PDCCC-H 260-B4260-067 (M24PC183) Project Drawings 2026-05-12.pdf

PDF 6 MB Posted

Attached to
Replace Failed VRF Systems #2 and #3 at Paul D Camp Community College, Hobbs Campus, PC# 260-B4260-067 (M24PC183)
Solicitation number
DBB-120366
Issued by
Suffolk City, Virginia

About this file

This is a project drawings document for the Virginia Community College System related to the replacement of two failed water-cooled Variable Refrigerant Flow (VRF) systems at Paul D. Camp Community College's Hobbs Campus in Suffolk, Virginia. The project, designated as State Project No. 260-B4260-067 (M24PC183), involves the complete replacement of VRF Systems #2 and #3, including water-cooled condensing units (WSHX-2 and WSHX-3), branch controllers (BC-2, BC-3A, and BC-3B), and multiple fan coil units (FC-9 through FC-33). The project encompasses approximately 31,940 square feet of the Oliver K. Hobbs Campus Building and includes removal of existing refrigerant piping, ductwork, and condensate systems, along with installation of new R-32 refrigerant piping, controls modifications, and integration with the existing building management system. A sealed bid deadline is set for 2:00 P.M. on Tuesday, June 23, 2026, with public bid opening at 2:00 P.M. on Wednesday, June 24, 2026. A pre-bid conference is scheduled for 10:00 A.M. on Wednesday, May 27, 2026, at the project site (271 Kenyon Road, Suffolk, Virginia 23434).

The project requires bidders to be registered vendors in eVA and to provide a Standard Commonwealth Bid Bond (form CO-10.2) and contract security regardless of bid amount. All pay applications and invoices must be processed through the Owner's web-based project management software, e-Builder. The drawings specify compliance with the 2021 Virginia Statewide Fire Prevention Code and NFPA 70, with fire watch requirements during welding and hot work operations. Sprinkler and fire alarm systems must remain active throughout construction. The project design is based on Trane/Mitsubishi equipment with acceptable alternates from LG and Daikin manufacturers. Critical construction requirements include coordination with the college's occupancy schedule to maintain means of egress during regular business hours (8:00 A.M. to 5:00 P.M., Monday through Friday), with all work in occupied spaces and corridors restricted to unoccupied hours. Additional requirements include refrigerant reclamation and disposal in accordance with state and local codes, removal and reinstallation of acoustic ceiling tiles and associated fixtures, and hydronic system balancing to 25 GPM per water source heat exchanger module for a total system flow of 250 GPM.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

T001

TI

TL

E

SH

EE

T

BDC

PJD

GJA

NOTE:

1. THE CONTRACTOR SHALL COMPLY WITH THE 2021 VIRGINIA STATEWIDE FIRE PREVENTION CODE

AND NFPA 70. THE CONTRACTOR SHALL MAINTAIN A COPY OF EACH DOCUMENT ONSITE

THROUGHOUT THE CONSTRUCTION PROCESS. CONTRACTOR SHALL POST A FIRE WATCH DURING

ANY WELDING, BRAZING, AND OTHER HOT WORK. CONTRACTOR SHALL MAINTAIN THE SPRINKLER

AND THE FIRE ALARM TO BE ACTIVE AT ALL TIMES DURING CONSTRUCTION.

PAUL D. CAMP COMMUNITY COLLEGE,

HOBBS CAMPUS BUILDING

REPLACE FAILED VRF SYSTEMS #2 AND #3

OLIVER K. HOBBS CAMPUS BUILDING

CAMP COMMUNITY COLLEGE

SUFFOLK, VIRGINIA

VIRGINIA COMMUNITY COLLEGE SYSTEM

TITLESHEET NO.

TITLE SHEETT001

STATE PROJECT NO: 260-B4260-067 M24PC183

MAY 12, 2026

MJT# 24-011

INDEX OF DRAWINGS

AREA MAP VICINITY MAP PLAN

NORTH

GENERAL CODE DATA:VECC COMPLIANCE STATEMENT

IN ACCORD WITH THE VIRGINIA ENERGY CONSERVATION CODE (VECC), THE BUILDING

SHALL COMPLY WITH ASHRAE 90.1-2019 SECTIONS 5, 6, 7, 8, 9, & 10. SECTION 5

BUILDING ENVELOPE WILL BE VIA SECTION 5.5 - PRESCRIPTIVE BUILDING ENVELOPE

OPTION. SECTION 6 COMPLIANCE WILL BE VIA SECTIONS 6.4 - MANDATORY

PROVISIONS AND 6.5 - PRESCRIPTIVE PATH.

LEAD MATERIALS DISCLOSURE STATEMENT

AN INSPECTION TO IDENTIFY LEAD CONTAINING OR COATED BUILDING COMPONENTS

HAS NOT BEEN CONDUCTED BECAUSE THE BUILDING WAS CONSTRUCTED AFTER

JANUARY 1, 1985 AND THE OWNER HAS NO KNOWLEDGE OF LEAD CONTAINING OR

COATED BUILDING COMPONENTS IN THE BUILDING. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO COMPLY WITH ALL VIRGINIA OCCUPATIONAL SAFETY AND

HEALTH (VOSH) REGULATIONS AS THEY PERTAIN TO EMPLOYEE EXPOSURES TO

LEAD. ALL LEAD AND LEAD-COATED BUILDING COMPONENTS SHALL BE RECYCLED

TO THE EXTENT POSSIBLE.

ASBESTOS DISCLOSURE STATEMENT

AN ASBESTOS INSPECTION WAS NOT PERFORMED BECAUSE ALL PORTIONS OF THE

EXISTING BUILDING THAT MAY BE AFFECTED BY THE WORK WERE ORIGINALLY

CONSTRUCTED AFTER JANUARY 1, 1985. NO ASBESTOS CONTAINING MATERIALS

SHALL BE USED ON THE PROJECT.

HPBA COMPLIANCE STATEMENT

IN ACCORD WITH THE HIGH PERFORMANCE BUILDINGS ACT, THE BUILDING IS

EXEMPT FROM COMPLIANCE BECAUSE THE COST OF THE RENOVATIONS DOES NOT

EXCEED 50% OF THE VALUE OF THE BUILDING.

M001 GENERAL NOTES, LEGEND, ABBREVIATIONS, AND SCHEDULES

APPLICABLE CODES: VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC) 2021 EDITION,

EFFECTIVE JANUARY 18, 2024

VIRGINIA EXISTING BUILDING CODE (VEBC), 2021 EDITION: LEVEL 2 ALTERATION

ADA90-TITLE II. (2010 ASAD CHAPTER 2 FOR SCOPING), ICC A117.1-2019 CHAPTERS 1 AND 2 FOR

TECHNICAL REQUIREMENTS.

VIRGINIA CONSTRUCTION CODE (VCC), 2021 - VUSBC PART 1

VIRGINIA ENERGY CONSERVATION CODE, 2021

VIRGINIA MECHANICAL CODE, 2021

VIRGINIA PLUMBING CODE, 2021

NATIONAL ELECTRICAL CODE - NFPA 70, 2020

VIRGINIA STATEWIDE FIRE PREVENTION CODE, 2021

INTERNATIONAL FIRE CODE, 2021

CONSTRUCTION AND PROFESSIONAL SERVICES MANUAL (CPSM) 2025 REV 0 DATED MARCH 17, 2025

BUILDING PURPOSE/OCCUPANCY: EDUCATIONAL OCCUPANCY FOR STUDENTS ABOVE 12TH GRADE

USE GROUP: GROUP B - BUSINESS

TYPE OF CONSTRUCTION: VCC TYPE IIIB

ORIGINAL CONSTRUCTION YEAR: COMPLETED IN 1995, UNDER THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC) 1990 EDITION (FIRST AMENDMENT), EFFECTIVE NOVEMBER 1, 1991.

FIRE ALARM SYSTEM: EXISTING

FIRE SUPPRESSION SYSTEM: AUTOMATIC WET-PIPE SPRINKLER SYSTEM THROUGHOUT BUILDING, DRY PIPE SYSTEM THROUGHOUT ATTIC

NO PROPOSED CHANGES IN OCCUPANCY LOADS OR MEANS OF EGRESS

BUILDING AREA: APPROX. 31,940 SF

MD101 PARTIAL FLOOR PLAN - AREA B - DUCTWORK DEMOLITION

MD102 PARTIAL ATTIC PLAN - AREA B - DUCTWORK DEMOLITION

MD201 PARTIAL FLOOR PLAN - AREA B - PIPING DEMOLITION

MD202 PARTIAL ATTIC PLAN - AREA B - PIPING DEMOLITION

E-001 GENERAL NOTES, LEGEND AND ABBREVIATIONS

ED-101 PARTIAL FLOOR PLAN - AREA B - DEMOLITION

E-102 PARTIAL ATTIC PLAN - AREA B - NEW WORK

E-201 ENLARGED MECHANICAL ROOM - DEMOLITION AND NEW WORK

PAUL D. CAMP COMMUNITY COLLEGE - HOBBS CAMPUS

271 KENYON RD

SUFFOLK, VA 23434

PROJECT LOCATION

ED-102

E-101

PARTIAL ATTIC PLAN - AREA B - DEMOLITION

PARTIAL FLOOR PLAN - AREA B - NEW WORK

M101 PARTIAL FLOOR PLAN - AREA B - DUCTWORK

M102 PARTIAL ATTIC PLAN - AREA B - DUCTWORK

M201 PARTIAL FLOOR PLAN - AREA B - PIPING

M202 PARTIAL ATTIC PLAN - AREA B - PIPING

M301 ENLARGED MECHANICAL ROOM PLAN - DEMOLITION AND NEW WORK

M401 MECHANICAL DETAILS

M501 AUTOMATIC TEMPERATURE CONTROLS

M402 VRF RISER DIAGRAMS

VIRGINIA COMMUNITY COLLEGE SYSTEM

PM: MIKE WAGNER, VCCO

CAPITAL OUTLAY PROJECT MANGER

300 ARBORETUM PLACE, SUITE 200

RICHMOND, VA 23236

(804) 819-5380

REFLECTED CEILING PLAN - DEMOLITION AND NEW WORKCP101

BUILDING OCCUPANCY AND MEANS-OF-EGRESS MAINTENANCE NOTES

1. THE MEANS OF EGRESS THROUGHOUT THE BUILDING SHALL NOT BE OBSTRUCTED WHILE THE BUILDING IS REGULARLY OCCUPIED

(TYPICALLY 8AM-5PM MONDAY THROUGH FRIDAY). ALL DEMOLITION AND NEW WORK LOCATED WITHIN THE MEANS OF EGRESS, INCLUDING CORRIDOR THERMOSTATS AND VRF EQUIPMENT LOCATED IN CORRIDOR UTILITY CLOSETS, SHALL BE PERFORMED DURING UNOCCUPIED HOURS. CONTRACTOR SHALL COORDINATE OCCUPANCY SCHEDULE WITH OWNER DURING CONSTRUCTION.

