PD_101_Plumbing Second Level Demolition Plan~2.pdf
PDF 629 KB Posted
- Attached to
- Electrical
- Solicitation number
- BD-22-2123-AVC01-AVCMB-72496
- Issued by
- Middlesex County, Massachusetts
About this file
This document contains the Plumbing Second Level Demolition Plan for the Assabet Valley Collaborative's REACH Evolution Tenancy project located at 28 Lord Road, 2nd level suite in Marlborough, Massachusetts. The plan provides general existing conditions notes and demolition instructions, including removing existing fixtures, piping, venting, and water heater. The existing plumbing will need to be field verified during the demolition phase, and any discrepancies must be reported to the General Contractor and Architect for review.
The project is part of a larger Electrical contract opportunity being offered by the Assabet Valley Collaborative, the Awarding Authority for the REACH Evolution Program. The contract is located in Middlesex County, Massachusetts and seeks bids from Electrical Contractors and Filed Sub-Bid Contractors for interior modifications to the tenant space.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL EXISTING CONDITIONS NOTES:
ALL EXISTING CONDITIONS ABOVE CEILINGS, BELOW FLOOR, OR IN WALLS ARE SHOWN APPROXIMATE AND HAVE NOT BEEN FIELD VERIFIED. ALL EXISTING PLUMBING SHOWN SHALL BE CONFIRMED IN FIELD DURING DEMOLITION PHASE.
SHOULD THERE BE SIZE OR SERVICE DISCREPANCIES DISCOVERED IN FIELD, THEY SHOULD BE RELAYED IN WRITING TO
THE GENERAL CONTRACTOR AND THE ARCHITECT FOR ENGINEER REVIEW
GENERAL DEMOLITION NOTES:
1. REMOVE ALL EXISTING FIXTURES, TRAPS, TRIM, STOPS & SUPPLIES.
2. REMOVE EXISTING SANITARY PIPING BACK TO ACTIVE MAIN.
3. EXISTING VENTING IS TO BE INSPECTED AND REPLACED AS NECESSARY TO PROVIDE COMPLETE AND CODE
COMPLIANT INSTALLATION.
4. REMOVE EXISTING COLD WATER SUPPLIES AND BRANCHES BACK TO ACTIVE MAIN.
5. REMOVE EXISTING HW SUPPLIES IN ENTIRETY.
6. REMOVE WATER HEATER AND ALL ASSOCIATED APPURTENANCES.
9. ALL PLUMBING LEFT ABANDONED SHALL BE LEFT VALVED, CAPPED / PLUGGED TO THE APPROVAL OF THE INSPECTOR.
ETBR HWH
ETBR SINK
S t a m p :
S h e e t :
Date:
7th March 2022
Scale:
4" = 1'-0"
Project No.:
2021.AVC_Reach
As sa be t V al le y Co lla bo ra tiv e:
R
EA
CH
E vo lu tio n te na nc y
L or d Ro ad M ar lb or ou gh M
A
G l e n n R
D a v i s
A .I
.A
W oo dr ow S tr ee t H ud so n, M
A . 0
8.
2.
e .d av is gm co m ca st
.n et
V isi t o ur n ew w eb sit e a t w w w
.g le nn da vi sa rc hi te ct s.
co m
D A
V I
S
A
R C
H I
T E
C T
S
O ur
9t h Ye ar
(2
2-se rv in g ou r c lie nt ele
Addendum No.1 : 24th March 2022
PD.101
PL
U
M
BI
N G
Se co nd F lo or
D em ol iti on P la n
File details come from the government source that posted it. Updated .