This is a set of detailed construction drawings for the Communication Tower Electrical and Fiber Improvement project at the Plant City Water Reclamation Facility (WRF) in Plant City, Florida, prepared by RK&K Engineers in March 2025. The project encompasses comprehensive electrical and telecommunications infrastructure upgrades required due to the planned demolition of an existing Public Works Building housing critical communication tower systems. The scope of work includes installation of a new 120/240V, single-phase electrical service with a 9kVA standby diesel generator equipped with an integral automatic transfer switch, relocation of DFS and MDS radio panels into a new NEMA 4X stainless steel radio cabinet, installation of new fiber optic ductbanks with concrete encasement, and construction of telecommunications rooms in the Warehouse and Maintenance Buildings. The drawings detail 13 sheets of specifications covering electrical demolition and proposed site plans, electrical schematic diagrams, one-line electrical diagrams, communication network configurations, grounding systems, and security fence specifications. The project requires a completely new copper clad steel grounding system with a minimum of three ground rods spaced 10 feet apart, new conduit routing from utility poles to metering locations, and coordination with the utility company for service disconnection and installation. Critical infrastructure notes specify that fiber optic communications from the tower to the Maintenance Building must remain operational during construction, with new ductbanks installed and tested before removal of existing systems, and the city will temporarily install microwave communications between buildings during the transition phase.

The electrical design provides for 2-12 pair single-mode fiber for IT network and 2-12 pair multimode fiber for operational technology (OT) network installations, with fiber optic patch panels mounted 48 inches above finished floor in telecommunications rooms and exothermically welded ground connections throughout. The project includes installation of transient voltage surge suppressors (TVSS), load centers with scheduled circuit breaker configurations, uninterruptible power supplies (UPS) with redundant 24VDC power supplies, and specialized grounding details for equipment, fence posts, and the communication tower ground ring. A 6-foot privacy chain-link security fence with white plastic slats and double swing gates is specified to enclose the generator and radio cabinet area, with concrete pad foundations detailed for both structures. The contractor must submit detailed conduit routing plans, ground rod locations, and service coordination schedules to the engineer for approval prior to installation, and is prohibited from using existing station power supplies without explicit owner authorization. All wiring must be installed in conduit with continuous conductors from source to load, with splices only permitted where approved by the owner or engineer, and all work must comply with National Electrical Code (NEC) standards and utility company requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

DATE:

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

N O

R

TH

PLANT CITY

WATER RECLAMATION FACILITY (WRF)

COMMUNICATION TOWER UPGRADE

PLANT CITY, FL

SITE

SHEET INDEX

DRAWING NO. SHEET NO. SHEET TITLE

1 G1 COVER SHEET

2 G2 KEY PLAN, LEGEND AND ABBREVIATIONS

3 E1 ELECTRICAL DEMOLITION SITE PLAN

4 E2 ELECTRICAL PROPOSED SITE PLAN

5 E3 ELECTRICAL PROPOSED SITE PLAN

6 E4 ELECTRICAL PROPOSED SITE PLAN

7 E5 ELECTRICAL DEMOLITION AND IMPROVEMENT PARTIAL PLANS

8 E6 EXISTING COMMUNICATION NETWORK

9 E7 PROPOSED COMMUNICATION NETWORK

10 E8 COMMUNICATIONS SCHEMATIC AND DETAIL

11 E9 ELECTRICAL ONE-LINE DIAGRAM, SCHEDULE AND TELECOMM. ROOM PLANS

12 ED1 ELECTRICAL AND COMMUNICATION DETAILS

13 ED2 ELECTRICAL GROUNDING DETAILS

SITE

N O

R

TH

SCALE: 1"=500'

SITE LOCATION MAP

SCALE: 1"=2000'

SITE VICINITY MAP

1"=2,000' 2,000' 0 2,000' 4,000'1,000'1000'500'500' 0

1"=500'

DF

MJR

AS SHOWN

MJR

COVER SHEET

G1

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\SUPPORT\ 22269-PLANTCITY-CT-G1-COVER_SHEET.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\SUPPORT\ 22269-PLANTCITY-CT-G1-COVER_SHEET.DWG 22269-PLANTCITY-CT-G1-COVER_SHEET.DWG 22269-PLANTCITY-CT-G1-COVER_SHEET.DWG 5/14/2025 2:05:24 PM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:G1 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:G1---- Plot Scale 1=1 Plot By:MROBINSON Layout:G1 Plot Scale 1=1 Plot By:MROBINSON Layout:G1MROBINSON Layout:G1 Layout:G1G1 dfoote Dean PE Signature dfoote Date dfoote Reference Dot dfoote Reference Dot

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

N O

R

TH

NOT TO SCALE

KEY PLAN

E3

E2

E1

ABBREVIATIONS

A AMPERE

AFF ABOVE FINISHED FLOOR

ATS AUTOMATIC TRANSFER SWITCH

AUX AUXILIARY

C CONDUIT

CT CURRENT TRANSFORMER

CKT CIRCUIT

CB CIRCUIT BREAKER

D DAMPER

DN DOWN

DWG DRAWING

EF EXHAUST FAN

FOPP FIBER OPTIC PATCH PANEL

FVNR FULL VOLTAGE NON-REVERSING

GRD,G GROUND

HP HORSEPOWER

HOA HAND-OFF-AUTOMATIC

KVA KILO-VOLT-AMPERES

LO LOCKOUT

LOR LOCKOUT RELAY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MFGR MANUFACTURER

