Parklanes ES - COOLING UPGRADES - Mechanical and Plumbing~1.pdf
PDF 882 KB Posted
- Attached to
- Centennial 4- Site Mechanical Cooling
- Solicitation number
- S-P26028-00009492
- Issued by
- Multnomah County, Oregon
About this file
This document is a set of technical plans and specifications for cooling upgrades at the Parklane Elementary School, located in Portland, Oregon. The mechanical and plumbing work includes the installation of a new 4-ton rooftop condensing unit, 5 new wall-mounted fan coil units, and associated refrigerant and condensate piping. The work is being performed for the Multnomah County and City of Portland school districts. The project involves upgrading the cooling system in the main office and support spaces of the school. No specific response dates, bid due dates, or award information is provided in the documents.
The technical specifications outline the equipment to be installed, including model numbers, capacities, efficiencies, and electrical requirements. The plans provide floor plans showing the locations of the new equipment and piping routing. The work must be coordinated with the existing building automation system controls. No additional pricing, funding, or contracting details are included in the provided documents.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
MP0.1 SYMBOLS LIST, GENERAL NOTES DETAILS & SCHEDULES -
MECH & PLUMBING
MP1.0 OVER FLOOR PLAN - MECHANICAL & PLUMBING
MP2.0 ENLARGED FLOOR PLANS - MECHANICAL & PLUMBING
Abbreviations
AIR CONDITION(ED)A/C
ACCESS DOORAD
ABOVE FINISHED FLOORAFF
BACKDRAFT DAMPERBDD
BELOW FINISHED FLOORBFF
BACKFLOW PREVENTERBFP
BRAKE HORSEPOWERBHP
CEILING DIFFUSERCD
CONDENSATE DRAINCD
CONTINUATIONCONT.
COEFFICIENT OF PERFORMANCECOP
CONDENSING UNITCU
CHECK VALVECV
COLD WATERCW
DROPD
DECIBELDB
DRY BULBDB
DIAMETERDIA
DIRECT EXPANSIONDX
ENTERING AIR TEMPERATUREEAT
ENERGY EFFICIENCY RATINGEER
EXHAUST FANEF
EFFICIENTEFF
ELECTRICALELECT
ENTERING WATER TEMPERATUREEWT
EXHAUSTEXH
FAHRENHEITF
FIRE DAMPERFD
FULL LOAD AMPSFLA
FEETFT
GALLONSGAL
GALLONS PER HOURGPH
GALLONS PER MINUTEGPM
HEADHD
HORSEPOWERHP
HEATINGHTG
HEATERHTR
HOT WATER COILHWC
INSIDE DIAMETERID
INVERT ELEVATIONIE
INCHESIN
KILOWATTKW
LEAVING AIR TEMPERATURELAT
POUNDSLBS.
LATENT HEATLH
MIXED AIRMA
MAXIMUMMAX
THOUSAND BTU'S PER HOURMBH
MOTORIZED DAMPERMD
MINIMUMMIN
NOT APPLICABLEN/A
NOT IN CONTRACTNIC
NUMBERNO.
NOT TO SCALENTS
OUTSIDE AIROA
OPPOSED BLADE DAMPEROBD
ON CENTEROC
OUTSIDE DIAMETEROD
PRESSURE DROPPD
PHASEPH
PRESSURE REDUCING VALVEPRV
POUNDS PER SQUARE INCHPSI
QUANTITYQTY
RISER
RETURN AIRRA
RETURNRET
REVOLUTIONS PER MINUTERPM
SUPPLY AIRSA
SEASONAL ENERGY EFFICIENCY RATINGSEER
SQUARE FEETSF
SENSIBLE HEATSH
SHUT OFF VALVESOV
STATIC PRESSURESP
TEMPERATURET, TEMP
TEMPERATURE DIFFERENCETD
TOTAL HEATTH
TOTAL PRESSURETP
VOLTV
WITHW/
WATTW
WET BULBWB
WATER COLUMNWC
Piping Fittings, Appurtenances and Equipment
CAP
CONTINUATION
Piping Systems
REFRIGERANT LIQUID AND SUCTION
MECHANICAL SYMBOL LIST
NOTE: This is a standard symbol list and not all items listed may be used.