2. NO WORK SHALL OCCUR IN EACH INDIVIDUAL BUILDING SPACE WHILE THE SPACE IS OCCUPIED. CONTRACTOR SHALL COORDINATE CONSTRUCTION SCHEDULE WITH COLLEGE INSTRUCTION SCHEDULE AND OWNER'S OCCUPANCY SCHEDULE.

3. EQUIPMENT, TOOLS, AND OTHER CONSTRUCTION MATERIALS SHALL NOT BE STORED IN THE PATH OF EGRESS WHILE THE CONSTRUCTION AREAS ARE OCCUPIED. CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING JOBSITE MATERIAL AND EQUIPMENT IN A LOCKABLE STORAGE CONTAINER OUTSIDE OF THE BUILDING AS NECESSARY, IN A LOCATION COORDINATED WITH THE OWNER.

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text A

KEY PLAN

NOT TO SCALE

SCALE FEET

5' 20'15'10'5'0 1/8" = 1'-0"

A

B

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

CP101

PA

R

TI

AL

F

LO

O R

P

LA

N

AR

EA

B

D U

C

TW

O R

K D

EM

O

LI

TI

O N

BDC

SLS

GJA

PARTIAL FLOOR PLAN - AREA B - DUCTWORK DEMOLITION

SCALE: 1/8"=1'-0"

NO WORK IN

THIS AREA

NOTE: EXISTING CONDITIONS ILLUSTRATED HAVE BEEN

DETERMINED FROM ORIGINAL CONSTRUCTION DOCUMENTS

AND LIMITED NON-INVASIVE FIELD INVESTIGATION. THE

CONTRACTOR SHALL INVESTIGATE FIELD CONDITIONS PRIOR

TO COMMENCEMENT OF WORK, COORDINATE AND MAKE

ADJUSTMENTS AS NECESSARY.

GENERAL DEMOLITION AND NEW WORK NOTES:

1. THE CONTRACTORS SHALL FIELD VERIFY ALL REFLECTED CEILING GRID ELEVATIONS, ORIENTATIONS, AND POSITIONS. REFLECTED CEILING GRID MAY VARY FROM THAT SHOWN ON THIS DRAWING.

INVENTORY ALL ACOUSTIC CEILING TILES BEFORE DEMOLITION.

2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND SALVAGE THE EXISTING ACOUSTICAL PANEL CEILING SYSTEM. AFTER COMPLETION OF MECHANICAL AND ELECTRICAL WORK, THE CONTRACTOR SHALL REINSTALL THE SALVAGED ACOUSTICAL PANEL CEILING AND RESTORE TO

PRE-CONSTRUCTION CONDITIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CEILING

COMPONENTS DAMAGED DURING THE REMOVAL AND REINSTALLATION PROCESS. ANY ACOUSTICAL

PANEL CEILING SYSTEM COMPONENTS DAMAGED PRIOR TO REMOVAL SHALL BE DOCUMENTED AND

SHARED WITH THE OWNER. UPON OWNER AUTHORIZATION, CONTRACTOR SHALL PROVIDE NEW

COMPONENTS TO REPLACE SAID DAMAGED EXISTING COMPONENTS. REFER TO THE BID FORM FOR

ADDITIONAL INFORMATION.

3. THE CONTRACTOR SHALL STORE AND PROTECT ALL REMOVED CEILING GRID FOR RE-INSTALLATION.

4. IMPROPERLY STORED AND HANDLED MATERIALS SHALL BE REPLACED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO THE OWNER.

5. DURING DEMOLITION, SORT TILES REMOVED BY APPEARANCE AND CONDITION. UPON

REINSTALLATION, PROVIDE TILES OF LIKE APPEARANCE TO PRESENT A UNIFORM CEILING FINISH.

6. CONTRACTOR SHALL COORDINATE EXACT QUANTITY AND LOCATION OF CEILING TILES, GRID, AND

ELECTRICAL FIXTURES TO BE REMOVED WITH NEW WORK. REFER TO ELECTRICAL SHEETS FOR

FIXTURES REQUIRING REMOVAL.

LEGEND

UPON COMPLETION OF MECHANICAL AND ELECTRICAL WORK,

RE-INSTALL CEILING TILES, GRID, LIGHT FIXTURES, SPRINKLER HEAD

COVERS, AND ANY OTHER CEILING MOUNTED EQUIPMENT RETAINED

FROM DEMOLITION. ALL EQUIPMENT SHALL BE RESTORED TO ITS

PRE-CONSTRUCTION CONDITION.

CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OF

CEILING TILES, GRID, LIGHT FIXTURES, SPRINKLER HEAD COVERS,

AND ANY OTHER CEILING MOUNTED EQUIPMENT INDICATED ON

ELECTRICAL REFLECTED CEILING PLAN DAMAGED DURING REMOVAL

AND REINSTALLATION. REFER TO SPECIFICATION SECTION 095113

FOR TILE AND GRID REQUIREMENTS.

AFTER REMOVAL OF SUPPLY DIFFUSERS AND RETURN GRILLES

CONTRACTOR, SHALL PROVIDE NEW CEILING TILES AND GRID

COMPONENTS TO PROVIDE A COMPLETE CEILING INSTALLATION.

REFER TO SPECIFICATION SECTION 095113 FOR TILE AND GRID

REQUIREMENTS.

REINSTALL ALL CEILING MOUNTED LIGHT FIXTURES, CCTV CAMERAS,

MOTION DETECTORS, WIRELESS ACCESS POINTS, CORD REELS, AND

PROJECTOR ASSEMBLIES SAVED DURING DEMOLITION IN NEW

CEILING AND RECONNECT TO EXISTING BRANCH CIRCUITRY SAVED

DURING DEMOLITION. EXTEND EXISTING BRANCH CIRCUITRY AS

REQUIRED. PROVIDE NEW ANNEALED, LIGHT ZINC-COATED FINISH,

12-GAUGE WIRE FROM ALL FOUR CORNERS TIED TO BUILDING

STRUCTURAL MEMBERS FOR 2'X4' RECESSED LIGHT FIXTURES.

SECURING SAFETY WIRES TO BRIDGING IS NOT ACCEPTABLE. THE

SUPPORTING WIRES SHALL BE DISTINGUISHABLE BY COLOR OR

TAGGING. PROVIDE ROD HANGERS CAPABLE OF SUPPORTING TWICE

THE WEIGHT OF THE FIXTURES SUPPORTED BY THE ROD HANGER

FOR ALL 1'X4' SURFACE MOUNTED LIGHT FIXTURES. ROD HANGERS

SHALL BE A MINIMUM .18" DIAMETER. COORDINATE NEW LIGHT

FIXTURE SUPPORTS WITH NEW DUCTWORK AND PIPING AND ADJUST

AS DIRECTED BY THE MECHANICAL CONTRACTOR.

DESCRIPTIONNO.

CAREFULLY REMOVE EXISTING CEILING TILES, GRID, LIGHT FIXTURES,

SPRINKLER HEAD COVERS, AND ALL OTHER CEILING MOUNTED

EQUIPMENT. REFER TO ELECTRICAL REFLECTED CEILING PLAN FOR

ADDITIONAL CEILING MOUNTED EQUIPMENT AND GENERAL NOTES ON

THIS DRAWING FOR ADDITIONAL REQUIREMENTS.

DISCONNECT AND REMOVE ALL CEILING MOUNTED LIGHT FIXTURES,

CCTV CAMERAS, MOTION DETECTORS, WIRELESS ACCESS POINTS,

CORD REELS, AND PROJECTOR ASSEMBLIES SHOWN ON THIS

DRAWING, U.O.N. AND SAVE FOR REUSE. LABEL ALL DEVICES WITH

REGARDS TO ROOM NUMBERS AND LOCATIONS TO ENSURE EACH

DEVICE IS INSTALLED IN THE SAME LOCATION FROM WHICH THEY

WERE REMOVED. SAVE ASSOCIATED BRANCH CIRCUITRY FOR REUSE.

RELOCATE EXISTING BRANCH CIRCUITRY AS REQUIRED TO

FACILITATE THE REMOVAL AND INSTALLATION OF NEW MECHANICAL

EQUIPMENT AND DUCTWORK. COORDINATE WORK WITH THE

MECHANICAL CONTRACTOR.

