This is an RFP exhibit list and supporting contract documentation for ADA Upgrades to the Davis Academic Building at Pueblo Community College (PCC), administered by the State of Colorado Office of the State Architect, State Buildings Program. The project requires construction contracting services to complete ADA accessibility improvements to an occupied academic building. The solicitation employs a Competitive Sealed Best Value bidding method, evaluating proposals based on technical approach, experience and past performance, project management approach, staffing plan, safety record, job standards, and availability of domestically produced goods, weighted at 40 percent of the total score, combined with sealed bid pricing at 60 percent. Bidders must acknowledge receipt of all addenda, provide completion timelines from Notice to Proceed to Substantial Completion and from Substantial Completion to Final Acceptance, and submit detailed responses addressing constructability, subcontractor management, organizational structure, phasing plans for work in an occupied facility, safety programs, workforce development, apprenticeship availability, worker benefits, and domestic material sourcing.
Bid security of not less than 5 percent of the bid price is required for projects estimated at $50,000 or more. The project is subject to Colorado prevailing wage requirements, with wage rates established by the Department of Labor, and compliance with the 80 percent Colorado labor requirement for public works projects exceeding $500,000. Apprenticeship utilization is mandatory for projects estimated at $1 million or more. The contract incorporates the State's Design/Bid/Build Agreement (Form SC-6.21) and General Conditions (Form SC-6.23), establishing payment procedures, performance and labor-material payment bonds, insurance requirements, change order processes, liquidated damages provisions, and a one-year guarantee of work. All work must comply with applicable Colorado building codes, environmental product declaration requirements under the Buy Clean Colorado Act, and applicable federal or state labor standards as designated in the contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PCC-Davis ADA-CSBV_RFP-2026.10.19-Final IFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFB-CSBV-App-A
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
EXHIBIT A1: EVALUATION OF QUALIFICATIONS
FORM: COMPETITIVE SEALED BEST VALUE BIDDING
Name of Firm: Pueblo Community College (PCC) Name of Project: ADA Upgrades – Davis Academic Building Evaluator No:_______________________________________ Date:______________________________________________
AFB REFERENCE MINIMUM REQUIREMENTS Y ____ N ____
If the minimum requirements (including letter from surety) have not been met, specify the reason(s):
INSTRUCTIONS:
1. Weights are to be assigned prior to evaluation and are to be consistent on all evaluation forms.
2. Use only whole numbers.
3. Rating: 0 = not provided, 1 = Unacceptable, 2 = Poor, 3 = Fair, 4 = Good, 5 = Excellent
4. Total score includes the sum total of all criteria.
5. A passing score (as a percentage of the total points available) is to be established by the state prior to evaluation.
1. TECHNICAL APPROACH TO PROJECT Weight X Rating = Score ◻ Provide a strategic project approach summary discussing how your firm will provide successful Construction Contracting Services for this project. Include specific examples (1-2 page excerpts) of actual products (estimates, progress reports, schedules, constructability reviews, value engineering studies, forms, etc.). x =
◻ Provide a detailed description of how your firm will select qualified sub-contractors and manage them effectively on this project.
Weight
X
Rating
Score
2. EXPERIENCE, PAST PERFORMANCE AND EXPERTISE Weight X Rating = Score ◻ Provide a description of successful prior construction contracts, including performance in the areas of cost, quality control, schedule, compliance with plans and specifications and adherence to applicable laws and regulations as performed by your firm and by your subcontractors. x =
3. PROJECT MANAGEMENT APPROACH Weight X Rating = Score ◻ Provide a description of the composition and management structure of your firm. Identify the firm’s roles and responsibilities and relevant technical expertise and experience of the key management personnel that will be used on this project. Provide a description and separate
NickPalaski Text Box
NickPalaski Text Box
NickPalaski Text Box graphic organizational chart complete with working titles identifying the lines of authority, responsibility and coordination between your firm and your subcontractors and, ◻ Describe the proposed project schedule, quality control program, financial resources, equipment to be used on this project and its current location, and any other information or resources that demonstrates your firm’s competency to perform this work. A large component of this will be your phasing plan and schedule in this occupied building.
