About this file
This document is a landscape architecture and civil engineering plan set for the South Canton Park project, prepared for the City of Canton, Georgia. The project is located at 2939 Marietta Highway in Canton, Cherokee County, and involves comprehensive site development including utility infrastructure, erosion control, tree protection, and accessibility planning. The documents are dated April 30, 2025, and represent 100% Construction Documents, with specific focus on site grading, utility installation, stormwater management, and park amenities. The total site area is approximately 6.20 acres, with 4.54 acres of disturbed area, and the anticipated construction start date is August 18, 2025.
The project includes detailed plans for utility installation such as water lines, sanitary sewer services, and stormwater management, with specific attention to erosion control measures and environmental protection. The engineering plans outline comprehensive strategies for managing site development, including tree protection zones, sensitive root zone management, and accessibility considerations. Specific technical elements include 6" PVC sanitary sewer services, 4" and 2" waterlines, fire hydrants, and multiple erosion control phases. The documents also provide extensive notes on construction sequencing, environmental compliance, and specific technical requirements for site development, emphasizing careful management of existing vegetation and site conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOW OR FORMERLY
ANGELA J. WHITAKER
(DB 1653, PG 1)
(DB MM, PG 446)
NOW OR FORMERLY
JENNA STONER
(DB 14825, PG 833)
NOW OR FORMERLY
GEORGIA POWER COMPANY
(PER TAX RECORDS)
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W W W W
W W W
W W W
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
G G G G G G G G G G G G
G G G GG
G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G G G G G G
G G G G G G G G G G G G G G G G G G G G G G G G
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
L.L.
L.L.
L.L.
L.L.
SS
SS
SS
W W W W
G G G G G G
G
G
G
G
G G
FO
W G
G
G NOW OR FORMERLY
PROPERTY SOLUTIONS
MANAGEMENT, LLC
(DB 14761, PG 2488)
(PB 29, PG 163)
14-0162-0017
NOW OR FORMERLY
CHEROKEE COUNTY
(DB 14145, PG 189)
14-0127-0234
W
W
W W W W
W W W W
M A
R
IE
T T
A H
IG
H
W A
Y (F
.K .A
G
E O
R G
IA
H
W Y
N O
. 5
' R
.W
IVEY DRIVE
40' R.W.
SUNSET DRIVE
50' R.W.
RIDGE PINE DRIVE
(40' R/W)
PINECREST DRIVE
60' R.W.
PINECREST DRIVE
60' R.W.
HB
HB
Xref P:\2102\008\CAD\Engineering\Park\XREFs\ARCH - Pavilion.dwg
Xref P:\2102\008\CAD\Engineering\Park\X REFs\ARCH - Restroom.dwg
34 33
36 34
373839
31 11
T 39 38 37
HB
FTE
FTE
FNTN
G
FC
I
G
FC
I
G
FC
I
GFC
I
GFCI
C#003
C#002
F#001
C#001
C#004
C#005
Xref P:\2102\008\CAD\Engineering\Park\XREFs\STRUCTURAL - Boardwalk.dwg
VAN
R
R
R
R
R
R
R
R
IRR
JB
SS SS SS
JB
SS SS SS
SS SS SS
JB
1135 1130
05 1100
11 4 1
1125112
2''W
2''W
2''W
2''W
4''W
6''W
6''W
6''W
6''W 6''W
2''W
2''W
W
W
W W
W
W
6''W
11011105
41 1140
JB
1 1
WEIR
SIZE
WEIR
SIZE
WEIR
SIZE
SSMH
EXSS MH 236
SSMH
EXSS MH 211
SSMH
SS1
SEE MEP PLANS FOR WATER AND SANITARY SEWER
CONTINUATION
SSCO (TYP.)
SEE MEP PLANS FOR WATER
6" PVC SANITARY SEWER SERVICE (TO BE
INSTALLED AT 2% MIN. SLOPE)
ADJUST EXISTING MANHOLE TOP TO
PROPOSED GRADE
ADJUST EXISTING MANHOLE TOP TO
PROPOSED GRADE
4" C900 WATERLINE
2" SDR-26 WATERLINE
FIRE HYDRANT
4" COMMERCIAL
METER
4"X2"X2" TEE
END OF 4" WATERLINE
2"X2"X3
4" TEE
4" CTS PE 4710
WATERLINE
IRRIGATION
CONTROLLER AND
CISTERN PUMP
FOOD TRUCK
PEDESTALS
3/4" CTS PE 4710
WATERLINE
3/4" CTS PE 4710
WATERLINE
HOSE BIB
3/4" C900 WATERLINE
8"x6" TS&V
6" C900 WATERLINE
TO VAULTS
6" METER -
COMPACT FIRE LINE
ASSEMBLY VAULT
6"X6"X4" TEE
3/4" CTS PE 4710
WATERLINE
2"X2"X3/4" TEE
6" DIP TO METER
6" C900 FIRELINE
2"X2"X3/4" TEE
2" SDR-26 WATERLINE
CONTRACTOR TO
COORDINATE WITH
WATER PROVIDER
ON SPECIFICS AND
INSTALLATION.
THRUST BLOCKING
TO BE PROVIDED
ON ALL BENDS
RELOCATE EX.
HYDRANT OUTSIDE
OF DITCH
W
EI
R
SI
ZE
W
EIR
SIZE
W
EIR
SIZE
W
EIR
SIZE
W
EI
R
SI
ZE
JB
SS SS SS
JB
SS SS SS
SS SS SS
JB
1135 1130
05 1100
11 4 1
1125112
2''W
2''W
2''W
2''W
4''W
6''W
6''W
6''W
6''W 6''W
2''W
2''W
W
W
W W
W
W
6''W
11011105
41 1140
JB
1 1
WEIR
SIZE
WEIR
SIZE
WEIR
SIZE
SSMH
EXSS MH 236
SSMH
EXSS MH 211
SSMH
SS1
SEE MEP PLANS FOR WATER AND SANITARY SEWER
CONTINUATION
SSCO (TYP.)
SEE MEP PLANS FOR WATER
6" PVC SANITARY SEWER SERVICE (TO BE
INSTALLED AT 2% MIN. SLOPE)
ADJUST EXISTING MANHOLE TOP TO
PROPOSED GRADE
ADJUST EXISTING MANHOLE TOP TO
PROPOSED GRADE
4" C900 WATERLINE
2" SDR-26 WATERLINE
FIRE HYDRANT
4" COMMERCIAL
METER
4"X2"X2" TEE
END OF 4" WATERLINE
2"X2"X3
4" TEE
4" CTS PE 4710
WATERLINE
IRRIGATION
CONTROLLER AND
CISTERN PUMP
FOOD TRUCK
PEDESTALS
3/4" CTS PE 4710
WATERLINE
3/4" CTS PE 4710
WATERLINE
HOSE BIB
3/4" C900 WATERLINE
8"x6" TS&V
6" C900 WATERLINE
TO VAULTS
6" METER -
COMPACT FIRE LINE
ASSEMBLY VAULT
6"X6"X4" TEE
3/4" CTS PE 4710
WATERLINE
2"X2"X3/4" TEE
6" DIP TO METER
6" C900 FIRELINE
2"X2"X3/4" TEE
2" SDR-26 WATERLINE
CONTRACTOR TO
COORDINATE WITH
WATER PROVIDER
ON SPECIFICS AND
INSTALLATION.
THRUST BLOCKING
TO BE PROVIDED
ON ALL BENDS
RELOCATE EX.
HYDRANT OUTSIDE
OF DITCH
W
EI
R
SI
ZE
W
EIR
SIZE
W
EIR
SIZE
W
EIR
SIZE
W
EI
R
SI
ZE
N.I.C. - SITE FEATURES WITHIN THIS BOUNDARY ARE
NOT TO BE COMPLETED AS PART OF THESE
DOCUMENTS. TO BE COMPLETED AS A SEPARATE
PROJECT
SITE FEATURES WITHIN THIS BOUNDARY
TO BE COMPLETED AFTER THE ELEVATED
TANK PROJECT HAS COMPLETED.
SS1
0+00 0+50 1+00 1+50 2+00 2+25
115.80 L.F. 6" PVC @ 3.43%
ST
A:
.1
TO
P
7.
I.O
4.
(S S1
TO BLDG
ST
A:
.8
TO
P
7.
I.O
3.
(E
XS
S M
H
6) I.I
4.
(T
O
BL
DG
SS1
ST
A:
.9
TO
P
1.
I.O
8.
(E
XS
S M
H
7) I.I
8.
(E
XS
S
M H
1)
I.I
0.
