Parking+Lot+Painting+&+Striping+IFB.docx

DOCX document 104 KB Posted

Attached to
Parking Lot Painting & Striping
Solicitation number
110.7-25-123
Issued by
Burleigh County, North Dakota

About this file

This is an Invitation for Bid (IFB) issued by the North Dakota State Procurement Office on behalf of the ND State Procurement Office, Office of Management and Budget, for parking lot painting and striping services at the ND State Capitol Grounds in Bismarck. The project encompasses 17 individual parking lots and traffic control areas totaling approximately 1,842 parking stalls, along with associated features including 63 handicap stalls, directional arrows, crosswalks, stop bars, and traffic control markings. The bid solicitation requires comprehensive prep work including sweeping, debris removal, and coordination with the Facilities Manager for scheduling. Work must be performed after 6:00 PM on weekdays for seven designated lots, while the remaining ten lots may be completed during standard business hours with mutual coordination. The bid question deadline is December 12, 2025, with bid responses due by December 19, 2025. A public bid opening will be held via Microsoft Teams webinar. The contract period runs from April 1, 2026, through April 1, 2027, with no automatic renewal but with STATE reserved options to extend for up to 12 months or renew for up to four additional 12-month periods under the same terms and conditions.

Pricing shall be firm and fixed for the initial contract period, with unit prices specified for each category of work and a separate hourly rate for additional sweeping services. All freight and handling costs must be included in the item prices with FOB delivery to the Bismarck area. The successful bidder must provide proof of NDDOT-preapproved paint lots and comply with NDDOT Standard Specifications for Road and Bridge Construction Section 762 regarding paint quality and dimensions. Bidders must include a minimum of two references, with at least one demonstrating similar project scope. Required insurance includes commercial general liability ($2,000,000 per occurrence), automobile liability ($500,000 per person/$2,000,000 per occurrence), workers' compensation, and employer's liability insurance ($2,000,000). The contract is structured as a cooperative purchasing agreement available to state entities, higher education institutions, counties, cities, nonprofit entities, tribal agencies, and other government bodies. Bidders must register with the North Dakota Secretary of State if required, complete background checks for all personnel accessing the facility at the contractor's expense, and maintain compliance with all federal, state, and local laws, safety regulations, and nondiscrimination requirements.

View the file

Other files

File Type Posted
Attachment+1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF NORTH DAKOTA

INVITATION FOR BID (IFB)

(February 2024)

DATE ISSUED
December 5, 2025
BID NUMBER
110.7-25-123
BID TITLE
Parking Lot Painting & Striping
COMMODITY CODE(S)
913-36; 912-76; 913-75,94; 929-67
BID QUESTION DEADLINE
December 12, 2025
CONTRACT NUMBER
055
BID RESPONSE DEADLINE
December 19, 2025
CONTRACT PERIOD
4/1/2026 – 4/1/2027

PROCUREMENT OFFICER

The Procurement Officer is the point of contact for this IFB. Bidders shall direct all communications regarding this IFB to the Procurement Officer. Please do not add the Procurement Officer to any marketing distribution lists.

PURCHASING AGENCY (STATE): ND State Procurement Office, Office of Management and Budget PROCUREMENT OFFICER: Seth Westby EMAIL: swestby@nd.gov

PHONE: 701-328-1953

TTY Users call: 7-1-1

Engaging in unauthorized communication or seeking to obtain information about an open solicitation with any state employee or official other than the responsible Procurement Officer or designee is sufficient grounds for suspension or debarment. [N.D.A.C. § 4-12-05-04(7)]

BID QUESTION DEADLINE

Bidders should carefully review the IFB including all attachments. Bidders may ask questions to obtain clarification and request additional information, or object to material in the IFB. Questions and objections must be submitted to the Procurement Officer in writing by the deadline identified in the IFB. If no deadline is specified, questions or objections must be received at least seven days prior to the Bid Response deadline. The Procurement Officer may elect to respond to questions received after the deadline.

Email is the preferred method of submission with the IFB number and title cited in the email subject line. Responses to questions will be distributed as a solicitation amendment unless the question can be answered by referring the bidder to a specific section of the IFB.

A person or firm interested in submitting a proposal should ensure all communications related to the procurement are only with the designated point of contact. This section does not restrict communication with state officials or any member of the legislative assembly unless the state official or member of the legislative assembly is involved directly with the procurement for which the person is interested or has submitted a bid or proposal (N.D.C.C. § 54-44.4-01.1).

STATE PROCUREMENT WEBSITE (SPO ONLINE)

This IFB and any related amendments and notices will be posted on the North Dakota OMB website using the State Procurement Online system (SPO Online). Bidders are responsible for checking this website to obtain all information and documents related to this IFB: https://apps.nd.gov/csd/spo/services/bidder/main.htm

Select Recent Solicitations and find this solicitation. Recent solicitations are listed by close date.

Bidders not having completed the Bidders List registration may request to receive notices related to this IFB by contacting the Procurement Officer in writing with the following information: IFB title, business name, contact person, mailing address, telephone number, and email address.

SECTION 1

BIDDERS INSTRUCTIONS

1. Bidder Checklist. Have you remembered to?

· Ensure your Bid Response complies with all instructions, terms and conditions, delivery requirements, and specifications.

· Prepare your price in the specified unit of measure, FOB: Destination to the shipping location.

· Sign your bid, and initial any changes or corrections

· Ensure your Bid Response is received by the Procurement Officer by the Bid Response deadline. Called to confirm receipt.

· If using a delivery service, check tracking to ensure the Bid Response will be delivered on time. Contact the Procurement Officer as soon as possible in the event of delays due to weather, etc.

· Submit any required samples or documents.

2. Definitions.

· Bidder: any person or firm submitting a competitive bid in response to a solicitation.

· Bid Response: the executed document submitted by a Bidder in response to a solicitation.