MH MOUNTING HEIGHT

MOD MOTOR OPERATED DAMPER

NEC NATIONAL ELECTRICAL CODE

No.,# NUMBER

OIT OPERATOR INTERFACE TERMINAL

OHE OVERHEAD ELECTRIC

OL OVERLOAD

P POLE

PCP PUMP CONTROL PANEL

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

PFC POWER FACTOR CORRECTION

RVSS REDUCED VOLTAGE SOLID-STATE

SEC SECOND

SF SUPPLY FAN

SW SWITCH

TGB TELECOMMUNICATION GROUNDING BUSBAR

TYP TYPICAL

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR

UGE UNDERGROUND ELECTRIC

UGT UNDERGROUND TELEPHONE

V VOLTS

WP WEATHER PROOF

XP EXPLOSION PROOF

GENERAL NOTES:

1. A GREEN INSULATED GROUNDING CONDUCTOR SHALL BE PROVIDED IN EVERY CONDUIT RUN TO FORM A CONTINUOUS GROUNDING

SYSTEM FROM PANEL AND TO ALL UTILIZATION, CONTROL AND SWITCHING EQUIPMENT.

2. ALL WIRING SHALL BE IN CONDUIT UNLESS WRITTEN APPROVAL IS GIVEN BY ENGINEER.

3. WIRE AND CABLE SHALL BE CONTINUOUS FROM SOURCE TO LOAD. SPLICES SHALL ONLY BE MADE WHERE APPROVED BY THE

OWNER/ENGINEER.

4. CONTRACTOR SHALL SUBMIT DETAILED CONDUIT ROUTING PLANS SHOWING ALL CONDUITS FOR APPROVAL PRIOR TO INSTALLATION.

5. THE CONTRACTOR SHALL NOT USE THE EXISTING STATION POWER SUPPLY FOR ANY REASON UNLESS SPECIFIC APPROVAL IS

GRANTED BY THE OWNER IN ADVANCE.

6. CONTRACTOR SHALL COORDINATE ANY CROSSING OF EXISTING/PROPOSED UTILITIES ALONG DUCTBANK ROUTING AND SHALL SUBMIT PROPOSED PROFILE INFORMATION TO THE ENGINEER FOR APPROVAL PRIOR TO INSTALLATION.

SERVICE GROUND NOTE:

A COMPLETELY NEW GROUNDING SYSTEM SHALL BE PROVIDED FOR THE JOB SITE. GROUND RODS SHALL BE COPPER CLAD STEEL.

THERMO-WELD CONNECTORS SHALL BE USED. PROVIDE ADDITIONAL GROUND RODS AS REQUIRED TO OBTAIN RESISTANCE LOWER THAN ALLOWABLE MAXIMUM SPECIFIED RESISTANCE UNDER DRY CONDITIONS (NO RAINFALL WITHIN 72 HOURS OF TEST). PROVIDE A MINIMUM OF 3 GROUND RODS, EVENLY SPACED A MINIMUM OF 10 FEET APART. CONTRACTOR SHALL SUBMIT PROPOSED GROUND ROD LOCATIONS FOR APPROVAL PRIOR TO INSTALLATION AS PART OF THE REQUIRED CONDUIT ROUTING SUBMITTAL.

SERVICE NOTES:

1. CONTRACTOR TO COORDINATE WITH UTILITY COMPANY FOR REMOVAL OF EXISTING METERING, AND INSTALLATION OF NEW

METERING. CONTRACTOR TO REMOVE PORTIONS OF SECONDARY CONDUITS IN COORDINATION WITH UTILITY COMPANY AND

INSTALL NEW CONDUITS FROM POLE TO METER AS SHOWN.

2. CONTRACTOR SHALL PROVIDE ALL WORK REQUIRED BY UTILITY COMPANY TO INSTALL SERVICE IN ACCORDANCE WITH UTILITY COMPANY STANDARDS INCLUDING CONDUIT, PADS, CT CABINETS, GROUNDING, METER SOCKETS, VAULTS, ETC.

3. CONTRACTOR SHALL CLOSELY COORDINATE THE EXECUTION AND SCHEDULING OF ALL WORK WITH UTILITY COMPANY AND SHALL

COMPLY WITH ALL APPLICABLE UTILITY COMPANY STANDARDS.

4. EXACT LOCATIONS OF METERING TO BE COORDINATED WITH AND APPROVED BY PLANT CITY, THE ENGINEER AND UTILITY COMPANY

PRIOR TO INSTALLATION.

5. CONTRACTOR SHALL GIVE THE PLANT CITY AND ENGINEER A MINIMUM OF 3 WORKING DAYS NOTICE FOR ANY MEETING SCHEDULED

WITH UTILITY COMPANY.

6. WITHIN 10 DAYS OF THE AWARD OF CONTRACT, THE CONTRACTOR SHALL SUBMIT HIS APPLICATION TO UTILITY COMPANY FOR TEMPORARY SERVICES REQUIRED FOR THE CONSTRUCTION TRAILER AND CONSTRUCTION ACTIVITIES, AND PROVIDE A COPY OF

THE APPLICATION TO PLANT CITY.

7. WITHIN 30 DAYS OF NOTICE TO PROCEED, THE CONTRACTOR SHALL SUBMIT ALL REQUIRED DATES FOR SERVICE DISCONNECTION

AND NEW PERMANENT SERVICE INSTALLATION TO THE ENGINEER.

8. ALL UTILITY WORK PERFORMED BY THE CONTRACTOR OUTSIDE THE DEFINED LIMIT OF DISTURBANCE SHALL BE PERFORMED WITHIN

THE EXISTING UTILITY EASEMENTS AND/OR RIGHTS-OF-WAY.

9. ALL COORDINATION WITH UTILITY COMPANY IS THE RESPONSIBILITY OF THE CONTRACTOR.

ELECTRICAL LEGEND

SYMBOL DESCRIPTION

S

LS

MOD

LIGHTING FIXTURE - CEILING OR STEM MOUNTED - TYPE

AS INDICATED

LIGHTING FIXTURE - WALL MOUNTED - TYPE AS

INDICATED.