(S S1
EXSS MH 236
115.80 L.F. 6" PVC @ 3.43%
16.36 L.F. 6" PVC @ 2.00%
SS1
0+00 0+50 1+00 1+50 2+00 2+25
115.80 L.F. 6" PVC @ 3.43%
ST
A:
.1
TO
P
7.
I.O
4.
(S S1
TO BLDG
ST
A:
.8
TO
P
7.
I.O
3.
(E
XS
S M
H
6) I.I
4.
(T
O
BL
DG
SS1
ST
A:
.9
TO
P
1.
I.O
8.
(E
XS
S M
H
7) I.I
8.
(E
XS
S
M H
1)
I.I
0.
(S S1
EXSS MH 236
115.80 L.F. 6" PVC @ 3.43%
16.36 L.F. 6" PVC @ 2.00%
C :\U se rs
\D
EB
O R
A~ 1.
M C
K\ Ap pD at a\ Lo ca l\T em p\
Ac Pu bl is h_
\2
2-
C -0
S ite
P la n.
dw g (4
.1 ) P lo tte d on
Ju n
, 2
- 9
:5 3a m b y de bo ra h.
m ck in ne y checked by:
project number:
contact:
drawn by:
s h e e t n u m b e r s h e e t t i t l e d r a w i n g d a t e d r a w i n g i n f o r m a t i o n c l i e n t i n f o r m a t i o n p r o j e c t a d d r e s s s e a l r e v i s i o n s
1447 Peachtree Street NE, Suite 850 Atlanta, Georgia 30309 404.873.6730 www.tsw-design.com c o n s u l t a n t n o r t h a r r o w + s c a l e
Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of TSW and may not be used in any way without the written permission of this office.
p r o j e c t i n f o r m a t i o n
N
0 105 2515 scale: 1" = 10'-0"
SHEET TITLE
GAB
GAB
GREG BRENNER (256) 508-3406
GREG.BRENNER@LAND.ENGINEERING
2102-008
CITY OF CANTON
110 ACADEMY STREET
CANTON, GA 30114
770.720.7674
2939 MARIETTA HWY
CANTON, GA 30114
SOUTH CANTON
PARK
APRIL 30, 2025
100% CONSTRUCTION DOCUMENTS
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
2102-008 Project Number:
CANTON
State:
County:
City:
Section:
District:
Land Lot:
Project Location:
NA
CANTON
CHEROKEE
GA
4/30/2025
A - 2ND SUBMITTAL - 05/29/25
N
GA
W es t G rid
00 30'
Horizontal Profile Scale 1" = 30'
5'
Ve rti ca l P ro fil e Sc al e
1"
00 30' 60'
Graphic Scale in Feet 1" = 30'
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
C-4.1
UTILITY
PLAN
UTILITY NOTES:
CONTRACTOR SHALL VERIFY THE LOCATION, SIZE, AND ELEVATION OF ALL EXISTING
UTILITIES PRIOR TO CONSTRUCTION. NOTIFY THE ENGINEER IMMEDIATELY OF ANY
DISCREPANCIES OR CONFLICTS.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES
PRIOR TO BEGINNING WORK AND SHALL COMPLY WITH THEIR REQUIREMENTS.
CALL 811 (OR LOCAL UTILITY NOTIFICATION CENTER) A MINIMUM OF 72 HOURS PRIOR
TO EXCAVATION.
ALL WATER MAIN MATERIALS AND INSTALLATION SHALL CONFORM TO LOCAL UTILITY
STANDARDS AND AWWA SPECIFICATIONS.
MINIMUM COVER FOR WATER MAINS SHALL BE 3.5 FEET UNLESS OTHERWISE NOTED.
ALL WATER LINES SHALL BE PRESSURE TESTED AND DISINFECTED PER APPLICABLE
STANDARDS BEFORE BEING PLACED INTO SERVICE.
CONTRACTOR SHALL COORDINATE WITH THE UTILITY PROVIDER FOR SERVICE TAPS,
METERS, AND INSPECTIONS.
SANITARY SEWER PIPES AND MANHOLES SHALL BE INSTALLED PER MUNICIPAL
STANDARDS.
MINIMUM SLOPE AND COVER SHALL BE MAINTAINED AS SHOWN ON PLANS UNLESS
APPROVED OTHERWISE.
ALL SANITARY SEWER LINES SHALL BE TESTED FOR INFILTRATION, EXFILTRATION, AND
DEFLECTION AS REQUIRED.
STORM DRAIN SYSTEMS SHALL BE INSTALLED PER PLAN AND LOCAL STANDARDS.
STRUCTURES SHALL BE SET TO FINISH GRADE AND ADJUSTED AS NEEDED FOR FINAL
PAVING.
CONTRACTOR SHALL PROTECT INLETS DURING CONSTRUCTION TO PREVENT SEDIMENT
ACCUMULATION.
PERFORM VISUAL INSPECTION AND CLEANING OF STORM PIPES BEFORE PROJECT
CLOSEOUT.
COORDINATE WITH RESPECTIVE UTILITY COMPANIES FOR INSTALLATION AND
INSPECTION OF ELECTRIC, GAS, TELEPHONE, FIBER, AND CABLE SERVICES.
CONTRACTOR SHALL PROVIDE ALL TRENCHING, BACKFILLING, AND CONDUIT PER
UTILITY COMPANY REQUIREMENTS UNLESS OTHERWISE NOTED.
MAINTAIN REQUIRED HORIZONTAL AND VERTICAL CLEARANCES BETWEEN UTILITIES.
CONFLICT RESOLUTION
IN THE EVENT OF UTILITY CONFLICTS NOT SHOWN ON THE PLANS, THE CONTRACTOR
SHALL NOTIFY THE ENGINEER AND AWAIT RESOLUTION BEFORE PROCEEDING.
LEGEND
CRITICAL ROOT ZONE (CRZ)
STRUCTURAL ROOT PLAT (SRP)
C :\U se rs
\D
EB
O R
A~ 1.
M C
K\ Ap pD at a\ Lo ca l\T em p\
Ac Pu bl is h_
\2
2-
C -0
S ite
P la n.
dw g (4
.2 ) P lo tte d on
Ju n
, 2
- 9
:5 3a m b y de bo ra h.
m ck in ne y checked by:
project number:
contact:
drawn by:
s h e e t n u m b e r s h e e t t i t l e d r a w i n g d a t e d r a w i n g i n f o r m a t i o n c l i e n t i n f o r m a t i o n p r o j e c t a d d r e s s s e a l r e v i s i o n s
1447 Peachtree Street NE, Suite 850 Atlanta, Georgia 30309 404.873.6730 www.tsw-design.com c o n s u l t a n t n o r t h a r r o w + s c a l e
Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of TSW and may not be used in any way without the written permission of this office.
p r o j e c t i n f o r m a t i o n
SHEET TITLE
GAB
GAB
GREG BRENNER (256) 508-3406
GREG.BRENNER@LAND.ENGINEERING
2102-008
CITY OF CANTON
110 ACADEMY STREET
CANTON, GA 30114
770.720.7674
2939 MARIETTA HWY
CANTON, GA 30114
SOUTH CANTON
PARK
APRIL 30, 2025
100% CONSTRUCTION DOCUMENTS
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
2102-008 Project Number:
CANTON
State:
County:
City:
Section:
District:
Land Lot:
Project Location:
NA
CANTON
CHEROKEE
GA
4/30/2025
A - 2ND SUBMITTAL - 05/29/25
00 50' 100'
Graphic Scale in Feet 1" = 50'
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
C-4.2
UTILITY
DETAILS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W W W W
W W W
W W W
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
G G G G G G G G G G G G
G G G GG
G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G G G G G G G
G G G G G G G G G G G G G G G G G G G G G G G G
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
SS
SS
POB
W W W W
G
G
G
G G
VAN
TcE
MjE
MjE
MjE
Ds1
Ds2
Ds3
Du
ALL DISTURBED AREA
Co
Sd2-S
X
X X
CONCRETE WASHDOWN AREA
Sd2-S
Sd2-S
Sd2-S
Sd2-S
Di
Di
Sd2-S
C-TF
C-
TF
C-
TF
C-TF
C-TF C-
TF
C-
TF
C-
TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF C-TF C-TF
C-
TF
C-
TF
C-TF
C-TF
C-
TF
C C
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-
TF
C-
TF
C-TFC-TFC-TFC-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TFC-TF
C-TFC-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TFC-TFC-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF C-TF
CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C C
C C
C C C C C C
C C
C C
C
C
C C C C C C
C
C
X X
XX
X X
X X
X X
XX
XX
XX
XX
X X
X X
XX
XX
X X
XX
X X
XX
X X
XX
XX
XX
XX XX
X X
X X
XX
TEMPORARY SEDIMENT TRAP 1
0.78 AC.
X X
X X
X X
X X
X X
XX
X X
TF
TF
TF
TF
TF
TF
TF
TF
TF
TFTFTFTF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF TF
TF
TF
TF
TF
TF
TF
TF
TFTFTFTFTFTF
TF TF
TF TF
TF
TF
TF
TF
TF
TF
TFTF
TF
TF TF
TF TF
TF
TFTF
TF
TF
TF
TF
TF TF TF
TF
TF
TF
TF
TF
TFTF
TF
TF
TFTF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TFTF
X X
X X
TEMPORARY SEDIMENT TRAP 2
0.21 AC.
Di
Di
Di
SILT FENCE STORAGE AREA 1
0.13 AC.
SILT FENCE STORAGE AREA 2
0.10 AC.
SILT FENCE STORAGE AREA 3
0.14 AC.
SILT FENCE STORAGE AREA 4
0.09 AC.
SILT FENCE STORAGE AREA 5
0.06 AC.
TEMPORARY SEDIMENT TRAP 3
3.26 AC.
Cd-HB
N.I.C. - SITE FEATURES WITHIN THIS BOUNDARY ARE
NOT TO BE COMPLETED AS PART OF THESE
DOCUMENTS. TO BE COMPLETED AS A SEPARATE
PROJECT
SITE FEATURES WITHIN THIS BOUNDARY
TO BE COMPLETED AFTER THE ELEVATED
TANK PROJECT HAS COMPLETED.
MAP UNIT NAMEMAP SYMBOL SOIL NAME
SOILS LEGEND
CA CARTECAY
6 TO 10 % SLOPES
CECIL SANDY LOAMCeC CECIL
WEHADKEE SOILSWF WEHADKEE
0 TO 2 % SLOPES
0 TO 2 % SLOPES
C :\U se rs
\D
EB
O R
A~ 1.
M C
K\ Ap pD at a\ Lo ca l\T em p\
Ac Pu bl is h_
\2
2-
C -0
S ite
P la n.
dw g (5
.1 ) P lo tte d on
Ju n
, 2
- 9
:5 3a m b y de bo ra h.
m ck in ne y checked by:
project number:
contact:
drawn by:
s h e e t n u m b e r s h e e t t i t l e d r a w i n g d a t e d r a w i n g i n f o r m a t i o n c l i e n t i n f o r m a t i o n p r o j e c t a d d r e s s s e a l r e v i s i o n s
1447 Peachtree Street NE, Suite 850 Atlanta, Georgia 30309 404.873.6730 www.tsw-design.com c o n s u l t a n t n o r t h a r r o w + s c a l e
Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of TSW and may not be used in any way without the written permission of this office.
p r o j e c t i n f o r m a t i o n
SHEET TITLE
GAB
GAB
GREG BRENNER (256) 508-3406
GREG.BRENNER@LAND.ENGINEERING
2102-008
CITY OF CANTON
110 ACADEMY STREET
CANTON, GA 30114
770.720.7674
2939 MARIETTA HWY
CANTON, GA 30114
SOUTH CANTON
PARK
APRIL 30, 2025
100% CONSTRUCTION DOCUMENTS
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
2102-008 Project Number:
CANTON
State:
County:
City:
Section:
District:
Land Lot:
Project Location:
NA
CANTON
CHEROKEE
GA
4/30/2025
A - 2ND SUBMITTAL - 05/29/25
VEGETATIVE MEASURESSTRUCTURAL PRACTICES
UNIFORM CODING SYMBOLS (2016)
Cd-Hb Straw-bale Checkdam
Cd-S Stone Checkdam
Ch-1 Channel Stabilization Category 1 (0-5 ft/sec)
Ch-2
Ch-3
Co Construction Exit
Cr Construction Road Stabilization
Dc-A Stream Diversion with Geotextile, Polyethylene, or Sod Lining
Dc-B Stream Diversion with Geotextile Lining.
Dc-C Stream Diversion with Geotextile & Rip-Rap Lining.
Di Diversion Ditch or Channel
Dn1 Temporary Downdrain Structure
Dn2 Permanent Downdrain Structure
Fr Filter Ring
Ga Gabion
Gr Grade Stabilization Structure
Lv Level Spreader
Rd Rock Filter Dam
Re Retaining Wall
Rt Retrofit
Sd1-NS Sediment Barrier Nonsensitive Areas
Sd1-S Sediment Barrier Sensitive Areas
Sd1-BB Sediment Barrier Brush Barrier
Sd1-Hb Sediment Barrier Hay Bales
Sd1-Bb Sediment Barrier Brush Barrier
Ds2 Disturbed Area Stabilization with Temporary Seeding
Disturbed Area Stabilization with Permanent SeedingDs3
Ds1 Disturbed Area Stabilization with Mulching Only
Bf Buffer Zone
Disturbed Area Stabilization with SoddingDs4
Dust Control on Disturbed AreasDu
Slope StabilizationSs
Stream Bank Stabilization with Permanent VegetationSb
Tackifiers - Synthetic PolymersTac-1
Sd2-B Inlet Sediment Trap Baffle Box
Sd2-Bg Inlet Sediment Trap Block & Gravel
Sd2-E Inlet Sediment Trap Excavated Inlet Protection
Sd2-F Inlet Sediment Trap - Filter Ring or Filter Fabric w/ Frame
Sd2-G Inlet Sediment Trap Gravel Inlet Protection
Sd2-P Inlet Sediment Trap Curb Inlet Protection
Sd2-S Inlet Sediment Trap Sod Inlet Protection
Sd3 Temporary Sediment Basin
Sr Temporary Stream Crossing
St Storm Drain Outlet Protection
Su Surface Roughening
Tc Tubidity Curtain
Wt Vegetated Waterway or Conveyance Channel
Sd4 Temporary Sediment Trap
Tr Tree Protection
Tackifiers - Organic PolymersTac-2
Tackifiers - Synthetic/Organic BlendsTac-3
Tackifiers - Organic with Synthetic FibersTac-4
Tackifiers - Synthetic/Organic Blends wit Synthetic FibersTac-5
Cd-Fs Compost Filter Sock Checkdam
Channel Stabilization Category 2 (5-10 ft/sec)
Channel Stabilization Category 3 (>10 ft/sec)
Sk Floating Surface SkimmerSb Seep Berm
Tp Topsoiling
SpB Seep Berm
NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES
AND PERMITS.
AMENDMENTS OR REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC
COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
WASTE MATERIALS SHALL NOT BE DISCHARGED INTO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION
404 PERMIT.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT
CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
ANY DISTURBED AREA REMAINING IDLE FOR 30 DAYS SHALL BE STABILIZED WITH PERMANENT VEGETATION.
ALL TEMPORARY AND PERMANENT SEEDING MUST BE PERFORMED AT THE APPROPRIATE SEASON. IN SUCH INSTANCES WHERE THE ESTABLISHMENT OF VEGETATION IS INOPPORTUNE DUE TO SEASON OR DROUGHT, DISTURBED AREA SHALL BE TEMPORARY STABILIZED USING 2"-4" OF MULCH (Ds1). ADDITIONAL PLANTINGS WILL BE NECESSARY IF A
SUFFICIENT STAND OF GRASS FAILS TO GROW.
THE LOCAL ISSUING AUTHORITY'S DESIGNEE WILL VERIFY ADEQUATE COVER (100% COVER, 70% COVER) OF PERMANENT STABILIZATION (Ds3, Ds4).
THE ES&PC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITES, AND IN SUCH A MANNER AS TO INSURE THAT SEDMIENT-LADEN WATER DO NOT ENTER THE
DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
THE PROPERTY OWNER AND CONTRACTOR ARE EQUALLY RESPONSIBLE FOR ALL EROSION CONTROL
ACTIVITIES.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN QUALIFIED PROFESSIONAL ADVICE WHEN QUESTIONS ARISE CONCERNING DESIGN AND EFFECTIVENESS OF EROSION CONTROL DEVICES, NOT THE LOCAL ISSUING
AUTHORITY.
FOR EACH SITE ON WHICH LAND DISTURBING ACTIVITY OCCURS, EACH ENTITY OR PERSON ACTING AS EITHER A PRIMARY, SECONDARY, OR TERTIARY PERMITTEE, AS DEFINED IN THE STATE GENERAL PERMIT, SHALL HAVE AS A MINIMUM ONE PERSON WHO IS IN RESPONSIBLE CHARGE OF EROSION AND SEDIMENTATION CONTROL ACTIVITIES ON BEHALF OF SAID ENTITY OR PERSON AND MEETS THE APPLICABLE (LEVEL A1) EDUCATION OR TRAINING CERTIFICATION REQUIREMENTS (O.C.G.A 12-7-19(a)(2)).
