About this file
This document is Addendum #2 for the Campus Repairs at Hobbs and Franklin Campuses project (Project Code #M22PC129) being conducted by the Virginia Community College System (VCCS) for Paul D. Camp Community College. The project involves repairs at two higher education facilities in Suffolk and Franklin, Virginia to address moisture/water-related issues. This addendum provides clarifications and responses to pre-bid questions, including adjusting the bid receipt and opening dates to January 30 and 31, 2024 respectively. It also includes updated drawings with approximate existing slab dimensions and courtyard spot elevations. A pre-bid conference was previously held on January 9, 2024 at the Hobbs and Franklin campuses, which was optional but highly recommended for bidders.
The project is funded by VCCS, with a standard Commonwealth Bid Bond (Form CO-10.2) and contract security required regardless of the bid amount. Bidders must be registered vendors in eVA. The bid submission deadline is 3:00 PM on January 30, 2024, with the bids being publicly opened and read aloud the following day at the same time. In-person hand delivery on the bid due date is supported at the specified location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #2
Date: January 22, 2024
Project: Paul D. Camp Community College
Hobbs and Franklin Campus Repairs
Project Code: M22PC129
Project Location: 271 Kenyon Road Suffolk, Va 23434 100 N. College Drive Franklin, Va 23851
Prepared By: Aaron Whitlock WDP Project No.: 21330B
PART 1 – NEW DOCUMENTS ISSUED WITH THIS DOCUMENT
1.1. NEW PROJECT MANUAL DOCUMENTS AND SPECIFICATIONS
a. None
1.2. NEW DRAWING SHEETS
a. None
1.3. NEW SKETCHES
a. None
PART 2 – DOCUMENTS DELETED BY THIS DOCUMENT
2.1. NEW PROJECT MANUAL DOCUMENTS AND SPECIFICATIONS
a. None
2.2. NEW DRAWING SHEETS
a. None
2.3. NEW SKETCHES
a. None
PART 3 – REVISED DOCUMENTS ISSUED WITH THIS DOCUMENT
3.1. NEW PROJECT MANUAL DOCUMENTS AND SPECIFICATIONS
a. None
3.2. NEW DRAWING SHEETS
a. None
3.3. NEW SKETCHES
a. None
ADDENDUM #2
Paul D. Camp Community College - Hobbs and Franklin Campus Repairs Project Code: M22PC129
WDP Project No.: 21330B January 18, 2024
Page No. 2
PART 4 – PROPOSED CHANGES IN THE WORK
1. None
PART 5 – CLARIFICATIONS
1. Adjusted Bid Dates:
• Bid Receipt 1/30/2024 @ 3:00 P.M.
• Bid Opening 1/31/2024 @ 3:00 P.M.
2. Pre-Bid Question Responses
END OF DOCUMENT
VIRGINIA COMMUNITY COLLEGE SYSTEM
Paul D. Camp Community College
Hobbs and Franklin Campus Repairs Project Code: M2PC129
WDP Project No.: 21330B
Pre-Bid Question Responses January 22, 2024
1. Drawing Sheet 1/A106 – Calls for detail 2/A105 to be installed, but 2/A105 is detail for admin. Building.
a. Incorrect callout. Should be 2/A106
2. Drawing Sheet 1/A106 – What are the dimensions of the new slab, as it appears to be larger than the existing that is to be removed?
a. Approximate existing slab dimensions are attached to this sheet. New slab layout should generally match the layout of the existing slab.
3. Drawing Sheet 1/A104 – Do the two “French Drain outfalls to the inlet require the same stone and perorated pipe as shown in detail 2/A105.
a. Outflow pipes should not be perforated, and no stone is to be used.
4. Request for admin. Courtyard elevations
a. Existing spot elevation measurements are attached to this sheet.
SCALE: 3
16"=1'-0"
SLAB PLAN1
C103 A106
PLAN NORTH
0 5' 10'
'-9
5 8"
4'- 2"
34'-41 8" 11'-4
15 16"
41'-9 5 8 "
DR
AF
T
CH
EC
K
DE
SI
GN
CH
EC
K
RE
VI
SI
ON
S
JOB NUMBER
DATE
SCALE
SHEET
Ga te w ay B ou le va rd
Su ite
M an as sa s, VA
-2
Of fic e:
.2
.9
To ll
Fr ee
: 8
.7
.0
Fa x:
.2
.9 w w w .w dp a.
co m
PR
OJ
EC
T
CO
DE
: M
PC
VC
CS
PA
UL
D
. C
AM
P
CO
MM
UN
IT
Y
CO
LL
EG
E
HO
BB
S
AN
D
FR
AN
KL
IN
C
AM
PU
S
RE
PA
IR
S
1 K
EN
YO
N
RO
AD
, S
UF
FO
LK
, V A
4, 0 N . C
OL
LE
GE
D
RI
VE
, F
RA
NK
LIN
, V A
W
OR
KF
OR
CE
S
LA
B
DI
ME
NS
IO
NS
AW JE
P
JE
P
JE
P
21330B
1-22-2024
AS NOTED
4.8"5.5"
4.5"4.9"
6.3"
4.8"
3.9"
5.3"
6.3"
4.8"
3.9" 5.7"
5.4"4.3"
0.0"
7.6"6.5"6.4"
43'
51'
59'
44'52 .5'
33'
30.5'
- EXISTING COURTYARD SPOT ELEVATIONS
DR
AF
T
CH
EC
K
DE
SI
GN
CH
EC
K
RE
VI
SI
ON
S
JOB NUMBER
DATE
SCALE
SHEET
Ga te w ay B ou le va rd
Su ite
M an as sa s, VA
-2
Of fic e:
.2
.9
To ll
Fr ee
: 8
.7
.0
Fa x:
.2
.9 w w w .w dp a.
co m
PR
OJ
EC
T
CO
DE
: M
PC
VC
CS
PA
UL
D
. C
AM
P
CO
MM
UN
IT
Y
CO
LL
EG
E
HO
BB
S
AN
D
FR
AN
KL
IN
C
AM
PU
S
RE
PA
IR
S
1 K
EN
YO
N
RO
AD
, S
UF
FO
LK
, V A
4, 0 N . C
OL
LE
GE
D
RI
VE
, F
RA
NK
LIN
, V A
EX
IS
TI
NG
C
OU
RT
YA
RD
E
LE
VA
TI
ON
S
AW JE
P
JE
P
JE
P
21330B
1-22-2024
AS NOTED
| Addendum #2 Cover Sheet |
| Addendum #2_Pre-Bid Question Responses |
| Courtyard Survey |
| Sheets and Views |
| C104 |
| Work Force Slab-Slab |
| Sheets and Views |
| Slab (2) |
File details come from the government source that posted it. Updated .