BATTERY POWERED EMERGENCY UNIT WITH INTEGRAL

CHARGER - No. OF HEADS AS INDICATED

EXIT SIGN

SWITCH - SINGLE POLE OR AS INDICATED BY SUBSCRIPT

- MH 48" AFF

DUPLEX GFI RECEPTACLE - 20A, 125V - MH 48" AFF

UNLESS NOTED OTHERWISE; PROVIDE WEATHERPROOF

ENCLOSURE

SIMPLEX RECEPTACLE - 20A, 125V - MH 48" AFF UNLESS

NOTED OTHERWISE. PROVIDE WEATHERPROOF

ENCLOSURE

CIRCUIT BREAKER

JUNCTION BOX - SIZE PER NEC OR AS INDICATED

PANELBOARD - TYPE AS NOTED - MH 6'-6" AFF TO TOP

CONDUIT - ON CEILING OR WALLS

CONDUIT - UNDER GROUND

HOMERUN TO PANEL - No. OF ARROWS INDICATES No. OF CIRCUITS AND No. OF CROSSLINES INDICATES No. OF #12

CONDUCTORS (NOT INCLUDING GROUND) - WHERE NO

CROSSLINES APPEAR 3-#12 CONDUCTORS ARE IMPLIED

MOTOR - HORSEPOWER AS NOTED

DISCONNECT SWITCH - TYPE AS INDICATED

MAGNETIC STARTER/CONTACTOR

LIMIT SWITCH

HATCH SWITCH

THERMOSTAT

EMERGENCY STOP PUSHBUTTON - MAINTAINED

FLOOD SENSOR

MOTOR OPERATED DAMPER

FREEZESTAT

PHONE SERVICE

EXISTING COMMUNICATION DUCTBANK

EXISTING COMMUNICATION HANDHOLE

PROPOSED COMMUNICATION DUCTBANK

PROPOSED COMMUNICATION HANDHOLE

GROUND ROD

EXOTHERMICALLY WELD JOINTS

SX

J

T

F

HS

A

M 25

DF

MJR

AS SHOWN

MJR

KEY PLAN, LEGEND AND ABBREVIATIONS

G2

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\SUPPORT\ 22269-PLANTCITY-CT-G2-KEY_PLAN.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\SUPPORT\ 22269-PLANTCITY-CT-G2-KEY_PLAN.DWG 22269-PLANTCITY-CT-G2-KEY_PLAN.DWG 22269-PLANTCITY-CT-G2-KEY_PLAN.DWG 5/14/2025 2:05:39 PM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:G2 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:G2---- Plot Scale 1=1 Plot By:MROBINSON Layout:G2 Plot Scale 1=1 Plot By:MROBINSON Layout:G2MROBINSON Layout:G2 Layout:G2G2 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

N O

R

TH

DF

MJR

AS SHOWN

MJR

ELECTRICAL SITE DEMOLITION PLAN

E1

MATCH LINE - SHEET E2

1"=20'

20' 0 20' 40'10'SCALE: 1"=20'-0"

ELECTRICAL SITE DEMOLITION PLAN

WAREHOUSE

BUILDING

SANITATION

BUILDING

MAINTENANCE

BUILDING

COMMUNICATION TOWER

AREA. SEE PARTIAL PLANS

ON E4 FOR DEMOLITION

AND PROPOSED LAYOUT.

N

M O

BL

EY

S

T

SPOONER DR

FIBER OPTIC PATCH CORD IN A 1" DIRECT

BURIED PVC CONDUIT (SEE NOTE 1)

FIBER OPTIC PATCH

CORD IN A 1" DIRECT

BURIED PVC CONDUIT

EXISTING DUCT BANK (SEE NOTE 2)

NOTES:

1. COMMUNICATIONS FROM TOWER TO MAINTENANCE BUILDING

MUST REMAIN IN SERVICE. DO NOT DEMOLISH DUCT BANK UNTIL

NEW DUCT BANK HAS BEEN INSTALLED AND FIBER OPTIC CABLE

HAS BEEN INSTALLED, TESTED AND OPERATIONAL.

2. IT NETWORK MUST REMAIN OPERATIONAL DURING

CONSTRUCTION FOR MAINTENANCE BUILDING, WAREHOUSE AND

SANITATION BUILDING. THE CITY WILL TEMPORARILY INSTALL

MICROWAVE COMMUNICATIONS BETWEEN THESE BUILDINGS AND

THE NEW SANITATION BUILDING DURING CONSTRUCTION.

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:26 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E1 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E1---- Plot Scale 1=1 Plot By:MROBINSON Layout:E1 Plot Scale 1=1 Plot By:MROBINSON Layout:E1MROBINSON Layout:E1 Layout:E1E1 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

FOR FIBER

OPTIC CABLE

FOR FIBER

OPTIC CABLE

FOR POWER

SCALE:

DATE:

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

N O

R

TH

DF

MJR

AS SHOWN

MJR

ELECTRICAL SITE PROPOSED PLAN

E2

MATCH LINE - SHEET E2

1"=20'

20' 0 20' 40'10'SCALE: 1"=20'-0"

ELECTRICAL SITE PROPOSED PLAN

WAREHOUSE

BUILDING

SANITATION

BUILDING

MAINTENANCE

BUILDING

COMMUNICATION TOWER

AREA. SEE PARTIAL PLANS

ON E4 FOR DEMOLITION

AND PROPOSED LAYOUT.

