Pavement Patching on I-65.pdf
PDF 289 KB Posted
- Attached to
- Pavement Patching on I-65
- Solicitation number
- R -45794-A
- Issued by
- Marion County, Indiana
About this file
This is a Notice to Highway Contractors issued by the Indiana Department of Transportation (INDOT) for multiple highway improvement projects across various districts in Indiana, with a letting date of November 5, 2026, at 10:00 AM. The notice solicits sealed proposals from contractors holding valid Certificates of Qualification from INDOT for diverse project types including pavement patching, bridge work, small structure replacements, bike and pedestrian facilities, intersection improvements, and various maintenance activities. The specific project relevant to the contract opportunity is Call 361 (R-45794-A) for Pavement Patching in Marion County on I-65 from 5.77 miles south of I-465S to 0.18 mile north of I-465S, with a completion date of November 2, 2027. All bids must be submitted electronically through Bid Express, and contractors must register in advance by emailing bidding requests to INDOTbidders@indot.in.gov no later than 9:00 AM on the bid opening date. Bid bonds executed through Surety2000 or Tinubu Surety Solution must accompany all bids, and performance bonds are required except for projects of $100,000 or less in specified categories. Contractors bidding on projects of $150,000 or more must submit a written employee drug testing plan compliant with Indiana Code 4-13-18.
The pavement patching contract (Call 361) has an MBE goal of 3.00 percent with qualifications designated as A(A), B(A), and E(Q). All detailed letting documents are available for free download from the INDOT Documents Download webpage, and bidders are responsible for checking the Bid Express website for all amendment files prior to the bid deadline. Bid Express does not support performance bond submittal; performance bonds must be submitted to the Construction Letting email inbox or delivered in paper form by the time set for receipt of proposals. The contract falls under INDOT's electronic bidding system, and all proposal bids will be downloaded from Bid Express immediately after the letting date and time, with bid readings and public release beginning at 11:30 AM on the INDOT webpage. In accordance with Title VI of the Civil Rights Act of 1964 and Title 49 of the Code of Federal Regulations, INDOT assures that minority business enterprises will be afforded full opportunity to submit bids and will not be discriminated against based on race, color, sex, age, national origin, religion, sexual orientation, gender identity, disability, or income status.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO HIGHWAY CONTRACTORS
November 5, 2026
Sealed proposals for certain highway improvements as described below will be received from contractors holding a valid Certificate of Qualification issued by the Indiana Department of Transportation (INDOT) until the above stated letting date and time.
ELECTRONIC BIDDING: All contracts within this notice are designated for electronic bidding via the Bid Express Online Bidding Exchange (Bid Express). Only electronic bids submitted via Bid Express will be accepted on contracts designated for electronic bidding.
LOCATION OF OPENING: All submitted proposal bids will be downloaded from Bid Express immediately after the above stated letting date & time.
Due to the time required to download and import them into the processing database, the reading and immediate public release of the proposal bids will begin at 11:30 AM on the INDOT webpage. With advanced notice, INDOT will accommodate anyone wishing to attend in-person the reading of the proposal bids.* To request in-person attendance of proposal bid readings please contact Contract Administration at indotbidders@indot.in.gov at least 24 hours prior to the letting. Proposal bids will be considered as provided for in the Rules governing INDOT bidding.
LETTING DOCUMENTS: Detailed Construction Contract letting documents will be available for downloading via the INDOT internet Documents Download webpage at no cost. Those document files are copyright free without restrictions on duplication or distribution. Required electronic bidding files will be available from the Bid Express website. It is the bidder's responsibility to check the Bid Express website for all amendment files prior to the deadline. An amendment file may not be communicated by the issuance of an INDOT revision notice.
BIDDER REGISTRATION: Contractors planning to submit electronic bids via Bid Express must register in advance by emailing their request to bid to:
INDOTbidders@indot.in.gov. Requests must indicate the contracts desired to bid with call number(s) and include the Contractor’s FEIN number. Only registered valid bidders may submit bids via Bid Express. Bidder registration requests must may be received no later than 9:00 AM (local time) on the bid opening date.