ROOF DECK.
LAP SEALANT.
CLAMPING STRAP.
STAINLESS STEEL
MEMBRANE.
ROOFING
SPLICE ADHESIVE.
NOTE:
INSULATION.
RIGID
ALUMINUM
PIPE COVER.
USE ROOF MEMBRANE
MANUFACTURER'S
MATERIALS. PATCH
AND REPAIR ROOF TO
COMPLY WITH ALL
ROOF WARRANTIES.
PRE-FAB
PIPE FLASHING.
LAP SEALANT.
SEE DETAIL 1/M0.1
PIPE COVER.
ALUMINUM
AIRTIGHT.
SPRAY FOAM INSULATION
FILL CAVITY WITH
TO FAN/COIL UNIT.
ROUTE REFRIGERATION PIPES
18 GA. SHEETMETAL CAP.
FLASHING.
ROOFING AND
SILICONE
ROOF.
SEAL.
COVER.
GALV OR ZINC-A-LUME
PIPES.
INSULATED REFRIGERANT
CONDENSING UNIT.
MAINTAIN CLEARANCES
AS SPECIFIED BY
MANUFACTURER.
PLATFORM CONSTRUCTION
TO BE COORDINATED WITH
ARCHITECT.
CURB (HEIGHT AS REQUIRED)
[1/8"] AIRCRAFT
CABLE. SEISMIC
GUY WIRE TYP.
OF FOUR SIDES.
SECURELY
FASTEN TO UNIT
CURB.
SEE STRUCTURAL FOR
ATTACHMENT TO ROOF.
METAL STUDS.
[5/8"] EYE BOLT
ATTACHED WITH
NUT AND WASHER
BOTH SIDES.
BOTH SIDES.
NUT AND WASHER
ATTACHED WITH
[5/8"] EYE BOLT
AIRCRAFT CABLE ATTACHMENT
CAPABLE OF WITHSTANDING
[80 LBS OF FORCE].
NOTE:
NO SCALE
1 REFRIGERANT PIPING COVER PENETRATION
ROOFTOP CONDENSING UNIT CURB2
NO SCALE
REF
3 CONDENSATE DRAIN CONNECTION
NO SCALE
CONDENSATE DRAIN
DOWN IN WALL.
C.P. ESCUTCHEON.
3/4" COPPER DRAIN FROM
FURNACE.
3/4" I.D. APPROVED HOSE
AND S.S. HOSE CLAMPS.
P-TRAP.
NOTE:
ADJUST ROUGH-IN
HEIGHT AS REQ'D.
CABINET TOP.
LOCATE PENETRATION
THROUGH WALL NEAR
CONNECTION TO MINIMIZE
EXPOSED PIPING.
HVAC CONTROLS NOTES
A. PROVIDE EACH MULTIZONE HEAT PUMP WITH A BAS INTEGRATION CONTROLLER
FOR COMBATIBILITY WITH INTERFACING WITH CONNECTION TO THE EXISTING
BACNET BUILDING AUTOMATION SYSTEM WITH AVAILABLE READ/WRITE POINTS
FROM THE HEAT PUMP CONTROLLER INCLUDING: ON/OFF, SET POINT, ROOM
TEMPERATURE, OPERATION MODE, FAN SPEED, LOUVER POSITION, ERROR CODE
AND INTERLOCK CONTROL WITH INDOOR UNIT ON/OFF.
B. EXTEND EXISTING BUILDING AUTOMATION SYSTEM TO CONNECT TO NEW HEAT
PUMP EQUIPMENT BUILDING AUTOMATION SYSTEM INTEGRATOR AND PROVIDE NEW
READ/WRITE AND BAS GRAPHICS FOR BUILDING AUTOMATION INTEGRATION.