Weight
X
Rating
Score
4. STAFFING PLAN Weight X Rating = Score ◻ Provide a detailed staffing plan of key management personnel to be assigned to this project from your firm and your subcontractors and identify the time commitments and all current office locations. x =
5. SAFETY PLAN AND SAFETY RECORD Weight X Rating = Score ◻ Describe your firm’s safety program and provide your firms’ safety record over the last ten years. x =
6. JOB STANDARDS Weight X Rating = Score ◻ Demonstrate on past projects examples how a high quality of workmanship was achieved and industry standards of care were achieved and, X =
◻ Describe the firm’s method of personnel procurement, employment of Colorado workers, work force development and long-term career opportunities of workers and, Weight
X
Rating
Score
◻ Describe the firm’s availability of training programs, including apprenticeships approved by the United States Department of Labor and, Weight
X
Rating
Score
◻ Describe the benefits provided to workers, including healthcare and defined benefit or defined contribution retirement benefits, and whether the firm pays industry-standard wages.
Weight
X
Rating
Score
7. AVAILABILITY AND USE OF DOMESTICALLY PRODUCED GOODS Weight X Rating = Score ◻ Describe how your firm intends to use domestically produced iron, steel, and related manufactured goods in this project.
x
Weight X Rating = Score
Total Score: _________
NickPalaski Text Box
NickPalaski Text Box
NickPalaski Text Box
NickPalaski Text Box
NickPalaski Text Box
NickPalaski Text Box
NickPalaski Text Box
NickPalaski Text Box
NickPalaski Text Box
EXHIBIT A2: QUALIFICATIONS AND BID RANKING
MATRIX: COMPETITIVE SEALED BEST VALUE
BIDDING
INSTRUCTIONS/EXAMPLE:
1. QUALIFICATIONS 40% / BID 60%
2. Insert total score from each evaluator's SUBMITTAL review.
3. Add all evaluators’ total scores and divide by the number of evaluators to determine the average score for each firm’s qualifications.
4. The maximum score for qualifications on the evaluation form is equivalent to 40 points and is equivalent to the maximum points available for qualifications. Therefore, each firm’s score is determined as a percentage of the maximum points available. To score each average qualification score, use the example formula.
5. Assume the highest score is 600.
SCORING OF QUALIFICATIONS
FIRM B: 600 X 40 points = 40 points
FIRM C: 500 X 40 points = 33.33 points
FIRM A: 400 X40 points = 26.66 points
6. Determine score for each firm’s sealed Bid with the lowest fee being equivalent to a maximum score of 60 points. To score each Bid, use the example formula.
7. Assume the lowest Bid was $100,000.
SCORING OF BIDS
FIRM A: $100,000 X 60 points = 60 points $100,000
FIRM B: $100,000 X 60 points = 48 points $125,000
FIRM C: $100,000 X 60 points = 39.99 points $150,000
8. Add the average qualification score to the Bid score to determine cumulative qualifications and fee score.
9. Numerically rank all firms with the highest scoring firm being the most qualified and advantageous to the state.
FIRM
QUALIFICATIONS
AVE.
QUALS
SCORE
BID
& BID
RANK
EVAL
#1
EVA
L #2
EVA
L #3
EVA
L #4
EVA
L #5
EVA
L #6
SBP-6.12
Rev 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
INFORMATION FOR BIDDERS
Institution or Agency:
Project No./Project Name:
1. BID FORM: Bidders are required to use the Bid form attached to the solicitation.
Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days. In addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, in calendar days.
Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:
2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.
3. APPLICABLE LAWS AND REGULATIONS: All work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.
4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form
SBP-6.12
satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.
5. TAXES: The Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the GENERAL CONDITIONS.
6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.
7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two
(2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.
8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative.
Bidders should note the Method of Award is applicable to this Bid as stated below.
