AND VERIFIED
SNUG
HIGH-STRENGTH BOLTING
VERIFICATION OF JOINT & APPLICATION OF CONNECTION
DETAILS INCLUDING MEMBER AND COMPONENT LOCATIONS,
BRACING, AND STIFFENERS
TABLE 1705.2-7 AWS D1.1 X
SINGLE PASS FILLET WELDS LESS THAN OR EQUAL TO 5/16" X
PLUG AND SLOT WELDS X
SINGLE PASS FILLET WELDS GREATER THAN 5/16" X
MULTIPASS FILLET WELDS X
COMPLETE AND PARTIAL JOINT PENETRATION GROOVE
WELDS
TABLE 1705.2-6 AWS D1.1 CLAUSE 8
X
ALL WELDS VISUALLY INSPECTED PER AWS D1.1 6.10.1
VERIFYING WELDER QUALIFICATIONS AWS D1.1 X RETAIN A RECORD OF QUALIFICATION CARDS
VERIFYING USE OF PROPER WPS'S
1705.2.1
AWS D1.1
AISC 360 N3.2
RETAIN A RECORD OF WELDING PROCEDURE
SPECIFICATIONS
STRUCTURAL STEEL WELDING
MATERIAL VERIFICATION OF WELD FILLER METALS
1705.2.1.1
TABLE 1705.2-5
AISC 360 A3.5
AISC 360 N3.2
APPLICABLE AWS A5
DOCUMENTS
X
MANUFACTURER'S CERTIFICATE OF COMPLIANCE
IDENTIFICATION MARKINGS TO CONFORM TO AWS
SPECIFICATION IN THE APPROVED CONSTRUCTION
DOCUMENTS
MATERIAL VERIFICATION OF ANCHOR BOLTS AND THREADED RODS
AISC 360 A3.4
AISC 360 N3.2
ASTM STANDARDS
SPECIFIED IN
CONSTRUCTION
DOCUMENTS
X MANUFACTURER'S CERTIFIED TEST REPORTS
MATERIAL VERIFICATION OF HIGH STRENGTH BOLTS, NUTS, AND
WASHERS
1705.2.1.1 1705.2.1.2
AISC 360 N5
TABLE 1705.2-1
TABLE 1705.2-2
AISC 360 A3.3
AISC 360 N3.2
ASTM STANDARDS
SPECIFIED IN
CONSTRUCTION
DOCUMENTS
RCSC 2.1
X
MANUFACTURER'S CERTIFIED TEST REPORTS
IDENTIFICATION MARKINGS TO CONFORM TO ASTM
STANDARDS AND SPECIFIED IN THE APPROVED
CONSTRUCTION DOCUMENTS
MANUFACTURER'S CERTIFICATE OF COMPLIANCE
MATERIAL VERIFICATION OF STRUCTURAL STEEL COMPONENTS
1705.2.1
TABLE 1705.2-3
ASTM A6
ASTM STANDARDS
SPECIFIED IN
CONSTRUCTION
DOCUMENTS
AISC 360 A3.1
AISC 360 N2.1
AISC 360 N3.2
X
CERTIFIED MILL TEST REPORTS
IDENTIFICATION MARKINGS TO CONFORM TO AISC 360
AND ASTM STANDARDS SPECIFIED IN THE APPROVED
CONSTRUCTION DOCUMENTS
FABRICATION OF STRUCTURAL ELEMENTS 1704.2.5.1 AISC 360 X REFER TO INSPECTION OF FABRICATOR REQUIREMENTS
STEEL FABRICATION
CONTRACTOR QUALITY CONTROL REQUIREMENTS AISC 360 CHAPTER N X X
CONTRACTOR TO PROVIDE QUALITY CONTROL FOR ALL
ITEMS INDICATED TO BE OBSERVED AND/OR PERFORMED
IN TABLE BELOW
CONTINUOUS/
PERFORM
PERIODIC/
OBSERVE
SYSTEM OR MATERIAL
OSSC CODE
REFERENCE
CODE OR STANDARD
REFERENCE
INSPECTION (NOTES 5 AND 6)
REMARKS
STEEL - SPECIAL INSPECTIONS
SINGLE PASS FILLET WELDS X
MULTI-PASS FILLET WELDS X
COMPLETE AND PARTIAL PENETRATION GROOVE WELDS X
ALL WELDS VISUALLY INSPECTED PER
AWS 1.2, 5.5
VERIFYING WELDER QUALIFICATIONS X RETAIN A RECORD OF QUALIFICATION CARDS
VERIFYING USE OF PROPER WPS'S X
RETAIN A RECORD OF WELDING PROCEDURE
SPECIFICATIONS
MATERIAL VERIFICATION OF WELD FILLER METALS
ADM M.9
ADM CH. N
AWS D1.2 SECTION 5
X MANUFACTURER'S CERTIFIED TEST REPORTS
MATERIAL VERIFICATION OF BOLTS X MANUFACTURER'S CERTIFIED TEST REPORTS
MATERIAL VERIFICATION OF STRUCTURAL ALUMINUM
1705.1.1
X CERTIFIED MILL TEST REPORTS
CONTINUOUS PERIODIC
OSSC CODE
REFERENCE
CODE OR STANDARD
REFERENCE
FREQUENCY (NOTE 6)SYSTEM OR MATERIAL
INSPECTION
REMARKS
ALUMINUM - SPECIAL INSPECTIONS
/4
/2
G R
A P
H
IC
S C
A L E
-F O
R R
E F
E R
E N
C E
O N
L Y
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 17" x 22".
SUBMITTED BY
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
DRAWING NO.
TYPE
DISC. SHT. NO.
EAN PAN
NO. DATE BY REVISIONS
A
PP
C A
N Y
O U
S E
E T
H E
A
IR
P L A
N E
S
T
H E
A D
J A
C E
N T
S A
M P
L E
S S
H O
W T
H R
E E
D
IF
F E
R E
N T
L E
V E
L S
O F
S H
A D
IN
G
S
E T
T
IN
G S
F O
R V
IE
W
IN
G
A N
D P
R
IN
T
IN
G D
R A
W
IN
G C
O N
T E
N T
A R
E O
P T
IM
IZ
E D
W H
E N
A L L T
H R
E E
P L A
N E
S A
R E
V
IS
IB
L E
T
H
IS
G U
ID
A
N C
E I S
P R
O V
ID
E
D F
O R
R E
F E
R E
N C
E O
N L Y b la c k g ra y g ra y lig h t d a rk
NO. DATE BY REVISIONS
A
PP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
TYPE
D R
A W
IN
G
S C
A L E
I S
R E
D U
C E
D
W H
E N
S H
E E
T S
IZ
E
I S x
B▲ A▲
7/21/2026 2:33:59 PM Autodesk Docs://PDX Moving Walkways, Play Area & Wayfinding Signage/PDX-103101-STR_Signage-Walkway.rvt
SPECIAL INSPECTIONS TABLES - STRUCTURAL
PORTLAND INTERNATIONAL AIRPORT
S0.004
AUGUST 2026
A. MONNIER
J. DE BOER
S. THOMAS
JAY OSTLUND
TERMINAL AND CONCOURSES WAYFINDING SIGNAGE
PDX 2026-512
CD
1031012026D004
9111 SW Fifth Ave., Suite 2600 Portland, OR 97204 O 503.227.3251 - F 503.227.7980
EXPIRES 12/31/202606/30/2028