PAST PERFORMANCE QUESTIONNAIRE.docx
DOCX document 17 KB Posted
- Attached to
- Y1PC--LANC CONSTRUCTION PHASE 1C Federal contract opportunity
- Solicitation number
- 36C10F22R0033
About this file
This document contains a past performance questionnaire for a construction project. The questionnaire requests information about a contractor's past work on Contract No. [redacted], with a value of $[redacted], for the project titled "[redacted]" located at [redacted] and completed on [redacted]. The evaluating organization representative is asked to provide ratings on a scale of Exceptional to Unsatisfactory for quality of products and services, performance, schedule, technical requirements, cost control, customer satisfaction, and overall assessment. Space for comments on any exceptional, good, marginal or unsatisfactory ratings is also provided.
The related federal contract opportunity is a solicitation from the Department of Veterans Affairs for construction phase 1C at the Los Angeles National Cemetery. The purpose of the project is to provide renovations and upgrades to select structures to protect remains and enhance historically sensitive buildings. The solicitation number is 36C10F22R0033 and it is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The response date is not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Government Responses to RFI Question 15 4.14.2022.pdf | ||
| 36C10F22R0033 0004.docx | DOCX document | |
| Government Responses to RFI Questions 4.11.2022.pdf | ||
| 36C10F22R0033 0003.docx | DOCX document | |
| 36C10F22R0033 LANC 4.11.2022.pdf | ||
| Wage Determination - SAM.gov - Published 4.1.2022.pdf | ||
| LANC Pre-Proposal Sign In.pdf | ||
| LANC Pre-Proposal Conference and Site Visit Walk-through .pptx | PPTX presentation | |
| 36C10F22R0033 0002.docx | DOCX document | |
| LANC - Hazardous Building Materials Inspection Report.pdf | ||
| LANC-SITE PLAN.pdf | ||
| 36C10F22R0033 0001.docx | DOCX document | |
| Pre-Proposal Inquiry (PPI) Form.docx | DOCX document | |
| Wage Determination - SAM.gov 3.4.2022.pdf | ||
| 36C10F22R0033.docx | DOCX document | |
| 898-032C LANC Bid Doc Plans 013122.pdf | ||
| 898-032C LANC Bid Specifications 013122.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 – Past Performance Questionnaire
PERFORMANCE QUESTIONNAIRE
Your assistance is requested in support of a source selection.
Please complete this Questionnaire and return it via email to: Isabell Coad (isabell.coad@va.gov)
Desired Response Date: NLT 04/04/2022 4:00 p.m. ET
When complete, the information on this form is SOURCE SELECTION SENSITIVE INFORMATION (41 U.S.C. 423) and shall be protected accordingly.
TO BE COMPLETED BY OFFEROR
1a. CONTRACTOR NAME & ADDRESS:
2. CONTRACT NO.:
3. CONTRACT AWARD DATE:
4. COMPLETION DATE:
5. CONTRACT VALUE (with options): $
1b. NAME OF PRIME CONTRACTOR (If this questionnaire is for a team member)
6. TYPE OF CONTRACT:
7. PROJECT TITLE, LOCATION, AND DESCRIPTION (AND TOTAL CONSTRUCTION VALUE AT PROJECT COMPLETION):
Please add a continuation page if additional space necessary.
TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE
8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:
b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:
Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.
| E = Exceptional |
| S = Satisfactory |
| U = Unacceptable |
| G = Very Good |
| M = Marginal |
| N/O = Not Observed |
A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).
E G S M U N/O
B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.
E G S M U N/O
C. Schedule – Assess the timeliness of contractor against the schedule of activities.
E G S M U N/O
D. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.
E G S M U N/O
E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.
E G S M U N/O
F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”.
E G S M U N/O
G. Overall Assessment.
E G S M U N/O
Comments (for any ratings of E, G, M, or U, please provide some brief comments about strengths & weaknesses you observed in this contractor that help us understand your rating. Feel free to provide additional pages if necessary):
File details come from the government source that posted it. Updated .