BEFORE BEGINNING ANY WORK, FIELD VERIFY THE WORKING

CONDITION OF ALL LIGHT FIXTURES AND AUXILIARY SYSTEM DEVICES

(CCTV CAMERAS, MOTION DETECTORS, WIRELESS ACCESS POINTS,

CORD REELS, AND PROJECTOR ASSEMBLIES) SCHEDULED FOR

REMOVAL. NOTIFY THE OWNER OF ANY DEFECTIVE EQUIPMENT.

AFTER INSTALLATION OF LIGHT FIXTURES AND AUXILIARY SYSTEMS

DEVICES SAVED DURING DEMOLITION RE-VERIFY THE WORKING

CONDITION OF EACH. REPLACE ALL DEVICES FOUND DEFECTIVE

AFTER REINSTALLATION WHICH WAS WORKING PRIOR TO REMOVAL

WITH NEW DEVICE TO MATCH EXISTING AT NO ADDITIONAL COST TO

THE OWNER.

DURING REMOVAL OF THE EXISTING CEILING TILES, SUPPORT ALL

EXISTING AUXILIARY SYSTEMS CABLES (DATA, CCTV, MOTION

DETECTORS, ETC.) FROM STRUCTURE ABOVE EXISTING CEILING.

ADJUST ROUTING OF THESE CABLES TO ACCOMMODATE THE

INSTALLATION OF NEW HVAC SYSTEM EQUIPMENT AND DUCTWORK.

RE-VERIFY THE WORKING CONDITION OF THESE CABLES AND

REPLACE ALL CABLES FOUND DEFECTIVE AFTER REINSTALLATION,

WHICH WERE WORKING PRIOR TO REMOVAL WITH CABLES TO MATCH

EXISTING AT NO ADDITIONAL COST TO OWNER.

DESCRIPTIONNO.

D1

DEMOLITION NOTES NEW WORK NOTES

(CP101 ONLY)

(CP101 ONLY)

LIMITS OF TEMPORARY SPRINKLER HEAD

MODIFICATION AND CEILING REMOVAL,

INCLUDING TILE, GRID, AND ELECTRICAL

DEVICES

RECESSED SPRINKLER HEAD

2' x 4' RECESSED LIGHT FIXTURES

1' x 4' RECESSED LIGHT FIXTURES

2' x 2' RECESSED LIGHT FIXTURES

SUPPLY AIR DIFFUSER

RETURN AIR GRILLE

EXISTING INTERIOR CEILING MOUNTED

CCTV CAMERA.

EXISTING CEILING MOUNTED MOTION

DETECTOR.

EXISTING CEILING MOUNTED WIRELESS

ACCESS DATA OUTLET.

EXISTING CEILING MOUNTED CORD REEL

EXISTING CEILING MOUNTED PROJECTOR

ASSEMBLY, INCLUDING RECEPTACLE AND

DATA OUTLET

MD

WA

CR

P

(THIS SHEET ONLY) (THIS SHEET ONLY)

SPRINKLER AND FIRE PROTECTION NOTES

1. CONTRACTOR SHALL REPLACE PENDANT SPRINKLERS WITH UPRIGHT SPRINKLERS WHEN THE

CEILING TILES ARE REMOVED DURING DEMOLITION. UPRIGHT SPRINKLERS SHALL BE LOCATED NO

MORE THAN 12" FROM ROOF DECK ABOVE. AFTER UPRIGHT SPRINKLERS ARE INSTALLED, ANY

OBSTRUCTIONS CREATED BY DUCTWORK, AND OTHER MEP ELEMENTS SHALL BE COORDINATED WITH

THE STATE FIRE MARSHALL FOR CORRECTION.

2. ALL WORK SHALL COMPLY WITH NFPA 13-2019 AND BE COORDINATED WITH THE STATE FIRE MARSHAL.

3. TEMPORARY UPRIGHT SPRINKLERS SHALL HAVE THE SAME TEMPERATURE RATINGS, RESPONSE RATINGS, AND K-FACTORS AS THE EXISTING SPRINKLERS. FLEXIBLE SPRINKLER CONNECTORS ARE

NOT ALLOWED.

4. LIFE SAFETY SHALL BE MAINTAINED DURING THE ENTIRE CONSTRUCTION PERIOD. OWNER AND CONTRACTOR SHALL COORDINATE WITH THE STATE FIRE MARSHAL PRIOR TO ANY CEILING REMOVAL.

IF COVERAGE CANNOT BE MAINTAINED, A FIRE WATCH THAT IS APPROVED BY THE STATE FIRE

MARSHAL AND COMPLIANT WITH IFC 901.7 WILL BE NECESSARY.

5. THE PROVISIONS OF THE 2021 INTERNATIONAL FIRE CODE (CHAPTER 33) SHALL BE STRICTLY OBSERVED AT ALL TIMES. ALL CONSTRUCTION SHALL BE IN COMPLIANCE WITH NFPA 241-2019 FOR

CONDITIONS NOT COVERED BY THE IFC.

6. IN THE EVENT OF ANY PLANNED OR UNPLANNED OUTAGE OF THE FIRE PROTECTION SYSTEM, THE

CONTRACTOR SHALL NOTIFY THE OWNER, STATE FIRE MARSHAL, AND LOCAL FIRE MARSHAL.

(THIS DRAWING ONLY)

D2

D3

D4

D1 1 2

CR

CR

CR

CR CR

P

MD MD

P P

WA

WA

D1

1 2

D1

1 2

D2 D3 D4

D1 1 2 4 D2 D3 D4

D2 D3 D4

D1

1 2

D1

1 2

D2 D3 D4

D1

1 2

D1

1 2

D2 D3 D4

D1

1 2

D1

1 2

D2 D3 D4

D1

1 2

D1

1 2

D2 D3 D4

D1

1 2

D1

1 2

D2 D3 D4

D1

1 2

D1

1 2

D2 D3 D4

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

M001

G

EN

ER

AL

N O

TE

S, L

EG

EN

D

, A

BB

R

EV

IA

TI

O N

S

AN

D S

C H

ED

U

LE

S

BDC

PJD

GJA

1. WHERE EQUIPMENT IS INDICATED TO BE REMOVED, IT SHALL MEAN COMPLETE REMOVAL

OF EQUIPMENT, INCLUDING SUPPORTS, CONTROLS AND INCIDENTAL ITEMS CONNECTED

OR FASTENED TO EQUIPMENT. OWNER MAINTAINS THE OWNERSHIP OF ALL ITEMS

TAGGED OR IDENTIFIED.

2. WHERE PIPING IS INDICATED TO BE REMOVED, IT SHALL MEAN COMPLETE REMOVAL OF

PIPING, INCLUDING VALVES, FITTINGS, INSULATION, SUPPORTS, HANGERS, BRACKETS,

CONTROLS AND INCIDENTAL ITEMS CONNECTED OR FASTENED TO THE PIPING. PIPING IS

DIAGRAMMATIC AND INDICATES THE GENERAL EXTENT OF WORK. NO ATTEMPT IS MADE

TO SHOW EVERY ELL, TEE, OFFSET, FITTING AND VALVE. REMOVE PIPING AS INDICATED

AND SPECIFIED.

3. WHERE DUCTWORK IS INDICATED TO BE REMOVED, IT SHALL MEAN COMPLETE REMOVAL

OF DUCTWORK, INCLUDING FITTINGS, INSULATION, SUPPORTS, CONTROLS AND

INCIDENTAL ITEMS CONNECTED OR FASTENED TO THE DUCTWORK. DUCTWORK IS

DIAGRAMMATIC AND INDICATES THE GENERAL EXTENT OF WORK. NO ATTEMPT IS MADE

TO SHOW EVERY ELL, TEE, OFFSET AND FITTING. REMOVE DUCTWORK AS INDICATED

AND SPECIFIED.

4. CONTRACTOR SHALL RECLAIM AND DISPOSE OF ALL REFRIGERANT IN ACCORDANCE

WITH ALL STATE AND LOCAL CODES PRIOR TO REMOVING THE EXISTING UNIT.

GENERAL DEMOLITION NOTES

1. CONTRACTOR SHALL VISIT JOB SITE TO DETERMINE EXTENT OF WORK INVOLVED PRIOR

TO BIDDING THE PROJECT.

2. THE MECHANICAL SYSTEM HAS BEEN DESIGNED IN ACCORDANCE WITH THE 2021

VIRGINIA UNIFORM STATEWIDE BUILDING CODE.

3. COORDINATE LOCATION OF ALL DUCTWORK AND THERMOSTATS WITH SPRINKLER

SYSTEMS AND ACCESSORIES INSTALLED BY OTHER TRADES SO AS TO PRESENT A NEAT

AND ATTRACTIVE INSTALLATION THROUGHOUT THE BUILDING.

4. ALL PIPING, VALVES, DUCTWORK, ETC., SHALL BE CONCEALED (ROUTED THROUGHOUT

ATTIC) UNLESS OTHERWISE NOTED.

5. PIPING ARRANGEMENTS ARE DIAGRAMMATIC.

6. ARRANGE PIPING AS REQUIRED TO CLEAR STRUCTURE, CONDUIT, LIGHTS, ETC.,

ALLOWING SPACE FOR HANGERS, INSULATION, ETC.

7. DUCT DIMENSIONS MAY BE MODIFIED AS APPROVED BY ENGINEER.

8. DUCT SIZES SHOWN ARE INSIDE FREE AREA DIMENSIONS.

9. REFER TO FIRE SAFETY DETAILS ON DRAWING M401 FOR PENETRATIONS THROUGH FIRE

RATED WALLS, PARTITIONS AND ASSEMBLIES.

