Part_I_PLANS_-_Doors_and_Anti-Ligature.pdf
PDF 7 MB Posted
- Attached to
- Anti-Ligature Med Room Door Mods Phase 1
- Solicitation number
- 0000034376
- Issued by
- San Luis Obispo County, San Luis Obispo City, California
About this file
This is a set of architectural plans from the California Department of State Hospitals (DSH) for door and anti-ligature modifications at DSH-Atascadero, with an issue date of April 4, 2024. The project involves replacing doors at medication rooms and selected patient rooms across multiple buildings to eliminate ligature points and provide labeled door assemblies. The scope includes measuring and verifying existing doors/frames/hardware, removing door leaves, preparing frames, installing new doors and hardware with finishes, providing new UL or Intertek labels, securing med rooms during work, and coordinating with staff to maintain medication distribution in alternative areas during construction. The work spans across Buildings 24, 508A, 509A, 510A, 511, 512, 513, 514, and others.
The plans detail extensive modifications including installation of continuous hinges with security screws, anti-ligature mortise locks, door closers mounted on med room sides, security glazing, and specialized shelf installations. The project must comply with 2022 California Building Codes and Standards, including specific fire safety requirements during construction. The plans include detailed door schedules, demolition plans, and new work plans for each building, totaling 93 sheets. Special attention is given to maintaining security during modifications and ensuring all new installations meet anti-ligature requirements while preserving necessary fire ratings and door functionality.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
516 514
520 518
510A
508A
517509A
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_T
0.
1.
dw g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
PROJECT AREA
LOCATION PLAN VICINITY MAP SCOPE OF WORK
10333 EL CAMINO REAL, ATASCADERO, CALIFORNIA 93422
DEPARTMENT OF STATE HOSPITALS - ATASCADERO
DEPARTMENT OF STATE HOSPITALS
1. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF CHAPTER 33 - FIRE SAFETY
DURING CONSTRUCTION OF THE 2022 CALIFORNIA FIRE CODE.
FIRE SAFETY DURING CONSTRUCTION
REPLACE DOORS AT MEDICATION ROOMS AND SELECTED PATIENT ROOMS TO ELIMINATE
LIGATURE POINTS AND TO PROVIDE LABELED DOOR ASSEMBLIES.
1. MEASURE AND VERIFY EXISTING DOORS, FRAMES AND HARDWARE.
2. REMOVE DOOR LEAVES AND PREPARE DOOR FRAMES TO RECEIVE NEW DOORS AND
HARDWARE.
3. INSTALL NEW DOORS AND HARDWARE AND FINISH.
4. PROVIDE NEW LABELS ON DOORS AND FRAMES BY UL OR INTERTEK.
5. SECURE THE MED ROOMS UNTIL THE WORK IS COMPLETE.
6. OWNER SHALL CONTINUE TO USE THE MED ROOM DURING CONSTRUCTION AND DISTRIBUTE
MEDICATIONS IN AN AREA AWAY FROM THE WORK.
DOORS AND ANTI-LIGATURE MODIFICATIONS
PHASE 1 AT MED ROOMS, STATEWIDE
MULTI-BUILDING SUBMITTAL - PRIMARY OSFM PERMIT NUMBER: XXXXXXXX
PROJECT INFORMATION
PREPARED BY:
J.C. CHANG & ASSOCIATES, INC.
ENGINEERS, ARCHITECTS AND PLANNERS
385 VAN NESS AVENUE, SUITE 208
TORRANCE, CALIFORNIA 90501
PHONE : (310) 212-7644
ARCHITECT OF RECORD /
PRIMARY PROFESSIONAL
MYOUNGJIN KANG
NO. C-37614
385 VAN NESS AVE. #208
TORRANCE, CALIFORNIA 90501
1. NO DEFERRED APPROVAL ON THIS PROJECT
DEFERRED APPROVALS
APPLICABLE CODES AND STANDARDS
1. 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R.
2. 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
(2021 INTERNATIONAL BUILDING CODE & 2021 CALIFORNIA AMENDMENTS)
3. 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.
(2020 NATIONAL ELECTRICAL CODE AND 2021 CALIFORNIA AMENDMENTS)
4. 2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R.
(2021 UNIFORM MECHANICAL CODE AND 2021 CALIFORNIA AMENDMENTS)
5. 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R.
(2021 UNIFORM PLUMBING CODE AND 2021 CALIFORNIA AMENDMENTS)
6. 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.
7. 2022 CALIFORNIA FIRE CODE, PART 9, TITLE 24 C.C.R.
(2021 INTERNATIONAL FIRE CODE AND 2021 CALIFORNIA AMENDMENTS)
8. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART 11,
TITLE 24 C.C.R.
9. 2022 CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24 C.C.R.
10. TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS.
PARTIAL LIST OF APPLICABLE STANDARDS
1. NFPA 13 AUTOMATIC SPRINKLER SYSTEMS (CA AMENDED) 2022 EDITION
2. NFPA 14 STANDPIPE SYSTEM (CA AMENDED) 2019 EDITION
3. NFPA 17a WET CHEMICAL SYSTEMS 2021 EDITION
4. NFPA 20 STATIONARY PUMPS 2019 EDITION
5. NFPA 24 PRIVATE FIRE MAINS (CA AMENDED) 2019 EDITION
6. NFPA 72 NATIONAL FIRE ALARM CODE (CA AMENDED) 2022 EDITION
7. NFPA 2001 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS 2018 EDITION
W/ CA AMENDMENTS
8. NFPA 101 LIFE SAFETY CODE 2021 EDITION
9. REFERENCE CODE SECTION FOR NFPA STANDARDS 2022 CBC (SFM)
CHAPTER 35
REFERENCE CODE SECTION FOR NFPA STANDARDS ARE IN 2022 CBC CHAPTER 35 OR 2022 CFC
CHAPTER 80. SEE CHAPTER 35 FOR STATE OF CALIFORNIA AMENDMENTS TO NFPA STANDARDS.
REFERENCE: 2022 CALIFORNIA FIRE CODE
1. SEE OVERALL SITE PLAN FOR SITE ACCESS FOR BOTH PUBLIC RIGHT OF WAY AND LOCAL
FIRE DEPARTMENT.
2. TURNAROUND CAN BE ACCOMPLISHED BY USING EXISTING SITE ROADS. SEE T0.2.
FIRE APPARATUS ACCESS
1. THE CONTRACTOR IS RESPONSIBLE FOR INVESTIGATING HAZARDOUS MATERIAL AT THE AREA
OF WORK INCLUDING BUT NOT LIMITED TO ASBESTOS AND LEAD, AND PROVIDING A REPORT
AND ABATEMENT PLAN ACCORDING TO THE CALIFORNIA STANDARD CODE AND CALOSHA
REQUIREMENTS.
HAZMAT NOTE
A MINIMUM OF 72 HOURS NOTICE WILL BE PROVIDED TO THE STATE FIRE MARSHAL WHEN
SCHEDULING ANY TESTS OR INSPECTIONS.
STATE FIRE MARSHAL SPECIAL INSPECTIONS
DRAWING INDEX
OSFM PERMIT NUMBERS FOR MULTIPLE BUILDINGS
BUILDING NAME
1. BUILDING 24
2. BUILDING 508A
3. BUILDING 509A
4. BUILDING 510A
5. BUILDING 511
6. BUILDING 512
7. BUILDING 513
8. BUILDING 514
9. BUILDING 515
10. BUILDING 516
11. BUILDING 517
12. BUILDING 518
13. BUILDING 519
14. BUILDING 520
15. BUILDING 521
16. BUILDING 522
17. BUILDING 523
NN
PREPARED FOR:
DEPARTMENT OF STATE HOSPITALS
ATASCADERO STATE HOSPITAL
10333 EL CAMINO REAL
ATASCADERO, CALIFORNIA 93422
DEPARTMENT OF STATE HOSPITALS (DSH)
1215 O STREET
SACRAMENTO, CALIFORNIA 95814
JOSHUA KAISER
CHIEF CONSTRUCTION MANAGER
OFFICE: (916) 248-0015
EMAIL: JOSHUA.KAISER@DSH.CA.GOV
JIM NETZ
ATASCADERO STATE HOSPITAL
10333 EL CAMINO REAL
ATASCADERO, CALIFORNIA 93422
RANDY DYE
CPO III
10333 EL CAMINO REAL
ATASCADERO, CALIFORNIA 93422
DESK: (805) 468-2249
CELL: (805) 712-6733
EMAIL: RANDY.DYE@DSH.CA.GOV
PROJECT LOCATION
EL CAM
INO REAL
SAN RAFAEL RD
SA
N
R
AF
AE
L
R D
BANE ST
OSFM PERMIT NUMBER
DRAWING INDEX
GENERAL
T0.1 TITLE SHEET
T0.2 FIRE ACCESS SITE PLAN
T0.3 STATE FIRE MARSHAL TRIAGE LIST
T0.4 BUILDING INFORMATION
ARCHITECTURAL
00-A0.1 ARCHITECTURAL COVER SHEET
00-A0.2 OVERALL SITE PLAN
00-A5.1 DETAIL SHEET
00-A5.2 DETAIL SHEET
01-A0.1 BUILDING 24 - UNIT 24 - FIRST AND SECOND FLOOR OVERALL PLAN
01-A1.1 BUILDING 24 - SECOND FLOOR DEMOLITION PLAN - MED - 3
01-A2.1 BUILDING 24 - SECOND FLOOR NEW WORK PLAN - MED 3
01-A6.1 DOOR SCHEDULE
SAN RAFAEL RD
DSA EXEMPTION NOTES
THIS WORK IS EXEMPT FROM FULL COMPLIANCE FOR ACCESSIBILITY.