SUBCONTRACTORS INVOLVED WITH LAND DISTURBANCE ACTIVITIES SHALL MEET THE EDUCATION REQUIREMENTS
(LEVEL 1) DESCRIBED IN O.C.G.A. 12-7-19.
THE ES&PC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION / LAND DISTURBANCE PERIOD, THESE ES&PC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN
WATER DO NOT LEAVE THE SITE.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST WEEKLY, AFTER EACH RAIN, AND
REPAIRED AS NECESSARY.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED NECESSARY BY
ON-SITE INSPECTION.
SILT FENCE SHALL MEET THE REQUIREMENTS OF SECTION 171 - TYPE C TEMPORARY SILT FENCE, OF THE GEORGIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATION, 1993 EDITION, AND BE WIRE
REINFORCED.
SILT FENCE SHALL NOT BE PLACED IN STREAM BUFFER OR FLOODPLAINS, UNLESS UTILIZED FOR THE CONSTRUCTION OF AN EXEMPT ACTIVITY (I.E. ROADWAY DRAINAGE STRUCTURES, SEWER/WATER CROSSINGS, OR DRAINAGE STRUCTURES) PER THE APPROVED PLANS. FOR SUCH DISTURBANCES WITHIN THE BUFFER, THE AREA SHALL BE IMMEDIATELY STABILIZED USING EROSION CONTROL MATTING AND/OR
BLANKETS ONCE THE ACTIVITY IS COMPLETE.
STABILIZED CONSTRUCTION EXITS SHALL BE INSTALLED AT THE BEGINNING OF LAND DISTURBANCE AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE
THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
SEDIMENT STORAGE VOLUME @ 67 CY/ACRE MUST BE INSTALLED PRIOR TO ANY OTHER LAND
DISTURBANCE ACTIVITY AND IN PLACE UNTIL FINAL STABILIZATION OCCURS.
AMENDMENTS/REVISION TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL, AND SUBSEQUENTLY
APPROVED BY THE SITE DEVELOPMENT STAFF.
X X X
XX XX XX
SILT FENCE SINGLE ROW
SILT FENCE DOUBLE ROW
C-TF C-TF C-TF L.O.D. AND TREE SAVE FENCE
TREE SAVE FENCETF TF TF TF
C C C C LIMITS OF DISTURBANCE
N
GA
W es t G rid
CARTECAY SOILS
00 30' 60'
Graphic Scale in Feet 1" = 30'
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
C-5.1
ES&PC PHASE 1 -
INITIAL PLAN
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W W W W
W W W
W W W
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
G G G G G G G G G G G G
G G G GG
G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G G G G G G G
G G G G G G G G G G G G G G G G G G G G G G G G
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
SS
SS
POB
W W W W
G
G
G
G G
JB
SS SS SS
JB
SS SS SS
SS SS SS
JB
1135 1130
05 1100
11 4 1
1125112
2''W
2''W
2''W
2''W
4''W
6''W
6''W
6''W
6''W 6''W
2''W
2''W
W
W
W W
W
W
6''W
11011105
41 1140
JB
WEIR
SIZE
WEIR
SIZE
WEIR
SIZE
W
EI
R
SI
ZE
W
EIR
SIZE
W
EIR
SIZE
W
EIR
SIZE
W
EI
R
SI
ZE
JB
SS SS SS
JB
SS SS SS
SS SS SS
JB
1135 1130
05 1100
11 4 1
1125112
2''W
2''W
2''W
2''W
4''W
6''W
6''W
6''W
6''W 6''W
2''W
2''W
W
W
W W
W
W
6''W
11011105
41 1140
JB
WEIR
SIZE
WEIR
SIZE
WEIR
SIZE
W
EI
R
SI
ZE
W
EIR
SIZE
W
EIR
SIZE
W
EIR
SIZE
W
EI
R
SI
ZE
TcE
MjE
MjE
MjE
Ds1
Ds2
Ds3
Du
ALL DISTURBED AREA
Co
Sd2-S
X
X X
CONCRETE WASHDOWN AREA
Sd2-S
Sd2-S
Sd2-S
Sd2-S
Sd2-F
Sd2-F
Sd2-F/P
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F/P
Sd2-F/P
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
St
St
St
Sd2-F
Sd2-F
Sd2-F
Sd2-F/P
Sd2-F
Sd2-F
Sd2-E
Sd2-F
Sd2-S
C-TF
C-
TF
C-
TF
C-TF
C-TF C-
TF
C-
TF
C-
TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF C-TF C-TF
C-
TF
C-
TF
C-TF
C-TF
C-
TF
C C
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-
TF
C-
TF
C-TFC-TFC-TFC-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TFC-TF
C-TFC-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TFC-TFC-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF C-TF
CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C C
C C
C C C C C
C C
C C
C
C
C
C C C C C C
C
C
X X
XX
X X
X X
X X
XX
XX
XX
XX
X X
X X
XX
XX
X X
XX
X X
XX
X X
XX
XX
XX
XX XX
X X
X X
XX
TF
TF
TF
TF
TF
TF
TF
TF
TF
TFTFTFTF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF TF
TF
TF
TF
TF
TF
TF
TF
TFTFTFTFTFTF
TF TF
TF TF
TF
TF
TF
TF
TF
TF
TFTF
TF
TF TF
TF TF
TF
TFTF
TF
TF
TF
TF
TF TF TF
TF
TF
TF
TF
TF
TFTF
TF
TF
TFTF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TFTF
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
Sd2-E
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP B
EXCAVATED INLET SEDIMENT TRAP B
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP B
EXCAVATED INLET SEDIMENT TRAP B
EXCAVATED INLET SEDIMENT TRAP C
EXCAVATED INLET SEDIMENT TRAP C
EXCAVATED INLET SEDIMENT TRAP C
EXCAVATED INLET SEDIMENT TRAP A
EXCAVATED INLET SEDIMENT TRAP C
EXCAVATED INLET SEDIMENT TRAP C
Sd2-F/P
Sd2-F
Sd2-E
Sd2-E
Sd2-F
ST
Q25: 38.00 CFS
V25: 7.5 FT/S
LA: 20'
D50: 0.90'
Fr
ST
Q25: 29.9 CFS
V25: 9.7 FT/S
LA: 18'
D50: 0.80'
ST
Q25: 1.8 CFS
V25: 10.0 FT/S
LA: 16'
D50: 0.70'
STONE
D50: 1.0'
Sk
N.I.C. - SITE FEATURES WITHIN THIS BOUNDARY ARE
NOT TO BE COMPLETED AS PART OF THESE
DOCUMENTS. TO BE COMPLETED AS A SEPARATE
PROJECT
SITE FEATURES WITHIN THIS BOUNDARY
TO BE COMPLETED AFTER THE ELEVATED
TANK PROJECT HAS COMPLETED.
C :\U se rs
\D
EB
O R
A~ 1.
M C
K\ Ap pD at a\ Lo ca l\T em p\
Ac Pu bl is h_
\2
2-
C -0
S ite
P la n.
dw g (5
.2 ) P lo tte d on
Ju n
, 2
- 9
:5 4a m b y de bo ra h.
m ck in ne y checked by:
project number:
contact:
drawn by:
s h e e t n u m b e r s h e e t t i t l e d r a w i n g d a t e d r a w i n g i n f o r m a t i o n c l i e n t i n f o r m a t i o n p r o j e c t a d d r e s s s e a l r e v i s i o n s
1447 Peachtree Street NE, Suite 850 Atlanta, Georgia 30309 404.873.6730 www.tsw-design.com c o n s u l t a n t n o r t h a r r o w + s c a l e
Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of TSW and may not be used in any way without the written permission of this office.
p r o j e c t i n f o r m a t i o n
SHEET TITLE
GAB
GAB
GREG BRENNER (256) 508-3406
GREG.BRENNER@LAND.ENGINEERING
2102-008
CITY OF CANTON
110 ACADEMY STREET
CANTON, GA 30114
770.720.7674
2939 MARIETTA HWY
CANTON, GA 30114
SOUTH CANTON
PARK
APRIL 30, 2025
100% CONSTRUCTION DOCUMENTS
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
2102-008 Project Number:
CANTON
State:
County:
City:
Section:
District:
Land Lot:
Project Location:
NA
CANTON
CHEROKEE
GA
4/30/2025
A - 2ND SUBMITTAL - 05/29/25
VEGETATIVE MEASURESSTRUCTURAL PRACTICES
UNIFORM CODING SYMBOLS (2016)
Cd-Hb Straw-bale Checkdam
Cd-S Stone Checkdam
Ch-1 Channel Stabilization Category 1 (0-5 ft/sec)
Ch-2
Ch-3
Co Construction Exit
Cr Construction Road Stabilization
Dc-A Stream Diversion with Geotextile, Polyethylene, or Sod Lining
Dc-B Stream Diversion with Geotextile Lining.