10. MAINTAIN PROPER CLEARANCES PER ELECTRICAL CODE ON ALL EQUIPMENT.

COORDINATE WITH ALL TRADES TO ENSURE CLEARANCES ARE NOT OBSTRUCTED.

11. INSTALL ALL WALL MOUNTED NON-ADJUSTABLE SENSORS AT 5'-0" FROM FINISHED

FLOOR TO TOP OF SENSOR. ADJUSTABLE DEVICES SHALL BE INSTALLED AT 4'-0" FROM

FINISHED FLOOR TO TOP OF SENSOR.

12. ALL ROUND BRANCH DUCTS TO DIFFUSERS SHALL MATCH NECK SIZES SHOWN ON

SCHEDULE, UNLESS OTHERWISE NOTED.

13. ALL DIFFUSERS, GRILLES AND REGISTERS SHALL BE SIZED TO HAVE A MINIMUM FREE

AREA OF 70% AND MEET PERFORMANCE CRITERIA SCHEDULED.

14. PROVIDE NEMA 3R ENCLOSURES FOR ALL FIELD INSTALLED CONTROLS, ACCESSORIES

AND ELECTRICAL COMPONENTS WHETHER INDICATED OR NOT.

15. ALL CONCEALED CONDENSATE DRAIN PIPING SHALL BE LABELED AT ITS TERMINATION

POINT TO INDICATE WHETHER THE DRAIN PIPING IS CONNECTED TO A PRIMARY OR

SECONDARY (AUXILIARY) MECHANICAL UNIT DRAIN.

GENERAL NOTES

ABBREVIATIONS

ø DIAMETER

AMP AMPERE

AMPS AMPERES

BC-x BRANCH CONTROLLER DESIGNATION

CFM CUBIC FEET PER MINUTE

COMP COMPRESSOR

COPH COEFFICIENT OF PERFORMANCE (HEATING)

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DEPTH

D CONDENSATE DRAIN

DB DRY BULB

dB(A) DECIBELS ADJUSTED

DDC DIRECT DIGITAL CONTROL

DN DOWN

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY

ESP EXTERNAL STATIC PRESSURE

°F DEGREES FAHRENHEIT

FC-x FAN COIL (VRF INDOOR UNIT) DESIGNATION

FD FLOOR DRAIN

FLA FULL LOAD AMPS

FT FEET

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

H HEIGHT

HD HEAD

IEER INTEGRATED ENERGY EFFICIENCY RATIO

kA KILO AMPS

L LENGTH

LBS POUNDS

MBH 1000 BRITISH THERMAL UNITS PER HOUR

MCA MINIMUM CIRCUIT AMPS

MED MEDIUM

MOCP MAXIMUM OVER CURRENT PROTECTION

NO NUMBER

OA OUTSIDE AIR

P-x PUMP DESIGNATION

PH PHASE

QTY QUANTITY

SCCR SHORT CIRCUIT CURRENT RATING

TEMP TEMPERATURE

V VOLTS

VRF VARIABLE REFRIGERANT FLOW

W WIDTH

WB WET BULB

WG WATER GURAGE

WSHX-x WATER SOURCE HEAT EXCHANGER (VRF) DESIGNATION

LEGEND

XX

MXXX

(X"/X") ø

COP

T

PT

PG

THERMOSTAT OR TEMPERATURE SENSOR,

CONTROLLING UNIT AS INDICATED

SECTION/PHOTO: LETTER "A"

SEE SHEET MXXX

VOLUME DAMPER

SUPPLY AIR DEVICE WITH FLEXIBLE DUCT

90° DUCT ELBOW - TURNED DOWN

DUCT ELBOW WITH TURNING VANES

DUCT SECTION - RETURN/EXHAUST

DUCT SECTION - SUPPLY

90° DUCT ELBOW - TURNED UP

90° DUCT ELBOW - TURNED DOWN

TRANSFER DUCT ABOVE CEILING, SIZE AS INDICATED

TRANSFER GRILLE, SIZE AS INDICATED

CEILING RETURN GRILLE

DUCT TRANSITION

SQUARE TO ROUND DUCT TRANSITION

CLEANOUT PLUG

ROUND DUCT

DIRECTION OF AIRFLOW

POINT OF CONNECTION FOR NEW WORK

REMOVE EXISTING TO THIS POINT

DEMOLITION NOTE

EXISTING SIZES AS INDICATED

NEW WORK NOTE

EXISTING TO REMAIN

NEW WORK

EXISTING TO BE REMOVED

PRESSURE GAUGE

PRESSURE/TEMPERATURE TEST PORT

STRAINER, Y-TYPE, WITH BLOWDOWN VALVE

THERMOMETER

THREADED UNION

DIRECTION OF FLOW IN PIPE

BALANCE EXISTING AIR TERMINAL TO CFM INDICATEDXXX

VD

CWS

CWR

D

RS

RL REFRIGERANT LIQUID PIPING

PIPING TO BE REMOVED

REFRIGERANT SUCTION PIPING

DIRECTION OF PITCH FOR PIPING OR DUCTWORK

PIPE SLEEVE

PIPE DOWN

PIPE TEE DOWN

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

BALL VALVE

BUTTERFLY VALVE

PIPE TEE UP

PIPE UP

CONDENSER WATER RETURN PIPING

CONDENSER WATER SUPPLY PIPING

DRAIN PIPING

EXISTING PIPING BELOW OR HIDDEN

GATE VALVE

RG REFRIGERANT GAS PIPING

EXISTING PIPING TO REMAIN

90° DUCT ELBOW - TURNED UP

ENLARGED PLAN: NUMBER "1"

SEE SHEET MXXX

A

MXXX

D1

T

SINGLE WALL DUCTWORK WITH 2" EXTERNALLY

WRAPPED BLANKET INSULATION

VRF WATER-COOLED CONDENSING UNIT SCHEDULE

UNIT

NO.

CAPACITY

(MBH)

COOLING HEATING

REFRIGERANT

MCA MOP V PH

WSHX-2 192.0 215.0 R-32 2 11 15 460 3

REMARKS: 1 PROVIDE WITH CMY-R200NCBK TWINNING

KIT TO JOIN BOTH MODULES.

FC-09 3.1843940.070.036.067.080.01075

DESCRIPTIONUNIT NO. dB(A)

VRF INDOOR FAN COIL UNIT SCHEDULE

COOLING

WB(°F)DB(°F)

EAT

HEATING

MCA

ELECTRICAL

V PH REMARKS

TPEFYP036MA1M0A1208

TOTAL

CFM TOTAL

MBH

EAT

DB(°F)

TOTAL

MBH

UNIT

WEIGHT

(LBS)

SELECTION BASED ON

"TRANE/ MITSUBISHI"

REMARKS: 1

DATA BASED ON "MEDIUM" FAN SPEED SETTING.

1700.131BC-2

VRF BRANCH CONTROLLER SCHEDULE

V PH MCA

REMARKS

CMB-M1012NU-MA-SV12

WEIGHT

(LBS)

NO. OF

BRANCHES

UNIT

NO.

REMARKS: 1 BASIS OF DESIGN EQUIPMENT REQUIRES

CONDENSATE DRAIN CONNECTION TO

BRANCH CONTROLLER. REFER TO ATTIC

PLAN FOR ADDITIONAL INFORMATION.

WSHX-3

BC-3A 1

FC-10 2.5663527.070.024.067.080.0740 1208 1

FC-11 3.5823817.070.015.067.080.0495 1208 1

FC-12 1

FC-13 3.01124027.070.024.067.080.0625 1208 1

FC-14 1

FC-15

FC-17

FC-59 745

FC-18 0.329285.670.05.067.080.0265 1208 1

FC-19 1

FC-20 1

FC-21 1

FC-22 1

FC-23 1

FC-24 1

FC-25 1

FC-26 1

FC-27 1

FC-28 1

FC-29 1.847289.070.08.067.080.0265 1208 1

FC-30 1

FC-31 1

FC-32

FC-33

CEILING CONCEALED

(DUCTED, MED STATIC)

VERTICAL AIR HANDLER

VERTICAL AIR HANDLER

CEILING CONCEALED

(DUCTED, HIGH STATIC)

CEILING CONCEALED

(DUCTED, MED STATIC)

CEILING CONCEALED

(DUCTED, HIGH STATIC)

CEILING CONCEALED

(DUCTED, MED STATIC)

CEILING CONCEALED

(DUCTED, HIGH STATIC)

VERTICAL AIR HANDLER

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CASSETTE

(4-WAY AIRFLOW)

CEILING CONCEALED

(DUCTED, MED STATIC)

VERTICAL AIR HANDLER

VERTICAL AIR HANDLER

VERTICAL AIR HANDLER

VERTICAL AIR HANDLER

ESP

(IN WG)

0.6

0.6

0.6

0.8

N/A

0.6

MOCP

REFRIGERANT

R-32

R-32

R-32

R-32

R-32

TPEFYP024MA1M0A

TPEFYP015MH1M0A

TPVFYP024AM1M0A

TPEFYP008MA1M0A

TPLFYP005FM1M0A

27.070.024.067.080.0740 0.6

4.11414434.070.030.067.080.0745 12080.8 15R-32 TPVFYP030AM1M0A

PROVIDE WITH 27" INTEGRAL CONDENSATE LIFT CAPABILITY.

1 3

1 3

2 5

DATA BASED ON "HIGH" FAN SPEED SETTING.3

PROVIDE WITH 24-GA AUXILIARY

DRAIN PAN MOUNTED UNDER UNIT.

UNIT SHALL BE 2'X2' CONFIGURATION.5

MOCP

15208

ELECTRICAL

2 PROVIDE WITH

ISOLATION BALL

VALVES ON ALL

PORTS.