N

M O

BL

EY

S

SPOONER DR

FIBER OPTIC PATCH

CORD IN A 1" DIRECT

BURIED PVC CONDUIT

PROPOSED WAREHOUSE

BUILDING TELECOMM. ROOM

PROPOSED HANDHOLE (TYP OF 3)

PROPOSED MAINTENANCE

BUILDING TELECOMM. ROOM

2-12 PAIR SINGLE MODE FIBER FOR IT NETWORK

AND 2-12 PAIR MUTLTMODE FIBER FOR OT NETWORK

EXISTING FIBER

OPTIC DUCT BANK

SECTION A-ASECTION A-A

SECTION A-A

SECTION B-B

CONTRACTOR SHALL INTERCEPT

EXISTING COMMUNICATIONS DUCT

BANK AND SET NEW HANDHOLE

EXISTING HANDHOLES

AutoCAD SHX Text SIZE No. 57 STONE

AutoCAD SHX Text 3"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

SCHEDULE 40 PVC DUCT, TYPICAL

AutoCAD SHX Text

YELLOW MARKER TAPE 12" BELOW FINISHED GRADE

AutoCAD SHX Text

FINISHED GRADE

AutoCAD SHX Text

TYPICAL CONCRETE ENCASED DUCTBANK DETAIL

AutoCAD SHX Text

36" MIN OR

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

%%U SECTION A-A

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

%%U SECTION B-B

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text 4"

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:27 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E2 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E2---- Plot Scale 1=1 Plot By:MROBINSON Layout:E2 Plot Scale 1=1 Plot By:MROBINSON Layout:E2MROBINSON Layout:E2 Layout:E2E2 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

NORTH

DF

MJR

AS SHOWN

MJR

ELECTRICAL SITE PROPOSED PLAN

E3

M

AT

C H

L

IN

E

- S

H

EE

T E1

M

AT

C H

L

IN

E

- S

H

EE

T E3

1"=20'

20' 0 20' 40'10'SCALE: 1"=20'-0"

ELECTRICAL SITE IMPROVEMENT PLAN

MAINTENANCE

BUILDING

NEW SANITATION

BUILDING

SPOONER DR

EXISTING FIBER

OPTIC DUCT BANK EXISTING HANDHOLES EXISTING FIBER

OPTIC DUCT BANK

EXISTING FIBER

OPTIC DUCT BANK

EXISTING FIBER

OPTIC DUCT BANK

EXISTING HANDHOLE

EXISTING ELECTRICAL/DATA ROOM

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:29 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E3 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E3---- Plot Scale 1=1 Plot By:MROBINSON Layout:E3 Plot Scale 1=1 Plot By:MROBINSON Layout:E3MROBINSON Layout:E3 Layout:E3E3 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

N O

R

TH

DF

MJR

AS SHOWN

MJR

ELECTRICAL SITE PROPOSED PLAN

E4

MATCH LINE - SHEET E2

1"=20'

20' 0 20' 40'10'SCALE: 1"=20'-0"

ELECTRICAL SITE IMPROVEMENT PLAN

OPERATIONS

BUILDING

VICTORIA AVE

PL

AN

AV

E

PL

AN

AV

E

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:30 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E4 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E4---- Plot Scale 1=1 Plot By:MROBINSON Layout:E4 Plot Scale 1=1 Plot By:MROBINSON Layout:E4MROBINSON Layout:E4 Layout:E4E4 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

GENERATOR

DISCONNECT

GENERATOR AUTOMATIC

TRANSFER SWITCH

TVSS

PANELBOARD

SERVICE DISONNECT

TVSS

METER

CT CABINET

AC UNIT

ANTENNA TOWER

DFS RADIO

MDS RADIO

GENERATOR

RELOCATED

GENERATOR

CONTRACTOR TO RUN

NEW CONDUCTORS IN A

3" EXPOSED SCHEDULE

80 PVC CONDUIT

CONCRETE PAD

GATE

FENCE

SEE NOTE 1

SANITATION BUILDING

(SEE NOTE 2)

UTILITY POLE

(APPROXIMATELY

80FT FROM METER) UTILITY POLE

REPLACE FENCE, POSTS,

GATE AND HARDWARE WITH

PRIVACY CHAIN LINK FENCE

PROPOSED FENCE

SECTION APPROX. 3'

FROM BUILDING

9kVA, 120/240V, SINGLE PHASE STANDBY

DIESEL GENERATOR WITH INTERGRAL

AUTOMATIC TRANSFER SWITCH (SEE NOTE 4)

ANTENNA TOWER

RADIO CABINET

(SEE NOTE 4)

EXISTING

RELOCATED

GENERATOR

SERVICE DISCONNECTUTILITY COMPANY METER

SEE NOTE 3

SERVICE GROUND

ROD (TYP OF 3)

TOWER GROUND ROD

GENERATOR GROUND ROD

FENCE GROUND ROD (TYP)

POST MOUNTED

RECEPTACLE. SEE

DETAIL ON ED1

LOAD CENTER "A"

MDS RADIO / DFS RADIO

STACK MOUNTED

BATTERY

ENCLOSURE

EXISTING TOWER

GROUND RING

EXTEND COAXIAL FROM TOWER INTO

RADIO CABINET USING APPROPRIATE RF

CONNECTORS AND WATERPROOFING KIT

SCALE:

DATE:

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

DF

MJR

AS SHOWN

MJR

ELECTRICAL DEMOLITION AND

IMPROVEMENT PARTIAL SITE PLANS

E5

SCALE: 3/8"=1'-0"

ELECTRICAL DEMOLITION PARTIAL PLAN 024" 12" 2' 4' 6'

3/8"=1'-0" SCALE: 3/8"=1'-0"

ELECTRICAL IMPROVEMENT PARTIAL PLAN

NOTES:

1. TEMPORARILY RELOCATE GENERATOR OUTSIDE OF FENCED IN AREA TO ALLOW ROOM FOR

NEW EQUIPMENT. GENERATOR WILL BE REMOVED BY OWNER WHEN BUILDING IS DEMOLISHED.