A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by, and the contract will be awarded on the base bid combined with deductible alternates, accepted in numerical order as listed in the Bid Alternates Form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with additive alternates in numerical order in as listed in the Bid Alternates Form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
9. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation where settlement will be advertised in electronic media.
SBP-6.13
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID FORM
Institution or Agency:
Project No./Project Name:
Bidder Acknowledges Receipt of Addenda Numbers: _______________________________
(See 3a below for the next 3 items)
Bidder Anticipates Services outside the United States or Colorado:* No Yes
Bidder will comply with 80% Colorado Labor on project above $500,000 No Yes
Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes
Base Bid $________________________
Bidder’s Time of Completion
Time Period from Notice to Proceed to Substantial Completion: ____________________________
Time Period from Substantial Completion to Final Acceptance: ____________________________
Total Time of Completion of Entire Project (a + b): _________________________
1. BID: Pursuant to the advertisement by the State of Colorado dated ______________ the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.
2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.
3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.
a. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) *
b. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) *
c. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs.
Attach proof of certification along with the bid submission. *
d. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S.
24-92-115
e. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.
4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. §24- 105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Office of the State Architect, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy.
5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above. If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.
6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.
7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.
8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.
9. The right is reserved to waive informalities and to reject any and all Bids.
*Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.
SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.
Dated this ________ Day of _______________________ , 20______
THE BIDDER:
By ________________________________________ _________________________________________________ Company Name Address
Phone Number ______________________________ _________________________________________________ City, State Zip Code
By ________________________________________ _________________________________________________ Name (Print) and Title Signature
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
SBP-6.14
STATE OF COLORADO
BID BOND
Institution or Agency: Pueblo Community College
Project No./Project Name: ADA Upgrades Davis Academic Building / #2026-049M25
KNOW ALL MEN BY THESE PRESENTS:
WHEREAS, hereinafter called the “PRINCIPAL”, is submitting a PROPOSAL for the above described project, to the STATE OF COLORADO, hereinafter called the “OBLIGEE”.
WHEREAS, the Advertisement for Bids has required as a condition of receiving the Proposals that the Principal submit with the PROPOSAL GUARANTY in an amount not less than five per cent (5%) of the Proposal, which sum it is specifically agreed is to be forfeited as Liquidated Damages in the event that the Principal defaults in his obligation as hereinafter specified, and, in pursuance of which Requirement, this Bid is made, executed and delivered.
NOW THEREFORE, the Principal and a corporation of the State of , duly authorized to transact business in Colorado, as Surety, are held and firmly bound unto the Obligee, in the sum of five per cent (5%) of the Principal’s total bid price, lawful money of the United States for the payment of which sum, well and truly to be made to the Obligee, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
FURTHER THAT, a condition of the obligation that the Principal shall maintain his Proposal in full force and effect for thirty (30) days after the opening of the proposals for the project, or, if the Principal’s Proposal is accepted, the Principal shall, within the prescribed time, execute the required Agreement, furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, Certificates of Insurance and Certification and Affidavit Regarding Illegal Aliens, then this obligation shall be null and void, otherwise it shall remain in full force and effect, and subject to forfeiture upon demand as Liquidated Damages.
IN WITNESS WHEREOF said Principal and Surety have executed this Bond, this ____ day of ________________________, A.D., 20 .
(Corporate Seal) THE PRINCIPAL
Company Name
ATTEST _________________________________________________
Address
City, State Zip Code
By ________________________________________ _________________________________________________
Name (Print) Signature
Name (Print) and Title
SBP-6.14
If the “Principal” is doing business as a Corporation, the Bid Bond shall be signed by an officer, i.e., President or Vice President. The signature of the officer shall be attested to by the Secretary and properly sealed.
If the “Principal” is an individual or a partnership, the Bid Bond shall so indicate and be properly signed.
(Corporate Seal) THE SURETY
____________________________________________ By_________________________________________________
Secretary Attorney-in-Fact
THIS BOND MUST BE ACCOMPANIED BY POWER OF ATTORNEY, EFFECTIVELY DATED.