· Commodities: all property, including equipment, supplies, materials, printing, insurance, and the lease of equipment.

· Contractor: any person or firm having a contract with a governmental body.

· Procurement Officer: an individual duly authorized to enter into and administer purchasing contracts and make written determinations with respect thereto; also includes an authorized representative acting with the limits of designated purchasing authority.

· Purchasing Agency (STATE): the entity on which the purchase is being made on behalf of.

· Services: the furnishing of labor, time, or effort by a Contractor, not involving the delivery of a specific end product other than reports that are merely incidental to the required performance.

· Solicitation: a document to notify prospective Bidders of a bidding opportunity.

· N.D.A.C.: North Dakota Administrative Code; rules with the force and effect of law.

· N.D.C.C.: North Dakota Century Code; state laws.

· OMB: Office of Management and Budget (OMB); a North Dakota state agency.

· SPO: State Procurement Office, a division of the Office of Management and Budget.

· SPO Online: a procurement information website maintained by the State Procurement Office pursuant to N.D.C.C. § 54-44.4-14.

3. Secretary of State Registration Requirements. The North Dakota Secretary of State has registration requirements for individuals and businesses transacting business in North Dakota. If the successful Offeror is determined to have a registration requirement with the North Dakota Secretary of State, they must be registered before the contract award and registration must remain active for the duration of the contract period (N.D.C.C. § 54-44.4-09.1)

See the OMB Guidelines to Vendor Registry for more information.

Visit the Secretary of State's Vendor Registration webpage for information on registration requirements and fees. Visit FirstStop, the Secretary of State's business and licensing software, for online form options.

· Check the Business Records database to see if a business is registered.

· Contact Secretary of State's office by email or call 701-328-2900 (choose menu item 2, then option 1).

· If you need to register, fees apply.

· Vendors may need to obtain businesses licenses. See the list of licenses required of businesses in the State of North Dakota. The link includes information on who to contact, application fees, renewal dates, and the legal reference.

4. Bidders List. Individuals or business entities desiring to be notified of bidding opportunities may apply to be placed on the Bidders List (N.D.C.C. § 54-44.4-09) Bidders Lists are used to notify vendors when solicitations are issued on the State Procurement Office Online system (SPO Online). Placement on the Bidders List does not guarantee a vendor will receive notice of every solicitation (N.D.A.C. § 4-12-05-01). There are no fees to register as a bidder. The online application form requests contact information for the receipt of solicitation notices. The Bidders List application and SPO Online system use commodity codes to identify categories of goods, services, and information technology.

The commodity codes used for this solicitation are: 913-36; 912-76; 913-75,94; 929-67 commodity codes.

Visit the OMB website for instructions and the online Bidders List Application:

Bidders List Registration Website

For assistance with Bidders List Registration, contact State Procurement Help Desk at 701-328-1728 or infospo@nd.gov.

5. Submission Instructions. Please follow these instructions to submit your Bid Response. Bid Responses must be received by the Procurement Officer by the Bid Response deadline. Bidders assume the risk of the delivery method selected. Late Bid Responses will be rejected.

Upload Response Through the State Procurement Online System (SPO Online):

Bidders must electronically submit Bid Responses through the State Procurement Office Online system (SPO Online) by the Bid Response deadline.

DO NOT WAIT UNTIL THE “LAST MINUTE” TO SUBMIT A RESPONSE. Recommend uploading response 24 hours prior to the Bid Response deadline.

Bidder must begin the electronic submission process well in advance of the Bid Response deadline to allow for transmission and resolution of any technical difficulties. Be advised that the STATE is not responsible for a Bidder’s failure to timely submit a Bid Response due to any technical difficulties. If you experience any technical difficulties contact the Procurement Officer or the State Procurement Office at infospo@nd.gov or 701.328.2740.

If documents are in the process of being uploaded when the Bid Response deadline occurs, the upload process will stop. The attempted submission will not be uploaded successfully and is ineligible for consideration. The STATE takes no responsibility for electronic submissions that are captured, blocked, filtered, quarantined, or otherwise prevented from uploading by any anti-virus or other security software.

1. This solicitation is posted on SPO Online at: https://apps.nd.gov/csd/spo/services/bidder/main.htm

2. Select “Recent Solicitations” and find this solicitation. Solicitations are listed by close date.

3. Use “Upload Response” to upload a maximum of five (5), clearly labeled documents before the Bid Response deadline.

4. Offerors must upload their Bid Response as requested in the Bid Response section of this IFB.

5. The maximum file size allowed is 50 MB per file.

6. There is a 50 character file name limitation for the document being uploaded.

7. There is 75 character limit in the TITLE field within SPO Online.

8. All SPO Online field entries must be alphanumeric. Dashes and underscores are allowed; however, the system does not accept other special characters such as apostrophe, & symbol, quotation marks, etc.

9. DO NOT submit documents that are embedded (zip files), movies, wmp, encrypted, or mp3 files.

10.Bidder will receive an email confirmation from infospo@nd.gov that the upload response was received including the “File Description” for the uploaded files. Review this email to ensure all files were successfully uploaded. If Bidder do not receive an email confirmation, the upload was not successful, and you will need to upload the files again. If Bidder does not receive an email confirmation after the reattempt, contact the Procurement Officer or the State Procurement Office at infospo@nd.gov or 701.328.2740.

Visit https://www.omb.nd.gov/sites/www/files/documents/doing-business-with-the-state/procurement/spo-electronic-response-external-job-aid.pdf for the SPO Electronic Response Job Aid which describes how to submit an electronic response.

6. Additional Terms and Conditions. Additional terms and conditions submitted with a Bid Response are of no effect unless accepted in writing by the Procurement Officer. Bid Responses with additional terms and conditions may be rejected as non-responsive. (N.D.A.C. § 4-12-11-06).