Dc-C Stream Diversion with Geotextile & Rip-Rap Lining.
Di Diversion Ditch or Channel
Dn1 Temporary Downdrain Structure
Dn2 Permanent Downdrain Structure
Fr Filter Ring
Ga Gabion
Gr Grade Stabilization Structure
Lv Level Spreader
Rd Rock Filter Dam
Re Retaining Wall
Rt Retrofit
Sd1-NS Sediment Barrier Nonsensitive Areas
Sd1-S Sediment Barrier Sensitive Areas
Sd1-BB Sediment Barrier Brush Barrier
Sd1-Hb Sediment Barrier Hay Bales
Sd1-Bb Sediment Barrier Brush Barrier
Ds2 Disturbed Area Stabilization with Temporary Seeding
Disturbed Area Stabilization with Permanent SeedingDs3
Ds1 Disturbed Area Stabilization with Mulching Only
Bf Buffer Zone
Disturbed Area Stabilization with SoddingDs4
Dust Control on Disturbed AreasDu
Slope StabilizationSs
Stream Bank Stabilization with Permanent VegetationSb
Tackifiers - Synthetic PolymersTac-1
Sd2-B Inlet Sediment Trap Baffle Box
Sd2-Bg Inlet Sediment Trap Block & Gravel
Sd2-E Inlet Sediment Trap Excavated Inlet Protection
Sd2-F Inlet Sediment Trap - Filter Ring or Filter Fabric w/ Frame
Sd2-G Inlet Sediment Trap Gravel Inlet Protection
Sd2-P Inlet Sediment Trap Curb Inlet Protection
Sd2-S Inlet Sediment Trap Sod Inlet Protection
Sd3 Temporary Sediment Basin
Sr Temporary Stream Crossing
St Storm Drain Outlet Protection
Su Surface Roughening
Tc Tubidity Curtain
Wt Vegetated Waterway or Conveyance Channel
Sd4 Temporary Sediment Trap
Tr Tree Protection
Tackifiers - Organic PolymersTac-2
Tackifiers - Synthetic/Organic BlendsTac-3
Tackifiers - Organic with Synthetic FibersTac-4
Tackifiers - Synthetic/Organic Blends wit Synthetic FibersTac-5
Cd-Fs Compost Filter Sock Checkdam
Channel Stabilization Category 2 (5-10 ft/sec)
Channel Stabilization Category 3 (>10 ft/sec)
Sk Floating Surface SkimmerSb Seep Berm
Tp Topsoiling
SpB Seep Berm
NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES
AND PERMITS.
AMENDMENTS OR REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC
COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
WASTE MATERIALS SHALL NOT BE DISCHARGED INTO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION
404 PERMIT.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT
CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
ANY DISTURBED AREA REMAINING IDLE FOR 30 DAYS SHALL BE STABILIZED WITH PERMANENT VEGETATION.
ALL TEMPORARY AND PERMANENT SEEDING MUST BE PERFORMED AT THE APPROPRIATE SEASON. IN SUCH INSTANCES WHERE THE ESTABLISHMENT OF VEGETATION IS INOPPORTUNE DUE TO SEASON OR DROUGHT, DISTURBED AREA SHALL BE TEMPORARY STABILIZED USING 2"-4" OF MULCH (Ds1). ADDITIONAL PLANTINGS WILL BE NECESSARY IF A
SUFFICIENT STAND OF GRASS FAILS TO GROW.
THE LOCAL ISSUING AUTHORITY'S DESIGNEE WILL VERIFY ADEQUATE COVER (100% COVER, 70% COVER) OF PERMANENT STABILIZATION (Ds3, Ds4).
THE ES&PC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITES, AND IN SUCH A MANNER AS TO INSURE THAT SEDMIENT-LADEN WATER DO NOT ENTER THE
DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
THE PROPERTY OWNER AND CONTRACTOR ARE EQUALLY RESPONSIBLE FOR ALL EROSION CONTROL
ACTIVITIES.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN QUALIFIED PROFESSIONAL ADVICE WHEN QUESTIONS ARISE CONCERNING DESIGN AND EFFECTIVENESS OF EROSION CONTROL DEVICES, NOT THE LOCAL ISSUING
AUTHORITY.
FOR EACH SITE ON WHICH LAND DISTURBING ACTIVITY OCCURS, EACH ENTITY OR PERSON ACTING AS EITHER A PRIMARY, SECONDARY, OR TERTIARY PERMITTEE, AS DEFINED IN THE STATE GENERAL PERMIT, SHALL HAVE AS A MINIMUM ONE PERSON WHO IS IN RESPONSIBLE CHARGE OF EROSION AND SEDIMENTATION CONTROL ACTIVITIES ON BEHALF OF SAID ENTITY OR PERSON AND MEETS THE APPLICABLE (LEVEL A1) EDUCATION OR TRAINING CERTIFICATION REQUIREMENTS (O.C.G.A 12-7-19(a)(2)).
SUBCONTRACTORS INVOLVED WITH LAND DISTURBANCE ACTIVITIES SHALL MEET THE EDUCATION REQUIREMENTS
(LEVEL 1) DESCRIBED IN O.C.G.A. 12-7-19.
THE ES&PC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION / LAND DISTURBANCE PERIOD, THESE ES&PC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN
WATER DO NOT LEAVE THE SITE.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST WEEKLY, AFTER EACH RAIN, AND
REPAIRED AS NECESSARY.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED NECESSARY BY
ON-SITE INSPECTION.
SILT FENCE SHALL MEET THE REQUIREMENTS OF SECTION 171 - TYPE C TEMPORARY SILT FENCE, OF THE GEORGIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATION, 1993 EDITION, AND BE WIRE
REINFORCED.
SILT FENCE SHALL NOT BE PLACED IN STREAM BUFFER OR FLOODPLAINS, UNLESS UTILIZED FOR THE CONSTRUCTION OF AN EXEMPT ACTIVITY (I.E. ROADWAY DRAINAGE STRUCTURES, SEWER/WATER CROSSINGS, OR DRAINAGE STRUCTURES) PER THE APPROVED PLANS. FOR SUCH DISTURBANCES WITHIN THE BUFFER, THE AREA SHALL BE IMMEDIATELY STABILIZED USING EROSION CONTROL MATTING AND/OR
BLANKETS ONCE THE ACTIVITY IS COMPLETE.
STABILIZED CONSTRUCTION EXITS SHALL BE INSTALLED AT THE BEGINNING OF LAND DISTURBANCE AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE
THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
SEDIMENT STORAGE VOLUME @ 67 CY/ACRE MUST BE INSTALLED PRIOR TO ANY OTHER LAND
DISTURBANCE ACTIVITY AND IN PLACE UNTIL FINAL STABILIZATION OCCURS.
AMENDMENTS/REVISION TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL, AND SUBSEQUENTLY
APPROVED BY THE SITE DEVELOPMENT STAFF.