SELECTION BASED ON

"TRANE/ MITSUBISHI"REFRIGERANT

R-32 2

MODULE

QTY COMP.

QTY

MODULE 1 PERFORMANCE DATA

GPM

25.4

WPD

(FT HD)

8.0

OPERATING WATER

TEMP. RANGE (°F)

50-113

SCCR

(kA)

168.0 188.0 2 8 15 460 31 25.4 8.0 50-113 5

2 REFER TO VRF RISER DIAGRAMS ON M402

FOR ADDITIONAL INFORMATION.

CONDENSATE PUMP SCHEDULE

REMARKS

P-5 42 15

UNIT

NO.

REMARKS: 1 PROVIDE APPROXIMATELY 2'-0" OF 3/8" CLEAR PVC TUBING AT PUMP

DISCHARGE, FOLLOWED BY 3/8" TO 1/2" REDUCER FITTING. ALL

PIPING DOWNSTREAM OF FITTING SHALL BE 1/2" SCHEDULE 40 PVC.

HEAD

(FT.)

RATED

GPH

ELECTRICAL DATA

V PH AMPS

115 1 1.5

P-6 42 15 1115 1 1.5

P-7 42 15 1115 1 1.5

P-10 42 15 1115 1 1.5

P-11 42 15 1115 1 1.5

BOILER STOP BUTTONB

OA

CFM

OA CFM IS PROVIDED BY AN EXISTING DEDICATED

VENTILATION UNIT INSTALLED IN NOVEMBER 2020.

THERE HAVE BEEN NO CHANGES TO SPACE AREAS

OR OCCUPANCY PROFILES SINCE THE

INSTALLATION OF SAID UNIT.

VRF WATER-COOLED CONDENSING UNIT SCHEDULE (CONTINUED)

REMARKS

ADDITIONAL

REFRIGERANT

CHARGE

(LBS)

PIPING

LENGTH

(FT)

UNIT

WEIGHT

(LBS)

34.0 486 812

EER

18.2

IEER

26.5 1

COPH

SELECTION BASED ON

"TRANE/ MITSUBISHI"

MCA MOP V PH

11 15 460 3

COMP.

QTY

MODULE 2 PERFORMANCE DATA

GPM

25.4

WPD

(FT HD)

8.0

OPERATING WATER

TEMP. RANGE (°F)

50-113

SCCR

(kA)

5 6.6

37.7 717 81218.7 26.911 15 460 31 25.4 8.0 50-113 5 6.7 TQRYP1684BMM0AN

TQRYP1924BMM0AN 2

EXISTING CEILING SUPPLY DIFFUSER

THE DESIGN SHOWN IS BASED ON TRANE "TPEFYP/TPVFYP/TPLFYP"

EQUIPMENT AND IS INTENDED ONLY TO SHOW THE GENERAL SIZE,

CONFIGURATION, LOCATION, CONNECTIONS AND SUPPORT FOR EQUIPMENT

OR SYSTEMS SPECIFIED WITH RELATION TO THE OTHER BUILDING SYSTEMS.

SEE SPECIFICATION SECTION 230500 FOR TECHNICAL REQUIREMENTS

PERTAINING TO THE EQUIPMENT. ACCEPTABLE ALTERNATES INCLUDE LG

"ARNU-M2/NJ/NK/TM/TN/TQ/TR" AND DAIKIN "FX-MQ/SQ/TQ/UQ"

REMARKS: 3 THE DESIGN SHOWN IS BASED ON TRANE "TQRY" EQUIPMENT AND IS INTENDED ONLY TO SHOW THE GENERAL SIZE, CONFIGURATION, LOCATION, CONNECTIONS AND SUPPORT FOR EQUIPMENT OR SYSTEMS SPECIFIED WITH RELATION TO THE OTHER BUILDING SYSTEMS. SEE SPECIFICATION SECTION 230500 FOR TECHNICAL REQUIREMENTS PERTAINING TO THE EQUIPMENT. ACCEPTABLE ALTERNATES INCLUDE LG "ARWM" AND DAIKIN "RWEYQ"

3 THE DESIGN SHOWN IS BASED ON TRANE "CMB" EQUIPMENT AND IS INTENDED

ONLY TO SHOW THE GENERAL SIZE, CONFIGURATION, LOCATION, CONNECTIONS

AND SUPPORT FOR EQUIPMENT OR SYSTEMS SPECIFIED WITH RELATION TO THE

OTHER BUILDING SYSTEMS. SEE SPECIFICATION SECTION 230500 FOR TECHNICAL

REQUIREMENTS PERTAINING TO THE EQUIPMENT. ACCEPTABLE ALTERNATES

INCLUDE LG "PRHR" AND DAIKIN "BSF"

1. THE ONLY FIRE RATED ASSEMBLIES IN THIS BUILDING ARE THE WALLS (1-HR) AND

CEILING (1-HR) IN THE MAIN MECHANICAL ROOM (D9). THERE ARE NO NEW

PENETRATIONS THROUGH THE MECHANICAL ROOM WALLS, AND CONTRACTOR SHALL

REUSE EXISTING PENETRATIONS THROUGH THE CEILING FOR NEW REFRIGERANT

SUCTION AND LIQUID PIPING. EXISTING PENETRATIONS SHALL BE MODIFIED IN

ACCORDANCE WITH FIRESTOPPING DETAIL ON M401.

FIRE-RATED ASSEMBLY NOTE

1. THE MEANS OF EGRESS THROUGHOUT THE BUILDING SHALL NOT BE OBSTRUCTED

WHILE THE BUILDING IS REGULARLY OCCUPIED (TYPICALLY 8AM-5PM MONDAY

THROUGH FRIDAY). ALL DEMOLITION AND NEW WORK LOCATED WITHIN THE MEANS OF

EGRESS, INCLUDING CORRIDOR THERMOSTATS AND VRF EQUIPMENT LOCATED IN

CORRIDOR UTILITY CLOSETS, SHALL BE PERFORMED DURING UNOCCUPIED HOURS.

CONTRACTOR SHALL COORDINATE OCCUPANCY SCHEDULE WITH OWNER DURING

CONSTRUCTION.

2. NO WORK SHALL OCCUR IN EACH INDIVIDUAL BUILDING SPACE WHILE THE SPACE IS

OCCUPIED. CONTRACTOR SHALL COORDINATE CONSTRUCTION SCHEDULE WITH

COLLEGE INSTRUCTION SCHEDULE AND OWNER'S OCCUPANCY SCHEDULE.

3. EQUIPMENT, TOOLS, AND OTHER CONSTRUCTION MATERIALS SHALL NOT BE STORED IN

THE PATH OF EGRESS WHILE THE CONSTRUCTION AREAS ARE OCCUPIED.

CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING JOBSITE MATERIAL AND

EQUIPMENT IN A LOCKABLE STORAGE CONTAINER OUTSIDE OF THE BUILDING AS

NECESSARY, IN A LOCATION COORDINATED WITH THE OWNER.

BUILDING OCCUPANCY AND MEANS-OF-EGRESS MAINTENANCE NOTES

1.0

3/4" DOOR UNDERCUT

DOOR LOUVER, FREE AREA AS INDICATED

R-32

SCHE

21.1

21.9

950.071BC-3B CMB-M104NU-MB-SV4 115208R-32 2 3

1700.131 CMB-M1012NU-MA-SV12 15208R-32

R-32

2.56635 1208 15 TPEFYP024MA1M0AR-32

3.5823817.070.015.067.080.0 12080.6 15R-32 TPEFYP015MH1M0A

3.5823817.070.015.067.080.0 12080.6 15R-32 TPEFYP015MH1M0A

3.01124027.070.024.067.080.0 12080.8 15R-32 TPVFYP024AM1M0A

3.01124027.070.024.067.080.0 12080.8 15R-32 TPVFYP024AM1M0A

14.11414434.070.030.067.080.0 12080.8 15R-32 TPVFYP030AM1M0A 2 6 7

14.11414434.070.030.067.080.0 12080.8 15R-32 TPVFYP030AM1M0A 2 6 7

14.11414434.070.030.067.080.0 12080.8 15R-32 TPVFYP030AM1M0A 2 6 7

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

0.329285.670.05.067.080.0 1208N/A 15R-32 TPLFYP005FM1M0A

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

SCALE FEET

5' 20'15'10'5'0 1/8" = 1'-0"

A

B

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

MD101

PA

R

TI

AL

F

LO

O R

P

LA

N

AR

EA

B

D U

C

TW

O R

K D

EM

O

LI

TI

O N

BDC

SLS

GJA

PARTIAL FLOOR PLAN - AREA B - DUCTWORK DEMOLITION

SCALE: 1/8"=1'-0"

(6"ø UP)

PREP RM.

B33

PREP RM.

B34

MECHANICAL

D9

AMUSEMENT

B21

WOMEN

D4

MEN

D3

BOOK

STORE

D6

MAINTENANCE

STORAGE

D11

FOYER

D5

NURSING

CLASSROOM

B5

CORRIDOR

B2

VEST

B1

READING

B3 MATH

B4

FOYER

B18

JANITOR

D2

LOUNGE

B19

JANITOR

STOR.

D1

OFFICE

C12

OFFICE

C11

OFFICE

C13

OFFICE

C10

OFFICE

C9

OFFICE

C8

OFFICE

C7

OFFICE

C6

OFFICE

C3

OFFICE

C4

OFFICE

C5

CLASSROOM

B6

CLASSROOM

B7B

CLASSROOM

B7A

COMPUTER LAB

B8

FOYER

B9.1

VEST.