7. Assistance to Bidders with a Disability. Bidders with a disability that need an accommodation must contact the Procurement Officer prior to Bid Response deadline so reasonable accommodation can be made.

8. Bid Response Held Firm. Bid Responses are not awarded at the bid opening. Bidders must hold their Bid Responses firm for 30 days, unless otherwise specified by the Procurement Officer in writing.

9. Bid Response Opening. A public Bid Response opening will be held. The Procurement Officer will hold the Bid Response opening will be held:

Webinar or Conference Call Participation Instructions:

Microsoft Teams Need help?

Join the meeting now Meeting ID: 220 016 738 632 91 Passcode: XX6F5HJ9

Dial in by phone +1 701-328-0950,,819126639# United States, Bismarck Find a local number Phone conference ID: 819 126 639# Join on a video conferencing device Tenant key: teams@join.nd.gov Video ID: 111 406 934 8 More info For organizers: Meeting options | Reset dial-in PIN

10. Bid Response Results. Interested parties may contact the Procurement Officer to obtain a summary of all Bid Responses received and the award. Bid Response results may be posted on SPO Online: https://apps.nd.gov/csd/spo/services/bidder/main.htm

11. Bidders List - Suspension and Debarment. Placement on the Bidders List does not guarantee a vendor will receive notice of every solicitation. A vendor may be removed from the Bidders List if a solicitation notice is undeliverable. Vendors may be suspended or debarred from the Bidders List for cause. (N.D.A.C. ch. 4-12-05)

12. Changes/Corrections. Bidders must initial any changes or corrections to the Bid Response, such as erasures and crossed out/rewritten prices. The Procurement Officer may confirm the Bid Response when changes are not initialed.

13. Multiple Bid Responses. Bidders may submit more than one Bid Response in response to this solicitation. Each Bid Response submitted must be prepared in accordance with the Bid Response instructions and meet the stated requirements.

14. Open Records Requests. Bid Responses are exempt records until the date and time of the Bid Response opening. After the Bid Response opening, all Bid Responses are subject to North Dakota open records laws. Interested parties may contact the Procurement Officer to request information related to this solicitation.

15. Packaging. All packaging must be strong and secure in accordance with accepted commercial practices.

16. Protests. Protests of the solicitation must be received by the Procurement Officer within seven days before the Bid Response deadline. Protests of the award or Notice of Intent to Award must be received by the Procurement Officer within seven days after receiving notice of award. Seven calendar days after award or issuance of the Notice of Intent to Award it will be assumed that all interested parties knew or should have known all the facts surrounding the award. Protests must be made in writing to the Procurement Officer and include the basis for the protest. (N.D.C.C. § 54-44.4-12; N.D.A.C. ch. 4-12-14.)

17. Signature. The Bidder’s authorized representative must provide their printed name, title, and sign the Bid Response. The lack of a signature may be waived as a minor informality, provided a signed Bid Response is submitted by the deadline established by the Procurement Officer. (N.D.A.C. ch. 4-12-10)

18. Specifications, Compliance. All Bid Responses must comply with the stated specifications, and the successful Bidder will be held responsible. Bidders who desire to submit commodities or services that deviate from these specifications or have any objections to the stated specifications must contact the Procurement Officer by the deadline for questions or at least seven days before the Bid Response deadline, so the Procurement Officer can determine whether the specifications need to be amended.

19. Specifications Prepared by Non-State Personnel. When a purchasing agency has specifications prepared by someone other than a state employee or official on behalf of the state, that person or business entity must be excluded from submitting bids or proposals in accordance with N.D.A.C. § 4-12-06-06.

20. Supplier Registration (Payee). The successful Bidder will be required to complete Supplier Registration, if not already registered as a Supplier. Any individual or business who will be receiving payment from a state agency or higher education institution must complete a registration process to collect important financial and taxpayer information. Payments are generally made by check or automatic clearing house (ACH), and taxpayer information must be collected in compliance with IRS requirements. The State and North Dakota University System (NDUS) have separate financial systems and vendor registration processes.

21. Withdrawal or changes to a Bid Response prior to the Bid Response deadline. Before the Bid Response deadline, the Bidder’s authorized representative may withdraw or change a Bid Response by making a written request to the Procurement Officer.

22. Withdrawals or changes to a Bid Response after the Bid Response deadline. After the Bid Response deadline, no changes may be made to Bid Response, except as provided in N.D.A.C. ch. 4-12-10. The Bidder’s authorized representative may make a written request to withdraw the Bid Response.

SECTION 2

EVALUATION AND AWARD

1. Award. Award will be made to the responsible Bidder with the lowest priced Bid Response that is responsive to the specifications and all other requirements stated herein. Award will be made as follows:

· All or none.

2. Award – Preference Laws. The reciprocal preference law, N.D.C.C.§ 44-08-01, was repealed effective August 1, 2023.

3. Award – Tie Bid Response Preference. If a tie occurs between two or more Bidders with equal Bid Response prices or offerors with identical evaluation scores:

a. Preference must be given to a resident North Dakota bidder, seller, vendor, offeror, or contractor as defined in N.D.C.C. § 44-08-02. (N.D.C.C. 54-44.4-05.1)

b. If a tie still remains, award shall be made in accordance with N.D.A.C. § 4-12-11-05.

4. Late Bid Responses. Bid Response responses must be received by the Procurement Officer by the Bid Response deadline. Late Bid Responses will be rejected, regardless of the degree of lateness, unless the delay is due to the error of the Procurement Officer and discovered before the selection of the successful Bidder. (N.D.A.C. § 4-12-08-13)

5. Responsiveness of the Bid Response. Any Bid Response that does not meet the requirements of the solicitation, other than mistakes determined to be minor informalities, will be rejected. (N.D.A.C. § 4-12-11-03)

6. Minor Informalities. The STATE reserves the right to waive minor informalities in Bid Responses. Minor informalities are insignificant omissions or nonjudgmental mistakes that are matters of form rather than substance, evident from the Bid Response document, with a negligible effect on price, quantity, quality, delivery, or contractual conditions that can be waived or corrected without prejudice to other Bidders. (N.D.A.C. ch. 4-12-10)

7. Mistakes. The Procurement Officer may confirm the Bid Response in the event of apparent errors, such as an unreasonably priced Bid Response. Mistakes will be handled in accordance with N.D.A.C. ch. 4-12-10.