C. NEW HEAT PUMP REFRIGERATION SYSTEM WILL BE CONTROLLED BY THE
MANUFACTURER PROVIDED CONTROLLER. SCHEDULING, ON/OFF CONTROL AND
TEMPERATURE SET POINT CONTROL WILL BE CONTROLLED THROUGH THE
BUILDING AUTOMATION SYSTEM. PROVIDE ADDITIONAL THIRD PARTY
TEMPERATURE SENSORS AS REQUIRED TO MAINTAIN BUILDING AUTOMATION
SYSTEM MONITORING FOR EACH ZONE SERVED BY NEW HEAT PUMPS.
D. HEAT PUMPS WILL OPERATE TO PROVIDE COOLING ONLY. HEATING AND
VENTILATION IS PROVIDED BY THE EXISTING HVAC SYSTEM. LOCK-OUT HEAT PUMP
HEATING OPERATION AND PROVIDE A TEMPERATURE SET POINT DEAD BAND
BETWEEN HEATING AND COOLING TO PREVENT SIMULTANEOUS HEATING AND
COOLING OPERATION OF THE EXISTING HEATING SYSTEM AND NEW HEAT PUMPS.
E. THE WORK OF THIS DIVISION SHALL BE PROVIDED BY A HONEYWELL AUTHORIZED
CONTROL INTEGRATOR (ACI). THE FOLLOWING CONTRACTORS ARE:
1. HUNTER-DAVISSON
2. MACDONALD MILLER
3. NORTHWEST CONTROL CO.
4. NO ALTERNATES OR SUBSTITUTION WILL BE ACCEPTED.
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street Suite 1600 Portland, OR 97204
TEL 503.382.2266
www.interfaceengineering.com
Shem Heiple
2023-1707
1/23/2024
PA
R
K
LA
N E
EL
EM
EN
TA
R Y
C O
O
LI
N G
U
PG
R A
D
ES
M
A
IN
O
FF
IC
E
SU
PP
O R
T
SP
A C
ES
SE
M ai n
PO
R
TL
A N
D , O
R
12/31/24EXPIRES:
SYMBOLS LIST,
GENERAL NOTES
DETAILS &
SCHEDULES -
MECH & PLUMBING
JR
MP0.1
FILE: MP0.1.DWG - MP0.1 | EDIT: 1/23/2024 3:20 PM BY JESUSR | PLOT: 1/23/2024 3:27 PM BY JESUS RODRIGUEZ
AMB. MAX. APPROX
NOM. CAP. TEMP. OF EFF. EFF. WT. DIMS
SYMBOL AREA SERVED TONS (MBH) ( °F ) DESIGN (EER2) (SEER2) (LBS) (WxDxH) VOLT/PH MCA MOCP NOTES CU-1 MAIN OFFICE 4 48.0 95 DAIKIN 5MXS48WVJU9 10.5 20.6 250 44x18x35 208/1 33.2 35 1
NOTES:
1. R-410A REFRIGERANT.
CONDENSING UNIT SCHEDULE
COOLING
BASIS MIN. MIN.
ELECTRICAL
BASIS MAX. APPROX
NOM. COND. TOTAL MIN SENS. OF WT. DIMS MOTOR
SYMBOL AREA SERVED TONS UNIT (MBH) (MBH) (F DB) (F WB) DESIGN (LBS) (WxDxH) VOLT/PH FLA NOTES FCU-1 OFFICE 1 CU-1 10.1 7.1 80.0 67.0 DAIKIN FTXS12WVJU9 30 32x9x12 208/1 0.13 1,2,3,4,5,6
FCU-2 OFFICE SEC/WAIT 1.5 CU-1 15.1 10.6 80.0 67.0 DAIKIN FTXS18WVJU9 50 42x10x14 208/1 0.36 1,2,3,4,5,6
FCU-3 WORKROOM 1 CU-1 10.1 7.1 80.0 67.0 DAIKIN FTXS12WVJU9 30 32x9x12 208/1 0.13 1,2,3,4,5,6
FCU-4 OFFICE STOR 0.5 CU-1 5.9 4.1 80.0 67.0 DAIKIN CTXS07WVJU9 30 32x9x12 208/1 0.09 1,2,3,4,5,6
FCU-5 HEALTH 0.5 CU-1 5.9 4.1 80.0 67.0 DAIKIN CTXS07WVJU9 30 32x9x12 208/1 0.09 1,2,3,4,5,6
NOTES:
1. WALL MOUNTED FAN COIL. TOTAL CAPACITY LISTED IS THE CORRECTED CAPACITY FOR UNITS CONNECTED TO 4-TON MULTIZONE CONDENSING UNIT.