B8

CORRIDOR

B17

FAC/

SEC

C1

(8"/8") UP

TO ATTIC

SEE ENLARGED PLAN

ON DRAWING M301

FC-33

FC-31

FC-30

(CUH-3)

(UH-1)

(CUH-2)

(FC-16)

(FC-8)

FC-14

T

T

T

T

T

TT

T

T TTT

T

T

T

T

TT

T

TT

T

T

T T

T

T

FC-32

FC-13

DISCONNECT RS/RL AND CONDENSATE DRAIN PIPING

AND REMOVE VRF VERTICAL AIR HANDLING UNIT.

EXISTING COMBINATION BASE FRAME/PLENUM BOX TO

REMAIN.

REMOVE DUCTWORK COMPLETE INCLUDING

INSULATION AND HANGERS, TO POINT INDICATED.

DISCONNECT AND REMOVE RS/RL PIPING COMPLETE

INCLUDING INSULATION AND HANGERS.

DISCONNECT AND REMOVE CONDENSATE DRAIN PIPING

COMPLETE INCLUDING INSULATION AND HANGERS.

DISCONNECT AND REMOVE CONDENSATE PUMP AND

ALL ASSOCIATED PIPING COMPLETE.

REMOVE EXISTING THERMOSTAT COMPLETE INCLUDING

ALL ASSOCIATED WIRING.

REMOVE SUPPLY DIFFUSER/RETURN GRILLE

COMPLETE.

DISCONNECT AND REMOVE VRF WATER-SOURCE HEAT

EXCHANGER. EXISTING CONCRETE PAD TO REMAIN.

ALL WORK ASSOCIATED WITH EQUIPMENT IN UTILITY

CLOSETS AND CORRIDORS MUST BE PERFORMED

WHEN THE BUILDING IS UNOCCUPIED IN ORDER TO NOT

OBSTRUCT MEANS OF EGRESS FROM REGULAR

BUILDING OCCUPANTS. CONTRACTOR SHALL

COORDINATE BUILDING OCCUPANCY SCHEDULE WITH

OWNER.

DEMOLITION NOTES

DESCRIPTIONNO.

D1

D2

WSHP-3

NO WORK IN

THIS AREA

T

COMP.

WOMEN

B15

CLASSRM

A19

OFFICE

A18

MEN

B14

FOYER

B16

COMP. REPAIR

B13

CLASSROOM

A20

COMPUTER LAB

A21

CORRIDOR

A17

CLASSROOM

B13.1

OFFICE

B11

SERVER RM

B12.1

FOYER

B12

ADMISSION/

CASHIER

A22

ACCT.

A23

VEST.

A1

COUNS

A5

TOIL.

A6

TOIL.

A5

CORR.

A8

FINANCIAL AID

A9

COUNSELOR

A10

STOR.

A2.1

OFFICE

A11

CONFERENCE

A12

PRES

A13

DEAN

A14

DEAN

A15

SEC/

RECEPT

A2

COUNS

A4

DIRECTOR

A3

D6

T D6

D8

D2

D1 D1

D2

D6D6

D6

D6

D6

D6 D6

D6

D6

D6

D6 D6 D6

D6

D6 D6

D6

D6

D6

D6

D6

D6

D6

D7 D7 D7

D7

D7

D7 D7

D7

D7 D7

D7

D7

D7

D7

D7

D7

D7

D7

D7 D7

D7

D7

10"ø UP

8"/8" UP

D1

D2

D2

D1

D1

D2

D2

D1

P1

MD101

(20"/8" UP)

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP

10"ø UP

8"/8" UP P1

MD101

FC-32/FC-33 REMOVAL PHOTO

NOT TO SCALE (FC-13/14 AND 30/31 SIMILAR)

D2

FC-32D1 FC-33D1

D3 D3

D4

D2 D2

D5 D7

D3

D4

D5

D6

D8

NOTE: EXISTING CONDITIONS ILLUSTRATED HAVE BEEN

DETERMINED FROM ORIGINAL CONSTRUCTION DOCUMENTS

AND LIMITED NON-INVASIVE FIELD INVESTIGATION. THE

CONTRACTOR SHALL INVESTIGATE FIELD CONDITIONS PRIOR

TO COMMENCEMENT OF WORK, COORDINATE AND MAKE

ADJUSTMENTS AS NECESSARY.

(WSHP-5)

1-HR FIRE RATED WALL

AND CEILING ASSEMBLY

D17

D17

D17

D17

D17

D17

D17

D17

D17

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

SCALE FEET

5' 20'15'10'5'0 1/8" = 1'-0"

A

B

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

MD102

PA

R

TI

AL

A

TT

IC

P

LA

N

AR

EA

B

D

U C

TW

O

R K

D

EM

O

LI

TI

O

N

BDC

SLS

GJA

(2 2"

/2 0"

(26"/24")

(4 2"

/2 2"

(2 6"

/2 4"

VD

VD

(18"/16")

(8"/8")

(22"/12")

(20"/18")

(16"/16")

VD

VD

(8"/8")

DN TO

FC-13

(12"/12")

(12"/12")

DN TO

FC-14

(12"/12")

(10"/10")

FC

-1

MATCHLINE A

(8"ø)

VDVD

VD

VD

VD

VD VD

VD

VD

VD

VD

VD

VD

VDVD

(14"/12"

TO FC-16)

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

ATTIC

ACCESS

LOCATION

VD

(DN TO

FC-8)

(10"/8")

(12"/12")

(8"/8")

(8"/8")

(8"/8")

(4"ø)

(4"ø)

(4"ø)

(4"ø)

(4"ø)

(4"ø)

FC-9

PARTIAL ATTIC PLAN - AREA B - DUCTWORK DEMOLITION

SCALE: 1/8"=1'-0"

(10"ø) DN

TO 1ST FLR

CEILING

(TYP. OF 4)

(10"/12")

(16"/12")

DN TO

1ST FLR

CEILING

(16"/12")

(10"/12")

(10"/10")

FC

-1

(16"/12")

(16"/12")

(10"/10") FC-12

VD

(10"ø) DN

TO 1ST FLR

CEILING

(TYP. OF 4)

VD

(16"/12") DN TO 1ST

FLR CEILING

(10"ø) DN TO 1ST FLR

CEILING (TYP. OF 4)

(10"/12")

(16"/12")

(16"/16") OA ABOVE

(16"/12") RA BELOW

(6"ø DN)

(12"/12" DN)

FC-11

VD

A

MD102MD102

(12"/12" DN)

(12"/12" DN)

(20"/8")

(10"/10")

FCU-59 SECTION

SCALE: 1/4"=1'-0"

A

MD102MD102

(16"/12 SA")

(16"/16" RA)

FC-59

(8"/8" OA)

FC-59

(10"ø) DN TO 1ST FLR

CEILING (TYP. OF 4)

FC-17

(8"ø) DN TO 1ST FLR

CEILING (TYP. OF 6)

FC-18

FC-20

FC-25

FC-24

FC-23

FC-22

FC-19

FC-28

FC-21

FC-26

VD

VD

(4"ø)

FC-29

FC-27

D11(4"ø)

D9

D9

D1

D2

D2

ATTIC

WALKWAY

FLOORD11

D11

D9 D9

D9D11

D9

D9

D11

D9

D9

D9

D9 D11

D9

D10

D10

D10 D10

D10

D10

D10

D9

D2

ROOF

P2

MD102

D2

D2

D2

D9 D9

D9

D9

D2

D2

(8"/8")

(20"/8" DN)

D9

D2

D2

P2

MD102

FC-11 REMOVAL PHOTO

NOT TO SCALE

D2

D3

FC-11

D2

D2D9

D1

D2 (16"/16")

D2

(10"/10")

(12"/12")

(12"/10")

DISCONNECT RS/RL AND CONDENSATE DRAIN PIPING

AND REMOVE VRF VERTICAL AIR HANDLING UNIT.

EXISTING COMBINATION BASE FRAME/PLENUM BOX TO

REMAIN.

REMOVE DUCTWORK COMPLETE INCLUDING

INSULATION AND HANGERS, TO POINT INDICATED.

DISCONNECT AND REMOVE RS/RL PIPING COMPLETE

INCLUDING INSULATION AND HANGERS.

DISCONNECT AND REMOVE VRF HORIZONTAL DUCTED

UNIT COMPLETE INCLUDING AUXILIARY DRAIN PAN,

CONTROLS AND HANGERS.

REMOVE SUPPLY/RETURN DUCTWORK COMPLETE

INCLUDING INSULATION AND HANGERS.

DISCONNECT EXISTING 4"Ø BRANCH VENTILATION DUCT

FROM UNIT RETURN DUCTWORK.

DEMOLITION NOTES

DESCRIPTIONNO.

D1

D2

D3

D9

D10

D11

NOTE: EXISTING CONDITIONS ILLUSTRATED HAVE BEEN

DETERMINED FROM ORIGINAL CONSTRUCTION DOCUMENTS

AND LIMITED NON-INVASIVE FIELD INVESTIGATION. THE

CONTRACTOR SHALL INVESTIGATE FIELD CONDITIONS PRIOR

TO COMMENCEMENT OF WORK, COORDINATE AND MAKE

ADJUSTMENTS AS NECESSARY.

D10

NO WORK IN

THIS AREA

(10"/10")

(10"/10")

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

SCALE FEET

5' 20'15'10'5'0 1/8" = 1'-0"

A

B

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

MD201

PA

R

TI

AL

F

LO

O R

P

LA

N

AR

EA

B

PI

PI

N G

D

EM

O

LI

TI

O

N

BDC

SLS

GJA

PARTIAL FLOOR PLAN - AREA B - PIPING DEMOLITION

SCALE: 1/8"=1'-0"

(3/4" G) PREP RM.