8. Responsibility of the Bidder. The Procurement Officer, at any time, may make a supplementary investigation as to the responsibility of any Bidder, even though the Bidder may be on the Bidders List. If a Bidder is determined to be not responsible, that Bid Response will be rejected even if it is the lowest Bid Response, and the Bidder may be debarred or suspended from the Bidders List. (N.D.A.C. § 4-12-11-04)

9. Rejection. The STATE reserves the right to reject any and all Bid Responses in whole or in part. The Procurement Officer will send a rejection notice, including the reason for rejection. Bid Responses will be rejected if:

a. the Bid Response is determined to be not responsive to the instructions, specifications, and other requirements of the solicitation, other than mistakes or omissions determined to be minor informalities;

b. the Bid Response is determined to be late;

c. the Bidder fails to comply with Bidders List Application requirements by the stated deadline;

d. the Bidder is determined to be not responsible, in accordance with N.D.A.C. § 4-12-11-04;

e. the Bid Response is not legible.

If all Bid Responses are rejected, the Procurement Officer will send written notice to Bidders, including the reason all Bid Responses were rejected. (N.D.A.C. § 4-12-11-09)

SECTION 3

SPECIAL TERMS AND CONDITIONS

1. State Contract. The contract resulting from this solicitation will be a State Contract made available to North Dakota state agencies and institutions.

2. Cooperative Purchasing. This contract is a cooperative purchasing contract established pursuant to N.D.C.C § 54-44.4-13. This contract is made available to state entities, institutions under the jurisdiction of the State Board of Higher Education, other government entities (including counties, cities, townships, public primary and secondary educational entities, governmental boards and commissions), nonprofit entities established on behalf of public entities, tribal agencies, transportation providers under N.D.C.C § 39-04.2, and the International Peace Garden (hereafter known as “Ordering Agencies”). Participation in this open-ended contract is not mandated; therefore, the estimated volume of this contract is not known. Contractor may contact the Procurement Officer for assistance in determining whether an entity is eligible to purchase under this contract.

3. Term of the Contract. The term of the contract issued as a result of this solicitation will be as follows:

a. Contract Period. This Contract term (Term) begins on April 1, 2026 or its Effective Date, and ends on April 1, 2027.

b. No Automatic Renewal. This Contract will not automatically renew.

c. Extension Option. STATE reserves the right to extend this Contract for an additional period of time, not to exceed twelve (12) months, beyond the current termination date of this contract.

d. Renewal Option. STATE may renew this Contract upon satisfactory completion of the initial Contract Term. STATE reserves the right to execute up to four (4) options to renew this Contract under the same terms and conditions for a period of twelve (12) months each.

4. Billing Address. After delivery of commodities or services under contract, the CONTRACTOR must submit a correct invoice. Payment will be made after inspection and acceptance.

· Invoices must be addressed to the Ordering Agency that places an order under this contract. All invoice and payment inquiries must be directed to the Ordering Agency. Any problems related to late payment may be escalated to the Procurement Officer.

5. Contract Amendment – Unanticipated Amendment. After a binding contract has been entered into, no changes may be made, unless prior written approval has been obtained from the Purchasing Agency through execution of a contract amendment. The Contractor may request changes, such as substitutions of a product, by submitting a written request to the Procurement Officer. Unanticipated amendments must be within the scope of the original contract, authorized by the terms of the contract and due to legitimate, unforeseen circumstances. (N.D.A.C. ch. 4-12-13)

6. Contract Estimated Volume. The volume of this contract is estimated. Estimates are not to be considered as either a minimum or maximum, but rather an estimate based upon past and anticipated usage. The CONTRACTOR or CONTRACTORs will be required to furnish actual requirements upon receipt of an order. This contract will not include items of a similar nature, which must be bought for emergency use.

7. Contract Sales Reports. The CONTRACTOR must maintain records of sales under the contract and furnish volume of sales information to the Procurement Officer. The CONTRACTOR must furnish reports listing all purchases made by all government entities using this contract. The report must be furnished within fourteen (14) days after the request by the Procurement Officer.

The report format will be determined by mutual agreement of the CONTRACTOR and the Procurement Officer.

8. Order Confirmation. The CONTRACTOR must confirm the receipt of orders by communicating with the Ordering Agency within one (1) working day of the order placement.

9. Delivery Time Required. The CONTRACTOR must meet the specified delivery requirements. If delivery cannot be made within the specified time, the CONTRACTOR must notify the Ordering Agency in writing of the delay and the approximate date delivery may be expected.

1. Delivery must be made upon an agreed upon time between the Ordering Agency and the CONTRACTOR when the Ordering Agency issues a contract or purchase order or uses a purchasing card.

10. Delivery Location - F.O.B. Point and Freight. Delivery, freight, and passage of title shall under this contract shall be as follows:

· F.O.B. Destination to any location within the Bismarck, ND surrounding area. All freight and handling is to be included in the item price. Title will pass to Ordering Agency upon delivery to the specified destination. The CONTRACTOR will file any claims.

11. Inspection and Acceptance or Rejection. The STATE reserves the right to conduct inspections and investigations related to the Bidder and the offered commodities or services, including but not limited to the firm, personnel, qualifications, and the commodities and services offered to make determinations regarding compliance with the Bid Response requirements and responsibility of the Bidder. All material and workmanship are subject to inspection and testing by the STATE at the point of manufacturer, place of storage, or upon receipt. The STATE reserves the right to reject any commodities or services and terminate the contract if the CONTRACTOR fails to comply with the specifications, terms and conditions, or the seller’s express or implied warranties. Rejected commodities will be removed at the CONTRACTOR’s expense. Failure to satisfactorily perform may result in suspension or debarment from the Bidders List.