FAILURE TO PROVIDE A PROPERLY EXECUTED BID BOND WITH A PROPERLY EXECUTED POWER
OF ATTORNEY WILL RESULT IN THE BIDDER’S PROPOSAL BEING DEEMED NON-RESPONSIVE.
State Form SBP–6.18 Issued 8/2023
STATE BUILDINGS PROGRAM
DIRECT LABOR BURDEN CALCULATION
Institution/Agency: Pueblo Comminuty College (PCC)
Project No./Name: 2026-049M25 / ADA Upgrades - Davis Academic Building
This form is required to be submitted for review prior to execution of a construction agreement.
List items below by the percentage of what makes up the total labor overhead; Items include benefits that a contractor pays to employees on their payroll. Examples include taxes, pension cost, health and dental insurance etc. The Labor Burden percentage must be agreed to by both the contractor and Principal Representative and will be included in the contract as part of Exhibit A and will be used in the calculation of any future Change Order Proposals (SC-6.312) Line 2.
Major sub-contractors defined as electricians, plumbers, mechanical contractors, excavators, millwork, concrete, block layers etc. Please provide one (1) Labor Burden Calculation Sheet per contractor and for each sub-contractor. These labor burdens shall be used in the calculation of any future Change Order Proposals (SC-6.312) Line 10.
State reserves the right to require back-up confirmation of all information included in this calculation.
Contractor/Subcontractor Name:
Percent of
Salary Paid
Payroll Taxes
Pension Costs
Health Insurance
Dental Insurance
Life Insurance
Other (Specify) Description: _________________________
Other (Specify) Description: _________________________
Total Labor Burden Percentage: 0%
"General Decision Number: CO20260027 05/18/2026
State: Colorado
Construction Types: Building
Counties: Colorado Counties of Pueblo
Modification Number Publication Date 0 01/02/2026 1 05/18/2026
ASBE0028-002 07/01/2025
Rates Fringes
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL
(DUCT, PIPE & MECHANICAL SYSTEM INSULATION).........$ 36.98 16.82
ELEC0012-005 09/01/2025
Rates Fringes
ELECTRICIAN.........................................$ 35.40 16.06
ENGI0009-017 05/01/2024
Rates Fringes
POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS)....$ 37.34 15.20
POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS).....$ 36.09 15.20
POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER).$ 35.78 15.20
POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER).$ 39.80 15.20
IRON0024-009 11/01/2024
Rates Fringes
IRONWORKER: ORNAMENTAL..............................$ 39.21 12.50
IRON0024-010 11/01/2024
Rates Fringes
IRONWORKER, STRUCTURAL..............................$ 39.21 12.50
PAIN0079-009 08/01/2024
Rates Fringes
PAINTER (SPRAY).....................................$ 27.41 11.56
PLAS0577-002 05/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 34.73 15.15
PLUM0058-005 07/01/2025
Rates Fringes
6/26/26, 7:14 AM SAM.gov https://sam.gov/wage-determination/CO20260027/1 1/5
PIPEFITTER, EXCLUDES HVAC DUCT AND PIPE
INSTALLATION........................................$ 47.60 18.10
PLUM0058-006 07/01/2025
Rates Fringes
PLUMBER (EXCLUDES HVAC DUCT AND PIPE INSTALLATION)..$ 47.60 18.10
SHEE0009-008 07/01/2025
Rates Fringes
SHEET METAL WORKER (INCLUDES HVAC DUCT AND PIPE
INSTALLATION).......................................$ 43.05 22.65
SUCO2013-013 07/31/2015
Rates Fringes
TRUCK DRIVER: DUMP TRUCK...........................$ 17.34 0.00
ROOFER..............................................$ 16.71 0.00
PAINTER (BRUSH AND ROLLER)..........................$ 17.20 0.00
OPERATOR: GRADER/BLADE.............................$ 21.50 0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER............$ 18.58 2.42
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 20.26 8.62
LABORER: PIPELAYER.................................$ 16.96 3.68
LABORER: MASON TENDER - CEMENT/CONCRETE............$ 16.00 0.00
LABORER: MASON TENDER - BRICK......................$ 15.99 0.00
LABORER: COMMON OR GENERAL.........................$ 13.67 1.36
CARPENTER...........................................$ 20.64 0.00
BRICKLAYER..........................................$ 21.96 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker https://sam.gov/wage-determination/CO20260027/1 2/5 protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the https://sam.gov/wage-determination/CO20260027/1 3/5 year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment https://sam.gov/wage-determination/CO20260027/1 4/5 data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
https://sam.gov/wage-determination/CO20260027/1 5/5
SC-6.21
Rev. 07/2025
STATE OF COLORADO
CONTRACTOR'S AGREEMENT
DESIGN/BID/BUILD (D/B/B)
(STATE FORM SC-6.21)
State Agency Insert Department or IHE’s Full Legal Name Department I.D.