PATIENTS WITH ACCOMMODATION NEEDS ARE LOCATED IN BUILDINGS 521, 522 AND 523. ALL
OTHER BUILDINGS DO NOT HOUSE PATIENTS WITH ACCESSIBILITY ACCOMMODATION.
MED ROOMS ARE CONSIDERED EMPLOYEE WORK AREAS AS PATIENTS ARE NOT ALLOWED IN THE
MED ROOMS.
THE PUBLIC IS NOT ALLOWED TO ACCESS THESE ROOMS AND ARE PROVIDED VISITING ROOMS
TO INTERACT WITH PATIENTS.
FULL COMPLIANCE WITH DISABLED ACCESS IMPROVEMENTS IS NOT REQUIRED PER THE
FOLLOWING:
11B-203 GENERAL EXCEPTIONS
11B-203.1 GENERAL
SITES, BUILDINGS, FACILITIES, AND ELEMENTS ARE EXEMPT FROM THESE REQUIREMENTS TO
THE EXTENT SPECIFIED BY 11B-203.
11B-203.9 EMPLOYEE WORKSTATIONS
SPACES AND ELEMENTS WITHIN EMPLOYEE WORKSTATIONS SHALL ONLY BE REQUIRED TO
COMPLY WITH SECTIONS 11B-207.1, 11B-215.3, 11B-302, 11B-303, 11B-308.1.1, 11B-308.1.2, AND
11B-404.2.3 UNLESS EXEMPTED BY OTHER PARTS OF THIS CODE. COMMON USE CIRCULATION
PATHS WITHIN EMPLOYEE WORKSTATIONS SHALL COMPLY WITH SECTION 11B-206.2.8.
EXCEPTION: RECEPTACLES, CONTROLS, AND SWITCHES THAT ARE AN INTEGRAL PART OF
WORKSTATION FURNISHING, FIXTURES AND EQUIPMENT SHALL NOT BE REQUIRED TO COMPLY
WITH SECTIONS 11B-308.1.1AND 11B-308.1.2
11B-206.2.8 EMPLOYEE WORK AREAS. COMMON USE CIRCULATION PATHS WITHIN EMPLOYEE
WORK AREAS SHALL COMPLY WITH SECTION 11B-402.
EXCEPTION: COMMON USE CIRCULATION PATHS LOCATED WITHIN EMPLOYEE WORK AREAS THAT
ARE AN INTEGRAL COMPONENT OF WORK AREA EQUIPMENT SHALL NOT BE REQUIRED TO
COMPLY WITH SECTION 11B-402.
02-A0.1 BUILDING 508A - UNIT 1 - FIRST FLOOR OVERALL PLAN
02-A0.2 BUILDING 508A - UNIT 2 - SECOND FLOOR OVERALL PLAN
02-A0.3 BUILDING 508A - UNIT 3 - THIRD FLOOR OVERALL PLAN
02-A1.1 BUILDING 508A - UNITS 1, 2, 3 & PHARMACY - FIRST, SECOND, AND THIRD FLOOR DEMOLITION
PLANS - MEDS - 6 & OFFICE - 14
02-A2.1 BUILDING 508A - UNITS 1, 2, 3 & PHARMACY - FIRST, SECOND, AND THIRD FLOOR DEMOLITION
PLANS - MEDS - 6 & OFFICE - 14
02-A6.1 DOOR SCHEDULE
03-A0.1 BUILDING 509A - UNIT 4 - FIRST FLOOR OVERALL PLAN
03-A0.2 BUILDING 509A - UNIT 5 - SECOND FLOOR OVERALL PLAN
03-A1.1 BUILDING 509A - UNITS 4 & 5 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 9 & 13 03-A2.1 BUILDING 509A - UNITS 4 & 5 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 9 & 13
03-A6.1 DOOR SCHEDULE
04-A0.1 BUILDING 510A - UNIT 6 - FIRST FLOOR OVERALL PLAN
04-A0.2 BUILDING 510A - UNIT 7 - SECOND FLOOR OVERALL PLAN
04-A1.1 BUILDING 510A - UNITS 6 & 7 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 44 & 45 04-A2.1 BUILDING 510A - UNITS 6 & 7 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 44 & 45
04-A6.1 DOOR SCHEDULE
05-A0.1 BUILDING 511 - UNIT 8 - FIRST FLOOR OVERALL PLAN
05-A0.2 BUILDING 511 - UNIT 9 - SECOND FLOOR OVERALL PLAN
05-A1.1 BUILDING 511 - UNITS 8 & 9 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 44 05-A2.1 BUILDING 511 - UNITS 8 & 9 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 44
05-A6.1 DOOR SCHEDULE
06-A0.1 BUILDING 512 - UNIT 10 - FIRST FLOOR OVERALL PLAN
06-A0.2 BUILDING 512 - UNIT 11 - SECOND FLOOR OVERALL PLAN
06-A1.1 BUILDING 512 - UNITS 10 & 11 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 13 06-A2.1 BUILDING 512 - UNITS 10 & 11 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 13
06-A6.1 DOOR SCHEDULE
07-A0.1 BUILDING 513 - UNIT 12 - FIRST FLOOR OVERALL PLAN
07-A0.2 BUILDING 513 - UNIT 13 - SECOND FLOOR OVERALL PLAN
07-A1.1 BUILDING 513 - UNITS 12 & 13 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 13 07-A2.1 BUILDING 513 - UNITS 12 & 13 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 13
07-A6.1 DOOR SCHEDULE
08-A0.1 BUILDING 514 - UNIT 14 - FIRST FLOOR OVERALL PLAN
08-A0.2 BUILDING 514 - UNIT 15 - SECOND FLOOR OVERALL PLAN
08-A1.1 BUILDING 514 - UNITS 14 & 15 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 46 & 47 08-A2.1 BUILDING 514 - UNITS 14 & 15 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 46 & 47
08-A6.1 DOOR SCHEDULE
09-A0.1 BUILDING 515 - UNIT 16 - FIRST FLOOR OVERALL PLAN
09-A0.2 BUILDING 515 - UNIT 17 - SECOND FLOOR OVERALL PLAN
09-A1.1 BUILDING 515 - UNITS 16 & 17 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 30 09-A2.1 BUILDING 515 - UNITS 16 & 17 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 30
09-A6.1 DOOR SCHEDULE
10-A0.1 BUILDING 516 - UNIT 18 - FIRST FLOOR OVERALL PLAN
10-A0.2 BUILDING 516 - UNIT 19 - SECOND FLOOR OVERALL PLAN
10-A1.1 BUILDING 516 - UNITS 18 & 19 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 30 10-A2.1 BUILDING 516 - UNITS 18 & 19 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 30
10-A6.1 DOOR SCHEDULE
11-A0.1 BUILDING 517 - UNIT 20 - FIRST FLOOR OVERALL PLAN
11-A0.2 BUILDING 517 - UNIT 21 - SECOND FLOOR OVERALL PLAN
11-A1.1 BUILDING 517 - UNITS 20 & 21 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 58 11-A2.1 BUILDING 517 - UNITS 20 & 21 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 58
11-A6.1 DOOR SCHEDULE
12-A0.1 BUILDING 518 - UNIT 22 - FIRST FLOOR OVERALL PLAN
12-A0.2 BUILDING 518 - UNIT 23 - SECOND FLOOR OVERALL PLAN
12-A1.1 BUILDING 518 - UNITS 22 & 23 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS 7 12-A2.1 BUILDING 518 - UNITS 22 & 23 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS 7
12-A6.1 DOOR SCHEDULE
13-A0.1 BUILDING 519 - UNIT 25 - FIRST FLOOR OVERALL PLAN
13-A0.2 BUILDING 519 - UNIT 26 - SECOND FLOOR OVERALL PLAN
13-A1.1 BUILDING 519 - UNITS 25 & 26 - FIRST AND SECOND FLOOR DEMOLITION PLANS - 7
13-A2.1 BUILDING 519 - UNITS 25 & 26 - FIRST AND SECOND FLOOR NEW WORK PLANS - 7
13-A6.1 DOOR SCHEDULE
14-A0.1 BUILDING 520 - UNIT 27 - FIRST FLOOR OVERALL PLAN
14-A0.2 BUILDING 520 - UNIT 28 - SECOND FLOOR OVERALL PLAN
14-A1.1 BUILDING 520 - UNITS 27 & 28 - FIRST AND SECOND FLOOR DEMOLITION PLANS - 11 14-A2.1 BUILDING 520 - UNITS 27 & 28 - FIRST AND SECOND FLOOR NEW WORK PLANS - 11
14-A6.1 DOOR SCHEDULE
15-A0.1 BUILDING 521 - UNIT 29 - FIRST FLOOR OVERALL PLAN
15-A0.2 BUILDING 521 - UNIT 30 - SECOND FLOOR OVERALL PLAN
15-A1.1 BUILDING 521 - UNITS 29 & 30 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS - 22 15-A2.1 BUILDING 521 - UNITS 29 & 30 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS - 22
15-A6.1 DOOR SCHEDULE
16-A0.1 BUILDING 522 - UNIT 31 - FIRST FLOOR OVERALL PLAN
16-A0.2 BUILDING 522 - UNIT 32 - SECOND FLOOR OVERALL PLAN
16-A1.1 BUILDING 522 - UNITS 31 & 32 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS - 22 16-A2.1 BUILDING 522 - UNITS 31 & 32 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS - 22
16-A6.1 DOOR SCHEDULE
17-A0.1 BUILDING 523 - UNIT 33 - FIRST FLOOR OVERALL PLAN
17-A0.2 BUILDING 523 - UNIT 34 - SECOND FLOOR OVERALL PLAN
17-A1.1 BUILDING 523 - UNITS 33 & 34 - FIRST AND SECOND FLOOR DEMOLITION PLANS - MEDS - 22 17-A2.1 BUILDING 523 - UNITS 33 & 34 - FIRST AND SECOND FLOOR NEW WORK PLANS - MEDS - 22
17-A6.1 DOOR SCHEDULE
TOTAL NUMBER OF SHEETS = 93
T0.1
TITLE SHEET
519520
518 517
509A
510A
508A
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_T
0.
2.
dw g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
LEGEND:
FIRE TRUCK ROUTE
FIRE HYDRANT
BUILDING NAME
02. 508A
03. 509A
04. 510A
05. 511
06. 512
07. 513
08. 514
09. 515
10. 516
11. 517
12. 518
13. 519
14. 520
15. 521
16. 522
01. 24
17. 523
N
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
PATIENT HOUSING - TREATMENT
SITE ACCESS FROM PUBLIC
RIGHT OF WAY AND USING
EXISTING PAVED ROADS
SALLY PORT
FIRE ACCESS SITE PLAN
NO TO SCALE
T0.2
FIRE ACCESS SITE PLAN
LOCAL FIRE AUTHORITY - ACCESS APPROVAL
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_T
0.
3.
dw g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
ITEM SUBMITTAL REQUIREMENTS SUBMITTAL RESPONSE REFERENCE
GENERAL
SEE FOR SPECIFIC SECTION COMMENTS NOT APPLICABLE
PROVIDE A COMPLETE PLAN REVIEW APPLICATION
SUBMIT PLANS SUFFICIENT SIZE
PROVIDE SITE ADDRESS
PROVIDE NAME OF OWNER AND OCCUPANT
IDENTIFY IF NEW CONSTRUCTION OR T.I
IDENTIFY IF NEW OR EXISTING TENANT SPACE
IDENTIFY IF DEFERRED SUBMITTAL
ADD OSFM FILE NUMBER TO TITLE SHEET
PROJECT IS A PHASED SUBMITTAL
SLIP SHEETS SHALL BE BOUND TO SET
SHEET INDEX
WET STAMP AND SIGN SHEETS
SCOPE OF WORK
PROVIDED WITH SUBMITTAL
FLOOR PLANS ARE 1/8"=1' MINIMUM
10333 EL CAMINO REAL, ATASCADERO, CALIFORNIA 93422
OWNER: DEPARTMENT OF STATE HOSPITAL
T.I.
EXISTING
ALL RELEVANT
SHEETS
NOT APPLICABLE
T0.1
T0.1
OSFM NO #### IS NOTED ON THE TITLE SHEET T0.1
PROJECT IS NOT PHASED
NOT APPLICABLE
SHEET INDEX IS ON T0.1 T0.1
ELECTRONIC SIGNATURE PROVIDED ON DOCUMENT ALL SHEETS
SCOPE OF WORK IS INCLUDED ON TITLE SHEET T0.1
ITEM SUBMITTAL REQUIREMENTS SUBMITTAL RESPONSE REFERENCE
ACCESS AND WATER SUPPLY
PROVIDE LOCAL FIRE AUTHORITY APPROVAL LETTER
FIRE DEPARTMENT ACCESS
FIRE DEPARTMENT CONNECTION
FIRE HYDRANTS
FIRE ALARM ANNUNCIATOR
FIRE ALARM CONTROL PANEL
KNOX BOX/KEY SWITCH
ELEVATOR GURNEY ACCOMODATION
OCCUPANT: DEPARTMENT OF STATE HOSPITAL
PROVIDED ON FIRE ACCESS SITE PLAN
T0.2
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE - NO ELEVATOR ACCESS TO ROOF
T0.2
PROVIDED ON FIRE ACCESS SITE PLAN
NOT AVAILABLE - USE FIRE HYDRANTS
NOT AVAILABLE
T0.3SEE ATTACHED LETTER
PROVIDE A KEY PLAN COORDINATED TO EACH SHEET
PROVIDE A NORTH ORIENTED SITE MAP
ORIENTATE ALL SHEETS TO NORTH
PROVIDE ADOPTED CODE CYCLE LISTINGS AND STANDARDS
PROVIDE A LEGIBLE SCALE. TYPICALLY 1/8"
PROVIDE APPROVED REFERENCE PLANS/DOCUMENTATION
SITE KEY PLAN IS PROVIDED
NORTH ORIENTED SITE PLAN IS PROVIDED T0.3
SITE PLAN IS ORIENTED TO NORTH, INDIVIDUAL DRAWINGS HAVE KEYPLAN
ALL RELEVANT
SHEETS
ADOPTED CODE CYCLE LISTINGS ARE INCLUDED ON TITLE SHEET
ALL FLOOR PLANS ARE 1/8" SCALE MINIMUM. ALL SITE PLANS ARE 1"=30'
NOT APPLICABLE -
T0.1
ALL RELEVANT
SHEETS
ALL RELEVANT
SHEETS
T0.3
S.F.M. TRIAGE LIST‚ LOCAL
FIRE AUTHORITY - ACCESS
APPROVAL
BUILDING INFORMATION
BUILDING NAME CONSTRUCTION
TYPE
NUMBER
OF STORIES
BUILDING
AREA
IN SQ. FT.
SEPARATED /
NON SEPARATED
SPRINKLER
COVERAGE FIRE ALARM
OTHER
PROTECTION
SYSTEM
SMOKE
CONTROL
SYSTEM
OCCUPANT
LOAD
YEAR BUILDING
CONSTRUCTED
HIGH FIRE
HAZARD
SEVERITY
ZONE
SEISMIC JOINT
EMERGENCY
RESPONDER RADIO
COVERAGE
OCCUPANCY
GROUP
I-2 / I-3
BUILDING
HEIGHT
AREA OF
PROJECT
ALLOWABLE
STORIES
(CBC TABLE
504.3)
USE
ALLOWABLE
AREA
(CBC TABLE
506.2)
YES NO 108 1954
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_T
0.
4.
dw g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
YES NO NO YES YES
PARTIAL NO 1954NO NO
1952 UBC TYPE
I-F.R. 2
20'-0" 8,118 PATIENT
HOUSING UNLIMITED UNLIMITED SEPARATED
33'-9" 32,255 26902. 508A
03. 509A
04. 510A
05. 511
06. 512
07. 513
08. 514
09. 515
10. 516
11. 517
12. 518
13. 519
14. 520
15. 521
16. 522
01. 24
17. 523
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
I-2 / I-3
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1958 UBC TYPE
I-F.R.
1958 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1958 UBC TYPE
I-F.R.
1952 UBC TYPE
I-F.R.
1994 UBC TYPE
I-F.R.
1994 UBC TYPE
I-F.R.
1994 UBC TYPE
I-F.R.
20'-0"
20'-0"
20'-4"
20'-4
20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
20'-0"
20'-4"
26'-11"
26'-11"
26'-11"
17,244
17,350
17,706
17,562
17,506
20,034
24,878
24,878
19,558
19,558
24,878
23,350
34,864
34,864
34,864
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
PATIENT
HOUSING
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
UNLIMITED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
SEPARATED
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
8,118
32,255
17,244
17,350
17,706
17,562
17,506
20,034
24,878
24,878
19,558
19,558
24,878
23,350
34,864
34,864
34,864
T0.4
BUILDING INFORMATION
HOSPITALS, ATASCADERO
FI
LE
: C :\U se rs
\A
LE
XP
E~
1\ Ap pD at a\ Lo ca l\T em p\
Ac Pu bl is h_
6\
_0
0- A0
.1 .d w g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
LIGHT, THIN LINES INDICATE EXISTING.
HEAVY, THICK LINES INDICATE NEW
HEAVY, SHORT DASHED LINES INDICATE
DEMOLITION OR REMOVAL
TYPICAL PLAN LEGEND
THIS SYMBOLOGY TO BE USED BY ARCHITECTURAL AND LAYOUT FOR
ALL FLOOR PLANS, EQUIPMENT, DEVICES, UTILITIES, ETC., SHOWN ON
DRAWINGS.
GENERAL NOTES
(D) DEMOLISH
(E) EXISTING
(N) NEW
@ AT
& AND
ADJ ADJACENT
ALUM ALUMINUM
A.R.F. ANIMAL RESCUE FORCE
ASTM. AMERICAN SOCIETY FOR
TESTING MATERIALS
ARCH. ARCHITECTURAL OR
ARCHITECT
A.C. ASPHALT CONCRETE
AVE. AVENUE
BLDG. BUILDING
CA. CALIFORNIA
C.B. CATCH BASIN
C.H. CEILING HEIGHT
CLG. CEILING
CEM CEMENT
CEM. MORT. CEMENT MORTAR
CLR. CLEAR
CONC. CONCRETE
CONC. BLK CONCRETE BLOCK
CONST. CONSTRUCTION
C.J. CONSTRUCTION JOINT
CORR. CORRIDOR
DET. DETAIL
DIA.Ø DIAMETER
DIM. DIMENSION
D.O. DOOR OPENING
D.F. DOUGLAS FIR
DN. DOWN
D.S. DOWN SPOUT
DWG. DRAWING
EA. EACH
E EAST
ELECT. ELECTRICAL
EL. ELEVATION
ENGR. ENGINEER
EQ. EQUAL
EXIST. EXISTING
EXP. EXPANSION
EXP. JT. EXPANSION JOINT
EXT EXTERIOR
F.O.C. FACE OF CONCRETE
F.O.M. FACE OF MASONRY
FT. FEET
FIN. FINISH
F.F. FINISH FLOOR OR
FACTORY FINISH
F.S. FINISH SURFACE
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER
CABINET
F.H.C. FIRE HOSE CABINET
F.H. FIRE HYDRANT
FLR. FLOOR
F.D. FLOOR DRAIN
GA. GAGE (GAUGE)
GSM GALVANIZED SHEET METAL
GALV. GALVANIZED
GL. GLASS
HGT. / HT. HEIGHT
H.B HOSE BIBB
IN. INCHES
INFO INFORMATION
I.D. INSIDE DIAMETER
JT. JOINT
LT.WT. LIGHT WEIGHT
FF. LINEAL FOOT
MFR. MANUFACTURER
M.O. MASONRY OPENING
MATL. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MTL. METAL
MIN. MINIMUM
MISC. MISCELLANEOUS
N NORTH
N.I.C. NOT IN CONTRACT
N.T.S. NOT ON SALE
NO. / # NUMBER
O.C. or O/C ON CENTER
OCC OCCUPANT/OCCUPANCY
O.D. OUTSIDE DIAMETER
P.A. PLANTING AREA
PLAS. PLASTER
PLYWD. PLYWOOD
PREFAB. PREFABRICATED
PL PROPERTY LINE
POC POINT OF CONTACT
QTY. QUANTITY
REQD. REQUIRED
R.O. ROUGH OPENING
SF SQUARE FOOT
SHT. SHEET
SIM. SIMILAR
S SOUTH
SPEC(S) SPECIFICATION(S)
SQ.FT. SQUARE FOOT/FEET
S. STL. STAINLESS STEEL
STD. STANDARD
STL. STEEL
S.D. STORM DRAIN
ST. STREET
STRUCT. STRUCTURAL
THK. THICK
T&G TONGUE & GROOVE
TYP. TYPICAL
U.L. UNDERWRITERS
LABORATORIES
INCORPORATED
U.B.C. UNIFORM BUILDING
U.N.O. UNLESS NOTED
OTHERWISE
VENT VENTILATION
V.P. VENT PIPE
V.T.R. VENT THROUGH ROOF
VERT. VERTICAL
VOL. VOLUME
W.H. WATER HEATER
W.M. WATER METER
WT. WEIGHT
W WEST
W.D. WINDOW DIMENSION
W.O. WINDOW OPENING
W/ WITH
W/O WITHOUT
WD. WOOD
ABBREVIATIONS SYMBOL LIST
X
X-XX
CENTERLINE DIMENSION
FACE DIMENSION LINE
DETAIL NUMBER
SHEET NUMBER
DETAIL REFERENCE SYMBOL
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
SYMBOL DESCRIPTION
DETAIL NUMBER
SHEET NUMBER
A2.01
EL. DETAIL NUMBER
SHEET NUMBER
A3.01
A3.01
SECTION NUMBER
(BUILDING SECTION)
SHEET NUMBER
A3.01
SECTION NUMBER
(BUILDING SECTION)
SHEET NUMBER
A3.01 1
DETAIL NUMBER
SHEET NUMBER
INTERIOR EL. SHOWN
WORK POINT
DATUM LINE
MATCH LINE
REVISION CLOUD AND DELTA
C.H. 9'-0"
GRID IDENTIFICATION
ROOM NAME
ROOM NUMBER
ROOM HEIGHT
EQUIPMENT TAG
X X-###
LOBBY
B-23
125 SQ.FT.
SQUARE FOOT/FEET
X
GENERAL PROJECT CODE NOTES
XX-XX
1. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS WHICH INCLUDE THE
OWNER/CONTRACTOR AGREEMENT, THE DRAWINGS AND ALL ADDENDA AND MODIFICATIONS
ISSUED BY THE DESIGNER.
2. THE CONTRACTOR SHALL REVIEW ALL DOCUMENTS AND VERIFY ALL DIMENSIONS AND FIELD
CONDITIONS AND SHALL CONFIRM THAT WORK IS BUILDABLE AS SHOWN. ANY CONFLICTS OR
OMISSIONS, ETC., SHALL BE IMMEDIATELY REPORTED TO THE DESIGNER FOR CLARIFICATION
PRIOR TO THE PERFORMANCE OF ANY WORK IN QUESTION.
3. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AND INSPECTIONS AND COMPLY WITH ALL
CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF ALL PUBLIC AUTHORITIES
(FEDERAL, STATE, OR LOCAL) GOVERNING THE WORK. THE MOST STRINGENT SHALL APPLY.
4. SUBSTITUTIONS, IF ALLOWED, MUST BE SUBMITTED TO THE DESIGNER FOR REVIEW (IN
CONFORMANCE WITH SPECIFIED PROCEDURES) PRIOR TO PURCHASE, FABRICATION, OR
INSTALLATION. PROPOSED SUBSTITUTIONS SHALL BE CLEARLY IDENTIFIED ON THE COVER
OF THE SUBMITTAL AND SHALL BE ACCOMPANIED WITH A COMPREHENSIVE COMPARATIVE
ANALYSIS OF THE 2 PRODUCTS FOR VERIFICATION OF EQUIVALENCY. IF SUCH A SUBMITTAL
REQUIRES ADDITIONAL REVIEW TIME BEYOND WHAT IS NORMALLY EXPECTED, THE
DESIGNER WILL BE COMPENSATED FOR THE ADDITIONAL TIME SPENT.
5. PROTECT THE BUILDING, ITS SYSTEMS, FINISHES, AND RELATED AND APPURTENANT ITEMS, SO AS NOT TO CAUSE DAMAGE DERIVED FROM THE WORK, COMPLY WITH BUILDING RULES
AND REGULATIONS.
6. "TYPICAL" OR "TYP." SHALL MEAN THAT THE CONDITION IS REPRESENTATIVE FOR SIMILAR
CONDITIONS THROUGHOUT, UNLESS OTHERWISE NOTED. DETAILS ARE USUALLY KEYED AND
NOTED "TYP." ONLY ONCE, WHEN THEY FIRST OCCUR.
7. "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED, VERIFY
DIMENSIONS AND ORIENTATION ON PLANS AND ELEVATIONS.
8. DIMENSIONS ARE NOT ADJUSTABLE WITHOUT WRITTEN APPROVAL FROM THE DESIGNER.
9. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR DEVIATIONS FROM
REQUIREMENTS OF THE CONTRACT DOCUMENTS BY THE DESIGNER'S REVIEW OF SHOP
DRAWINGS, PRODUCT DATA SAMPLES OR SIMILAR SUBMITTALS UNLESS THE CONTRACTOR
HAS SPECIFICALLY INFORMED THE DESIGNER IN WRITING OF SUCH DEVIATION AT THE TIME
OF SUBMITTAL AND THE DESIGNER HAS REVIEWED THE SPECIFIC DEVIATION FOR
COMPLIANCE WITH THE INTENT OF THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
NOT BE RELIEVED OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN SHOP DRAWINGS,
PRODUCT DATA, SAMPLES OR SIMILAR SUBMITTALS BY THE DESIGNER'S REVIEW THEREOF.
10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE, REQUEST & FORWARD TO
THE DESIGNER FOR REVIEW AND APPROVAL SHOP DRAWINGS, PRODUCT DATA, SAMPLES &
SIMILAR SUBMITTALS REQUIRED BY THE CONTRACT DOCUMENTS IN A TIMELY MANNER IN
ORDER TO ALLOW PROPER REVIEW, APPROVAL, AND LEAD TIME ON ORDERING MATERIALS
AND EQUIPMENT SUCH THAT THERE ARE NO DELAYS TO THE PROJECT SCHEDULE.
INCOMPLETE SUBMITTALS WILL BE RETURNED UN-REVIEWABLE. THE DESIGNER SHALL BE
COMPENSATED FOR ADDITIONAL SERVICES FOR SUBMITTALS REQUIRING MORE THAN 2
REVIEWS DUE TO LACK OF INFORMATION, INCORRECT OR INCOMPLETE INFORMATION.
11. OPEN JOINTS, PENETRATIONS AND OTHER OPENINGS IN INTERIOR WALLS, FLOORS AND THE
BUILDING ENVELOPE RESULTING FROM THE INSTALLATION OF CONDUITS AND UTILITIES
SHALL BE CAULKED, SEALED, GASKETED, FIRESTOPPED OR WEATHER STRIPPED AS
REQUIRED TO LIMIT AIR LEAKAGE AND MAINTAIN FIRE RATINGS. ALL SUCH PENETRATIONS
SHALL BE FIRESTOPPED FOR 2 HOUR PROTECTION UNLESS OTHERWISE NOTED.
PENETRATIONS IN NON-RATED CONSTRUCTION SHALL BE CAULKED WITH PICK-PROOF
SECURITY SEALANT..
12. ALL MANUFACTURED ARTICLES, MATERIAL AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, USED, CLEANED, AND CONDITIONED AS DIRECTED BY THE
MANUFACTURER UNLESS HEREIN SPECIFIED TO THE CONTRARY. IN CASE OF DIFFERENCE
BETWEEN THE MANUFACTURER'S INSTRUCTION AND THE CONTRACT DOCUMENTS, THE
CONTRACTOR SHALL NOTIFY THE DESIGNER BEFORE PROCEEDING.
13. ALL CONTRACT DOCUMENTS, INCLUDING WITHOUT LIMITATION THESE GENERAL NOTES AND
THE SPECIFICATIONS SHALL APPLY NOT ONLY TO THE GENERAL CONTRACTOR BUT TO ALL
SUBCONTRACTORS AND SUPPLIERS FOR THE PROJECT. THE WORD "CONTRACTOR" SHALL
HEREAFTER APPLY EQUALLY AND WITHOUT EXCEPTION TO ALL SUBS AND SUPPLIERS. ALL
CONTRACTORS ARE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH BOTH THESE
NOTES AND THE SPECIFICATIONS.
14. GENERAL NOTES ARE AN AID TO THE CONTRACTOR IN UNDERSTANDING THE WORK AND
SHOULD NOT BE CONSTRUED AS BEING COMPLETE IN EVERY DETAIL. IT IS THE EXPLICIT AND
SPECIFIC RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE, VERIFY THE EXISTING
CONDITIONS AND FAMILIARIZE HIMSELF THOROUGHLY WITH THE SCOPE OF WORK, AND
REPORT ALL DISCREPANCIES BETWEEN THE DRAWINGS AND THE ASSUMED OR ACTUAL
CONDITIONS TO THE ATTENTION OF THE DESIGNER (ARCHITECT).
15. NO ONE DRAWING OR SPECIFICATION SECTION SHALL "GOVERN". CONTRACTOR SHALL
CORRELATE WORK BETWEEN ARCHITECTURAL DRAWINGS AND SPECIFICATIONS AND
CONSULTANT DRAWINGS AND SPECIFICATIONS. CONTRACTOR SHALL ALSO CORRELATE
WORK BETWEEN DRAWINGS OF DIFFERENT SCALES WITHIN EACH SECTION. IT IS THE
EXPLICIT AND SPECIFIC RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE CONTRACT
DOCUMENTS IN THEIR ENTIRETY, REPORT ALL DISCREPANCIES ENCOUNTERED THEREIN TO
THE ATTENTION OF THE DESIGNER AND AWAIT RESOLUTION BEFORE PROCEEDING WITH
ANY WORK AFFECTED BY SUCH DISCREPANCIES. WHERE THE REQUIREMENTS OF EITHER
THE GENERAL NOTES OR THE SPECIFICATIONS MAY BE AT VARIANCE WITH THE GENERAL
CONDITIONS, THE MORE RESTRICTIVE PROVISION SHALL GOVERN.
16. ALL LINES, SYMBOLS, NOTES, TONES, AND OTHER GRAPHIC DEVICES CONTAINED IN THE
CONTRACT DOCUMENTS CARRY SPECIFIC OR INFERENTIAL MEANING. ITEMS INDICATED IN
THESE WAYS ARE A PART OF THE SCOPE OF WORK AND WILL BE REQUIRED BY THE OWNER
AND DESIGNER TO BE INCLUDED IN THE SCOPE OF THE CONTRACTOR'S WORK WHETHER
THEY HAVE BEEN INCLUDED IN THE CONTRACTOR'S ORIGINAL BID OR NOT. ANY ITEMS WHICH
REQUIRE FURTHER CLARIFICATION BY THE DESIGNER FOR THE SPECIFIC BENEFIT OF THE
CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGNER FOR SUCH
CLARIFICATION BEFORE COMMENCEMENT OF ANY WORK.
17. DESIGN WORK IS THE RESPONSIBILITY OF THE DESIGNER. THE CONTRACTOR SHALL ASSUME
DESIGN LIABILITY AND ALL RESPONSIBILITY FOR CHANGES IN THE SCOPE OF WORK NOT
BROUGHT TO THE ATTENTION OF THE DESIGNER.
18. THE CONTRACTOR SHALL PAY SPECIFIC ATTENTION TO ALL DIMENSIONED OR INFERENTIAL
PLAN AND SECTIONAL SPECIAL RELATIONSHIPS, AND SHALL VERIFY ALL ALIGNMENTS
BEFORE COMMENCING WORK.
19. DIMENSIONS MARKED "VERIFY" ARE TO BE CHECKED FOR ACCURACY BY THE CONTRACTOR
AS WORK PROGRESSES, AND ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION
OF THE DESIGNER BEFORE PROCEEDING.
20. DIMENSIONS MARKED "CLEAR" OR MINIMUM ARE NOT ADJUSTABLE WITHOUT THE
AUTHORIZATION FROM THE DESIGNER. "ALIGN" MEANS TO ACCURATELY LOCATE FINISHED
FACES IN THE SAME PLANE AS INDICATED.
21. CONTRACTOR SHALL NOT SCALE THE DRAWINGS, FIGURED DIMENSIONS ONLY ARE TO BE
USED FOR ALL ASPECTS OF THE WORK. ALL DIMENSIONS ARE TO FACE OF FINISH SURFACE,
U.O.N.
1. THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO RECONSTRUCT THE HOSPITAL BUILDING
IN ACCORDANCE WITH THE 2022 CBSC. SHOULD ANY CONDITION DEVELOP NOT COVERED BY
THE APPROVED CONSTRUCTION DOCUMENTS, WHEREIN THE FINISHED WORK WILL NOT COMPLY
WITH THE 2022 CBSC, AMENDED CONSTRUCTION DOCUMENTS (ACDS) DETAILING AND
SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND APPROVED BY THE AUTHORITY
HAVING JURISDICTION (AHJ) BEFORE PROCEEDING WITH THE WORK.
2. SUPPORTS AND ATTACHMENTS OF ALL EQUIPMENT TO BE INSTALLED AS A PART OF THIS
PROJECT SHALL BE DETAILED ON CONSTRUCTION DOCUMENTS, EXCEPT THOSE EXEMPT BY THE
2022 CBC SECTION 1617A.1.18.
EQUIPMENT SUPPORTS AND ATTACHMENTS SHALL BE APPROVED BY THE APPROPRIATE DESIGN
PROFESSIONAL OF RECORD (RDP) AND THE AHJ AS A PART OF FIELD REVIEWS/OBSERVATIONS.
THE INSPECTOR OF RECORD (IOR) SHALL ASSURE THAT THE ABOVE REQUIREMENTS ARE
ENFORCED.
3. WHEN INSTALLING DRILLED-IN ANCHORS IN EXISTING NON-PRESTRESSED REINFORCED
CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING
REINFORCING BARS SEE STRUCTURAL DRAWINGS FOR REQUIREMENTS. MAINTAIN A
MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN
ANCHOR.
4. A PROJECT INSPECTOR EMPLOYED BY THE OWNER AND APPROVED BY THE AHJ SHALL
PROVIDE CONTINUOUS INSPECTION OF THE WORK. THE DUTIES OF THE INSPECTOR ARE
DEFINED IN PART 1,TITLE 24,CCR.
5. UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS,
STANDARDS, MANUFACTURER'S INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY
AGENCIES, WHEN USED TO SPECIFY REQUIREMENTS FOR MATERIALS OF DESIGN ELEMENTS
SHALL MEAN THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF SUBMISSION OF
BIDS, OR THE DATE OF THE CHANGE ORDER OR FIELD ORDER, AS APPLICABLE.
6. ALL RATED ASSEMBLIES NOTED HERE ARE APPLICABLE ONLY TO MANUFACTURERS
SPECIFIED IN THESE ASSEMBLIES. IF AN ALTERNATE MANUFACTURER IS PROPOSED, THE
CONTRACTOR MUST SUBMIT ALTERNATE & LISTED ASSEMBLIES FOR REVIEW AND
APPROVAL BY THE OWNERS REP. PRIOR TO BEGINNING ANY PARTITION WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK BEGUN OR COMPLETED WHICH DOES
NOT CONFORM TO ASSEMBLIES LISTED.
7. ALL WORK SHALL BE PERFORMED DURING REGULAR BUSINESS HOURS. UNLESS OTHERWISE
REQUESTED/DETERMINED BY THE OWNER AND SHALL BE DONE ON AN OVERTIME BASIS TO
BE COORDINATED WITH THE OWNER'S REPRESENTATIVE AS REQUIRED.
8. FOR DETAILED REQUIREMENTS FOR THE USE OF PRE-APPROVED PIPES, DUCTS, AND
CONDUITS SEISMIC BRACING SYSTEMS, SEE MECHANICAL & ELECTRICAL DRAWINGS.
DOOR MARK - SEE DOOR SCHEDULE
ON SHEET - 00-A3.3
00-A0.1
ARCHITECTURAL COVER
SHEET
519520
518 517
509A
510A
508A
OVERALL SITE PLAN
NO TO SCALE N
SEE SHEET
15-A0.1 FIRST FLOOR &
15-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 521
SEE SHEET
17-A0.1 FIRST FLOOR &
17-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 523
SEE SHEET
16-A0.1 FIRST FLOOR &
16-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 522
SEE SHEET
14-A0.1 FIRST FLOOR &
14-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 520
SEE SHEET
13-A0.1 FIRST FLOOR &
13-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 519
SEE SHEET
12-A0.1 FIRST FLOOR &
12-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 518
SEE SHEET
11-A0.1 FIRST FLOOR &
11-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 517
SEE SHEET
1-A0.1 FIRST FLOOR &
1-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 24
SEE SHEET
03-A0.1 FIRST FLOOR &
03-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 509A
SEE SHEET
04-A0.1 FIRST FLOOR &
04-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 510A
SEE SHEET
07-A0.1 FIRST FLOOR &
07-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 513
SEE SHEET
08-A0.1 FIRST FLOOR &
08-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 514
SEE SHEET
10-A0.1 FIRST FLOOR &
10-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 516
SEE SHEET
09-A0.1 FIRST FLOOR &
09-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 515
SEE SHEET
06-A0.1 FIRST FLOOR &
06-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 512
SEE SHEET
05-A0.1 FIRST FLOOR &
05-A0.2 SECOND FLOOR
OVERALL FLOOR PLAN - BLDG. 511
SEE SHEET
02-A0.1 FIRST FLOOR &
02-A0.2 SECOND FLOOR
02-A0.3 THIRD FLOOR
OVERALL FLOOR PLAN - BLDG. 508A
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_0
0- A0
.2 .d w g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
00-A0.2
OVERALL SITE PLAN
ANTI-LIG SMOKE SEAL.
CLOSER MOUNT ON
MED RM SIDE
(E) HM FRAME; MODIFY TO
RECEIVE NEW HARDWARE
(E) CONC WALL
7"
1"
1"
14 GA ASTRAGAL, STICH
WELDED TO DOOR. PROVIDE
SECURITY SEALANT AT GAPS
BETWEEN WELDS.
16 GA SHELF AND
BRACKETS; WELD TO DOOR
1"
/1 6"
3/ 4"
3/4"
/3 2"27
/3 2"
5/16"
CONT HINGE, FULL MORTISE -
WIDE THROW: 040XY BY IVES ,
WITH SECURITY SCREWS.
PROVIDE TIPIT AT TOP TO
ELIMINATE LIGATURE POINT
REMOVE FRAME
GUIDANCE LIP
(E) HM FRAME
AND CONC WALL
SMOKE SEAL CLOSER, MOUNT
ON MED RM SIDE
7/ 8"
1 19/32"
1 3/8" MIN
SMOKE SEAL
TIPIT - LIGATURE
RESISTANT HINGE
TRIM W/ SECURITY
SCREWS
CLOSURE PLATE TO
MATCH TIPIT
CONT WIDE THROW HINGE
EXISTING HM DOOR
FRAME IN CONC WALL
JAMB HEAD
NEW 16 GA HM DOOR
EXISTING HM FRAME TO
BE MODIFIED TO ACCEPT
NEW HARDWARE
(E) CONCRETE WALL
7"
SHELF AT LOWER DOOR HALF
ASTRAGAL AT
BOTTOM OF UPPER
DOOR HALF
ANTI-LIG SMOKE SEAL. LOCATION
SHOWN IS FOR LATCH SIDE.
3/ 4"
3/4"
/3 2"27 /3
2"
5/16"
REMOVE FRAME GUIDANCE LIP
(E) HM FRAME AND
CONC WALL
SMOKE SEAL
/1 6"
1' -0
CONT HINGE, FULL MORTISE -WIDE
THROW: 040XY BY IVES , WITH
SECURITY SCREWS. PROVIDE TIPIT AT
TOP TO ELIMINATE LIGATURE POINT
EXISTING HM
DOOR FRAME
IN CONC WALL
SHELF WITH
MITERED
CORNERS AND
EASED EDGES
JAMB
LCN 4210T, MOUNT
ON MED RM SIDE
7/ 8"
1 19/32"
1 3/8" MIN
SMOKE SEAL
TIPIT - LIGATURE
RESISTANT HINGE
TRIM W/ SECURITY
SCREWS
CLOSURE PLATE TO
MATCH TIPIT
CONT WIDE THROW HINGE
AT HOLD-OPEN PROVIDE SHIELD
AT TOP, SIMILAR TO TIP-IT, TO
ELIMINATE LIGATURE POINT
HEAD
CONTINUOUS TURN-DOWN
AT EACH END
1" 1"
16 GA SHELF AND BRACKETS;
WELD TO DOOR. PROVIDE
SECURITY SEALANT AT ALL GAPS
14 GA ASTRAGAL, STICH
WELDED TO DOOR.
PROVIDE SECURITY
SEALANT AT GAPS
BETWEEN WELDS.
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_0
0- A5
.1 .d w g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
GENERAL NOTES:
HEAD DETAIL
00-A5.1
SCALE:
1. REFER TO HARDWARE GROUP SCHEDULE ON 00-A6.1.
2. ALL DOORS ARE 1 3/4" THICK UNLESS OTHERWISE NOTED.
3. DIMENSION FOR WIDTH IS DIMENSION OF OPENING W/O FRAME. PROVIDE FRAME OF
APPROPRIATE WIDTH FOR SCHEDULED OPENING.
4. V.I.F. - VERIFY DIMENSIONS IN FIELD
5. RATED DOORS TO BE POSITIVE LATCHING. 20 MINUTE RATED ASSEMBLIES SHALL BE
PROVIDED WITH APPROVED GASKETING MATERIAL INSTALLED TO PROVIDE A SEAL WHERE
THE DOOR MEETS THE STOP ON BOTH SIDES AND THE TOP NFPA 252, UL 10B OR UL 10C.
MANUFACTURERS' INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE FOR
ALL RATED DOOR ASSEMBLIES.
6. SWINGING TYPE FIRE DOORS & SMOKE & DRAFT CONTROL ASSEMBLIES SHALL BE TESTED &
LABELED IN ACCORDANCE W/ NFPA 252, UL 10B OR UL 10C. IN ACCORDANCE WITH THE
REQUIREMENTS OF THE LISTED ASSEMBLY, THE MANUFACTURERS INSTALLATION
INSTRUCTIONS SHALL BE PROVIDED W/ EA. ASSEMBLY FOR INSTALLATION AND FOR REVIEW
BY THE INSPECTION AUTHORITY.
1. HAND-ACTIVATED DOOR OPENING HARDWARE, HANDLES, PULLS. LATCHES, LOCKS AND
OTHER OPERATING DEVICES ON ACCESSIBLE DOORS SHALL HAVE A SHAPE THAT IS EASY TO
GRASP WITH ONE HAND AND DOES NOT REQUIRE TIGHT GRASPING, TIGHT PINCHING OR
TWISTING OF THE WRIST TO OPERATE. HARDWARE SHALL BE CENTERED BETWEEN 34"
(864mm) AND 48" (1219mm) ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE
HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS, U-SHAPED HANDLES OR OTHER
HARDWARE DESIGNED TO PROVIDE PASSAGE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION.
2. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE
OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT.
3. THE FORCE REQUIRED TO PUSH OR PULL OPEN A DOOR OR GATE SHALL BE AS FOLLOWS:
A. INTERIOR DOORS OR GATES: 5 lbs (22.2N) MAXIMUM
B. REQUIRED FIRE DOORS: THE MINIMUM OPENING FORCE ALLOWED BY THE
APPROPRIATE ADMINISTRATIVE AUTHORITY, NOT TO EXCEED 15 lbs (66.7N)
THESE FORCES DO NOT APPLY TO THE FORCE REQUIRED TO RETRACT LATCH BOLTS OR
DISENGAGE OTHER DEVICES THAT HOLD THE DOOR OR GATE IN A CLOSED POSITION.
4. FIRE DOOR ASSEMBLIES REQUIRED TO HAVE A MINIMUM FIRE PROTECTION RATING OF 20
MINUTES WHERE LOCATED IN CORRIDOR WALLS OR SMOKE BARRIER WALLS HAVING A
FIRE-RESISTANCE RATING IN ACCORDANCE WITH TABLE 716.5 CBC SHALL BE TESTED IN
ACCORDANCE WITH NFPA 252 OR UL 10C WITHOUT THE HOSE STREAM TEST.
5. GLAZING IN DOOR ASSEMBLIES IN CORRIDORS AND SMOKE BARRIERS - IN A 20-MINUTE FIRE
DOOR ASSEMBLY, THE GLAZING MATERIAL IN THE DOOR ITSELF SHALL HAVE A MINIMUM
FIRE-PROTECTION-RATED GLAZING OF 20 MINUTES AND SHALL BE EXEMPT FROM THE HOSE
STREAM TEST.
6. FIRE DOOR ASSEMBLIES & SHUTTERS SHALL BE INSTALLED IN ACCORDANCE WITH CBC
SECTION 716 AND NFPA 80.
7. SMOKE AND DRAFT CONTROL DOORS COMPLYING WITH UL 1784 SHALL BE LABELED IN
ACCORDANCE WITH SECTION 716.5.6.1 AND SHALL SHOW THE LETTER "S" ON THE FIRE RATING
LABEL OF THE DOOR. THIS MARKING SHALL INDICATE THAT THE DOOR AND FRAME ASSEMBLY
ARE IN COMPLIANCE WHEN LISTED OR LABELED GASKETING IS ALSO INSTALLED.
8. FIRE DOORS AND FRAMES SHALL BE LABELED SHOWING THE NAMES OF THE MANUFACTURER
AND THE THIRD-PARTY INSPECTION AGENCY.
9. FIRE RATED GLAZING SHALL BEAR A LABEL OR OTHER IDENTIFICATION SHOWING THE NAME
OF THE MANUFACTURER, THE TEST STANDARD AND INFORMATION REQUIRED IN TABLE
716.1(1) THAT SHALL BE ISSUED BY AN APPROVED AGENCY AND SHALL BE PERMANENTLY
IDENTIFIED ON THE GLAZING
10. FIRE DOORS SHALL BE SELF- OR AUTOMATIC-CLOSING IN ACCORDANCE WITH CBC SECTION 716.
11. SINGLE FIRE DOORS AND BOTH LEAVES OF PAIRS OF SIDE-HINGED SWINGING FIRE DOORS
SHALL BE PROVIDED WITH AN ACTIVE LATCH BOLT THAT WILL SECURE THE DOOR WHEN IT IS
CLOSED.
CODE NOTES:
00-A5.1
DETAIL SHEET
DUTCH DOOR SHELF DETAIL
00-A5.1
SCALE:
JAMB - LATCH SIDE
00-A5.1
SCALE:
CORRIDOR FLUSH DOOR WITH CONTINUOUS HINGE
00-A5.1
SCALE:
6" = 1'-0"
0 1 42 INCHES
6" = 1'-0"
0 1 42 INCHES
6" = 1'-0"
0 1 42 INCHES
6" = 1'-0"
0 1 42 INCHES
00-A5.1
SCALE:
6" = 1'-0"
0 1 42 INCHES
CORRIDOR DUTCH DOOR DETAIL
00-A5.1
SCALE:
6" = 1'-0"
0 1 42 INCHES
CORRIDOR DUTCH DOOR WITH CONTINUOUS HINGE
HEAD DETAIL
1/8" X 1/2" CLOSED CELL
NEOPRENE GASKET
1/4" PLATE SLIDING
DOOR RECEIVER
SECURITY LOCK
1/4" PL SLIDING DOOR
LATCH RECEIVER AT
OPEN AND CLOSED
POSITION
L 1" X 1" X 3/16" WELD
TO TUBE
2" 2"
V .I.
F.
5/8"
VIF
3" 3"
5/8"
VERIFY
IN
FIELD
4'
0"
VI
F
PATCH AND REFRAME (E)
WALL TO RECEIVE NEW
WINDOW FRAME
SECURITY GLAZING IN GASKETS
3'
0" A
FF
V.
I.F
SILL DETAIL
1/
"JAMB DETAILS
1 1/4"
1/8" X 1/2" CLOSED CELL
NEOPRENE GASKET
1/4" DEADLOCK BAR
1" X 1" X 3/16" U-NOTCH AS
SHOWN TO RECEIVE
DEADLOCK BAR WELD TO
TUBE
1/4" PL KEEPER
1/4" PL COVER
L 1" X 1" X 3/16" WELD
TO TUBE 14 GA CONT "BRAUN" 3211 E HINGE
PLUG WELD TO SHIM PLATE AT
TUBE @ 6" OC
1/4" PIN
2"2 1/16"
1-1/4".
5/
8"
VI
F
2"2"
5/
8"
VE
R
IF
Y
IN
FI
EL
D
2' - 8".
VIF
SPEAKER OPENING,
MATCH EXISTING
1"
3 - 3/8"
PATCH AND REFRAME (E)
WALL TO RECEIVE NEW
WINDOW FRAME
SECURITY GLAZING IN GASKETS 15/32"
21/32"
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_0
0- A5
.2 .d w g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
GENERAL NOTES:
1. ALL DOORS ARE 1 3/4" THICK UNLESS OTHERWISE NOTED.
2. DIMENSION FOR WIDTH IS DIMENSION OF OPENING W/O FRAME. PROVIDE FRAME OF
APPROPRIATE WIDTH FOR SCHEDULED OPENING.
3. V.I.F. - VERIFY DIMENSIONS IN FIELD
4. RATED DOORS TO BE POSITIVE LATCHING. 20 MINUTE RATED ASSEMBLIES SHALL BE
PROVIDED WITH APPROVED GASKETING MATERIAL INSTALLED TO PROVIDE A SEAL WHERE
THE DOOR MEETS THE STOP ON BOTH SIDES AND THE TOP NFPA 252, UL 10B OR UL 10C.
MANUFACTURERS' INSTALLATION INSTRUCTIONS SHALL BE AVAILABLE ON THE JOB SITE FOR
ALL RATED DOOR ASSEMBLIES.
5. SWINGING TYPE FIRE DOORS & SMOKE & DRAFT CONTROL ASSEMBLIES SHALL BE TESTED &
LABELED IN ACCORDANCE W/ NFPA 252, UL 10B OR UL 10C. IN ACCORDANCE WITH THE
REQUIREMENTS OF THE LISTED ASSEMBLY, THE MANUFACTURERS INSTALLATION
INSTRUCTIONS SHALL BE PROVIDED W/ EA. ASSEMBLY FOR INSTALLATION AND FOR REVIEW
BY THE INSPECTION AUTHORITY.
1. HAND-ACTIVATED DOOR OPENING HARDWARE, HANDLES, PULLS. LATCHES, LOCKS AND
OTHER OPERATING DEVICES ON ACCESSIBLE DOORS SHALL HAVE A SHAPE THAT IS EASY TO
GRASP WITH ONE HAND AND DOES NOT REQUIRE TIGHT GRASPING, TIGHT PINCHING OR
TWISTING OF THE WRIST TO OPERATE. HARDWARE SHALL BE CENTERED BETWEEN 34"
(864mm) AND 48" (1219mm) ABOVE THE FLOOR. LATCHING AND LOCKING DOORS THAT ARE
HAND-ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS, U-SHAPED HANDLES OR OTHER
HARDWARE DESIGNED TO PROVIDE PASSAGE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION.
2. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE
OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT.
3. THE FORCE REQUIRED TO PUSH OR PULL OPEN A DOOR OR GATE SHALL BE AS FOLLOWS:
A. INTERIOR DOORS OR GATES: 5 lbs (22.2N) MAXIMUM
B. REQUIRED FIRE DOORS: THE MINIMUM OPENING FORCE ALLOWED BY THE
APPROPRIATE ADMINISTRATIVE AUTHORITY, NOT TO EXCEED 15 lbs (66.7N)
THESE FORCES DO NOT APPLY TO THE FORCE REQUIRED TO RETRACT LATCH BOLTS OR
DISENGAGE OTHER DEVICES THAT HOLD THE DOOR OR GATE IN A CLOSED POSITION.
4. FIRE DOOR ASSEMBLIES REQUIRED TO HAVE A MINIMUM FIRE PROTECTION RATING OF 20
MINUTES WHERE LOCATED IN CORRIDOR WALLS OR SMOKE BARRIER WALLS HAVING A
FIRE-RESISTANCE RATING IN ACCORDANCE WITH TABLE 716.5 CBC SHALL BE TESTED IN
ACCORDANCE WITH NFPA 252 OR UL 10C WITHOUT THE HOSE STREAM TEST.
5. GLAZING IN DOOR ASSEMBLIES IN CORRIDORS AND SMOKE BARRIERS - IN A 20-MINUTE FIRE
DOOR ASSEMBLY, THE GLAZING MATERIAL IN THE DOOR ITSELF SHALL HAVE A MINIMUM
FIRE-PROTECTION-RATED GLAZING OF 20 MINUTES AND SHALL BE EXEMPT FROM THE HOSE
STREAM TEST.
6. FIRE DOOR ASSEMBLIES & SHUTTERS SHALL BE INSTALLED IN ACCORDANCE WITH CBC
SECTION 716 AND NFPA 80.
7. SMOKE AND DRAFT CONTROL DOORS COMPLYING WITH UL 1784 SHALL BE LABELED IN
ACCORDANCE WITH SECTION 716.5.6.1 AND SHALL SHOW THE LETTER "S" ON THE FIRE RATING
LABEL OF THE DOOR. THIS MARKING SHALL INDICATE THAT THE DOOR AND FRAME ASSEMBLY
ARE IN COMPLIANCE WHEN LISTED OR LABELED GASKETING IS ALSO INSTALLED.
8. FIRE DOORS AND FRAMES SHALL BE LABELED SHOWING THE NAMES OF THE MANUFACTURER
AND THE THIRD-PARTY INSPECTION AGENCY.
9. FIRE RATED GLAZING SHALL BEAR A LABEL OR OTHER IDENTIFICATION SHOWING THE NAME
OF THE MANUFACTURER, THE TEST STANDARD AND INFORMATION REQUIRED IN TABLE
716.1(1) THAT SHALL BE ISSUED BY AN APPROVED AGENCY AND SHALL BE PERMANENTLY
IDENTIFIED ON THE GLAZING
10. FIRE DOORS SHALL BE SELF- OR AUTOMATIC-CLOSING IN ACCORDANCE WITH CBC SECTION 716.
11. SINGLE FIRE DOORS AND BOTH LEAVES OF PAIRS OF SIDE-HINGED SWINGING FIRE DOORS
SHALL BE PROVIDED WITH AN ACTIVE LATCH BOLT THAT WILL SECURE THE DOOR WHEN IT IS
CLOSED.
CODE NOTES:
00-A5.2
DETAIL SHEET
WINDOWS DETAIL
00-A5.2
SCALE:
6" = 1'-0"
0 1 42 INCHES
681 SF
Activity
146 SF
Med
96 SF
Nurse
198 SF
Exam
209 SF
Therapy
353 SF
4-P
359 SF
4-P
361 SF
4-P
369 SF
4-P
361 SF
4-P
362 SF
4-P
136 SF
Staff
108 SF
Storage
112 SF
P.Toi
199 SF
P.Shwr
42 SF
Soiled
110 SF
Office
107 SF
Seclusion
58 SF
Clean Laund.
58 SF
Stor
36 SF
Jan
188 SF
Mech
20 SF
S.Toi
26 SF
S.Toi
20 SF
P.Toi
19 SF
P.Toi
20 SF
P.Toi
19 SF
P.Toi
19 SF
P.Toi
Entry
Dorm A
Dorm B
Dorm C
Dorm D
Dorm E
Dorm F
Roof
D.F.
DEPARTMENT OF STATE
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_0
1- A0
.1 .d w g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
BUILDING KEYPLAN N
516 514
520 518
510A
508A
517509A
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
0 202 FEET10
1/16" = 1'-0"
BUILDING 24 - UNIT 24 - SECOND FLOOR OVERALL PLAN
SCALE:
SEE SHEETS
01-A1.1 FOR DEMOLITION PLANS &
01-A2.1 FOR NEW WORK PLANS
N
1 HOUR RATED FIRE PARTITION (20
MIN RATED OPENING PROTECTION)
2 HOUR RATED FIRE WALL/BARRIER
(FIRE SMOKE BARRIER - BUILDING OR
OCCUPANCY SEPARATION - 90 MIN.
RATED OPENING PROTECTION)
NON-RATED PARTITION
LEGEND:
SEISMIC JOINT/BUILDING SEPARATION
SMOKE BARRIER
1 HOUR RATED FIRE BARRIER (OR
OCCUPANCY SEPARATION - 60 MIN
RATED OPENING PROTECTION)
01-A0.1
BUILDING 24 - UNIT 24 -
FIRST AND SECOND FLOOR
OVERALL PLAN
MED ROOM
NURSE ROOM
TOILET
1 2
HOSPITALS, ATASCADERO
FI
LE
: L :\2
4\
1-
D oo rs a nd A nt i-L ig at ur e, S ta te w id e\
C
AD
\D
SH
-A ta sc ad er o\
_0
1- A1
.1 .d w g
D
AT
E/
TI
M E:
Se p
, 0 2:
PM
JCCA
BUILDING KEYPLAN
N
516 514
520 518
510A
508A
517509A
Checked
Vault File Number
Project Number
Reference North Sheet Scale
Sheet Number
Designed
Sheet Title
Supervisor
Issue Date
Drawn
Project
Description
No.
DateIssue
00000000000XXXX
DEPARTMENT OF
STATE HOSPITALS
(DSH)
AS SHOWN
DSA STAMP
DOORS AND
ANTI-LIGATURE
MODIFICATIONS
PHASE 1 AT MED
ROOMS
04/04/2024
JCCA #: 24791-2
DSH
Client Agency
DEPARTMENT OF STATE HOSPITALS
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
DEMOLITION KEYNOTES:
REMOVE EXISTING DOOR AND HARDWARE; EXISTING FRAME
TO REMAIN. PREPARE FRAME TO RECEIVE NEW HARDWARE
AND DOOR
SECOND FLOOR DEMOLITION PLAN - UNIT 24 - MED ROOM - 3
SCALE: N0 41 FEET3
1/2" = 1'-0"
1 HOUR RATED FIRE PARTITION (20
MIN RATED OPENING PROTECTION)
2 HOUR RATED FIRE WALL/BARRIER
(FIRE SMOKE BARRIER - BUILDING OR
OCCUPANCY SEPARATION - 90 MIN.
RATED OPENING PROTECTION)
LEGEND:
NON-RATED PARTITION
01-A1.1
BUILDING 24 - SECOND
FLOOR DEMOLITION PLAN -
MED - 3
GENERAL DEMOLITION NOTES:
1. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE WITH THE
FACILITY THE DETAILS FOR DEMOLITION AND CONSTRUCTION
ACTIVITIES FOR EACH PROJECT LOCATION SO PREPARATIONS AND
ARRANGEMENTS CAN BE MADE TO MAINTAIN OPERATIONS AND TO
MINIMIZE DISTRUPTIONS TO HOSPITAL SERVICES.
2. THE CONTRACTOR SHALL COORDINATE WITH THE FACILITY TO
ARRANGE FOR THE REMOVAL OR MOVEMENT OF ANY EQUIPMENT,
FURNITURE OR APPURTENANCES, NOT WITHIN THE SCOPE OF
WORK, NECESSARY TO ACCOMMODATE DEMOLITION AND
CONSTRUCTION ACTIVITIES.
3. THE DEMOLITION DRAWINGS ARE DIAGRAMMATIC AND DO NOT
SHOW EXACT AMOUNT OF REMOVAL. THE CONTRACTOR SHALL VISIT
THE JOB SITE AND DETERMINE THE FULL EXTENT OF THE
DEMOLITION WORK INVOLVED PRIOR TO SUBMITTING A BID.
4. PROTECT EXISTING BUILDING AND SITE FROM ANY POSSIBLE
DAMAGE DUE TO THE CONSTRUCTION WORK INCLUDING THE
DELIVERY OF EQUIPMENT AND MATERIALS AND REMOVAL OF
EQUIPMENT AND DEBRIS.
5. THE CONTRACTOR SHALL PROTECT AND COVER ALL FIXTURES AND
EQUIPMENT IN AREAS AFFECTED BY WORK, AND UPON COMPLETION
OF WORK, SHALL THOROUGHLY CLEAN ALL FIXTURES, EQUIPMENT
WALLS, FLOOR AND HARDWARE.
6. PLASTIC FILM WHEN USED FOR DUST PROTECTION, SHALL BE FLAME
RESISTANT.
7. REMOVE FROM SITE AND LEGALLY DISPOSE OF ALL REFUSE, DEBRIS,
RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION
OPERATIONS DAILY. CONTRACTOR SHALL ASSUME ALL COSTS OF
DISPOSAL OF DEBRIS FROM DEMOLISHED WORK. SITE TO BE LEFT
BROOM CLEAN EVERY DAY.
8. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/CONSTRUCTION
MANAGER AFTER DEMOLITION OF ANY EXPOSED, PREVIOUSLY
HIDDEN CONDITIONS THAT REQUIRE INSPECTION FOR
COORDINATION WITH NEW CONSTRUCTION.
9. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/CONSTRUCTION
MANAGER OF ANY CONDITION FOUND TO EXIST WHICH IS NOT
CONSISTENT WITH THE CONTRACT DOCUMENTS.
10. WORK AREAS ARE TO REMAIN SECURE AND LOCKABLE DURING
CONSTRUCTION AS REQUIRED BY USER/ OWNER/ BUILDING
MANAGEMENT CONTRACTOR SHALL COORDINATE WITH USER/
OWNER/ BUILDING MANAGEMENT AS REQUIRED TO ENSURE
SECURI…
This is the start of the file's text. The full file is on GovTribe.