If commodities or services are rejected as being not compliant with the requirements of this solicitation, the STATE will inform the CONTRACTOR in writing. The Purchasing Agency may provide the CONTRACTOR with a reasonable opportunity to cure, whenever practicable, as set forth in writing by the Purchasing Agency.

12. Invoicing.

Orders will be placed by state agencies and institutions.

13. Pricing – Tax Exempt. All prices must be in United States currency. Bid Response prices must include all discounts and deductions, and to be less federal and state taxes. Bidders may contact the Procurement Officer to obtain the Purchasing Agency’s tax exemption number and tax-exempt certificate.

14. Price Adjustment. Pricing during the term of the contract will be as follows:

· Pricing, Firm-Fixed with Adjustment Provisions. Pricing shall be firm for the first contract period. After the firm-fixed period, the CONTRACTOR may submit a request for a price increase to the Procurement Officer. Requests for a price increase must include a copy of the manufacturer's official notice or other evidence that the increase or decrease is applicable to all customers. The STATE reserves the right to accept or reject, within 30 days, or cancel the contract. The CONTRACTOR shall immediately inform the STATE of any price decreases. Price changes will become effective upon execution of a contract amendment. All orders placed are to be billed at prices in effect at the time of the order, not the date the shipment is made.

15. Pricing, Unit of Measure. The unit prices is to be according to the unit of measurement specified in the solicitation. In the event of mathematical differences between the unit price and extended total, the unit price will prevail. (N.D.A.C. § 4-12-10-02)

16. Specifications, Brand Name or Equivalent. Unless otherwise indicated in the solicitation specifications, the use of a specific brand name or make/model is for illustrative purposes only, and the STATE will consider equivalent products. If an alternate brand offered by a Bidder is rejected as not being equivalent, the Procurement Officer send a rejection notice, including the reason for rejection.

Specifications, Brand Name. The specific brand name or make/model is required, and substitutions will not be accepted.

17. Background Checks for CONTRACTOR Personnel. The Purchasing Agency requires all background checks to be performed on all CONTRACTOR Personnel who will access the facility.

CONTRACTOR shall provide the Procurement Officer with the names of all individuals that will have access to the premises along with background checks for each individual for approval by the Purchasing Agency. This information must be received prior to the CONTRACTOR Personnel attempting to access the facility, and the CONTRACTOR must receive confirmation of approval. CONTRACTOR will be responsible for notifying the Procurement Officer or designee if any CONTRACTOR Personnel changes and provide background checks for any new CONTRACTOR Personnel. Under no circumstance shall any CONTRACTOR Personnel have access to the facility without a background check and approval by the Purchasing Agency. All background check and supporting documentation shall be provided through the North Dakota Bureau of Criminal Investigation. The cost of the background checks will be the CONTRACTOR’s responsibility. At any time during the contract period, the Purchasing Agency may request the CONTRACTOR to provide updated background checks of any CONTRACTOR Personnel that have access to the premises.

18. Travel. CONTRACTOR acknowledges travel costs are covered by the Contractual Amount and shall not invoice STATE for travel costs.

SECTION 4

DETAILED SPECIFICATIONS

1. Project. The North Dakota OMB-Facilities Management (FM) seeks a bid for completing parking lot painting/striping of the ND State Capitol Grounds. In addition, FM seeks painting/striping bids for each individual parking lot and other locations. Prep work will be included in each bid and the requirements are explained in the Conditions Section. The Criteria Section explains the painting/striping to be completed. For other Ordering Agencies, CONTRACTOR will use the agreed upon pricing structure set forth in Section 6 – Bid Response Form.

1. Minimum Qualifications. Potential bidders must include a minimum of two (2) references in the Bid Response with contact information. One (1) reference must include a project of a similar size/scope of work as represented in this bid.

1. Conditions. CONTRACTOR shall provide all labor and equipment necessary to perform prep work and painting/striping. Prep work will involve sweeping entire lot, sidewalks, curbsides, entrances, etc. The contractor shall remove all debris from the property. CONTRACTOR will coordinate with Facilities Manager to schedule work. Work must be performed after 6:00 PM CT on weekdays, Monday thru Friday, for the following parking lots: Category 5 – Official Lot, Category 7 – ADA Lot, Category 10 – Liberty Memorial Lot, Category 11 – Heritage Center Lot, Category 12 – SOB Area, Category 14 – J-Wing East Lot, and Category 16 – DOT Lot. Work may be performed during working hours on weekdays, Monday thru Friday, upon mutually-agreed scheduling and coordination with FM for the following parking lots: Category 2 – North West Lot, Category 3 – North East Lot, Category 4 – North Lot, Category 6 – Legislative Lot, Category 8 – Dock Lot, Category 9 – Visitor Lot, Category 13 – J-Wing West Lot, Category 15 – State Fleet Lot, and Category 17 – Pedestrian & Traffic Control Areas. Work performed on weekends must be coordinated with the Facilities Manager to schedule around events.

1. Criteria. Work specifications for contract with the FM is to perform parking lot painting and striping at ND State Capitol Grounds, Bismarck, ND. The paint used and painting performed shall match the existing color scheme and meet North Dakota Department of Transportation (NDDOT) specifications for quality and dimensions. These specifications are listed in Section 762 of “Standard Specifications for Road and Bridge Construction” located at the following link: https://www.dot.nd.gov/sites/www/files/documents/Standard%20Specifications/%602024%20NDDOT%20Standard%20Specifications%20for%20Road%20and%20Bridge%20Construction.pdf of their “Standard Specifications for Road and Bridge Construction.” The paint used shall meet specifications and be included as one of the preapproved paint lots by NDDOT as shown listed in section 880 – Pavement Markings of “Standard Specifications for Road and Bridge Construction.” More information can be found here: https://www.dot.nd.gov/construction-and-planning/planning-process/research/materials-and-research/water-based-pavement.CONTRACTOR shall provide proof of preapproved paint lots prior to commencing work.