Insert Department identification Contract I.D. Number Insert CMS number or other contract number Project Number Insert OSC Project Number Project Name Insert Project as as provided by the State Controller's Office Contractor Name Insert Contractor's full Legal Name including "Inc.", "LLC" etc.
Principal Representatives For the State:
Name Department Name Address Line 1 Address Line 2 City, State ZIP Email
For Contractor:
Name Company Name Address Line 1 Address Line 2 City, State ZIP Email
ATTACHMENT 1: The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23)
Rev. 07/2025 TOC
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
TABLE OF CONTENTS… ...................................................................................................... Page Table of Contents for the entire Agreement is located in THE GENERAL CONDITIONS OF THE
CONTRACTOR’S DESIGN/BID/BUILD (D/B/B) AGREEMENT (SC-6.23)
SIGNATURE PAGE ........................................................................ Error! Bookmark not defined.
RECITALS:
1 ARTICLE 1 PERFORMANCE OF THE WORK
2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
3 ARTICLE 3 TIME OF COMPLETION
4 ARTICLE 4 ESSENTIAL CONDITION
5 ARTICLE 5 CONTRACT SUM
5.1 CONDITION PRECEDENT
6 ARTICLE 6 CONTRACT DOCUMENTS
6.1 CAPITALIZED TERMS
7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation
7.2 MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples
7.3 MODIFICATION 1 OF ARTICLE 27: Labor and Wages
7.4 MODIFICATION 2 OF ARTICLE 27: Labor and Wages
7.5 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations
7.6 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion
7.7 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages
8 ARTICLE 8 NOTICE IDENTIFICATION
EXHIBIT A: CONTRACTORS BID ........................................................................................... A EXHIBIT B: PERFORMANCE BOND ....................................................................................... B EXHIBIT C: LABOR AND MATERIAL PAYMENT BOND ........................................................... C EXHIBIT D: INSURANCE CERTIFICATE(S) ............................................................................... D EXHIBIT E: BUILDING CODE COMPLIANCE POLICY ............................................................... E EXHIBIT F: STATE SALES AND USE TAX FORM ..................................................................... A
EXHIBIT G: APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP
CONTRIBUTION RATES ..................................................................................................... B
EXHIBIT H: APPRENTICESHIP UTILIZATION CERTIFICATIONS ................................................ C
SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS
Rev. 07/2025 1
SIGNATURE PAGE
THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT
Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.