BID BONDS: An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid.
PERFORMANCE BONDS: A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Bid Express does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids.
CONTRACTOR EMPLOYEE DRUG TESTING PLAN: Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor’s employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids.
October 07, 2026Published:
Letting Date & Time:
INDIANA DEPARTMENT OF TRANSPORTATION
10:00 AMat
INDIANA DEPARTMENT OF TRANSPORTATION
Contract Administration Division 100 North Senate Avenue, N758-Cont Indianapolis, IN 46204 For more information call (317)232-5300.
INTERNET WEBPAGE ADDRESSES:
Documents Download webpage - http://erms.indot.in.gov/ViewDocs/ Rules for Bidding webpage - http://www.in.gov/dot/div/contracts/letting/general/105iac11.pdf Letting Information Index webpage - http://www.in.gov/dot/div/contracts/letting/index.html Bid Express website - https://www.bidx.com/
TITLE VI ASSURANCES: In accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Sub Title A, Office of the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation, the Indiana Department of Transportation assures minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, age, national origin, religion, sexual orientation, gender identity, disability/handicap or income status in consideration for an award.
atNovember 5, 2026 10:00 AMLetting Date & Time:
R -39073-A BIKE AND PEDESTRIAN FACILITIES
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
1592448 BIKE AND PEDESTRIAN FACILITIES1592448
HANCOCK COUNTY - ALONG CR 200W FROM 600 FT S OF WEST
900N TO N FORTVILLE PIKE
June 02, 2028 0.00
C(B) E(A) E(E)
Completion Date DBE Goal:
Qualifications:
R -42227-A INTERSECTION IMPROVEMENT, ROUNDABOUT, BIKE
AND PED FACILITY
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
1901880 INTERSECTION IMPROVEMENT, ROUNDABOUT1901880
HAMILTON COUNTY - ON SR 38 AT LOGAN STREET
2500934 BIKE AND PEDESTRIAN FACILITIES2500934
HAMILTON COUNTY - ON SR 38 AT LOGAN STREET
May 19, 2028 0.00
B(A) C(B) E(F)
Completion Date DBE Goal:
Qualifications:
R -42446-A SMALL STRUCTURE REPLACEMENT
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
1900028 SMALL STRUCTURE REPLACEMENT CV 421-046-227.00 CULVERT1900028
LAPORTE COUNTY - ON US 421 OVER E ARM LITTLE CALUMET
RIVER, 3.22 MI S OF I-94
1900029 SMALL STRUCTURE REPLACEMENT CV 421-046-229.10 CULVERT1900029
LAPORTE COUNTY - ON US 421 OVER WEST BRANCH TRAIL
CREEK, 1.2 MILES S OF I-94
June 30, 2028 0.00
C(B) E(E)
Completion Date DBE Goal:
Qualifications:
R -43210-A SMALL STRUCTURES AND DRAINS CONSTRUCTION
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2001612 SMALL STRUCTURES AND DRAINS CONSTRUCTION2001612
JASPER COUNTY - ON SR 10 AT VARIOUS LOCATIONS
2001615 SMALL STRUCTURES AND DRAINS CONSTRUCTION2001615
JASPER COUNTY - ON SR 110 AT VARIOUS LOCATIONS
September 24, 2027 0.00
C(B) E(E)
Completion Date DBE Goal:
Qualifications:
R -43746-A HMA OVERLAY, PREVENTIVE MAINTENANCE
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2100170 HMA OVERLAY, PREVENTIVE MAINTENANCE2100170
WASHINGTON COUNTY - ON SR 60 FROM 2.86 MILES W OF SR 335
TO 100 FEET W OF SR 335
July 30, 2027 0.00
B(A) E(R)
Completion Date DBE Goal:
Qualifications:
R -43809-A SMALL STRUCTURE REPLACEMENT