The painting/striping listed below must be performed according to current paint schemes:

1. Traffic Control: Paint/Repaint - Stop Bars, DOT Directional Arrows, 8” Channel Lines, and Double Yellow Traffic Divider Lanes

1. Crosswalks: Paint/Repaint - Lines or Blocks

1. ADA Spots: Paint/Repaint in OSHA Blue – Unloading Zone, Handicap Stencil, and any curb striping

1. Directional Arrows: Paint/Repaint – Stencil

1. Crosshatch Lines: Paint/Repaint – Lines

A diagram of the all parking lots are shown in Attachment 1 – ND Capitol Grounds. The parking lots to be painted/striped and included in the ND Capitol Grounds total bid as well as by individual bid are as follows:

1. North West Lot – (280 parking stalls)

1. North East Lot – (124 parking stalls)

1. North Lot – (148 parking stalls)

1. Official Lot – (64 parking stalls)

1. Legislative Lot – (181 numbered parking stalls, 6 Handicap stalls & 8 white motorcycle stalls with yellow crosshatch lines at end)

1. ADA Lot – (15 Handicap stalls)

1. Dock Lot – (3 parking stalls)

1. Visitor Lot – (87 parking stalls, 6 Handicap stalls & 3 No Parking stalls)

1. Liberty Memorial Lot – (53 parking stalls & 4 Handicap stalls)

1. Heritage Center Lot – (123 parking stalls & 8 Handicap stalls)

1. SOB Area – (6 Handicap stalls & 4 crosswalks): West Lot – (40 parking stalls) - SOB South Lot – (18 parking stalls) - SOB North Lot – (120 parking stalls)

1. J-Wing West Lot – (119 parking stalls & 8 Handicap stalls)

1. J-Wing East Lot – (196 parking stalls & 15 directional arrows)

1. State Fleet Lot – (94 parking stalls)

1. DOT Lot – (373 parking stalls & 10 Handicap stalls)

1. Pedestrian & Traffic Control Areas – (42 border line crosswalks, 13 block style crosswalks, 9 traffic control with flow at intersections & 10 traffic stop bars approx. 2’ x 12’)

1. Standards. It is expected that all tasks will be performed as indicated. If CONTRACTOR does not complete the tasks as indicated, FM reserves the right to discontinue service and search for another provider without penalty. All work shall be completed in a professional manner. Unprofessional or unfinished work will not be allowed and shall be grounds for termination of the Contract. Non-compliance with itemized criteria shall also constitute grounds for termination of the Contract.

1. Safety Requirements. CONTRACTOR shall keep informed of and comply with all federal, state, and local laws, regulations, and other legal requirements governing the safety, health, sanitation, and performance of the Contract in general. In addition, CONTRACTOR shall provide, inspect and maintain all safeguards, and safety devices, protective equipment, safety programs, and other needed actions that are necessary to execute this Contract.

SECTION 5

RISK MANAGEMENT REQUIREMENTS

Bidders are instructed to review the following provisions. Objections to these provisions must be made in writing to the Procurement Officer by the deadline for questions.

1. Indemnification. Indemnification provisions are incorporated and made part of this solicitation and resultant contract.

· Contractor agrees to defend, indemnify, and hold harmless the state of North Dakota, its agencies, officers, and employees (State), from and against claims based on the vicarious liability of the State or its agents, but not against claims based on the State’s contributory negligence, comparative and/or contributory negligence or fault, sole negligence, or intentional misconduct. This obligation to defend, indemnify, and hold harmless does not extend to professional liability claims arising from professional errors and omissions. The legal defense provided by Contractor to the State under this provision must be free of any conflicts of interest, even if retention of separate legal counsel for the State is necessary. Any attorney appointed to represent the State must first qualify as and be appointed by the North Dakota Attorney General as a Special Assistant Attorney General as required under N.D.C.C. § 54-12-08. Contractor also agrees to reimburse the State for all costs, expenses and attorneys' fees incurred if the State prevails in an action against Contractor in establishing and litigating the indemnification coverage provided herein. This obligation shall continue after the termination of this agreement.

2. Insurance. Insurance provisions are incorporated and made part of this solicitation and resultant contract. Bidders are instructed to review the Insurance Requirements. The Successful Bidder will be required to provide the required proof of insurance prior to contract award, and failure to provide evidence of insurance coverage is a material breach and grounds for award rescission. Failure of the CONTRACTOR to keep the required insurance in effect during the term of the contract is grounds for termination of the contract.

CONTRACTOR shall provide certificate of insurance and any endorsements to STATE electronically to:

Name: Seth Westby Email Address: swestby@nd.gov Email Subject Line: Certificate of Insurance – 055 – Parking Lot Painting & Striping

Contractor shall secure and keep in force during the term of this agreement and Contractor shall require all subcontractors, prior to commencement of an agreement between Contractor and the subcontractor, to secure and keep in force during the term of this agreement, from insurance companies, government self-insurance pools or government self-retention funds, authorized to do business in North Dakota, the following insurance coverages:

1) Commercial general liability, including premises or operations, contractual, and products or completed operations coverages (if applicable), with minimum liability limits of $2,000,000 per occurrence.

2) Automobile liability, including Owned (if any), Hired, and Non-Owned automobiles, with minimum liability limits of $500,000 per person and $2,000,000 per occurrence.

3) Workers’ compensation coverage meeting all statutory requirements. The policy shall provide coverage for all states of operation that apply to the performance of this contract.

4) Employer’s liability or “stop gap” insurance of not less than $2,000,000 as an endorsement on the workers compensation or commercial general liability insurance.