X X X
XX XX XX
SILT FENCE SINGLE ROW
SILT FENCE DOUBLE ROW
C-TF C-TF C-TF L.O.D. AND TREE SAVE FENCE
TREE SAVE FENCETF TF TF TF
C C C C LIMITS OF DISTURBANCE
N
GA
W es t G rid
CARTECAY SOILS
MAP UNIT NAMEMAP SYMBOL SOIL NAME
SOILS LEGEND
CA CARTECAY
6 TO 10 % SLOPES
CECIL SANDY LOAMCeC CECIL
WEHADKEE SOILSWF WEHADKEE
0 TO 2 % SLOPES
0 TO 2 % SLOPES
00 30' 60'
Graphic Scale in Feet 1" = 30'
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
C-5.2
ES&PC PHASE 2 -
INTERMEDIATE PLAN
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W W W W
W W W
W W W
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
G G G G G G G G G G G G
G G G GG
G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G
G
G
G
G
G
G
G
G G G G G G G
G G G G G G G G G G G G G G G G G G G G G G G G
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
SS
SS
W W W W
G
G
G G
15.00
68.78 20.00
20.00
10.00 10.00
10.00
HB
HB
Xref P:\2102\008\CAD\Engineering\Park\XREFs\ARCH - Pavilion.dwg
Xref P:\2102\008\CAD\Engineering\Park\X REFs\ARCH - Restroom.dwg
34 33
36 34
373839
31 11
T
39 38 37
HB
FTE
FTE
FNTN
G
FC
I
G
FC
I
G
FC
I
GFC
I
GFCI
C#003
C#002
F#001
C#001
C#004
C#005
2 1
1 1
2 2
2 2
2 2 2
2 2
2 2
2 2
2 2
2 2
2 2
1 1 1
1 1
1 1 1
1 1
1 1
1 1
1 1
1 1
2 2
1 1
11 1
1 1
1 1
1 1
2 2
1 1
1 1
2 2
1 1
11 111
1 1 11
1 1 1
1 1
1 1
2 2
1 1
1 1
1 1
1 1
1 1
1 1
11 1
11 1
1 1
1 1 1 1
1 1
1 1
3 3
1 1
Xref P:\2102\008\CAD\Engineering\Park\XREFs\STRUCTURAL - Boardwalk.dwg
VAN
R
R
R
R
R
R
R
R
IRR
JB
SS SS SS
JB
SS SS SS
SS SS SS
JB
1135 1130
05 1100
11 4 1
1125112
2''W
2''W
2''W
2''W
4''W
6''W
6''W
6''W
6''W 6''W
2''W
2''W
W
W
W W
W
W
6''W
11011105
41 1140
JB
1 1
WEIR
SIZE
WEIR
SIZE
WEIR
SIZE
W
EI
R
SI
ZE
W
EIR
SIZE
W
EIR
SIZE
W
EIR
SIZE
W
EI
R
SI
ZE
JB
SS SS SS
JB
SS SS SS
SS SS SS
JB
1135 1130
05 1100
11 4 1
1125112
2''W
2''W
2''W
2''W
4''W
6''W
6''W
6''W
6''W 6''W
2''W
2''W
W
W
W W
W
W
6''W
11011105
41 1140
JB
1 1
WEIR
SIZE
WEIR
SIZE
WEIR
SIZE
W
EI
R
SI
ZE
W
EIR
SIZE
W
EIR
SIZE
W
EIR
SIZE
W
EI
R
SI
ZE
TcE
MjE
MjE
MjE
Ds1
Ds2
Ds3
Du
ALL DISTURBED AREA
Co
Sd2-S
X
X X
CONCRETE WASHDOWN AREA
Sd2-S
Sd2-S
Sd2-S
Sd2-S
Sd2-F
Sd2-F
Sd2-F/P
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F/P
Sd2-F/P
Sd2-F
Sd2-F
Sd2-F
Sd2-F
Sd2-F
St
St
St
Sd2-F
Sd2-F
Sd2-F
Sd2-F/P
Sd2-F
Sd2-F
Sd2-F
Sd2-S
C-TF
C-
TF
C-
TF
C-TF
C-TF C-
TF
C-
TF
C-
TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF C-TF C-TF
C-
TF
C-
TF
C-TF
C-TF
C-
TF
C C
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-
TF
C-
TF
C-TFC-TFC-TFC-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TFC-TF
C-TFC-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TFC-TFC-TF
C-TF
C-TF
C-TF C-TF
C-TF
C-TF
C-TF
C-TF C-TF C-TF
CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC
C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C C
C C
C C C C C
C C
C C
C
C
C
C C C C C C
C
C
X X
XX
X X
X X
X X
XX
XX
XX
XX
X X
X X
XX
XX
X X
XX
X X
XX
X X
XX
XX
XX
XX XX
X X
X X
XX
TF
TF
TF
TF
TF
TF
TF
TF
TF
TFTFTFTF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF TF
TF
TF
TF
TF
TF
TF
TF
TFTFTFTFTFTF
TF TF
TF TF
TF
TF
TF
TF
TF
TF
TFTF
TF
TF TF
TF TF
TF
TFTF
TF
TF
TF
TF
TF TF TF
TF
TF
TF
TF
TF
TFTF
TF
TF
TFTF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TF
TFTF
Sd2-F/P
Sd2-F
Sd2-F
ST
Q25: 38.00 CFS
V25: 7.5 FT/S
LA: 20'
D50: 0.90'
Fr
ST
Q25: 29.9 CFS
V25: 9.7 FT/S
LA: 18'
D50: 0.80'
ST
Q25: 1.8 CFS
V25: 10.0 FT/S
LA: 16'
D50: 0.70'
STONE
D50: 1.0'
Sk
N.I.C. - SITE FEATURES WITHIN THIS BOUNDARY ARE
NOT TO BE COMPLETED AS PART OF THESE
DOCUMENTS. TO BE COMPLETED AS A SEPARATE
PROJECT
SITE FEATURES WITHIN THIS BOUNDARY
TO BE COMPLETED AFTER THE ELEVATED
TANK PROJECT HAS COMPLETED.
C :\U se rs
\D
EB
O R
A~ 1.
M C
K\ Ap pD at a\ Lo ca l\T em p\
Ac Pu bl is h_
\2
2-
C -0
S ite
P la n.
dw g (5
.3 ) P lo tte d on
Ju n
, 2
- 9
:5 3a m b y de bo ra h.
m ck in ne y checked by:
project number:
contact:
drawn by:
s h e e t n u m b e r s h e e t t i t l e d r a w i n g d a t e d r a w i n g i n f o r m a t i o n c l i e n t i n f o r m a t i o n p r o j e c t a d d r e s s s e a l r e v i s i o n s
1447 Peachtree Street NE, Suite 850 Atlanta, Georgia 30309 404.873.6730 www.tsw-design.com c o n s u l t a n t n o r t h a r r o w + s c a l e
Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of TSW and may not be used in any way without the written permission of this office.
p r o j e c t i n f o r m a t i o n
SHEET TITLE
GAB
GAB
GREG BRENNER (256) 508-3406
GREG.BRENNER@LAND.ENGINEERING
2102-008
CITY OF CANTON
110 ACADEMY STREET
CANTON, GA 30114
770.720.7674
2939 MARIETTA HWY
CANTON, GA 30114
SOUTH CANTON
PARK
APRIL 30, 2025
100% CONSTRUCTION DOCUMENTS
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
2102-008 Project Number:
CANTON
State:
County:
City:
Section:
District:
Land Lot:
Project Location:
NA
CANTON
CHEROKEE
GA
4/30/2025
A - 2ND SUBMITTAL - 05/29/25
VEGETATIVE MEASURESSTRUCTURAL PRACTICES
UNIFORM CODING SYMBOLS (2016)
Cd-Hb Straw-bale Checkdam
Cd-S Stone Checkdam
Ch-1 Channel Stabilization Category 1 (0-5 ft/sec)
Ch-2
Ch-3
Co Construction Exit
Cr Construction Road Stabilization
Dc-A Stream Diversion with Geotextile, Polyethylene, or Sod Lining
Dc-B Stream Diversion with Geotextile Lining.
Dc-C Stream Diversion with Geotextile & Rip-Rap Lining.
Di Diversion Ditch or Channel
Dn1 Temporary Downdrain Structure
Dn2 Permanent Downdrain Structure
Fr Filter Ring
Ga Gabion
Gr Grade Stabilization Structure
Lv Level Spreader
Rd Rock Filter Dam
Re Retaining Wall
Rt Retrofit
Sd1-NS Sediment Barrier Nonsensitive Areas
Sd1-S Sediment Barrier Sensitive Areas
Sd1-BB Sediment Barrier Brush Barrier
Sd1-Hb Sediment Barrier Hay Bales
Sd1-Bb Sediment Barrier Brush Barrier
Ds2 Disturbed Area Stabilization with Temporary Seeding
Disturbed Area Stabilization with Permanent SeedingDs3
Ds1 Disturbed Area Stabilization with Mulching Only
Bf Buffer Zone
Disturbed Area Stabilization with SoddingDs4
Dust Control on Disturbed AreasDu
Slope StabilizationSs
Stream Bank Stabilization with Permanent VegetationSb
Tackifiers - Synthetic PolymersTac-1
Sd2-B Inlet Sediment Trap Baffle Box
Sd2-Bg Inlet Sediment Trap Block & Gravel
Sd2-E Inlet Sediment Trap Excavated Inlet Protection
Sd2-F Inlet Sediment Trap - Filter Ring or Filter Fabric w/ Frame
Sd2-G Inlet Sediment Trap Gravel Inlet Protection
Sd2-P Inlet Sediment Trap Curb Inlet Protection
Sd2-S Inlet Sediment Trap Sod Inlet Protection
Sd3 Temporary Sediment Basin
Sr Temporary Stream Crossing
St Storm Drain Outlet Protection
Su Surface Roughening
Tc Tubidity Curtain
Wt Vegetated Waterway or Conveyance Channel
Sd4 Temporary Sediment Trap
Tr Tree Protection
Tackifiers - Organic PolymersTac-2
Tackifiers - Synthetic/Organic BlendsTac-3
Tackifiers - Organic with Synthetic FibersTac-4
Tackifiers - Synthetic/Organic Blends wit Synthetic FibersTac-5
Cd-Fs Compost Filter Sock Checkdam
Channel Stabilization Category 2 (5-10 ft/sec)
Channel Stabilization Category 3 (>10 ft/sec)
Sk Floating Surface SkimmerSb Seep Berm
Tp Topsoiling
SpB Seep Berm
NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES
AND PERMITS.