2. CITY IS PLANNING TO DEMOLISH SANITATION BUILDING AFTER THE NEW SANITATION BUILDING

IS COMPLETED.

3. REMOVE VEGETATION WITHIN FENCED IN AREA. INSTALL WEED GUARD FABRIC AND COVER

WITH CRUSHED STONE.

4. PROVIDE CONCRETE PAD UNDER GENERATOR AND RADIO CABINET, SEE DETAIL XX.

5. VERIFY LOCATION OF TOWER GROUND RING AND ADJUST LOCATION OF RADIO CABINET TO NOT

DISTURB RING. NEW GROUND SYSTEM SHALL BE BONDED TO TOWER GROUNDING SYSTEM.

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:34:02 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E5 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E5---- Plot Scale 1=1 Plot By:MROBINSON Layout:E5 Plot Scale 1=1 Plot By:MROBINSON Layout:E5MROBINSON Layout:E5 Layout:E5E5 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

DF

MJR

AS SHOWN

MJR

EXISTING COMMUNICATION NETWORK

E6

IT FOPP

CLOSET

WAREHOUSE BLDG

FOPP

TELECOMM. ROOM

NEW SANITATION BLDG

FOPP

OFFICE

FOPP

SECOND FLOOR ATTIC

SANITATION BLDG

FOPP

TELECOMM. ROOM

OPERATIONS BLDG

FO(IT) FO(IT) FO(IT) FO(IT) FO(IT) FO(IT)

FO(IT) FO(IT) FO(IT) FO(IT)

FO(IT)

FO

(IT

FO(IT)FO(IT)FO(IT)

FO

(IT

FO

(IT

FO

(IT

FO(IT)FO(IT)FO(IT)

FO

(IT

FO

(IT

FO

(IT

FO(IT) FO(IT) FO(IT)

FO

(IT)

FO

(IT)

FO

(IT)

FO

(IT)MAINTENANCE BLDG

FO

(IT)

FO

(IT)

FO

(IT)

FO

(IT)

FO(IT) FO(IT) FO(IT)

FO(IT)

FO(IT)

FO(IT)

FO(IT)

FO

(IT

FO(IT)

FO(IT)

FO(IT)

FO(IT)

FO

(IT

FO(IT) FO(IT) FO(IT)

FO

(IT)

FO

(IT)

FO

(IT)

FO

(IT)

NOTES:

1. REMOVE FIBER OPTIC CABLE, UNDERGROUND CONDUITS AND PULL BOXES TO SOURCE.

2. REMOVE FIBER OPTIC CABLE FROM SANITATION BUILDING TO OPERATIONS BUILDING'S

TELECOMMUNICATION ROOM.

ANTENNA (TYP OF 2)

DFS RADIO PANEL

TO BE RELOCATED

IN NEW CABINET

MDS RADIO PANEL

TO BE RELOCATED

IN NEW CABINET

COMMUNICATION TOWER

FIBER OPTIC PATCH CORD

IN A 1" DIRECT BURIED PVC

CONDUIT TO BE REMOVED

12 STRAND SINGLE MODE FIBER

OPTIC CABLE FOR IT NETWORK

PULLBOX TYPICAL

12 STRAND MULTIMODE

FIBER OPTIC CABLE FOR

IT AND OT NETWORKS

12 STRAND MULTIMODE

FIBER OPTIC CABLE FOR

IT AND OT NETWORKS

NOTE 2

12 STRAND MULTIMODE FIBER

OPTIC CABLE FOR IT NETWORK

12 STRAND MULTIMODE

FIBER OPTIC CABLE FOR

IT AND OT NETWORKS

12 STRAND SINGLE MODE FIBER

OPTIC CABLE FOR IT NETWORK

FO(IT)

FO(IT)

FO(IT)

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:32 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E6 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E6---- Plot Scale 1=1 Plot By:MROBINSON Layout:E6 Plot Scale 1=1 Plot By:MROBINSON Layout:E6MROBINSON Layout:E6 Layout:E6E6 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

OT FOPP

IT FOPP

TELECOMM. ROOM

NEW SANITATION BLDG

IT FOPP

TELECOMM. ROOM

FOPP

FOPP

TELECOMM. ROOM

OPERATIONS BLDG

FO(IT) FO(IT) FO(IT) FO(IT)

FO

(O

T)

FO

(O T)

MAINTENANCE BLDG

FO

(O

T)

FO

(O T)

FO

(O

T)

FO

(O T)

FO(OT) FO(OT) FO(OT)

FO(OT)

FO(OT)

FO(OT)

FO(IT)

FO(IT)

FO(IT)

FO

(IT

SCALE:

DATE:

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

DF

MJR

AS SHOWN

MJR

PROPOSED COMMUNICATION NETWORK

E7

TELECOMM. ROOM

WAREHOUSE BLDG

FO(IT) FO(IT) FO(IT)

FO

(IT)

FO

(IT)

FO

(IT)

FO

(IT)

ANTENNA (TYP OF 2)

DFS RADIO PANEL

TO BE RELOCATED

IN NEW CABINET

MDS RADIO PANEL

TO BE RELOCATED

IN NEW CABINET

COMMUNICATION TOWER

EXISTING 12 STRAND SINGLE MODE

FIBER OPTIC CABLE FOR IT NETWORK

EXISTING PULLBOX TYPICAL

PROPOSED 12 STRAND MULTIMODE

FIBER OPTIC CABLE FOR OT NETWORKS

PROPOSED 12 STRAND MULTIMODE FIBER

OPTIC CABLE FOR OT NETWORKS

FO

(IT)