The insurance coverages listed above must meet the following additional requirements:

1) Any deductible or self-insured retention amount or other similar obligation under the policies shall be the sole responsibility of the Contractor. Optional Provision: The amount of any deductible or self-retention is subject to approval by the State.

2) This insurance may be in policy or policies of insurance, primary and excess, including the so-called umbrella or catastrophe form and must be placed with insurers rated “A-” or better by A.M. Best Company, Inc., provided any excess policy follows form for coverage. Less than an “A-” rating must be approved by the State. The policies shall be in form and terms approved by the State.

3) The duty to defend, indemnify, and hold harmless the State under this agreement shall not be limited by the insurance required in this agreement.

4) The state of North Dakota and its agencies, officers, and employees (State) shall be endorsed on the commercial general liability policy on a primary and noncontributory basis, including any excess policies (to the extent applicable), as additional insured. The State shall have all the benefits, rights, and coverages of an additional insured under these policies that shall not be limited to the minimum limits of insurance required by this agreement or by the contractual indemnity obligations of the Contractor.

5) A “Waiver of Subrogation” waiving any right to recovery the insurance company may have against the State.

6) The Contractor shall furnish a certificate of insurance to the undersigned State representative prior to commencement of this agreement. All endorsements shall be provided as soon as practicable..

7) Contractor shall provide at least 30-day notice of any cancellation or material change to the policies or endorsements. Contractor shall provide on an ongoing basis, current certificates of insurance during the term of the contract. A renewal certificate will be provided 10 days prior to coverage expiration. Optional Provision: An updated, current certificate of insurance shall be provided in the event of any change to a policy.

SECTION 6

BID RESPONSE FORM

Item No.
Qty
Unit
Specifications
Unit Price
Total Price

CATEGORY 1: CAPITOL COMPLEX COMPLETE

1.
1842
Each
Parking Stalls
$
$
2.
181
Each
Parking Stalls with Numbers
$
$
3.
8
Each
White Motorcycle Stalls w/ Yellow Crosshatch Lines
$
$
4.
63
Each
63 Handicap Stalls
$
$
5.
15
Each
15 Directional Arrows
$
$
6.
3
Each
3 No Parking Stalls
$
$
7.
42
Each
42 Crosswalks w/ Border Lines
$
$
8.
13
Each
13 Block Style Crosswalks
$
$
9.
9
Each
9 Traffic Control w/ Flow at Intersections
$
$
10.
10
Each
10 Traffic Stop Bars
$
$
11.
4
Each
4 Crosshatch Lines – Capitol Mall
$
$
12.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 2: NORTH WEST LOT

1.
280
Each
Parking Stalls
$
$
2.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 3: NORTH EAST LOT

1.
124
Each
Parking Stalls
$
$
2.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 4: NORTH LOT

1.
148
Each
Parking Stalls
$
$
2.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 5: OFFICIAL LOT

1.
64
Each
Parking Stalls
$
$
2.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 6: LEGISLATIVE LOT

1.
181
Each
Parking Stalls w/ Numbers
$
$
2.
6
Each
Handicap Stalls
$
$
3.
8
Each
White Motorcycle Stalls w/ Yellow Crosshatch Lines
$
$
4.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 7: ADA LOT

1.
15
Each
Handicap Stalls
$
$
2.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 8: DOCK LOT

1.
3
Each
Parking Stalls
$
$
2.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 9: VISITOR LOT

1.
87
Each
Parking Stalls
$
$
2.
6
Each
Handicap Stalls
$
$
3.
3
Each
No Parking Stalls
$
$
4.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 10: LIBERTY MEMORIAL LOT

1.
53
Each
Parking Stalls
$
$
2.
4
Each
Handicap Stalls
$
$
3.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 11: HERITAGE CENTER LOT

1.
123
Each
Parking Stalls
$
$
2.
8
Each
Handicap Stalls
$
$
3.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 12: SOB AREA

1.
178
Each
Parking Stalls
$
$
2.
6
Each
Handicap Stalls
$
$
3.
4
Each
Crosswalks
$
$
4.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 13: J-WING WEST LOT

1.
119
Each
Parking Stalls
$
$
2.
8
Each
Handicap Stalls
$
$
3.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 14: J-WING EAST LOT

1.
196
Each
Parking Stalls
$
$
2.
15
Each
Directional Arrows
$
$
3.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 15: STATE FLEET LOT

1.
94
Each
Parking Stalls
$
$
2.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 16: DOT LOT

1.
373
Each
Parking Stalls
$
$
2.
10
Each
Handicap Stalls
$
$
3.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 17: PEDESTRIAN & TRAFFIC CONTROL AREAS

1.
42
Each
Border Line Crosswalks
$
$
2.
13
Each
Block Style Crosswalks
$
$
3.
9
Each
Traffic Control w/ Flow at Intersections
$
$
4.
10
Each
Traffic Stop Bars – Approx. 2’ x 12’
$
$
5.
4
Each
Crosshatch Lines – Capitol Mall
$
$
6.
1
Each
Prep Fee w/ Disposal
GRAND TOTAL:
$

CATEGORY 18: ADDITIONAL SWEEPING / CURB LINE PAINTING

1.
1
Hour
Hourly Rate for Additional Sweeping of Roadways w/ Disposal
$
2.
1
Linear Foot
Curb Line Painting (Per Linear Foot)
$

REFERENCES:

Reference 1: (SIMILAR SIZE/SCOPE OF WORK)

Name of Business:

Address:

Contact Person:

Phone Number:

Email:

Reference 2:

Name of Business:

Address:

Contact Person:

Phone Number:

Email:

Service Provider: The CONTRACTOR must provide a dedicated service provider to support for this contract. During the contract term, the CONTRACTOR shall notify the Procurement Officer if CONTRACTOR’s service provider changes.