In accordance with §24-30-202, C.R.S., this Contract is not valid until signed by the State Controller (or an authorized delegate) or the Title of IHE CFO per the Fiscal Rules of the individual Institution of Higher Education
Project Number/Name: Insert OSC Project Number followed by Project Name Contract ID No.: Insert CMS Number & Encumbrance Number
CONTRACTOR
INSERT: Legal Name of Contractor
By: Name & Title of Person Signing for Contractor
Date: __________________
STATE OF COLORADO
Jared S. Polis, Governor
INSERT: Name of Agency or IHE INSERT: Name & Title of Head of Agency or
IHE
By: Name & Title of Person Signing for Agency or
IHE
Date: __________________
State Buildings Program
By: Name & Title of Person Signing for State Buildings
Date: __________________
LEGAL REVIEW
Philip J. Weiser, Attorney General
By: Assistant Attorney General
Date: __________________
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD
By: Name of Agency or IHE Delegate Effective Date: __________________
Rev. 07/2025 2
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD (D/B/B) AGREEMENT
(STATE FORM SC-6.21)
Department ID: Insert Dept. Code Contract ID #: Insert Contract ID Project #:Insert Project #
1. PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Insert Department's or IHE's Full Legal Name hereinafter referred to as the State or Principal Representative, and Insert Contractor's full Legal Name including "Inc.", "LLC" etc.
having its offices at Street address, City, State and Zip Code hereinafter referred to as the Contractor.
2. EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State Controller or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Contractor for any Work performed or expense incurred before the Effective Date.
RECITALS:
WHEREAS, the Principal Representative intends to engage the services of a Contractor for the Insert Project Name as provided by the State Controller's Office hereinafter called the Project;
and
WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment.
WHEREAS, the State has Appropriated and the Principal Representative has been authorized to expend the total sum of Insert Dollar Value in Written Words Dollars ($ ) for this project including all professional services, construction/improvements, project contingencies, furnishings, movable equipment, reimbursable expenses and miscellaneous expenses; and
(WHEREAS, funds are available for only a portion of the services defined herein, as more fully described in the funding Condition Precedent clause in Article 5.1; and)
WITNESSETH, that the State of Colorado and the Contractor agree as follows:
Rev. 07/2025 3
1 ARTICLE 1 PERFORMANCE OF THE WORK
The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents for the above referenced Project.
2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
The Contractor agrees to perform the Work to the highest industry standards and to the satisfaction of the State of Colorado and its contractor in strict accordance with the provisions of the Contract Documents.
3 ARTICLE 3 TIME OF COMPLETION
The Contractor agrees to Substantially Complete the Project within calendar days from the date of the Notice to Proceed, in addition, the Contractor agrees to finally complete the Project from Substantial Completion to Final Acceptance within calendar days for a total time of completion of the entire Project of calendar days.
The Contractor shall perform the Work with due diligence to completion.
4 ARTICLE 4 ESSENTIAL CONDITION
Timely completion of the Project is an essential condition of this Agreement. The Contractor shall be subject to any liquidated damages described in Article 7.6 for failure to satisfactorily complete the Work within the time periods in Article 3 above.
5 ARTICLE 5 CONTRACT SUM
The Contractor shall be paid for the performance of this Agreement, subject to any additions and deductions as provided for in Articles 32, 34 and 35 of The General Conditions of the Construction Contract SC-6.23, the sum of INSERT DOLLAR VALUE IN
WORDS DOLLARS AND NO/100 ($ ).
Name of Document Short Description of Work/Date Dollar Amount Base Bid Amount Base Bid Alt. # Alt. #
Total Contract Sum -$
5.1 CONDITION PRECEDENT
Rev. 07/2025 4
(At the time of the execution of this Agreement, there are sufficient funds budgeted and appropriated to compensate the Contractor only for performance of the services through and including Insert the project phases that have been fully funded Therefore, it shall be a Condition Precedent to the Contractor’s performance of the remaining services and the State's liability to pay for such performance, sufficient funding must be appropriated and made available to the Principal Representative for the Project prior to and, as a further Condition Precedent, a written Amendment is entered into in accordance with the State of Colorado Fiscal Rules, stating that additional funds are lawfully available for the project. If either Condition Precedent is not satisfied by , the Contractor’s obligation to perform services for Insert the scope pf work or phases that will be completed in the future and the State's obligation to pay for such service is discharged without liability to each other. If funding is eventually made available after , the Contractor has no right to perform services under of this Agreement and the state has no right to require the Architect/Engineer to perform the said services.)