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
1701334 SMALL STRUCTURE REPLACEMENT CV 030-064-18.75 CULVERT1701334
PORTER COUNTY - ON US 30 OVER UNT, 4.73 MILES EAST OF SR
1701335 SMALL STRUCTURE REPLACEMENT CV 030-064-19.10 CULVERT1701335
PORTER COUNTY - ON US 30 OVER UNT TO LAKE LOUISE, 5.26
MILES WEST OF SR 2
June 02, 2028 0.00
B(A) C(B) 0112E(E)
Completion Date DBE Goal:
R -43915-A SMALL STRUCTURE PIPE LINING
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2100762 SMALL STRUCTURE PIPE LINING CV 049-064-37.65 CULVERT2100762
PORTER COUNTY - ALONG SR 49 OVER UNT TO DAMON RUN, 0.7
MILE SOUTH OF I-90
August 01, 2027 0.00
E(E) 0290
Completion Date DBE Goal:
Qualifications:
R -43950-A INTERCHANGE MODIFICATION
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2000159 INTERCHANGE MODIFICATION2000159
MARION COUNTY - ON I-465 AT KEYSTONE AVENUE
October 05, 2027 0.00
E(D) E(G)
Completion Date DBE Goal:
Qualifications:
R -44008-A BIKE AND PEDESTRIAN FACILITIES
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2101141 BIKE AND PEDESTRIAN FACILITIES2101141
PORTER COUNTY - ALONG THE TOD PARKING LOT TO NAPOLEON
ST AND INDIANA STREET
November 15, 2028 0.00
A(B) C(B) 0120
Completion Date DBE Goal:
R -44293-A BIKE AND PEDESTRIAN FACILITIES
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2101688 BIKE AND PEDESTRIAN FACILITIES2101688
HARRISON COUNTY - ON MULBERRY ST FROM E POPLAR ST TO
COLLEGE AVE
May 07, 2028 0.00
A(B) C(B) E(F)E(A)
Completion Date DBE Goal:
Qualifications:
R -44392-A SMALL STRUCTURES AND DRAINS CONSTRUCTION
Crawfordsville DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200503 SMALL STRUCTURES AND DRAINS CONSTRUCTION CV 040-084-
15.65 CULVERT
2200503
VIGO COUNTY - ON US 40, 7.40 MILES EAST OF I-70
June 30, 2028 0.00
C(B) E(E)
Completion Date DBE Goal:
R -44432-A SMALL STRUCTURE REPLACEMENT AND PIPE LINING
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200495 SMALL STRUCTURES AND DRAINS CONSTRUCTION2200495
DECATUR COUNTY - ON SR 46 OVER UNT TO COBBS FORK, 5.3
MILES EAST OF US 421
2200601 SMALL STRUCTURE PIPE LINING CV 003-016-73.10 CULVERT2200601
DECATUR COUNTY - ON SR 3 OVER UNNAMED DITCH, 1.43 MILES
NORTH OF US 421
2200603 SMALL STRUCTURE PIPE LINING CV 003-016-67.41 CULVERT2200603
DECATUR COUNTY - ON SR 3 OVER UNT TO FALL FORK, 0.69 MILE
EAST OF SR 46
2200605 SMALL STRUCTURE REPLACEMENT CV 003-016-61.68 CULVERT2200605
DECATUR COUNTY - ON SR 3 OVER UNT TO WYALOOSING CREEK,
5.04 MILES S OF SR 46
July 19, 2027 0.00
C(B) E(E) 02900112
Completion Date DBE Goal:
Qualifications:
R -44492-A SMALL STRUCTURE REPLACEMENT AND PIPE LINING
Vincennes DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200571 SMALL STRUCTURE REPLACEMENT CV 056-059-62.26 CULVERT2200571
ORANGE COUNTY - ON SR 56 OVER UNT TO DAVIS CREEK, 4.66
MILES WEST OF SR 145
2500553 SMALL STRUCTURE PIPE LINING CV 145-059-35.26 CULVERT2500553
ORANGE COUNTY - ON SR 145 OVER UNT TO PATOKA LAKE, 3.60
MILES N OF SR 164
August 01, 2027 0.00
C(B) E(E) 0290
Completion Date DBE Goal:
R -44635-A HMA OVERLAY, MINOR STRUCTURAL AND BRIDGE
THIN DECK OVERLAY
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200750 BRIDGE THIN DECK OVERLAY (I94)I80-16-04296 COMPOSITE
CONTINUOUS STEEL BEAM
2200750
LAKE COUNTY - ON I-94W OVER I-90, 0.46 MILE EAST OF I-80