Service Provider/ Sales Representative Name:

Address:

City & State & ZIP

Phone Number:

Cell Phone Number:

Toll Free Number:

E-Mail Address:

Fax Number:

BIDDER INFORMATION AND SIGNATURE

By submitting a Bid Response, the Bidder agrees to sell, furnish, and deliver to the STATE all commodities and services contained in this Invitation for Bid for which a contract is awarded by the STATE. The Bidder shall fully perform the contract in accordance with all the specifications, requirements, terms, and conditions, and shall comply with all applicable provisions of the North Dakota Century Code, including chapters 54-44.4, 46-02, and 44-08, and North Dakota Administrative Code Chapter 4-12, made part of the Invitation for Bid and resultant contract by reference.

Written acceptance of the Bid Response by the STATE constitutes a binding contract made and entered into by and between the State of North Dakota, acting through the Purchasing Agency, and the Bidder named below. Written acceptance may be made by execution of a contract, purchase order, or order using a state purchasing card.

NOTICE. All notices or other communications required under this Contract must be given by registered or certified mail and are complete on the date postmarked when addressed to the parties identified herein. Notice provided under this provision does not meet the notice requirements for monetary claims against the STATE found at N.D.C.C. § 32‑12.2‑04.

Bidder/Contractor Name:

Contractor Federal Employer Identification Number (FEIN)

Bidder Street Address/ P.O. Box:

City, State ZIP:

Contact Name:

Contact Title:

Telephone Number:

Email:

Authorized Representative Signature:

Date:

STATE OF NORTH DAKOTA

BID ACCEPTANCE AND CONTRACT AWARD

The parties to this contract (Contract) are the state of North Dakota, acting through the Purchasing Agency (STATE), and the above-named Bidder (CONTRACTOR). This Contract is not effective until fully executed by both parties. If no start date is specified in the Term of Contract, the most recent date of signatures of the parties shall be deemed the Effective Date.

NOTICE. All notices or other communications required under this Contract must be given by registered or certified mail and are complete on the date postmarked when addressed to the parties identified herein. Notice provided under this provision does not meet the notice requirements for monetary claims against the STATE found at N.D.C.C. § 32‑12.2‑04.

Acting through its Purchasing Agency:

BY: (Signature)

Printed Name:

Title:

Date:

SECTION 7

CONTRACT TERMS AND CONDITIONS

1. Scope of Work. CONTRACTOR, in exchange for the compensation paid by STATE under this Contract, shall provide the commodities and services described in this solicitation.

2. Compensation.

Contractual Amount STATE shall pay for the accepted services provided by CONTRACTOR under this Contract an amount not to exceed the amount indicated on the Bid Response form (Contractual Amount). The Contractual Amount is firm for the duration of the Contract and constitutes the entire compensation due CONTRACTOR for performance of its obligations under this Contract, unless amended, regardless of the difficulty, materials or equipment required, including fees, licenses, overhead, profit and all other direct and indirect costs incurred by CONTRACTOR, except as provided by an amendment to this Contract.

Payment

1) Payment made in accordance with this Compensation section shall constitute payment in full for the services and work performed and the deliverables and work(s) provided under this Contract and CONTRACTOR shall not receive any additional compensation hereunder.

2) STATE shall make payment under this Contract within forty-five (45) calendar days after receipt of a correct invoice.

3) Payment of an invoice by STATE will not prejudice STATE’s right to object to or question that or any other invoice or matter in relation thereto. CONTRACTOR's invoice will be subject to reduction for amounts included in any invoice or payment made which are determined by STATE, on the basis of audits conducted in accordance with the terms of this Contract, not to constitute allowable costs. At STATE’s sole discretion, all payments shall be subject to reduction for amounts equal to prior overpayments to CONTRACTOR.

4) For any amounts that are or will become due and payable to STATE by CONTRACTOR, STATE reserves the right to deduct the amount owed from payments that are or will become due and payable to CONTRACTOR under this Contract.

3. Prepayment. STATE will not make any advance payments before performance by CONTRACTOR under this Contract.

4. Payment of Taxes by State. STATE is not responsible for and will not pay local, state, or federal taxes. STATE will furnish certificates of exemption upon request by the CONTRACTOR.

5. Purchasing Card. STATE may make a payment using a government credit card. CONTRACTOR will accept a government credit card without passing the processing fees for the government credit card back to STATE.

6. Termination.

a. Termination for Convenience or by Mutual Agreement This Contract may be terminated by STATE upon thirty (30) days’ written notice to CONTRACTOR. This Contract may be terminated by mutual consent of both parties executed in writing.

b. Early Termination in the Public Interest STATE is entering into this Contract for the purpose of carrying out the public policy of the State of North Dakota, as determined by its Governor, Legislative Assembly, Agencies and Courts. If this Contract ceases to further the public policy of the State of North Dakota, STATE, in its sole discretion, by written notice to CONTRACTOR, may terminate this Contract in whole or in part.

c. Termination for Lack of Funding or Authority STATE by written notice to CONTRACTOR, may terminate the whole or any part of this Contract under any of the following conditions:

1) If funding from federal, state, or other sources is not obtained and continued at levels sufficient to allow for purchase of the services or supplies in the indicated quantities or term.

2) If federal or state laws or rules are modified or interpreted in a way that the services are no longer allowable or appropriate for purchase under this Contract or are no longer eligible for the funding proposed for payments authorized by this Contract.

3) If any license, permit, or certificate required by law or rule, or by the terms of this Contract, is for any reason denied, revoked, suspended, or not renewed.

Termination of this Contract under this subsection is without prejudice to any obligations or liabilities of either party already accrued prior to termination.

d. Termination for Cause STATE may terminate this Contract effective upon delivery of written notice to CONTRACTOR, or any later date stated in the notice:

1) If CONTRACTOR fails to provide…

This is the start of the file's text. The full file is on GovTribe.