2. MANUFACTURER PROVIDED CONDENSATE PUMP KIT.
3. CONDENSATE OVERFLOW SHUT-OFF FLOAT SWITCH.
4. WIRED REMOTE THERMOSTAT WITH SCHEDULING, SETPOINT, FAN SPEED, AIRFLOW DIRECTION CAPABILITY.
5. INDOOR UNIT RECEIVES POWER FROM CONDENSING UNIT.
6. CONDENSATE PUMP RECEIVES POWER FROM FAN COIL UNIT.
DX FAN COIL SCHEDULE
COOLING ELECTRICAL
ENT. AIR
MP2.0
GYM
110 SOR
LAV
BOYS
GIRLS
STOR
OFFICE
VESTIBULE
RISER
ROOM
CORRIDOR
UP
UP
DN
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
CLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOMCLASSROOM
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
RR GIRLS
RR GIRLS
RR BOYS
RR BOYS
JAN STOR
OFFICE
STOR
KITCHEN
TEACHERS
STOR
RR BOYS
TEACHERS
OFFICE
OFFICE
SEC/WAIT
OFFICE
WORKRM.
HALLWAY
MECH
OFFICE
VAULT
CONT PIT
TOILET
STOR HEALTH
KITCHEN
TOILET
STOR
KITCHEN
CAN WASH
KITCHEN
DRY STOR
KITCHEN
COOLER
TEACHER
DINING
DRESS RM.
GIRLS
DRESS RM.
BOYS
STOR
124A
HALL
HALL
JAN TOILETTOILET
STAGE
WORKRM
TOILET
LIBRARY
COMPUTER
CORR
ENTRY
O L I V E R E L E M E N T A R Y
(FUTURE MIDDLE SCHOOL)
CORR
CORR
MULTIPURPOSE
CORR
CORR
CORRIDOR
CORR
0 16' 32'
SCALE: 1/16"=1'-0"
8'
1 OVERALL FLOOR PLAN - MECHANICAL & PLUMBING
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street Suite 1600 Portland, OR 97204
TEL 503.382.2266
www.interfaceengineering.com
Shem Heiple
2023-1707
1/23/2024
PA
R
K
LA
N E
EL
EM
EN
TA
R Y
C O
O
LI
N G
U
PG
R A
D
ES
M
A
IN
O
FF
IC
E
SU
PP
O R
T
SP
A C
ES
SE
M ai n
PO
R
TL
A N
D , O
R
12/31/24EXPIRES:
OVERALL FLOOR
PLAN -
MECHANICAL &
PLUMBING
SPL
MP1.0
OFFICE
STOR
OFFICE
OFFICE
SEC/WAIT
OFFICE
WORKRM.
HALLWAY
OFFICE
VAULT
CONT PIT
TOILET
STOR HEALTH
ENTRY
FCU-1
FCU-4
FCU-5
T T
T
T
T
FCU-2
FCU-3
REF
REF
R
EF
R
EF
SHEET KEYNOTES
1. ROUTE PUMPED CONDENSATE DISCHARGE (PD) UP AS HIGH AS
POSSIBLE. EXTEND PIPE AS SHOWN ON PLANS. DROP PD PIPE
BELOW FCU-3, AND EXTEND TO WALL AS SHOWN.
2. PUMPED CONDENSATE DISCHARGE (PD) FROM FCU-3. TIE INTO
1" PD BELOW.