FO(IT) FO(IT) FO(IT) FO(IT)

FO

(IT)

FO

(IT)

FO(OT)

FO(IT) FO(IT) FO(IT) FO(IT)

FO(OT) FO(OT) FO(OT) FO(OT)

FO(IT) FO(IT) FO(IT) FO(IT)

FO

(O

T)

FO(IT)

OT FOPP

FO(OT)

FO(IT)

RADIO CABINET

PROPOSED PULLBOX

(TYP OF 3)

PROPOSED 12 STRAND SINGLE MODE

FIBER OPTIC CABLE FOR IT NETWORK

EXISTING 12 STRAND SINGLE MODE

FIBER OPTIC CABLE FOR IT NETWORK

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:33 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E7 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E7---- Plot Scale 1=1 Plot By:MROBINSON Layout:E7 Plot Scale 1=1 Plot By:MROBINSON Layout:E7MROBINSON Layout:E7 Layout:E7E7 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

FINISHED GRADE

3/4" CHAMFER, ALL

AROUND (TYP)

ALUMINUM TWO-DOOR PAD MOUNTED

NEMA 4X ENCLOSURE

6' -0

6'-0"

POWER COMPANY METER

AND SERVICE DISCONNECT

HEATER

UPS

DFS RADIO

MDS RADIO

LED LIGHT FIXTURE

WITH DOOR SWITCH

LOAD CENTER "A"

LEFT INTERIOR

SCALE: 3/4"=1'-0"

RADIO CABINET ELEVATION

FOPP

LOAD CENTER "A"

FOPP

GFCI RECEPTACLE

GFCI RECEPTACLE

GUSSET (TYP OF 2)

BATTERIES

STANDOFF (TYP)

SUN SHIELD

EXHAUST GRILL

OWNER WILL FURNISH

SPARE RADIOS FOR

INSTALLATION IN CABINET

SUPPLY FAN WITH FILTER

GRILL, AND THERMOSTAT

3 PORT ENTRANCE PANEL

BACKPLATE PLATES

SCALE:

DATE:

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

15A

15A INTERIOR PANEL LIGHT WITH

DOOR SWITCH

20A

TVSS

20A

15A

UPS

IN

OUT

15A

UTILITY

PWR

TESTUPS

XOO

OXO

XOX

25A

10A-1P

L N

24VDC

POWER

SUPPLY

NO. 1

FAILURE ALARM

TO 24VDC

INPUT MODULE

10A-1P

L N

24VDC

POWER

SUPPLY

NO. 2

FAILURE ALARM

TO 24VDC

INPUT MODULE

B+ B-

24VDC

POWER

SUPPLY

REDUNDANCY

MODULE

A+ A-

ENCLOSURE

LIGHTING

INTERIOR PANEL

CONVENIENCE OUTLET

GFI DUPLEX RECEPTACLE

TVSS

(120V SERVICE SITE)

L2L1 N G

BATTERY 1

BATTERY 2

120VAC UPS POWER

LOCATED IN

PANELBOARD

NL

DF

MJR

AS SHOWN

MJR

COMMUNICATION SCHEMATIC AND DETAIL

E8

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:34 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E8 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E8---- Plot Scale 1=1 Plot By:MROBINSON Layout:E8 Plot Scale 1=1 Plot By:MROBINSON Layout:E8MROBINSON Layout:E8 Layout:E8E8 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

SCALE: 3/4"=1'-0"

WAREHOUSE BUILDING TELECOMM. ROOM

TGB MOUNTED 16" AFF. RUN #6 GROUND WIRE

TO SERVICE EQUIPMENT GROUNDING BUSBAR.

3/4"x4'x8" FIRE RETARDANT

PLYWOOD BACKERBOARD

OVERHEAD CABLE TRAY

OPEN 19" RACK BOLTED TO

FLOOR (FURNISHED BY OWNER)

PROVIDE VERTICAL CABLE TRAY

MOUNTED TO PLYWOOD BACKBOARD

FIBER OPTIC PATCH

PANEL MOUNTED 48" AFF

DUCT BANK ENTRANCE INTO

ROOM FOR FIBER OPTIC CABLE

SCALE: 3/4"=1'-0"

MAINTENANCE BUILDING TELECOMM. ROOM

TGB MOUNTED 16" AFF. RUN #6 GROUND WIRE

TO SERVICE EQUIPMENT GROUNDING BUSBAR.

3/4"x4'x8" FIRE RETARDANT

PLYWOOD BACKERBOARD

OVERHEAD CABLE TRAY

OPEN 19" RACK BOLTED TO

FLOOR (FURNISHED BY OWNER)

PROVIDE VERTICAL CABLE TRAY

MOUNTED TO PLYWOOD BACKBOARD

FIBER OPTIC PATCH

PANELS MOUNTED 48" AFF

SCALE: 1/2"=1'-0"

NEW SANITATION BUILDING ELEC. IT-DATA ROOM

EXISTING DUCT UNDER SLAB

EXISTING IT RACK

FIBER OPTIC PATCH PANEL MOUNTED 48" AFF

EXISTING GROUNDING BUSBAR

3-#3 & 1-#8 GROUND

3-#3 & 1-#8 GROUND

IN 2" PVC CONDUIT

G

STANDBY GENERATOR WITH INTEGRAL

AUTOMATIC TRANSFER SWITCH

240V, 100A, SINGLE PHASE ENCLOSED CIRCUIT

BREAKER (SERVICE ENTRANCE RATED)

NEMA 4X STAINLESS STEEL RADIO CABINET

SCALE:

DATE:

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

LOAD CENTER "A" SCHEDULE

VOLTAGE: 120/240V, SINGLE PH, 3W

MAIN BUS BARS AND LUGS: 125A

MAIN BREAKER: 100A

PANEL TYPE: NEMA 3R

MIN. A.I.C. RATING: 22,000

LOCATION: STANCHION MOUNTED

LOADS SERVED WIRE

SIZE COND

LOAD KVA

POLE BKR

TRIP

PHASE

BKR

TRIP POLE

LOAD KVA

COND WIRE

SIZE LOADS SERVED

A B A B A B

TVSS 12 0,0 2 20 1 2 20 1 .06 12 CABINET LIGHT

0.0 3 4 20 1 .18 12 CABINET RECEPTACLE

CABINET UPS 12 .18 1 20 5 6 20 1 0.0 SPARE

SPARE 0.0 1 20 7 8 20 1 0.0 SPARE

SPARE 0.0 1 20 9 10 20 1 0.0 SPARE

SPACE 0.0 11 12 SPACE

SPACE 0.0 13 14 SPACE

SPACE 15 16 SPACE

0.2 0.0 0.1 0.2

CONNECTED KVA: 0.42

LOAD CENTER "A"

NO SCALE

ELECTRICAL ONE-LINE DIAGRAM

UTILITY METER

DF

MJR

AS SHOWN

MJR

ELECTRICAL ONE-LINE DIAGRAM, SCHEDULE

AND TELECOMM. ROOM PLANS

E9

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:36 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E9 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:E9---- Plot Scale 1=1 Plot By:MROBINSON Layout:E9 Plot Scale 1=1 Plot By:MROBINSON Layout:E9MROBINSON Layout:E9 Layout:E9E9 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

FINISHED GRADE

3/4" CHAMFER, ALL

AROUND (TYP)

8"

6" STONE

#5@2" BOTH WAYS

#5@2" (TYP)

GENERATOR/RADIO CABINET

6"

SCALE: 3/4"=1'-0"

GENERATOR/RADIO CABINET FOUNDATION DETAIL

GRADE

NOT TO SCALE

TYPICAL DUCT BANK TO ABOVE GRADE TRANSITION

PVC CONDUIT

FEMALE PVC TO THREADED

PVC COATED RGS ADAPTER

CONCRETE DUCT BANK

CONCRETE DUCT BANK

INSTALL REBAR DOWELS

INTO STRUCTURE AND

EPOXY FILL HOLE TO

PREVENT SETTLEMENT

PVC COATED RIGID

METAL SWEEPING 90

PVC COATED RIGID

METAL COUPLING

PVC COATED RIGID

METAL CONDUIT

STRUCTURE OR WALL

NEMA 4X STAINLESS

STEEL PULL-BOX

316 STAINLESS

STEEL 1-1/2" STRUT

AND CONDUIT CLAMP

SLIP COUPLING

NOT TO SCALE

SECURITY FENCE DETAIL

NOT TO SCALE

DOUBLE SWING GATE DETAIL

12'-0"

2 GATES @ 6'-0" EACH

GATE POST (TYP)

CENTERSTOP

5" MAX DISTANCE BETWEEN

BOTTOM OF GATE AND PAVEMENT

SINGLE POST FOOTING

ADJUSTABLE LENGTH

TRUSS ROD (TYP)

6"

6"

5" MAX DISTANCE BETWEEN GATE AND

GATE POST IN THE CLOSED POSITION

TYPE A CHAIN LINK FENCE, BLACK IN

COLOR W/ #9 GAUGE GALVANIZED

FENCE WIRE FABRIC AND SQUARE MESH

OPENINGS NO LARGER THAN 2 INCHES

6' -0

PLUNGER BAR

SINGLE POST FOOTING

3' -6

TY

P)

6" (TYP)

POST (TYP)

10'-0" OC (TYP)

FINISHED GRADE

BOTTOM TENSION WIRE

TENSION BAND

TYPE A CHAIN LINK FENCE, BLACK IN

COLOR W/ #9 GAUGE GALVANIZED

FENCE WIRE FABRIC AND SQUARE MESH

OPENINGS NO LARGER THAN 2 INCHES

STABILIZED

SURFACE

CENTER RAIL

TOP RAIL

TAUT REINFORCING WIRES (AT

LEAST 9 GAUGE) WOVEN THROUGH

FABRIC AT TOP OF FENCE

INSTALL WHITE PLASTIC SLATS INSIDE THE

FENCE MESH TO PROVIDE VISUAL SCREEN

6' -0

6" (TYP)

INSIDE AREA OUTSIDE AREA

SECTION A-A

A

A

NOTES:

1. ALL MATERIAL TO CONFORM TO FEDERAL SPEC RR-F-191G (1-25-74).

2. ALL GALVANIZED FITTINGS TO CONFORM TO ASTM-A153.

3. ALL FENCE COMPONENTS TO BE VINYL COATED.

4. NO ALUMINUM TIES SHALL BE PERMITTED.

5. POST AND FRAME SIZES MAY REQUIRE MODIFICATION TO MEET SPECIFIC PROJECT REQUIREMENTS.

GATE POST (TYP)

CONCRETE FOOTING

LATCH POST

6' -0

OPENING

2 1/4" 2 1/4"

3' -6

6"

16"

INSTALL 2.875" OD

HINGE POST INTO

EXISTING FENCE

FULCRUM GATE LATCH

NOT TO SCALE

PEDESTRIAN ELEAVATION

FINISHED GRADE

SCALE:

DATE:

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

DF

MJR

AS SHOWN

MJR

ELECTRICAL AND

COMMUNICATION DETAILS

ED1

AutoCAD SHX Text

6'-0" MAX.

AutoCAD SHX Text

2'-0" MIN.

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:38 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:ED1 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:ED1---- Plot Scale 1=1 Plot By:MROBINSON Layout:ED1 Plot Scale 1=1 Plot By:MROBINSON Layout:ED1MROBINSON Layout:ED1 Layout:ED1ED1 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

FENCE GATE

FENCE POST

EXISTING GRADE

FLEXIBLE BRAIDED

GROUND CABLE

#2 COPPER GROUND CABLE

10'-0"x 3/4" GROUND ROD

NOT TO SCALE

FENCE GROUNDING DETAIL GROUND ROD INSTALLATION

NOT TO SCALE

GRADE

CONTINUED TO

GROUND GRID

DETAIL "A"

GRADE

THERMITE WELDED

GROUND CONNECTION

nVENT MOLD #GTC182G

#2/0 STRANDED

GROUNDING SYSTEM

3/4" X 10'-0" LONG COPPER

CLAD STEEL GROUND ROD

2'

0"

BUILDING/STRUCTURAL

OR EQUIPMENT STEEL

DRILL & TAP 3/8-16

BUILDING/STRUCTURAL

OR EQUIPMENT STEEL

SEE DETAIL "A"

2' -0

" M

IN

6"

TYPICAL SKID/STRUCTURE GROUNDING CONNECTION

NOT TO SCALE

3/4" X 10'-0" LONG

COPPER CLAD STEEL

GROUND ROD

THERMITE WELDED

GROUND CONNECTION

nVENT MOLD #PTC2G2G

(ALTERNATE CONNECTION OPTION)

NOTES:

1. CONDUIT STRAPS TO BE USED WNEN CONDUIT STUBS-UP ABOVE GRADE 6" OR MORE.

2. 1" PVC CONDUIT SLEEVE SHALL EXTEND BELOW GRADE 12" MINIMUM.

3. LUBRICATE ALL GROUNDING TERMINATIONS WITH PENETROX A-13.

4. IF SQUARE TUBING IS USED ON THE STRUCTURE INSTEAD OF I-BEAM, ITEMS 2&3 ON BACK SIDE OF

BEAM WILL NOT BE USED. SERVIT POST WILL SCREW INTO STRUCTURE ONLY.

GROUND CONNECTOR

3/8" WASHER

3/8" NUT

TYPICAL

#2 AWG STRANDED

BARE CONDUCTOR

JOINT COMPOUND

(SEE NOTE 3)

1" PVC CONDUIT SLEEVE

(SEE NOTE 2)

TYPICAL GROUND CONNECTION

1/2"-13 NC x 1" COPPER

BOLT, NUT & WASHER

NEMA LUG, 3/16" X 1"

SINGLE HOLE, 1/2" BOLT

OFFSET, CADWELD #B-101-DE-OL

#2/0 STRANDED

COPPER

GROUND LOOP

ABOVE GRADE EQUIPMENT

BURNDY SERVIT POST

#KC26B1 (OR EQUAL)

1/2 - 13 UNC-2A

#2 BARE STRANDED COPPER

#2/0 GROUND LOOP CONDUCTOR

EXOTHERMICALLY WELDED TO

INTERCONNECTING GROUND

ELECTRODES BELOW GRADE

NOT TO SCALE

TYPICAL EQUIPMENT BOLTED

GROUND LUG CONNECTION

NOT TO SCALE

NOT TO SCALE

3 PORT ENTRANCE PANEL

ISOMETRIC VIEWFRONT VIEW

GROUND STRAP

WEATHER BOOT

UNIT GROUND STRAP

& SANDWICH PLATE

RETAINING RING

TYPICAL PROTECTOR

(NOT PROVIDED)

TYPICAL CABLE

(NOT PROVIDED)

HORIZONTAL GROUND PANEL

BAR MASET GROUND

ENTRANCE PANEL

GROUND FINGER &

SUPPORT BLOCK

SANDWICH BAR

GROUND STRAP SILVER

SOLDER TO GROUNDING RING

CONDUCTOR UNDERGROUND

ENTRANCE PANEL HORIZONTAL GROUND PANEL

WEATHER BOOT

GROUND STRAP

GROUND STRAP SILVER

SOLDER TO GROUNDING RING

CONDUCTOR UNDERGROUND

GROUND RINGGROUND RING

SCALE:

DATE:

DRAWN BY:

CHECKED BY:

MARCH 2025

NO.

PLANT CITY WATER RECLAMATION FACILTY

(WRF) COMMUNICATION TOWER UPGRADE

13SHEET OF

DRAWING NUMBER

22269

PROJECT NUMBER

DESIGN BY:

DESCRIPTION DATEBY

Responsive People | Creative Solutions

P: 813.386.1315 4055 Riveredge Drive, Suite 130 | Tampa, Fl 33637

Engineers | Construction Managers | Planners | Scientists www.rkk.com

DF

MJR

AS SHOWN

MJR

ELECTRICAL GROUNDING DETAILS

ED2

AutoCAD SHX Text FILE LOCATION: C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG C:\USERS\MROBINSON\RK&K\PLANT CITY - 22269.004 - WASTEWATER COMM TOWER BUILDING DEMO\03 ICE\CADD\PLANS\ELECTRICAL\ 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 22269-PLANTCITY-CT_ELECTRICAL.DWG 5/23/2025 9:29:40 AM ---- Plot Scale 1=1 Plot By:MROBINSON Layout:ED2 ---- Plot Scale 1=1 Plot By:MROBINSON Layout:ED2---- Plot Scale 1=1 Plot By:MROBINSON Layout:ED2 Plot Scale 1=1 Plot By:MROBINSON Layout:ED2MROBINSON Layout:ED2 Layout:ED2ED2 dfoote Dean PE Signature dfoote Date dfoote Reference Dot

Sheets and Views
G1
2025-05-23T17:13:17-0400
Dean L. C. Foote
ISSUED FOR BID

File details come from the government source that posted it. Updated .