AMENDMENTS OR REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC
COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
WASTE MATERIALS SHALL NOT BE DISCHARGED INTO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION
404 PERMIT.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT
CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
ANY DISTURBED AREA REMAINING IDLE FOR 30 DAYS SHALL BE STABILIZED WITH PERMANENT VEGETATION.
ALL TEMPORARY AND PERMANENT SEEDING MUST BE PERFORMED AT THE APPROPRIATE SEASON. IN SUCH INSTANCES WHERE THE ESTABLISHMENT OF VEGETATION IS INOPPORTUNE DUE TO SEASON OR DROUGHT, DISTURBED AREA SHALL BE TEMPORARY STABILIZED USING 2"-4" OF MULCH (Ds1). ADDITIONAL PLANTINGS WILL BE NECESSARY IF A
SUFFICIENT STAND OF GRASS FAILS TO GROW.
THE LOCAL ISSUING AUTHORITY'S DESIGNEE WILL VERIFY ADEQUATE COVER (100% COVER, 70% COVER) OF PERMANENT STABILIZATION (Ds3, Ds4).
THE ES&PC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITES, AND IN SUCH A MANNER AS TO INSURE THAT SEDMIENT-LADEN WATER DO NOT ENTER THE
DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
THE PROPERTY OWNER AND CONTRACTOR ARE EQUALLY RESPONSIBLE FOR ALL EROSION CONTROL
ACTIVITIES.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN QUALIFIED PROFESSIONAL ADVICE WHEN QUESTIONS ARISE CONCERNING DESIGN AND EFFECTIVENESS OF EROSION CONTROL DEVICES, NOT THE LOCAL ISSUING
AUTHORITY.
FOR EACH SITE ON WHICH LAND DISTURBING ACTIVITY OCCURS, EACH ENTITY OR PERSON ACTING AS EITHER A PRIMARY, SECONDARY, OR TERTIARY PERMITTEE, AS DEFINED IN THE STATE GENERAL PERMIT, SHALL HAVE AS A MINIMUM ONE PERSON WHO IS IN RESPONSIBLE CHARGE OF EROSION AND SEDIMENTATION CONTROL ACTIVITIES ON BEHALF OF SAID ENTITY OR PERSON AND MEETS THE APPLICABLE (LEVEL A1) EDUCATION OR TRAINING CERTIFICATION REQUIREMENTS (O.C.G.A 12-7-19(a)(2)).
SUBCONTRACTORS INVOLVED WITH LAND DISTURBANCE ACTIVITIES SHALL MEET THE EDUCATION REQUIREMENTS
(LEVEL 1) DESCRIBED IN O.C.G.A. 12-7-19.
THE ES&PC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION / LAND DISTURBANCE PERIOD, THESE ES&PC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN
WATER DO NOT LEAVE THE SITE.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST WEEKLY, AFTER EACH RAIN, AND
REPAIRED AS NECESSARY.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED NECESSARY BY
ON-SITE INSPECTION.
SILT FENCE SHALL MEET THE REQUIREMENTS OF SECTION 171 - TYPE C TEMPORARY SILT FENCE, OF THE GEORGIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATION, 1993 EDITION, AND BE WIRE
REINFORCED.
SILT FENCE SHALL NOT BE PLACED IN STREAM BUFFER OR FLOODPLAINS, UNLESS UTILIZED FOR THE CONSTRUCTION OF AN EXEMPT ACTIVITY (I.E. ROADWAY DRAINAGE STRUCTURES, SEWER/WATER CROSSINGS, OR DRAINAGE STRUCTURES) PER THE APPROVED PLANS. FOR SUCH DISTURBANCES WITHIN THE BUFFER, THE AREA SHALL BE IMMEDIATELY STABILIZED USING EROSION CONTROL MATTING AND/OR
BLANKETS ONCE THE ACTIVITY IS COMPLETE.
STABILIZED CONSTRUCTION EXITS SHALL BE INSTALLED AT THE BEGINNING OF LAND DISTURBANCE AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE
THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
SEDIMENT STORAGE VOLUME @ 67 CY/ACRE MUST BE INSTALLED PRIOR TO ANY OTHER LAND
DISTURBANCE ACTIVITY AND IN PLACE UNTIL FINAL STABILIZATION OCCURS.
AMENDMENTS/REVISION TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL, AND SUBSEQUENTLY
APPROVED BY THE SITE DEVELOPMENT STAFF.
X X X
XX XX XX
SILT FENCE SINGLE ROW
SILT FENCE DOUBLE ROW
C-TF C-TF C-TF L.O.D. AND TREE SAVE FENCE
TREE SAVE FENCETF TF TF TF
C C C C LIMITS OF DISTURBANCE
N
GA
W es t G rid
CARTECAY SOILS
MAP UNIT NAMEMAP SYMBOL SOIL NAME
SOILS LEGEND
CA CARTECAY
6 TO 10 % SLOPES
CECIL SANDY LOAMCeC CECIL
WEHADKEE SOILSWF WEHADKEE
0 TO 2 % SLOPES
0 TO 2 % SLOPES
00 30' 60'
Graphic Scale in Feet 1" = 30'
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
C-5.3
ES&PC PHASE 3 -
FINAL PLAN
se rs
\D
EB
O R
A~ 1.
M C
K\ Ap pD at a\ Lo ca l\T em p\
Ac Pu bl is h_
\2
2-
C -0
S ite
P la n.
dw g (5
.4 ) P lo tte d on
Ju n
, 2
- 9
:5 4a m b y de bo ra h.
m ck in ne y checked by:
project number:
contact:
drawn by:
s h e e t n u m b e r s h e e t t i t l e d r a w i n g d a t e d r a w i n g i n f o r m a t i o n c l i e n t i n f o r m a t i o n p r o j e c t a d d r e s s s e a l r e v i s i o n s
1447 Peachtree Street NE, Suite 850 Atlanta, Georgia 30309 404.873.6730 www.tsw-design.com c o n s u l t a n t n o r t h a r r o w + s c a l e
Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of TSW and may not be used in any way without the written permission of this office.
p r o j e c t i n f o r m a t i o n
SHEET TITLE
GAB
GAB
GREG BRENNER (256) 508-3406
GREG.BRENNER@LAND.ENGINEERING
2102-008
CITY OF CANTON
110 ACADEMY STREET
CANTON, GA 30114
770.720.7674
2939 MARIETTA HWY
CANTON, GA 30114
SOUTH CANTON
PARK
APRIL 30, 2025
100% CONSTRUCTION DOCUMENTS
1601 S Zack Hinton Parkway McDonough, Georgia 30253
T 678.814.4346, F 678.814.4348 www.land.engineering
GA COA LSF0946 / PEF6180
PROFESSIONAL ENGINEERS AND SURVEYORS
2102-008 Project Number:
CANTON
State:
County:
City:
Section:
District:
Land Lot:
Project Location:
NA
CANTON
CHEROKEE
GA
4/30/2025
A - 2ND SUBMITTAL - 05/29/25
1. PRIOR TO THE LAND DISTURBING CONSTRUCTION, THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE
AREA SITE DEVELOPMENT INSPECTOR.
2. THE CONTRACTOR SHALL OBSERVE THE PROJECT SEQUENCE SHOWN ON THE PLANS. THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO INSURE THAT LAND STRIPPED OF ITS NATURAL COVER IS EXPOSED ONLY IN SMALL
QUANTITIES.
3. THE OWNER AGREES TO PROVIDE AND MAINTAIN OFF-STREET PARKING ON THE SUBJECT PROPERTY DURING THE ENTIRE
CONSTRUCTION PERIOD.
4. NO STAGING AREAS, MATERIAL STORAGE, CONCRETE WASH OUT AREAS, OR DEBRIS BURN AND BURIAL HOLES SHALL BE LOCATED
WITHIN 500 FEET OF DESIGNATED TREE PROTECTION AREAS.
5. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE AT ALL TIMES.
6. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL
MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND-DISTURBING ACTIVITIES.
7. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, THE LIMITS OF LAND DISTURBANCE SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS, OR OTHER APPROPRIATE MEANS. THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE
SHALL OCCUR OUTSIDE THE APPROVED LIMITS INDICATED ON THE APPROVED PLANS.
8. PRIOR TO ANY OTHER CONSTRUCTION, A STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED AT EACH POINT OF ENTRY
TO, OR EXIT FROM, THE SITE OR ONTO ANY PUBLIC ROADWAY.
9. THE FOLLOWING INITIAL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY OTHER CONSTRUCTION ACTIVITY.
a. THE CONSTRUCTION EXIT, CONSISTING OF A MINIMUM PAD SIZE OF 20 FEET BY 50 FEET WITH A MINIMUM OF 6" THICK STONE, SHALL BE PLACED AS SHOWN ON THE PLAN. THE STONE SIZE SHOULD CONSIST OF COURSE AGGREGATE BETWEEN 1-1/2" AND 3-1/2" IN DIAMETER AND OVERLAID ON A GEOTEXTILE UNDERLINER. THE GEOTEXTILE UNDERLINER SHALL MEET THE
REQUIREMENTS OF AASHTO M288-96, SECTION 7.3 SEPARATION REQUIREMENTS.
b. IMMEDIATELY AFTER THE ESTABLISHMENT OF CONSTRUCTION ENTRANCE/EXITS, ALL PERIMETER EROSION CONTROL AND STORM WATER MANAGEMENT DEVICES SHALL BE INSTALLED AS SHOWN ON THE CLEARING-PHASE I-EROSION CONTROL PLAN.
c. TYPE "C" SILT FENCE SHOULD BE INSTALLED AT THE PERIMETER OF THE DISTURBED AREA AS SHOWN ON THE PLAN. THE SILT FENCE SHOULD BE PLACED IN ACCORDANCE WITH THE MANUAL FOR EROSION CONTROL IN GEORGIA, TABLE 6-20.2. THE SILT FENCE SHOULD BE KEPT ERECT AT ALL TIMES AND REPAIRED WHEN REQUESTED BY THE SITE INSPECTOR OR THE PROJECT DESIGN PROFESSIONAL OF RECORD. SILT SHOULD BE REMOVED WHEN ACCUMULATION REACHES ONE-HALF HEIGHT OF THE BARRIER. THE PERIMETER SILT FENCE SHOULD BE INSPECTED DAILY FOR ANY FAILURES. ANY FAILURES OF SAID FENCING
SHOULD BE REPAIRED IMMEDIATELY.
d. INLET SEDIMENT PROTECTION MEASURES SHALL BE INSTALLED ON ALL EXISTING STORM STRUCTURES AS SHOWN ON THE
PLAN. SEE SEPARATE DETAILS FOR SPECIFICS ON TYPE OF INLET PROTECTION SPECIFIED.
e. STONE CHECK DAMS SHALL BE INSTALLED IN AREAS OF CONCENTRATED FLOWS AS SHOWN ON THE PLAN.
f. TREE PROTECTION FENCING SHOULD BE INSTALLED PRIOR TO THE START OF ANY LAND DISTURBANCE ACTIVITY AND MAINTAINED UNTIL FINAL LANDSCAPE IS INSTALLED. THE TREE PROTECTION FENCING SHOULD BE INSPECTED DAILY. ANY
FAILURES OF SAID FENCING SHOULD BE REPAIRED IMMEDIATELY.
10. AFTER INSTALLATION OF INITIAL EROSION CONTROL MEASURES, THE SITE CONTRACTOR SHALL SCHEDULE AN INSPECTION BY THE PROJECT DESIGN PROFESSIONAL. NO OTHER CONSTRUCTION ACTIVITIES SHALL OCCUR UNTIL THE PROJECT DESIGN PROFESSIONAL APPROVES THE INSTALLATION OF SAID EROSION CONTROL MEASURES. IF UNFORESEEN CONDITIONS EXIST IN THE FIELD THAT WARRANT ADDITIONAL EROSION CONTROL MEASURES, THE CONTRACTOR MUST CONSTRUCT ANY ADDITIONAL EROSION CONTROL
DEVICES DEEMED NECESSARY BY THE SITE INSPECTION.
CLEARING - PHASE I - EROSION CONTROL NOTES
11. AFTER APPROVAL OF THE INITIAL EROSION CONTROL INSTALLATION, THE CONTRACTOR MAY PROCEED WITH CLEARING AND
GRUBBING ACTIVITIES. AS CLEARING PERMITS, THE CONTRACTOR SHALL CONSTRUCT TEMPORARY SEDIMENT PONDS AND DIVERSION DIKES AS SHOWN ON THE CLEARING PHASE PLAN TO CONTROL EROSION AND STORM WATER RUN-OFF.
12. THE CONTRACTOR CAN UTILIZE CLEARED TREES AS BARRIER BRUSH SEDIMENT CONTROL IN AREAS SHOWN ON PLAN WHERE INITIAL
GRADING ACTIVITIES WILL NOT OCCUR.
13. NO BURN OR BURY PITS SHALL BE PERMITTED ON THE CONSTRUCTION SITE WITHOUT WRITTEN PERMISSION BY THE OWNER AND/OR
THE ENGINEER OF RECORD.
14. ADDITIONAL SILT BARRIERS MUST BE PLACED AS SHOWN ON THE PLAN AS ACCESS IS OBTAINED DURING CLEARING. NO GRADING SHALL TAKE PLACE UNTIL SILT BARRIER INSTALLATION AND SEDIMENT PONDS ARE CONSTRUCTED AS SHOWN ON THE CLEARING
PHASE EROSION CONTROL PLAN.
15. ALL SILT FENCE MUST MEET THE REQUIREMENTS OF SECTION 171-TEMPORARY SILT FENCE FOR THE DEPARTMENT OF
TRANSPORTATION, STATE OF GEORGIA, STANDARD SPECIFICATIONS, 1983 EDITION.
16. ALL ITEMS IN THIS SECTION OF THE SPECIFICATIONS SHALL MEET THE REQUIREMENTS AS SET FORTH IN SECTION 161, 162, 163, AND
164 OF THE GEORGIA D.O.T. STANDARD SPECIFICATIONS, FOR ROADS AND BRIDGES.
17. MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 7 DAYS OF LAND DISTURBANCE.
18. ALL DISTURBED AREAS LEFT MULCHED AFTER 30 DAYS SHALL BE STABILIZED WITH TEMPORARY VEGETATION.
19. SEDIMENT AND EROSION CONTROL MEASURES SHOULD BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE-HALF THE CAPACITY OF THE DEVICE. ADDITIONAL DEVICES MUST BE
INSTALLED IF NEW CHANNELS HAVE DEVELOPED.
20. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACK OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1-3" OF STONE, AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLE ONTO PUBLIC ROADWAY OR INTO STORM DRAIN MUST BE REMOVED
IMMEDIATELY.
21. WHEN ANY CONSTRUCTION BORDERS A DRAINAGE COURSE, THE CONTRACTOR SHALL NOT DEPOSIT ANY BUILDING OR OTHER EXCAVATION SPOIL DIRT, CONSTRUCTION TRASH OR DEBRIS, ETC. IN THE DRAINAGE COURSE OR ASSOCIATED FLOOD PLAIN.
22. GRADING EQUIPMENT MUST CROSS FLOWING STREAMS BY THE MEANS OF BRIDGING OR CULVERTS, EXCEPT WHEN SUCH METHODS ARE NOT FEASIBLE; ALL STREAM CROSSINGS WILL BE PERFORMED IN ACCORDANCE WITH THE LATEST REVISION OF THE "MANUAL
FOR EROSION AND SEDIMENTATION CONTROL IN GEORGIA."
23. DISCHARGE OF STORMWATER RUN-OFF FROM DISTURBED AREAS TO A STREAM SHALL BE CONTROLLED TO THE EXTENT THAT TURBIDITY OF THE STREAM DOWNSTREAM FROM THE DISCHARGE SHALL NOT EXCEED 25 NEPHELOMETRIC TURBIDITY UNITS HIGHER THAN THE TURBIDITY LEVEL OF THE RECEIVING STREAM IMMEDIATELY UPSTREAM FROM THE STORMWATER RUN-OFF DISCHARGE AT
THE TIME OF SUCH DISCHARGE.
24. DISPOSE OF WASTE SOILS AND CLEARED AND GRUBBED MATERIALS OFF-SITE AT A LOCATION SECURED BY THE CONTRACTOR, AND IN
ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
25. CONTRACTOR SHALL INSPECT CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING
PROPERLY.
26. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE AS DIRECTED BY THE ON SITE INSPECTOR OR THE DESIGN PROFESSIONAL.
27. FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION CONTROL MEASURES WILL…