3. ROUTE PUMPED CONDENSATE DISCHARGE (PD) UP AS HIGH AS
POSSIBLE. EXTEND PIPE AS SHOWN ON PLANS. ROUTE PIPE
THROUGH WALL TO CONNECT TO 1" PD.
4. ROUTE PUMPED CONDENSATE DISCHARGE (PD) DOWN ALONG
INTERIOR WALL, EXPOSED. EXTEND THROUGH EXTERIOR WALL
TO DISCHARGE 12 INCHES ABOVE EXTERIOR GRADE WITH
DOWNTURN.
5. ROUTE PUMPED CONDENSATE DISCHARGE (PD) UP AS HIGH AS
POSSIBLE TO ADJACENT WALL. ROUTE PD DOWN ALONG
INTERIOR WALL, EXPOSED. EXTEND THROUGH EXTERIOR WALL
TO DISCHARGE 12 INCHES ABOVE EXTERIOR GRADE WITH
DOWNTURN.
6. ROUTE PUMPED CONDENSATE DISCHARGE (PD) UP AS HIGH AS
POSSIBLE TO OFFICE CLOSET. ROUTE 1" PD DOWN ALONG
INTERIOR WALL, EXPOSED. EXTEND THROUGH EXTERIOR WALL
TO DISCHARGE 12 INCHES ABOVE EXTERIOR GRADE WITH
DOWNTURN.
GENERAL SHEET NOTES
A. CONTRACTOR TO FIELD VERIFY CONDENSATE ROUTING AND
TERMINATION LOCATIONS AND PROVIDE ALTERNATE ROUTING
IF LOCATION SHOWN IS NOT CONSISTENT WITH EXISTING
CONDITIONS.
B. FOR EXTERIOR CONDENSATE DISCHARGE: DO NOT TERMINATE
CONDENSATE FROM MECHANICAL UNITS ABOVE CONCRETE
OR OTHER NONPERMEABLE SURFACE.
C. INSTALL WALL MOUNTED FCU CLOSE TO CEILING WITH MFR'S
RECOMMENDED TOP CLEARANCE. IF EXISTING CONDITIONS DO
NOT PERMIT INSTALLATION, CONTACT ENGINEER WITH
PROPOSED NEW LOCATION FOR REVIEW PRIOR TO
INSTALLATION.
D. REFRIGERANT ROUTE SHOWN DEMONSTRATES DESIGN
INTENT TO MINIMIZE EXPOSED REFRIGERANT LINESETS.
VERIFY WITH EXISTING CONDITIONS AND OBTAIN APPROVAL
FROM OWNER AND ENGINEER BEFORE PROCEEDING WITH
INSTALLATION.
VALLEY
LOW
RAISED ROOF AREA
SK2
SK2
C
CU-1
OFFICE BELOW
REVISIONS
DATE
JOB NO.
CHECKED BY
DRAWN BY
SHEET NUMBER
SHEET TITLE
100 SW Main Street Suite 1600 Portland, OR 97204
TEL 503.382.2266
www.interfaceengineering.com
Shem Heiple
2023-1707
1/23/2024
PA
R
K
LA
N E
EL
EM
EN
TA
R Y
C O
O
LI
N G
U
PG
R A
D
ES
M
A
IN
O
FF
IC
E
SU
PP
O R
T
SP
A C
ES
SE
M ai n
PO
R
TL
A N
D , O
R
12/31/24EXPIRES:
0 4' 8'
SCALE: 1/4"=1'-0"
2'
2 ENLARGED FLOOR PLAN - MECHANICAL
ENLARGED FLOOR
PLANS -
MECHANICAL &
PLUMBING
SPL
MP2.0
0 8' 16'
SCALE: 1/8"=1'-0"
4'
2 ENLARGED ROOF PLAN - MECHANICAL
| Sheets and Views |
| MP0.1 |
| MP1.0 |
| OLE1 |
| MP2.0 |
| OLE1 |