B33

PREP RM.

B34

MECHANICAL

D9

AMUSEMENT

B21

WOMEN

D4

MEN

D3

BOOK

STORE

D6

MAINTENANCE

STORAGE

D11

FOYER

D5

NURSING

CLASSROOM

B5

CORRIDOR

B2

VEST

B1

READING

B3 MATH

B4

FOYER

B18

JANITOR

D2

LOUNGE

B19

JANITOR

STOR.

D1

OFFICE

C12 OFFICE

C11

OFFICE

C13

OFFICE

C10

OFFICE

C9

OFFICE

C8

OFFICE

C7

OFFICE

C6

OFFICE

C3

OFFICE

C4 OFFICE

C5

WOMEN

B15

CLASSRM

A19

OFFICE

A18

MEN

B14

FOYER

B16

CLASSROOM

B6

CLASSROOM

B7B

CLASSROOM

B7A

COMPUTER LAB

B8

FOYER

B9.1

COMP. REPAIR

B13

CLASSROOM

A20

COMPUTER LAB

A21

CORRIDOR

A17

CLASSROOM

B13.1

OFFICE

B11

SERVER RM

B12.1

FOYER

B12

VEST.

B8

CORRIDOR

B17

FAC/

SEC

C1

ADMISSION/

CASHIER

A22

ACCT.

A23

VEST.

A1

COUNS

A5

TOIL.

A6

TOIL.

A5

CORR.

A8

FINANCIAL AID

A9

COUNSELOR

A10

STOR.

A2.1

OFFICE

A11

CONFERENCE

A12

PRES

A13

DEAN

A14

DEAN

A15

LOBBY

A16

SEC/

RECEPT

A2

COUNS

A4

DIRECTOR

A3

SEE ENLARGED PLAN

ON DRAWING M-301

(FC-39) (FC-40)

(FC-36)

(FC-41)

(F C

-3 8)

(F C

-3 7)

(FC-42)

(FC-34)

(FC-35)

(CUH-3)

(FC-45)

(FC-47) (FC-48)

(FC-49)

(FC-50)

(FC-51)(F

C

-5 7)

(FC-56) (FC-55) (FC-54) (FC-52)

(FC-53)

(UH-1)

(CUH-2) (FC-16)

(FC-8)

FC-14

(FC-46)

(CUH-4)

G

(2-1/2" G)

(GAS METER)

FC-32

(6" )

(4" )

FC-13

DISCONNECT RS/RL AND CONDENSATE DRAIN PIPING

AND REMOVE VRF VERTICAL AIR HANDLING UNIT.

EXISTING COMBINATION BASE FRAME/PLENUM BOX TO

REMAIN.

DISCONNECT AND REMOVE RS/RL PIPING COMPLETE

INCLUDING INSULATION AND HANGERS.

DISCONNECT AND REMOVE CONDENSATE PUMP AND

ALL ASSOCIATED PIPING COMPLETE.

DISCONNECT AND REMOVE VRF WATER-SOURCE HEAT

EXCHANGER. EXISTING CONCRETE PAD TO REMAIN.

DISCONNECT AND REMOVE CWS/CWR PIPING

COMPLETE TO APPROXIMATELY 2' BELOW CLOSET

CEILING.

ALL WORK ASSOCIATED WITH EQUIPMENT IN UTILITY

CLOSETS MUST BE PERFORMED WHEN THE BUILDING IS

UNOCCUPIED IN ORDER TO NOT OBSTRUCT MEANS OF

EGRESS FROM REGULAR BUILDING OCCUPANTS.

CONTRACTOR SHALL COORDINATE BUILDING

OCCUPANCY SCHEDULE WITH OWNER.

DEMOLITION NOTES

DESCRIPTIONNO.

D1

D1

FC-30D1

P-6D5

P-7D5

D3

D3D3

RS/RL UP

RS/RL UP RS/RL UP

RS/RL UP

P-5D5

D3D3

RS/RL UP RS/RL UP

D1 D1

P3

MD201

(4")

RS/RLD3

(CWS/CWR) UP

P-11

D12

C W

S C

W R

WSHP-3

P3

MD201

FC-11 REMOVAL PHOTO

NOT TO SCALE

D3

WSHX-3D1 WSHX-3D1

P-11D5

D3

D12 D12 D12

D8

D3

D5

D8

D12

NOTE: EXISTING CONDITIONS ILLUSTRATED HAVE BEEN

DETERMINED FROM ORIGINAL CONSTRUCTION DOCUMENTS

AND LIMITED NON-INVASIVE FIELD INVESTIGATION. THE

CONTRACTOR SHALL INVESTIGATE FIELD CONDITIONS PRIOR

TO COMMENCEMENT OF WORK, COORDINATE AND MAKE

ADJUSTMENTS AS NECESSARY.

COMP.

(2 1/2" )

(CWS/CWR TO

CLOSED CIRCUIT

COOLER)

(1 1/4") D

D

(1-1/4")

D5

NO WORK IN

THIS AREA

(WSHP-5)

D

FC-31D1

D3

(1-1/4") (1 1/4" )

(2" )

D

C W

S C

W R

C W

S C

W R

FC-33D1

CWS

CWR

(2-1/2")

(4")

(4")

(4")

D17

1-HR FIRE RATED WALL

AND CEILING ASSEMBLY

D17

D17

D17

D17

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

SCALE FEET

5' 20'15'10'5'0 1/8" = 1'-0"

A

B

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

MD202

PA

R

TI

AL

A

TT

IC

P

LA

N

AR

EA

B

PI

PI

N

G D

EM

O

LI

TI

O N

BDC

SLS

GJA

PARTIAL ATTIC PLAN - AREA B - PIPING DEMOLITION

SCALE: 1/8"=1'-0"

FC-17

FC-9

FC

-1

FC-12

FC-11

FC-59

DN TO FC-13

DN TO FC-14

BC-2

DN TO WSHX-3

(DN TO WSHX-1)

DN TO WSHX-2

(BC-1)

BC-3

DN TO FC-30

DN TO FC-31

DN TO FC-32

DN TO FC-33

(BC-4)

D

D

D D

D

FC-15

D

P-10

FC-25

FC-24

FC-23

FC-22

FC-18

FC-29

FC-19

FC-20

FC-28

FC-27

FC-21

FC-26

D5

D1

D13

D3

D3

D14

D9

D3 D3

D13

D13

D9

D14

D9

D9

D9

D9

D9

D9

D9

D9

D9

D9

D9 D9

D9

D9

D13

D13

D13

D13

D13

D13

D13

D3

D9

D9

D3 D3

DISCONNECT RS/RL AND CONDENSATE DRAIN PIPING

AND REMOVE VRF VERTICAL AIR HANDLING UNIT.

EXISTING COMBINATION BASE FRAME/PLENUM BOX TO

REMAIN.

DISCONNECT AND REMOVE RS/RL PIPING COMPLETE

INCLUDING INSULATION AND HANGERS.

DISCONNECT AND REMOVE CONDENSATE PUMP AND

ALL ASSOCIATED PIPING COMPLETE.

DISCONNECT AND REMOVE VRF HORIZONTAL DUCTED

UNIT COMPLETE INCLUDING AUXILIARY DRAIN PAN,

CONTROLS AND HANGERS.

REMOVE CONDENSATE DRAIN PIPING COMPLETE

INCLUDING INSULATION AND HANGERS TO POINT

INDICATED.

REMOVE VRF BRANCH CONTROLLER COMPLETE

INCLUDING HANGERS, ACCESSORIES, RS/RL, AND

CONDENSATE DRAIN PIPING.

DEMOLITION NOTES

DESCRIPTIONNO.

D1

D3

D5

D9

D13

D14

NOTE: EXISTING CONDITIONS ILLUSTRATED HAVE BEEN

DETERMINED FROM ORIGINAL CONSTRUCTION DOCUMENTS

AND LIMITED NON-INVASIVE FIELD INVESTIGATION. THE

CONTRACTOR SHALL INVESTIGATE FIELD CONDITIONS PRIOR

TO COMMENCEMENT OF WORK, COORDINATE AND MAKE

ADJUSTMENTS AS NECESSARY.

D

D

P4

MD202

P4

MD201

FC-59 REMOVAL PHOTO

NOT TO SCALE

FC-59D1

D5

D5

D

D13D13 D

NO WORK IN

THIS AREA

(1-1/4")

(1-1/2")

(3/4") (3/4")

(1-1/4") (3/4")

(1")

(1")

(3/4")

(1")

(3/4")

(1") D

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

SCALE FEET

5' 20'15'10'5'0 1/8" = 1'-0"

A

B

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

M101

PA

R

TI

AL

F

LO

O R

P

LA

N

AR

EA

B

N

EW

W O

R K

BDC

PJD

GJA

PREP RM.

B33

PREP RM.

B34

MECHANICAL

D9

AMUSEMENT

B21

WOMEN

D4

MEN

D3

BOOK

STORE

D6

MAINTENANCE

STORAGE

D11

FOYER

D5

NURSING

CLASSROOM

B5

CORRIDOR

B2

READING

B3 MATH

B4

FOYER

B18

JANITOR

D2

LOUNGE

B19

JANITOR

STOR.

D1

OFFICE

C12

OFFICE

C11

OFFICE

C13

OFFICE

C10

OFFICE

C9

OFFICE

C8

OFFICE

C7

OFFICE

C6

OFFICE

C3

OFFICE

C4

OFFICE

C5

WOMEN

B15

CLASSRM

A19

OFFICE

A18

MEN

B14

FOYER

B16

CLASSROOM

B6

CLASSROOM

B7B

CLASSROOM

B7A

COMPUTER LAB

B8

FOYER

B9.1

COMP. REPAIR

B13

CLASSROOM

A20

COMPUTER LAB

A21

CORRIDOR

A17

CLASSROOM

B13.1

OFFICE

B11

SERVER RM

B12.1

FOYER

B12

VEST.