2200751 BRIDGE THIN DECK OVERLAY (I94)I80-16-04296 COMPOSITE
CONTINUOUS STEEL BEAM
2200751
LAKE COUNTY - ON I-94E OVER I-90, 0.46 MILE EAST OF I-80
2200821 HMA OVERLAY, MINOR STRUCTURAL2200821
PORTER COUNTY - ON I-94 FROM I-80/90 TO 0.52 MILE EAST OF SR
June 01, 2028 0.00
B(A) D(B) E(C)
Completion Date DBE Goal:
Qualifications:
R -45582-A PAVEMENT PATCHING
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2400568 PAVEMENT PATCHING2400568
ALLEN COUNTY - ON I-469 FROM 0.54 MI EAST OF I-69 TO 0.57 MI
WEST OF SR 1
October 30, 2027 0.00
A(A) E(Q)
Completion Date
Qualifications:
WBE Goal: 0.00 IVOSB Goal: 0.00MBE Goal:
R -45664-A SMALL STRUCTURE REPLACEMENT
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2300980 SMALL STRUCTURE REPLACEMENT CV 016-037-20.50 CULVERT2300980
JASPER COUNTY - ON SR 16 OVER SPURGEON DITCH, 5.74 MILES
EAST OF US 231
October 15, 2027 0.00
C(B) E(E)
Completion Date DBE Goal:
R -45794-A PAVEMENT PATCHING
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2400726 PAVEMENT PATCHING2400726
MARION COUNTY - ON I-65 FROM 5.77 MILES S OF I-465S TO 0.18
MILE N OF I-465S
November 02, 2027 0.00
A(A) B(A) E(Q)
Completion Date
Qualifications:
WBE Goal: 0.00 IVOSB Goal: 3.00MBE Goal:
R -45886-A PAVEMENT MARKINGS AND SIGN MODERNIZATION
Crawfordsville DistrictCall
Contract
Project Control No. LocationFederal/State No.
2401657 PAVEMENT MARKINGS2401657
FOUNTAIN COUNTY - ON VARIOUS ROADS THROUGHOUT THE
COUNTY
2401658 SIGN MODERNIZATION2401658
FOUNTAIN COUNTY - ALONG VARIOUS ROADS THROUGHOUT THE
COUNTY
September 01, 2027 0.00
E(D) E(G)
Completion Date DBE Goal:
Qualifications:
R -46136-A INTERSECTION IMPROVEMENT WITH ADDED TURN
LANES
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2000022 INTERSECTION IMPROVEMENT WITH ADDED TURN LANES2000022
LAKE COUNTY - ON US 20 AT SR 152
June 05, 2028 0.00
B(A) C(B)
Completion Date DBE Goal:
R -46147-A HMA OVERLAY, PREVENTIVE MAINTENANCE
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200834 HMA OVERLAY, PREVENTIVE MAINTENANCE2200834
BARTHOLOMEW COUNTY - ON I-65 FROM 0.44 MILE N OF US 31 TO
0.54 MILE N OF SR 252
October 30, 2027 0.00
B(A)
Completion Date DBE Goal:
Qualifications:
R -46447-A SIDEWALK CONSTRUCTION AND DRAINAGE
IMPROVEMENTS
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2501048 SIDEWALK CONSTRUCTION AND DRAINAGE IMPROVEMENTS2501048
LAKE COUNTY - ALONG CATHERINE ST, 71ST AVE AND 70TH AVE IN
MERRILLVILLE
July 16, 2027 0.00
C(B) E(E) E(F)
Completion Date DBE Goal:
Qualifications:
R -46935-A TREE REMOVAL AND TRIMMING
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2600938 TREE REMOVAL AND TRIMMING2600938
HAMILTON COUNTY - ALONG SR 32 FROM 520 FT E OF EAST ST TO
625 FT W OF RIVER AV
January 01, 2028 0.00
C(B) 0380
Completion Date
Qualifications:
WBE Goal: 0.00 IVOSB Goal: 3.00MBE Goal:
B -43912-A BRIDGE THIN DECK OVERLAY
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2400455 BRIDGE THIN DECK OVERLAY 002-45-09632 CONTINUOUS
REINFORCED CONCRETE SLAB
2400455
LAKE COUNTY - ON SR 2 OVER MJ BROWN DITCH, 2.70 MILES
EAST OF I-65
April 30, 2027 0.00
C(B) E(C) 0272
Completion Date DBE Goal:
Qualifications:
B -44260-A BRIDGE DECK OVERLAY AND REHABILITATION OR
REPAIR
Crawfordsville DistrictCall
Contract
Project Control No. LocationFederal/State No.
2101713 BRIDGE DECK OVERLAY 54-00175 CONTINUOUS REINFORCED
CONCRETE SLAB
2101713
MONTGOMERY COUNTY - ON CR 550E OVER BIG RACCOON
CREEK, 0.40 MILE S OF SR 234
2101715 BRIDGE REHABILITATION OR REPAIR 54-00066 CONTINUOUS
REINFORCED CONCRETE SLAB
2101715
MONTGOMERY COUNTY - ON CR 300S OVER WALNUT FORK
SUGAR CRK, 0.10 MI OF US 136
2101723 BRIDGE DECK OVERLAY 54-00063 CONTINUOUS REINFORCED
CONCRETE SLAB
2101723
MONTGOMERY COUNTY - ON CR 625E OVER SUGAR CREEK, 0.10
MILE NORTH OF SR 32
August 15, 2027 0.00
C(B) D(A) E(C)
Completion Date DBE Goal:
B -44266-A BRIDGE REPLACEMENT
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2101729 BRIDGE REPLACEMENT 38-00093 CONTINUOUS REINFORCED
CONCRETE SLAB
2101729
JAY COUNTY - ON CR 350W OVER SIPE DITCH, 0.90 MILE NORTH
OF SR 26
September 17, 2027 0.00
C(B) D(A) 0250
Completion Date DBE Goal:
Qualifications:
B -44268-A BRIDGE REHABILITATION OR REPAIR
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2101735 BRIDGE REHABILITATION OR REPAIR 18-00030 CONTINUOUS
REINFORCED CONCRETE SLAB
2101735
DELAWARE COUNTY - ON EATON-ALBANY PIKE OVER REES DITCH,
0.55 MILE E OF FW AVE
September 17, 2027 0.00
C(B) D(A)
Completion Date DBE Goal:
Qualifications:
B -44466-A BRIDGE DECK OVERLAY AND COPING REPLACEMENT
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200670 BRIDGE DECK OVERLAY AND COPING REPLACEMENT 050-36-06788
CONTINUOUS REINFORCED CONCRETE SLAB
2200670
JACKSON COUNTY - ON US 50 OVER VON FANGE DITCH, 0.82 MILE
WEST OF SR 11
October 01, 2027 0.00
D(A) E(C)
Completion Date DBE Goal:
B -44533-A REPLACE SUPERSTRUCTURE
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200710 REPLACE SUPERSTRUCTURE I469-18-07027 CONTINUOUS
COMPOSITE PLATE GIRDER
2200710
ALLEN COUNTY - ON MINNICH ROAD NB OVER I-469, 1.73 MILES
WEST OF US 30
2200711 REPLACE SUPERSTRUCTURE I469-18-07027 CONTINUOUS
COMPOSITE PLATE GIRDER
2200711
ALLEN COUNTY - ON MINNICH ROAD SB OVER I-469, 1.73 MILES
WEST OF US 30
October 30, 2027 0.00
D(B)
Completion Date DBE Goal:
Qualifications:
B -44534-A BRIDGE DECK OVERLAY
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200786 BRIDGE DECK OVERLAY I69-311-07303 BSBL CONTINUOUS
PRESTRESSED CONCRETE I-BEAM
2200786
ALLEN COUNTY - ON I-69S OVER WASHINGTON CENTER ROAD,
0.62 MI N OF SR 3
2200787 BRIDGE DECK OVERLAY I69-311-07303 BNBL CONTINUOUS
PRESTRESSED CONCRETE I-BEAM
2200787
ALLEN COUNTY - ON I-69N OVER WASHINGTON CENTER ROAD,
0.62 MI N OF SR 3
2200788 BRIDGE DECK OVERLAY I69-310-04550 DSBL CONTINUOUS
PRESTRESSED CONCRETE I-BEAM
2200788
ALLEN COUNTY - ON I-69S OVER SPY RUN CREEK, 0.42 MI S OF SR
2200789 BRIDGE DECK OVERLAY I69-310-04550 DNBL CONTINUOUS
PRESTRESSED CONCRETE I-BEAM
2200789
ALLEN COUNTY - ON I-69N OVER SPY RUN CREEK, 0.42 MI S OF SR
October 30, 2027 0.00
D(B) E(C)
Completion Date DBE Goal:
B -44535-A BRIDGE THIN DECK OVERLAY AND NEW SIGNAL
INSTALLATION
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200984 BRIDGE THIN DECK OVERLAY I469-00-07031 COMPOSITE
CONTINUOUS STEEL BEAM
2200984
ALLEN COUNTY - ON I-469E OVER I-69, 5.51 MILES SOUTH OF US
2200985 BRIDGE THIN DECK OVERLAY I469-00-07031 COMPOSITE
CONTINUOUS STEEL BEAM
2200985
ALLEN COUNTY - ON I-469W OVER I-69, 5.51 MILES SOUTH OF US
2400753 NEW SIGNAL INSTALLATION2400753
ALLEN COUNTY - ON SR 1 AND I-469 RAMPS
August 21, 2027 0.00
D(B) E(A) 0272
Completion Date DBE Goal:
Qualifications:
B -44536-A BRIDGE DECK OVERLAY
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200548 BRIDGE DECK OVERLAY 003-44-07156 REINFORCED CONCRETE
SLAB
2200548
LAGRANGE COUNTY - ON SR 3 OVER MILL RACE, 2.98 MILES
NORTH OF US 20
November 01, 2027 0.00
C(B) D(A) 0250
Completion Date DBE Goal:
B -44548-A BRIDGE REPLACEMENT AND REHABILITATION
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200564 BRIDGE REPLACEMENT CV 016-035-101.75 CULVERT2200564
HUNTINGTON COUNTY - ON SR 16 OVER SILVER CREEK BRANCH,
1.47 MILES E OF SR 105
2200955 BRIDGE DECK OVERLAY 105-35-06867 CONTINUOUS REINFORCED
CONCRETE SLAB
2200955
HUNTINGTON COUNTY - ON SR 105 OVER SILVER CREEK, 1.57
MILES SOUTH OF SR 16
October 31, 2027 0.00
D(A) E(E)
Completion Date DBE Goal:
Qualifications:
B -44588-A SMALL STRUCTURES AND DRAINS CONSTRUCTION
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200497 SMALL STRUCTURES AND DRAINS CONSTRUCTION 48288
CULVERT
2200497
DELAWARE COUNTY - ON SR 32 OVER UNT TO TRUITT DITCH, 0.95
MILE EAST OF US 35
June 25, 2027 0.00
E(E) E(K)
Completion Date DBE Goal:
Qualifications:
B -44653-A BRIDGE COATING
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200537 BRIDGE COATING I80-03-07553 CONTINUOUS COMPOSITE PLATE
GIRDER
2200537
LAKE COUNTY - ON I-80 OVER KENNEDY AVENUE, 0.97 MILE EAST
OF US 41
June 30, 2027 0.00
D(B) E(M)
Completion Date DBE Goal:
B -45063-A BRIDGE REPLACEMENT
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
1900048 BRIDGE REPLACEMENT 035-27-10469 PRESTRESSED CONCRETE
BULB-T BEAM
1900048
GRANT COUNTY - ON US 35 OVER DEER CREEK, 0.25 MILE WEST
OF SR 9
October 31, 2027 0.00
D(A)
Completion Date DBE Goal:
Qualifications:
B -45410-A BRIDGE THIN DECK OVERLAY
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2300825 BRIDGE THIN DECK OVERLAY 203-72-03078 PRESTRESSED
CONCRETE I-BEAM
2300825
SCOTT COUNTY - ON SR 203 OVER WOODS FORK CREEK, 1.52
MILES SOUTH OF SR 3
July 30, 2027 0.00
D(A) 0272
Completion Date DBE Goal:
Qualifications:
B -45648-A BRIDGE THIN DECK OVERLAY
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2300840 BRIDGE THIN DECK OVERLAY 912-45-06599 COMPOSITE
CONTINUOUS STEEL BEAM
2300840
LAKE COUNTY - ON SR 912 OVER GUTHRIE STREET, 0.32 MILE
WEST OF US 12
June 11, 2027 0.00
D(B) 0272
Completion Date DBE Goal:
B -46218-A SMALL STRUCTURE REPLACEMENT
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200547 SMALL STRUCTURE REPLACEMENT CV 262-058-8.80 CULVERT2200547
OHIO COUNTY - ON SR 262 OVER UNNAMED DITCH, 8.80 MILES S
OF US 50
August 13, 2027 0.00
C(B) 0103
Completion Date DBE Goal:
Qualifications:
B -46893-A TREE REMOVAL AND TRIMMING
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2600795 TREE REMOVAL AND TRIMMING2600795
VARIOUS COUNTIES - ALONG VARIOUS ROADS THROUGHOUT THE
GREENFIELD DISTRICT
March 12, 2027 0.00
Completion Date
Qualifications:
WBE Goal: 0.00 IVOSB Goal: 3.00MBE Goal:
M -46855-A TREE REMOVAL AND TRIMMING
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2500498 TREE REMOVAL AND TRIMMING2500498
VARIOUS COUNTIES - ALONG VARIOUS ROADS THROUGHOUT THE
LAPORTE DISTRICT
March 31, 2027 0.00
Completion Date
Qualifications:
WBE Goal: 0.00 IVOSB Goal: 3.00MBE Goal:
T -44553-A RAISED PAVEMENT MARKINGS, REFURBISHED
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2201087 RAISED PAVEMENT MARKINGS, REFURBISHED2201087
VARIOUS COUNTIES - ON VARIOUS ROADS THROUGHOUT THE
FORT WAYNE DISTRICT
November 15, 2027 0.00
Completion Date DBE Goal:
Qualifications:
T -46088-A RAISED PAVEMENT MARKINGS, REFURBISHED
Crawfordsville DistrictCall
Contract
Project Control No. LocationFederal/State No.
2500040 RAISED PAVEMENT MARKINGS, REFURBISHED2500040
VARIOUS COUNTIES - ALONG VARIOUS ROADS THROUGHOUT THE
CRAWFORDSVILLE DISTRICT
July 31, 2027 0.00
Completion Date DBE Goal:
Qualifications:
T -46195-A TRAFFIC SIGNALS MODERNIZATION
Crawfordsville DistrictCall
Contract
Project Control No. LocationFederal/State No.
1800215 TRAFFIC SIGNALS MODERNIZATION1800215
TIPPECANOE COUNTY - ON SR 26 AT CR 900E, 4.71 MILES EAST OF
I-65
June 30, 2028 0.00
B(A) E(A)
Completion Date DBE Goal:
File details come from the government source that posted it. Updated .