Past Performance Questionnaire.pdf

PDF 261 KB Posted

Attached to
C1DA--Project 575-23-107 | Expand Electrical Capability | Design
Solicitation number
36C25925R0113
Issued by

About this file

This document is a Past Performance Questionnaire, a comprehensive evaluation form designed to assess a contractor's performance across multiple dimensions of a government contract. The form covers seven key performance areas: Quality, Schedule/Timeliness, Customer Satisfaction, Management/Personnel/Labor, Cost/Financial Management, Safety/Security, and General Performance. Each section uses a rating scale from Exceptional (E) to Unsatisfactory (U), with an option for Not Available (N), allowing the client to provide detailed feedback on the contractor's performance.

The questionnaire requires detailed input from both the contractor and the client, capturing critical information such as contract type, work performed (prime or subcontractor), contract value, complexity, and performance metrics. Sections require specific comments explaining ratings, particularly for marginal or unsatisfactory scores. The form concludes with a section for documenting overall strengths, weaknesses, deficiencies, and final comments, providing a comprehensive assessment that can be used in future contract evaluations and bidding processes.

View the file

Other files

File Type Posted
36C25925R0113_2.docx DOCX document
36C25925R0113_1.docx DOCX document
36C25925R0113.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

Solicitation Number: Project Title:

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number: Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number: Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title: Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name: Title:

Phone Number: Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

Section D: Performance Information: Choose the letter on the scale that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY

UNSATISFACTORY OR MARGINAL RATINGS.

E VG S M U N

Exceptional (Outstanding)

Very Good (Above Average)

Satisfactory Marginal Unsatisfactory Not Available

Performance meets Performance meets Performance meets Performance does Performance does No record of past contractual contractual contractual not meet some not meet most performance or the requirements and requirements and requirements. The contractual contractual record is exceeds many to exceeds some to contractual requirements. The requirements and inconclusive.

the Government’s the Government’s performance of the contractual recovery is not benefit. The benefit. The element or sub- performance of the likely in a timely contractual contractual element contains element or sub- manner. The performance of the performance of the some minor element being contractual element or sub- element or sub- problems for which evaluated reflects a performance of the element being element being corrective actions serious problem for element or sub-evaluated was evaluated was taken by the which the element contains a accomplished with accomplished with Contractor appear, Contractor has not serious problem(s) few minor problems some minor or were, yet identified for which the for which corrective problems for which satisfactory. corrective actions. Contractor’s actions taken by the corrective actions The Contractor’s corrective actions Contractor were taken by the proposed actions appear or were highly effective Contractor were effective appear only marginally effective, ineffective or were not fully implemented

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N a.1. Comments:

b) Ability to meet quality standards specified for technical performance

E

VG

S

M

U

N b.1. Comments:

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance c.1. Comments:

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance) d.1. Comments:

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

2.a.1 Comments:

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

2.b.1. Comments:

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

3. a.1. Comments:

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

3.b.1. Comments:

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

3.c.1. Comments:

d) Overall customer satisfaction E VG S M U N

3.d.1 Comments:

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

4.a.1. Comments:

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

4.b.1 Comments:

c) Government Property Control E VG S M U N

4.c.1. Comments:

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

4.d.1. Comments:

e) Utilization of Small Business concerns E VG S M U N

4.e.1. Comments:

f) Ability to simultaneously manage multiple projects with multiple disciplines

4.f.1. Comments:

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

4.g.1. Comments:

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

4.h.1. Comments:

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

5.a.1. Comments:

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

5.b.1. Comments:

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

5.c.1. Comments:

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes

No

5.d.1. Comments:

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

5.e.1. Comments:

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

5.f.1 Comments:

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

6.a.1 Comments:

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

6.b.1. Comments:

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

7.a.1. Comments:

b) Compliance with contractual terms/provisions (explain if specific issues)

7.b.1. Comments:

c) Would you hire or work with this firm again? (If no, please explain below)

7.c.1. Comments:

d) In summary, provide an overall rating for the work performed by this contractor.

7.d.1. Comments:

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

STRENGTHS:

WEAKNESSES:

DEFICIENCIES:

COMMENTS:

Past Performance Information provided by:

(Printed Name)

Signature: Date:

Organization: Phone:

File details come from the government source that posted it. Updated .