B8

CORRIDOR

B17

FAC/

SEC

C1

ADMISSION/

CASHIER

A22

ACCT.

A23

VEST.

A1

COUNS

A5

TOIL.

A6

TOIL.

A5

CORR.

A8

FINANCIAL AID

A9

COUNSELOR

A10

STOR.

A2.1

OFFICE

A11

CONFERENCE

A12

PRES

A13

DEAN

A14

DEAN

A15

LOBBY

A16

SEC/

RECEPT

A2

COUNS

A4

DIRECTOR

A3

FC-13

PARTIAL FLOOR PLAN - AREA B - DUCTWORK

SCALE: 1/8"=1'-0"

(6"ø UP)

(8"/8") UP

TO ATTIC

SEE ENLARGED PLAN

ON DRAWING M301

(CUH-3)

(UH-1)

(CUH-2)

(FC-16)

(FC-8)

T

T

T

T

(20"/8" UP)

(WSHP-5)

T

T

T

T

T

TT

T

T TTT

T

T

T

T

TT

T

TT

T

T

T

T

PROVIDE NEW TEMPERATURE SENSOR AND CONTROL

WIRING. WHERE EXISTING WIRING RAN EXPOSED,

PROVIDE SURFACE-MOUNTED RACEWAY AND PAINT TO

MATCH WALL COLOR.

PROVIDE NEW VRF VERTICAL AIR HANDLING UNIT AND

MOUNT ON EXISTING BASE FRAME/PLENUM BOX.

PROVIDE NEW SUPPLY DUCTWORK AND INSULATION

FROM NEW VERTICAL AIR HANDLING UNIT AND

CONNECT TO EXISTING AT POINT INDICATED.

REFER TO "VRF INDOOR CASSETTE UNIT INSTALLATION

DETAIL" ON M401 FOR ADDITIONAL INFORMATION.

PROVIDE NEW VRF WATER SOURCE HEAT EXCHANGER

AND MOUNT ON EXISTING CONCRETE PAD.

IN SPACES WHERE RETURN GRILLES ARE REMOVED

FROM EXISTING CEILING, REPLACE WITH NEW

ACOUSTIC CEILING TILE TO MATCH EXISTING. REFER

TO 095113 "ACOUSTICAL PANEL CEILINGS" FOR

ADDITIONAL INFORMATION.

MAINTAIN MANUFACTURER'S RECOMMENDED SERVICE

CLEARANCES AT ALL TIMES.

ALL WORK ASSOCIATED WITH EQUIPMENT IN UTILITY

CLOSETS MUST BE PERFORMED WHEN THE BUILDING IS

UNOCCUPIED IN ORDER TO NOT OBSTRUCT MEANS OF

EGRESS FROM REGULAR BUILDING OCCUPANTS.

CONTRACTOR SHALL COORDINATE BUILDING

OCCUPANCY SCHEDULE WITH OWNER.

PROVIDE 1.0 SF FREE AREA DOOR LOUVERS IN BOTH

UTILITY CLOSET DOORS TO PROVIDE TRANSFER AIR

PATH FOR REFRIGERANT LEAK MITIGATION.

DESCRIPTIONNO.

NEW WORK NOTES

FC-59

FC-15

FC-10

FC-9

FC-12

1 1

FC-14

WSHX-39

FC-142

18"/16"

FC-33

FC-32

FC-332

FC-322

FC-312

18"/16"

FC-30

18"/16"

FC-302

FC-31

FC-17FC-13

FC-18 FC-20

FC-21

FC-19

FC-22

FC-23

FC-24

FC-184 FC-204

FC-194

FC-214

FC-224

FC-234

FC-244

FC-254

FC-264FC-274

FC-27

FC-26

FC-25

FC-28

FC-284

FC-29

150 150

FC-11

185 185

185 185

185 185

185185

155 155

155 155

155 155

190 185

185185

NO WORK IN

THIS AREA

1-HR FIRE RATED WALL

AND CEILING ASSEMBLY

20 21

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

SCALE FEET

5' 20'15'10'5'0 1/8" = 1'-0"

A

B

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

M102

PA

R

TI

AL

A

TT

IC

P

LA

N

AR

EA

B

N

EW

W

O R

K

BDC

PJD

GJA

KEY PLAN

NOT TO SCALE

SCALE FEET

5' 20'15'10'5'0 1/8" = 1'-0"

A

B

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

COMM. NO:

C O

X

RO

A D

Co ns ul tin g En gi ne er s

TH

O

M

PS

O N

E

N

TE

RP

RI

SE

P

A

RK

W A

Y G

LE

N

A

LL

EN

, V

A

REVISIONS

H A

M

PT

O N

, V A

DESCRIPTIONMARK DATE

S . L

YN

N

H A

VE

N

R O

A D

VA

B

EA

CH

, V A

TE

LE

PH

O N

E:

(7

) 5

-4

PR

O

JE

CT

N U

M

BE

R:

4-

05.12.2026

SU

FF

O

LK

, V

IR

G

IN

IA

R

EP

LA

C

E

FA

IL

ED

V R

F

SY

ST

EM

AN

D

O

LI

VE

R

K . H

O

BB

S C

AM

PU

S

BU

IL

D

IN

G

C

AM

P C

O M

M U

N

IT

Y C

O

LL

EG

E

ST

AT

E

PR

O

JE

C T

N O

0- B4

0-

M

PC

24-011

05-12-2026

(2 2"

/2 0"

(26"/24")

(4 2"

/2 2"

(2 6"

/2 4"

VD

VD

(18"/16")

(8"/8")

(22"/12")

(20"/18")

(16"/16")

VD

VD

(8"/8")

DN TO

FC-13

(12"/12")

(12"/12")

DN TO

FC-14

(12"/12")

(10"/10")

MATCHLINE A

(8"ø)

VDVD

VD

VD

VD

VD VD

VD

VD

VD

VD

VD

VD

VDVD

(14"/12"

TO FC-16)

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

ATTIC

ACCESS

LOCATION

VD

(DN TO

FC-8)

(10"/8")

(12"/12")

(8"/8")

(8"/8")

(8"/8")

(4"ø)

(4"ø)

(4"ø)

(4"ø)

(4"ø)

(10"ø) DN

TO 1ST FLR

CEILING

(TYP. OF 4)

(10"/12")

(16"/12")

DN TO

1ST FLR

CEILING

(16"/12")

(10"/12")

(10"/10")

(16"/12")

(16"/12")

(10"/10")

VD

(10"ø) DN

TO 1ST FLR

CEILING

(TYP. OF 4)

VD

(16"/12") DN TO 1ST

FLR CEILING

(10"ø) DN TO 1ST FLR

CEILING (TYP. OF 4)

(10"/12")

(16"/12")

(16"/16") OA ABOVE

(16"/12") RA BELOW

(6"ø DN)

(12"/12" DN)

VD

(12"/12" DN)

(12"/12" DN)

(20"/8")

(10"/10")

(16"/12 SA")

(16"/16" RA)

(8"/8" OA)

(10"ø) DN TO 1ST FLR

CEILING (TYP. OF 4)

(8"ø) DN TO 1ST FLR

CEILING (TYP. OF 6)

VD

VD

(4"ø)

(4"ø)

ATTIC

WALKWAY

FLOOR

ROOF

(8"/8")

(20"/8" DN)

(16"/16")

(10"/10")

(12"/12")

(12"/10")

(10"/10")

(10"/10")

FC-11

FC-17

FC-9

FC

-1

FC-12

A M102

FC-59

M102

PARTIAL ATTIC PLAN - AREA B - DUCTWORK

SCALE: 1/8"=1'-0"

PROVIDE NEW VRF VERTICAL AIR HANDLING UNIT AND

MOUNT ON EXISTING BASE FRAME/PLENUM BOX.

PROVIDE NEW SUPPLY DUCTWORK AND INSULATION

FROM NEW VERTICAL AIR HANDLING UNIT AND

CONNECT TO EXISTING AT POINT INDICATED.

PROVIDE NEW VRF HORIZONTAL DUCTED UNIT. REFER

TO "VRF HORIZONTAL DUCTED UNIT INSTALLATION

DETAIL" ON M401 FOR ADDITIONAL INFORMATION.

PROVIDE NEW DUCTWORK AND INSULATION FROM NEW

HORIZONTAL AIR HANDLING UNIT AND CONNECT TO

EXISTING AT POINT INDICATED.

PROVIDE NEW 4"ø BRANCH DUCTWORK AND CONNECT

TO FRESH AIR INLET ON VRF CASSETTE UNIT.

MAINTAIN MANUFACTURER'S RECOMMENDED SERVICE

CLEARANCES AT ALL TIMES.

DESCRIPTIONNO.

NEW WORK NOTES

5 6

66 5

FC-155

16"/12"

5 16"/12"

12"/12"

6 12"/12"

7 (TYP)

(12"/10")

FC-295

7 (TYP)

7 (TYP)

FCU-59 SECTION

SCALE: 1/4"=1'-0"

A M102M102

2 FC-59

16"/16"

NO WORK IN

THIS AREA

360 430 35

75 65

280280

16"/12"

(EXISTING DUCTWORK

ROUTED ABOVE

SERVICE CLEARANCE)

(EXISTING DUCTWORK

ROUTED ABOVE

SERVICE CLEARANCE)

AutoCAD SHX Text Lic. No. 052245

AutoCAD SHX Text

GREGORY J ALLEN III

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .