About this file
This is a Construction Contract Project Manual and Supplemental Conditions document issued by the State of Florida Department of Military Affairs for Project Number 220024, the 3600 Area Paving project at Camp Blanding Joint Training Center in Starke, Florida. The project involves repaving four streets (Ludlow, Bristol, Greenwich, and Winterhaven) with an estimated construction cost of $467,000, which falls into Level 4 contract category ($200,000-$500,000). The solicitation was issued on July 22, 2026, and the work includes replacing culverts where new paving crosses them with like-for-like installations and concrete mitered ends, as well as removing grass from roadway edges and driveways. The project must achieve substantial completion within 90 calendar days after the Notice to Proceed, with liquidated damages assessed at $155.66 per calendar day for delays. The contractor is required to attend an initial construction conference with project stakeholders prior to or immediately after construction begins.
Bidders must submit a bid bond with proposals exceeding $100,000 and must comply with all qualification requirements outlined in Florida Statutes Chapters 399, 455, 489, and 633, submitting Form FNG 5085 Contractor's Experience Questionnaire and Financial Statement at bid opening. The contractor bears responsibility for obtaining and paying for all required building permits and fees from local authorities, with the exception of those under the jurisdiction of the State Fire Marshal. Additional contractor obligations include providing and maintaining a 12' x 12' watertight Architect/Engineer field office with specified amenities, installing a telephone line with long-distance charges paid by the caller and other charges paid by the contractor, furnishing all water and electricity for construction and testing, providing 24-hour site security against theft and vandalism, and erecting a project sign at a prominent location. If Davis-Bacon and related federal labor standards apply, the contractor must comply with all applicable prevailing wage requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MAP.pdf | ||
| SCOPE OF WORK.pdf | ||
| Invitation To Bid.pdf | ||
| Proposal - Subcontractors List.pdf | ||
| Qualifications Requirement Instructions.pdf | ||
| Part 2 Gen Terms and Cond.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Contract Project Manual for the
GENERAL TERMS & CONDITIONS
PART 1 – SUPPLEMENTAL CONDITIONS
LEVELS 4 & 5
(Level 4 - $200,000 - $500,000) (Level 5 – Over $500,000)
Revised June 2023 (All previous revisions are obsolete)
STATE OF FLORIDA
DEPARTMENT OF MILITARY AFFAIRS
2305 STATE ROAD 207
St. Augustine, Florida 32086
INTRODUCTION TO ARCHITECT-ENGINEER
The following Non-Technical Specifications are part of the bidding and contract process for construction of projects over $200,000. These documents are designed to (i) ensure compliance with applicable laws, (ii) protect the State’s interests, and (iii) make the contracting process easier for all parties. Please check with this office to ensure that you have the most current version
The documents are divided into two parts, the first part includes instructions and forms that may be customized by the Architect-Engineer. The second part which is in .pdf format is not to be altered or revised. Part 1 and Part 2 must be included as part of the Technical Specifications in their entirety.
Part 1 – Portions of this section may be customized by the Architect-Engineer as needed.
a. Architect-Engineer Checklist – Verify that all items on this checklist have been completed.
b. Cover Sheet - This form may be customized but must be completed and included in the
Technical Specifications.
c. Supplementary Terms and Conditions – This form MUST be completed and included in the
Technical Specifications as it contains vital information pertaining to bid project.
d. Notice to Bidder Instructions – Please include this notice in the specifications.
e. Advertisement To Bid Form – This form is prepared by the DMA Contract Manager.
f. Bidder Proposal Letter – This form is prepared by the DMA Contract Manager.
Part 2 – General Terms and Conditions and Standardized Forms - (PDF files) - This section MUST be included in the Technical Specifications.
a. General Terms and Conditions
b. Agreement Between Contractor and Owner (Exhibit 1)
c. Performance and Labor and Material Bonds (Exhibits 2 & 3)
d. Owner’s Certificate of Partial Payment (Exhibit 4)
e. Contractor’s Affidavit of Contract Completion (Exhibit 5)
f. Contractor’s Status Report Of Minority & Disabled Veteran's Business Enterprise (Exhibit 6)
PROJECT NUMBER: 220024
PROJECT NAME: 3600 AREA PAVING LUDLOW, BRISTOL, GREENWICH
AND WINTERHAVEN STREETS
CAMP BLANDING JOINT TRAINING CENTER, STARKE, FLORIDA
TO BE CONSTRUCTED FOR:
Department of Military Affairs
82 Marine Street St. Augustine, FL 32084
CONTRACT ADMINISTERED BY
Department of Military Affairs
Construction and Facility Management Office 2305 State Road 207
St. Augustine, Florida, 32033
Plans and Specs developed by:
Camp Blanding Joint Training Center (DPW)
Starke, Florida
SUPPLEMENTARY TERMS AND CONDITIONS
July 22, 2026
Project Number: 220024
Project Name and Location: “3600 AREA PAVING LUDLOW, BRISTOL, GREENWICH AND WINTERHAVEN
STREETS”, CAMP BLANDING JOINT TRAINING CENTER, STARKE, FLORIDA
OWNER: Florida Department of Military Affairs
Project Designed By: Jeff Collins (CBJTC DPW)
This document forms an integral part of the Request for Proposal Documents and the Contract Documents. The receipt of this document must be acknowledged in the space provided on your Proposal. This General Terms and Conditions are hereby modified as follows:
1. SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES: Section C-7 is amended in part as follows: This Project is to be substantially complete within -90- calendar days after the date of the Notice to Proceed. This date may be extended only in accordance with the Contract Documents. If the project is not substantially completed by the required date, liquidated damages shall be assessed at the rate of $155.66 per calendar day.
2. ARCHITECT/ENGINEER'S FIELD OFFICE. The Contractor shall provide and maintain a watertight office at the Project for the exclusive use of the Architect/Engineer and his representatives, not less than 12' x 12' in size, one room with at least one window in each exterior wall and an independent outside entrance door fitted with hardware and lock, artificial light, a bench with one drawer, a blueprint rack, a heater and a window air conditioner. This office and equipment shall become the property of the Contractor upon completion of the contract.
3. TELEPHONE. A telephone shall be installed in the Architect/Engineer's office and it shall remain until the full completion of the project. Charges for long distance calls shall be paid by the person making the calls. All other telephone charges shall be paid by the Contractor.
4. WATER. Water necessary for construction of the building and testing its plumbing and mechanical systems shall be furnished by the Contractor. He shall make all connections, install a meter, take out and pay for all permits necessary, do all piping and clear away all evidence of same after the job is completed.
5. ELECTRICITY. All electricity for light and power necessary for the construction of the building and testing of its electrical and mechanical systems shall be paid for by the Contractor. The Contractor shall make all necessary arrangements for this service and perform the work required.
6. PROJECT SIGN. A sign shall be erected at the site by the Contractor and shall be 3/4"- 4' X 8' exterior grade plywood mounted on 4 x 4 wood posts (p.t.), located in a prominent location approved by the Architect/Engineer and Owner. Sign shall conform to the size, colors and design specifications provided by Architect/Engineer or owner.
7. INITIAL CONSTRUCTION CONFERENCE. Immediately prior to starting construction or as soon as possible after the construction has started, the Owner will arrange a meeting with the project stakeholders. The purpose of this meeting shall be to discuss requirements and responsibilities of the various parties involved with the objective of expeditious handling of the construction contract. The Owner's Contract Manager and Project Manager will chair this meeting.
8. SITE SECURITY. The Contractor shall pay for and be responsible to secure the site and the project against theft, vandalism, fire and for public safety at all times (24 hours per day) from Notice to Proceed until Substantial Completion.
9. DAVIS-BACON REQUIREMENTS. If Davis-Bacon and related laws apply, they will be addressed in Section D of the General Terms and Conditions. If applicable, then all applicable federal labor standards clauses are incorporated into the Contract Documents. The Contractor agrees to familiarize itself with “Making Davis-Bacon Work – A Contractor’s Guide to Prevailing Wage Requirements for Federally-Assisted Construction Projects” and to comply with all applicable regulations.
EXCEPT AS SPECIFICALLY PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS OF THE BIDDING
DOCUMENTS AND CONTRACT DOCUMENTS REMAIN UNCHANGED.
[END]
Date Issued:
A/I Initials:
NOTICE TO BIDDERS
The following General Terms and Conditions and the Supplemental Terms and Conditions are part of the bidding and contract process for construction projects in excess of $200,000. These non-technical documents are designed to (i) ensure compliance with applicable laws, (ii) protect the State’s interests, and (iii) make the contracting process easier for all parties. Please review carefully all sections in the non-technical specifications including the following items:
1. All Bidders must submit a bid bond with their bid proposal if the bid exceeds $100,000.00. For details please refer to Section B-11 of the General Terms and Conditions.
2. All Bidders must submit bids in accordance with the publicized Invitation to Bid (ITB). If prequalification to bid is required, it will be stated within the ITB along with instructions.
3. Criminal History Background Checks, if included in the General Terms and Conditions, must be obtained for all employees and agents of the Contractor and its subcontractors, their agents and employees, and all other persons performing any of the work under a contract to the Contractor working within buildings or facilities either owned or managed by the Department of Military Affairs.
Details of this responsibility are outlined in Article C-38 of the General Terms and Conditions.
4. All Bidders are responsible for the cost of insurance and bonds. Please refer to Sections C-1 through
C-3 of the General Terms and Conditions for required types of insurance and Exhibits 2 and 3 to review the requirements on the bond forms.
5. Proposal Form may be obtained with the ITB or as instructed in the ITB.
6. Samples of some Forms required by the Department of Military Affairs (DMA) are shown in the
General Terms and Conditions. Forms for use during contract performance will be provided by DMA after contract award.
(GENERAL TERMS AND CONDITIONS BEGIN HERE)
Remove this page and add the Division One Non-Technical General Terms and Conditions for Levels 4 & 5. Ensure any items requiring selection to be included have been addressed. These items are highlighted in the text.
Please confirm that the completed “Bid Cover Sheet” and “Supplemental Terms and Conditions” are inserted in the front of this section.
File details come from the government source that posted it. Updated .