Parking Lot- PWS(3).pdf
PDF 111 KB Posted
- Attached to
- Parking Lot Painting & Redesign
- Solicitation number
- 26QA002
About this file
This is a Performance Work Statement (PWS) for a one-time parking lot striping and painting service at the U.S. Army Corps of Engineers facility located at 803 Front Street, Norfolk, Virginia 23510. The contractor must complete all work within 30 days of contract award.
The scope requires the contractor to provide all personnel, equipment, materials, and supervision necessary to clean and restripe the entire parking lot. Specific services include: cleaning the lot with commercial-grade sweeper and blower equipment; blacking out all existing striping and lettering; applying new striping using a Government-approved design; stripe designations for handicap spaces, standard parking spots, and van-accessible spaces; stenciling "RESERVED" in yellow paint in designated areas; and stenciling four Electric Vehicle (EV) charging station locations in green paint. The contractor must submit two parking lot design layout options for Government review and selection prior to commencing striping work. The Government furnishes no property or services. All work must comply with industry standards for parking lot striping and ADA requirements, with striping that is clean, uniform, clearly visible, and durable with weather-resistant paint. Deliverables consist of the two design layout options and completion of all striping and stenciling work in accordance with the selected design.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Parking_Lot_Striping_SOW(2).pdf | ||
| Parking Layout Oct 2025-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Title: Parking Lot Striping and Painting – One-Time Service Location: U.S. Army Corps of Engineers, 803 Front Street, Norfolk, Virginia 23510 Period of Performance: One-time service, to be completed within 30 days of contract award
1.0 Scope
The contractor shall provide all personnel, equipment, materials, and supervision necessary to perform cleaning and restriping of the parking lot at the U.S. Army Corps of Engineers building. This is a one-time requirement.
2.0 Description of Services
The contractor shall:
• Clean the entire parking lot using a commercial-grade sweeper and blower.
• Black out all existing lettering and striping currently on the parking lot surface.
• Re-stripe all parking spaces using a new design approved by the Government.
• Stripe all handicap spaces, standard parking spots, and van-accessible spaces.
• Stencil the word “RESERVED” in designated areas using yellow paint.
• Provide stencil work for four (4) Electric Vehicle (EV) charging stations using green paint.
• Offer two design layout options for Government review. The Government will select one prior to the start of striping work.
3.0 Government Furnished Property/Services
None.
4.0 Deliverables
• Two (2) parking lot design layout options for Government review and selection.
• Completion of all striping and stenciling work in accordance with the selected design.
5.0 Acceptance Criteria
All work must meet industry standards for parking lot striping and ADA compliance.
Striping must be clean, uniform, and clearly visible. Paint must be durable and weather resistant.
6.0 Period of Performance
All work must be completed within 30 days from contract award.
| Performance Work Statement (PWS) |
| 1.0 Scope |
| 2.0 Description of Services |
| 3.0 Government Furnished Property/Services |
| 4.0 Deliverables |
| 5.0 Acceptance Criteria |
| 6.0 Period of Performance |
File details come from the government source that posted it. Updated .