6 ARTICLE 6 CONTRACT DOCUMENTS
The Contract Documents, as enumerated in Article 1.1 of The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23), (the “General Conditions”).
The Contract Documents, including the General Conditions, are all essential parts of this Agreement and are fully incorporated herein.
6.1 CAPITALIZED TERMS
Capitalized terms used herein and not defined shall have the meanings ascribed to them in The General Conditions of Design/Bid/Build (D/B/B) Agreement (SC-6.23)
7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
The provisions of this Article 7 alter or enlarge upon the following Articles (the General Conditions of the Contractor’s Design/Bid/Build Agreement SC-6.23):
7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation.
If the box below is marked, certification of apprenticeship utilization is required for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical and plumbing work on the project.
☒ ______ Principal Representative initial
7.2 MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples
If the box below is marked, the Buy Clean Colorado Act, §24-92-117, C.R.S., shall be applicable to the Project. The Contractor is responsible for submitting Environmental Product Declaration (EPD) information for all eligible materials to be used on the project.
☐ ______ Principal Representative initial
7.3 MODIFICATION 1 OF ARTICLE 27: Labor and Wages
Rev. 07/2025 5
If the box below is marked, the Federal Davis-Bacon Act shall be applicable to the Project.
The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
☐ ______ Principal Representative initial
7.4 MODIFICATION 2 OF ARTICLE 27: Labor and Wages
If the box below is marked, the State prevailing wage statute shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
☐ ______ Principal Representative initial
7.5 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations
If the box below is marked, and initialed by the State as noted, the requirement to participate in facilitated negotiations shall be deleted from this Contract. Article 39, Non- Binding Dispute Resolution – Facilitated Negotiations, shall be deleted in its entirety and all references to the right to the same where ever they appear in the contract shall be similarly deleted.
The box may be marked only for projects with an estimated value of less than $500,000.
☒ ______ Principal Representative initial
7.6 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion
If the box below is marked the six month guarantee inspection is not required.
☐ ______ Principal Representative initial
7.7 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages
If an amount is indicated immediately below, liquidated damages shall be applicable to this Project as, and to, the extent shown below. Where an amount is indicated below, liquidated damages shall be assessed in accordance with and pursuant to the terms of The General Conditions of the Design/Bid/Build Agreement Article 46, Time of Completion And Liquidated Damages, in the amounts and as here indicated. The election of liquidated damages shall limit and control the parties right to damages as the State’s sole and exclusive remedy for delay.
7.7.1 Inability To Use The Project
For the inability to use the Project, for each day after the number of calendar days specified in the Contractor’s bid for the Project and the Agreement for achievement of Substantial Completion, until the day that the Project has achieved Substantial Completion and the Notice of Substantial Completion is issued, the Contractor agrees that an amount equal Insert dollar value in words Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum
Rev. 07/2025 6 for any deficiency, if amounts on account thereof are deducted from remaining amounts due, but amounts remaining are insufficient to cover the entire assessment.
7.7.2 Damages Related to Extended Closeout
For damages related to or arising from additional administrative, technical, supervisory and professional expenses related to and arising from the extended closeout period, for each day in excess of the number of calendar days specified in the Contractor’s bid for the Project and the Agreement to finally complete the Project as defined by the issuance of the Notice of Final Acceptance (after the issuance of the final Notice of Substantial Completion), the Contractor agrees that an amount equal to Insert dollar value in words Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due but amounts remaining are insufficient to cover the entire assessment.
8 ARTICLE 8 NOTICE IDENTIFICATION
All Notices pertaining to this Agreement and the General Conditions (SC-5.23) or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing.
NOTICE TO PRINCIPAL REPRESENTATIVE:
Insert Name of Individual acting on the PR behalf Insert Street Address City, State Zip Code Insert email address
With copies to State Buildings Program (or Delegate) Insert Name of Individual acting on OSA/SBP behalf Insert Street Address City, State Zip Code Insert email address
NOTICE TO CONTRACTOR:
Insert Name of Individual acting on the contractor behalf…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .