Paonia 2MG Tank Rehab Bid Drwgs.pdf
PDF 1003 KB Posted
- Attached to
- RFP 2025-04 2MG Tank Rehab
- Solicitation number
- 2025-04
- Issued by
- Eagle County, Colorado
About this file
The document is a set of bid drawings for the 2MG Tank Rehabilitation project for the Town of Paonia, Colorado, prepared by SGM Engineering (SGM) in March 2025. The project involves comprehensive rehabilitation of a two-million-gallon (2MG) water storage tank located near the Lamborn Water Treatment Plant. The scope of work includes repairing the interior and exterior of the tank, replacing tank components, removing and replacing tank roofing, and performing all associated rehabilitation tasks. The project drawings provide detailed technical specifications for the tank repair, including overflow details, roof support sections, handrail configurations, and structural modifications.
The bid documents are designed for electronic submission via email to Cory Heiniger, the Public Works Director, with specific contact information provided for project inquiries. The project engineer is Brandyn Bair, P.E. (License #42640), and the drawings include a vicinity map showing the tank's location in a forested area. While specific budget details are not explicitly stated in the drawings, the comprehensive technical specifications suggest a significant infrastructure investment aimed at maintaining the town's potable water storage infrastructure. The drawings indicate precise engineering specifications, including structural steel requirements, welding standards, and detailed repair methodologies to ensure the tank meets current water storage and safety standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Add#1_Paonia 2MG Tank Rehab.pdf | ||
| Add#2_Paonia 2MG Tank Rehab.pdf | ||
| Paonia 2MG Tank Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R ev is io n
Dwg No.
Job No.
Drawn by:
Date:
File:
PE:QC:
D at e By
Pr oj ec t M ile st on e:
2013-471.013
SF
03.18.25
BB
2MG Tank Rehabilitation
XX
Scope of Work
· Recoat interior and exterior of 2MG Tank
· Repair or replace misc. steel tank components
· Remove and replace tank hatch
· Remove and replace tank vent
2MG Tank
Project Contacts
Stefen Wynn, Town Administrator
Vicinity Map
Project Engineer stefenw@townofpaonia.com (970)527-4101
Brandyn Bair, P.E. 42640
BI
D
D R
AW
IN
G S
2MG Tank Rehabilitation
Town of Paonia
Town of Paonia
118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com
214 Grand Ave.
Paonia, CO 81428
Bid Drawings March 2025
Title:
2M G
T an k R eh ab ilit at io n
Cover
To w n of
P ao ni a
W es t S ixt h St re et
, S ui te
G le nw oo d
Sp rin gs , C
O
0.
5.
w w
.s gm
-in c.
co m
Lamborn WTP
Cory Heiniger, PW Director coryheiniger_PW@townofpaonia.com (970)527-4101
AutoCAD SHX Text i:\2013\2013-471 town of paonia\013-2mg tank coating\H-Dwgs\Civil\PS-Sheetset\2MG Tank Rehabilitation.dwg Plotted: 3/19/2025 9:40 AM By: Scott Forrester Plotted: 3/19/2025 9:40 AM By: Scott Forrester3/19/2025 9:40 AM By: Scott Forrester By: Scott ForresterScott Forrester
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UNCC 1-800-922-1987
AutoCAD SHX Text Sheet List Table
AutoCAD SHX Text Sheet Number
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text
AutoCAD SHX Text Cover
AutoCAD SHX Text G1
AutoCAD SHX Text General Notes
AutoCAD SHX Text S1
AutoCAD SHX Text Tank Rehabilitation Plan
AutoCAD SHX Text S2
AutoCAD SHX Text Tank Rehabilitation Details is io n
Dwg No.
Job No.
Drawn by:
Date:
File:
PE:QC:
D at e By
Pr oj ec t M ile st on e:
2013-471.013
SF
03.18.25
BB
2MG Tank Rehabilitation
XX
G1
BI
D
D R
AW
IN
G S
Title:
2M G
T an k R eh ab ilit at io n
General Notes
To w n of
P ao ni a
W es t S ixt h St re et
, S ui te
G le nw oo d
Sp rin gs , C
O
0.
5.
w
.s gm
-in c.
i:\2013\2013-471 town of paonia\013-2mg tank coating\H-Dwgs\Civil\PS-Sheetset\2MG Tank Rehabilitation.dwg Plotted: 3/19/2025 9:40 AM By: Scott Forrester Plotted: 3/19/2025 9:40 AM By: Scott Forrester3/19/2025 9:40 AM By: Scott Forrester By: Scott ForresterScott Forrester
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS PRIOR TO START OF CONSTRUCTION. NOTIFY CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS PRIOR TO START OF CONSTRUCTION. NOTIFY ENGINEER OF ANY DISCREPANCIES OR CONFLICTS FOUND IN THE CONTRACT DOCUMENTS AND/OR FIELD CONDITIONS. 2. NO HOLES, OPENINGS, OR ALTERATIONS TO THE EXISTING TANK MAY BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE OWNER, NO HOLES, OPENINGS, OR ALTERATIONS TO THE EXISTING TANK MAY BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE OWNER, ENGINEER, OR AS SHOWN ON THE DRAWINGS. 3. SHORING AND SCAFFOLDING REQUIRED FOR STRUCTURAL REPAIRS ARE THE CONTRACTOR'S RESPONSIBILITY. SHORING AND SCAFFOLDING REQUIRED FOR STRUCTURAL REPAIRS ARE THE CONTRACTOR'S RESPONSIBILITY. 4. AS-BUILT OR RECORD DRAWINGS WERE NOT AVAILABLE FOR THIS TANK. AS-BUILT OR RECORD DRAWINGS WERE NOT AVAILABLE FOR THIS TANK. 5. THE CONTRACTOR SHALL REVISE FRAMING MEMBERS, PLATES AND CONNECTIONS AS DIRECTED BY THE ENGINEER IN ORDER TO THE CONTRACTOR SHALL REVISE FRAMING MEMBERS, PLATES AND CONNECTIONS AS DIRECTED BY THE ENGINEER IN ORDER TO ACCOMMODATE ACTUAL FIELD CONDITIONS, DIMENSIONS AND GEOMETRY AT NO ADDITIONAL COST TO THE OWNER. 6. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF CONSTRUCTION WITH THIRD PARTY NON-DESTRUCTIVE TESTING COMPANY AND CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF CONSTRUCTION WITH THIRD PARTY NON-DESTRUCTIVE TESTING COMPANY AND OWNER HIRED WELDING AND COATING INSPECTORS. 7. CLEANING AND DISINFECTION OF THE TANK IS THE CONTRACTORS RESPONSIBILITY AND SHALL BE COORDINATED WITH THE OWNER CLEANING AND DISINFECTION OF THE TANK IS THE CONTRACTORS RESPONSIBILITY AND SHALL BE COORDINATED WITH THE OWNER PRIOR TO DISINFECTION. 8. THE CONTRACTOR SHALL CONTACT ALL UTILITY OWNERS TO VERIFY BOTH LOCATION AND DEPTH OF UTILITIES (WATER, FIBER OPTIC, THE CONTRACTOR SHALL CONTACT ALL UTILITY OWNERS TO VERIFY BOTH LOCATION AND DEPTH OF UTILITIES (WATER, FIBER OPTIC, DRAIN/OVERFLOW, GAS, PHONE, ELECTRIC, CABLE, AND OTHER) BEFORE ANY WORK BEGINS. CONTRACTOR SHALL BEAR THE RESPONSIBILITY FOR THE PROTECTION OF UTILITIES DURING CONSTRUCTION. NO ADDITIONAL PAYMENT WILL BE MADE FOR UTILITIES LOCATED BUT NOT SHOWN IN DRAWINGS. 9. THE CONTRACTOR WILL BE RESPONSIBLE FOR RESTORING DISTURBED AREAS AT THE SITE. THE CONTRACTOR WILL BE RESPONSIBLE FOR RESTORING DISTURBED AREAS AT THE SITE. 10. THE CONTRACTOR IS REQUIRED TO PROVIDE ALL SUBMITTALS AS OUTLINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR IS REQUIRED TO PROVIDE ALL SUBMITTALS AS OUTLINED IN THE CONTRACT DOCUMENTS. 11. THE EXISTING TANK INTERIOR AND EXTERIOR COATINGS CONTAIN LEAD-BASED PAINT. CONTRACTOR IS RESPONSIBLE FOR ALL LEAD THE EXISTING TANK INTERIOR AND EXTERIOR COATINGS CONTAIN LEAD-BASED PAINT. CONTRACTOR IS RESPONSIBLE FOR ALL LEAD ABATEMENT PROCEDURES AND DISPOSAL OF LEAD-BASED PAINT MATERIALS.
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
STRUCTURAL STEEL INSTALLATION:
AutoCAD SHX Text
1. REFER TO SPECIFICATIONS 05100, 05510, AND 05523 FOR ADDITIONAL REQUIREMENTS. REFER TO SPECIFICATIONS 05100, 05510, AND 05523 FOR ADDITIONAL REQUIREMENTS. 2. FURNISH AND INSTALL TEMPORARY BRACING FOR NEW FRAMING AS NECESSARY TO PROVIDE STABILITY DURING ERECTION AND TO FURNISH AND INSTALL TEMPORARY BRACING FOR NEW FRAMING AS NECESSARY TO PROVIDE STABILITY DURING ERECTION AND TO PREVENT DISTORTION OR DAMAGE TO THE FRAMING DUE TO WIND, SEISMIC, OR ERECTION FORCES. 3. REMOVE TEMPORARY BRACING WHEN ERECTION IS COMPLETE. REMOVE TEMPORARY BRACING WHEN ERECTION IS COMPLETE. 4. FIELD WELDING SHALL BE DONE BY WELDERS CURRENTLY QUALIFIED AND APPROVED FOR THE PROCEDURES USED. NO WELDING FIELD WELDING SHALL BE DONE BY WELDERS CURRENTLY QUALIFIED AND APPROVED FOR THE PROCEDURES USED. NO WELDING SHALL BE COMPLETED WHEN SURFACES ARE WET, EXPOSED TO RAIN OR WIND, OR WHEN WELDERS ARE EXPOSED TO INCLEMENT CONDITIONS THAT WILL AFFECT THE QUALITY OF WORKMANSHIP.
AutoCAD SHX Text
INSPECTION, TESTING AND QUALITY ASSURANCE:
AutoCAD SHX Text
1. STRUCTURAL STEEL CONSTRUCTION WILL BE INSPECTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE (IBC) 2015 AND STRUCTURAL STEEL CONSTRUCTION WILL BE INSPECTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE (IBC) 2015 AND ENGINEER. 2. FIELD WELDING WILL BE INSPECTED VISUALLY AND BY NON-DESTRUCTIVE TESTING BY A THIRD PARTY AWS CERTIFIED WELDING FIELD WELDING WILL BE INSPECTED VISUALLY AND BY NON-DESTRUCTIVE TESTING BY A THIRD PARTY AWS CERTIFIED WELDING INSPECTOR PROVIDED BY THE OWNER. RADIOGRAPH TESTING OF THE DOOR SHEET IS THE RESPONSIBILITY OF THE CONTRACTOR. 3. ACCEPTANCE CRITERIA AND TESTING FREQUENCY FOR INSPECTED WELDS SHALL BE IN ACCORDANCE WITH TABLE 6.1 OF AWS D1.1. ACCEPTANCE CRITERIA AND TESTING FREQUENCY FOR INSPECTED WELDS SHALL BE IN ACCORDANCE WITH TABLE 6.1 OF AWS D1.1. AND SPECIFICATION 05523. 4. THE OWNER WILL HIRE A NACE CERTIFIED COATING INSPECTOR. NEW COATING SYSTEMS SHALL BE TESTED AND INSPECTED PER THE OWNER WILL HIRE A NACE CERTIFIED COATING INSPECTOR. NEW COATING SYSTEMS SHALL BE TESTED AND INSPECTED PER SPECIFICATION 09713.
AutoCAD SHX Text
1. AN INDEPENDENT LATERAL ANALYSIS WAS NOT COMPLETED AS PART OF THIS PROJECT. UNDERSTANDING THE TANK WAS ORIGINALLY AN INDEPENDENT LATERAL ANALYSIS WAS NOT COMPLETED AS PART OF THIS PROJECT. UNDERSTANDING THE TANK WAS ORIGINALLY DESIGNED TO MEET AWWA D100, WHICH INCLUDES LATERAL LOADS, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE DESIGN CALCULATION PACKAGE SEALED BY A LICENSED PROFESSIONAL ENGINEER IN THE STATE OF COLORADO FOR ALL REPLACEMENT FRAMING, INCLUDING A COMPLETE LATERAL ANALYSIS. 2. THE FOLLOWING MINIMUM STANDARDS AND DESIGN LOADS SHOULD BE USED. DESIGN CODES: THE FOLLOWING MINIMUM STANDARDS AND DESIGN LOADS SHOULD BE USED. DESIGN CODES: A. INTERNATIONAL BUILDING CODE (IBC), 2015. INTERNATIONAL BUILDING CODE (IBC), 2015. B. AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARD FOR WELDED STEEL TANKS FOR WATER STORAGE, 2011 WITH AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARD FOR WELDED STEEL TANKS FOR WATER STORAGE, 2011 WITH HISTORIC VERSIONS WHERE APPROPRIATE. C. AMERICAN PETROLEUM INSTITUTE (API) 650, 11TH EDITION, 2007. AMERICAN PETROLEUM INSTITUTE (API) 650, 11TH EDITION, 2007. D. AMERICAN PETROLEUM INSTITUTE (API) 653, 5TH EDITION, 2014. AMERICAN PETROLEUM INSTITUTE (API) 653, 5TH EDITION, 2014. E. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) 360-05, 13TH EDITION. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) 360-05, 13TH EDITION. F. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE), MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES 7, 2010. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE), MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES 7, 2010. DESIGN LOADS: A. DEAD LOAD MEMBER SELF WEIGHT AND PERMANENT EQUIPMENT (490 PCF) DEAD LOAD MEMBER SELF WEIGHT AND PERMANENT EQUIPMENT (490 PCF) MEMBER SELF WEIGHT AND PERMANENT EQUIPMENT (490 PCF) B. ROOF LIVE LOAD 15 PSF, AWWA D100 ROOF LIVE LOAD 15 PSF, AWWA D100 15 PSF, AWWA D100 C. SNOW LOAD SNOW LOAD GROUND 55 PSF, SEAC 2016 COLORADO DESIGN SNOW LOADS 55 PSF, SEAC 2016 COLORADO DESIGN SNOW LOADS ROOF 50 PSF, ASCE 7-10 50 PSF, ASCE 7-10 D. WIND (SEE NOTE 1, ABOVE) WIND (SEE NOTE 1, ABOVE) BASIC WIND SPEED 120 MPH, ASCE 7-10 BASIC WIND SPEED 120 MPH, ASCE 7-10 120 MPH, ASCE 7-10 Iw 1.15, AWWA D100 1.15, AWWA D100 EXPOSURE C C WIND PRESSURES ±30.0 PSF (SIDEWALL), AWWA D100 ±30.0 PSF (SIDEWALL), AWWA D100 ±30.0 PSF (ROOF), AWWA D100 E. SEISMIC (SEE NOTE 1 ABOVE) SEISMIC (SEE NOTE 1 ABOVE) OCCUPANCY IV IV IMPORTANCE FACTOR, Ie 1.5 1.5 SOIL SITE CLASS D, ASSUMED D, ASSUMED Ss 0.161g 0.161g S1 0.054g 0.054g Fa 1.60 1.60 Fv 2.40 2.40 SDS 0.171g 0.171g SD1 0.087g 0.087g SEISMIC DESIGN CATEGORY C (PER ASCE 7-10)C (PER ASCE 7-10)
AutoCAD SHX Text
STRUCTURAL DESIGN AND LOADS FOR REPLACEMENT VERTICAL FRAMING:
LANDSCAPE NOTES: 1. ALL AREAS DISTURBED BY BUILDING OR UTILITY CONSTRUCTION OR OVER-LOT GRADING SHALL BE ALL AREAS DISTURBED BY BUILDING OR UTILITY CONSTRUCTION OR OVER-LOT GRADING SHALL BE REVEGETATED WITH DRYLAND SEED MIXTURE. PROVIDE FRESH, CLEAN, NEW-CROP SEED COMPLYING WITH TOLERANCE FOR PURITY AND GERMINATION ESTABLISHED BY OFFICIAL SEED ANALYSIS OF NORTH AMERICA. PROVIDE SEED OF GRASS SPECIES, PROPORTIONS AND MINIMUM PERCENTAGES OF PURITY, GERMINATION, AND MAXIMUM PERCENTAGE OF WEED SEED, AS SPECIFIED. 2. FOR DRYLAND SEEDED AREAS, PROVIDE FERTILIZER WITH COMMERCIAL TYPE MIXTURE OF 16-16-8 OR FOR DRYLAND SEEDED AREAS, PROVIDE FERTILIZER WITH COMMERCIAL TYPE MIXTURE OF 16-16-8 OR SIMILAR RATION, NOT LESS THAN 15 LBS PER ACRE FOR NITROGEN RATE. 3. MULCH ALL SEEDED AREAS WITH CONWEB LONG FIBER MULCH, HAY OR STRAW. MATERIAL FOR STRAW MULCH ALL SEEDED AREAS WITH CONWEB LONG FIBER MULCH, HAY OR STRAW. MATERIAL FOR STRAW MULCHING SHALL CONSIST OF STRAW OR OATS, BARLEY, WHEAT OR RYE AND SHALL NOT CONTAIN SEED OF NOXIOUS WEEDS. CLEAN FIELD HAY MAY BE SUBSTITUTED FOR STRAW WHEN APPROVED BY THE ENGINEER. STRAW OR HAY IN SUCH AN ADVANCED STAGE OR DECOMPOSITION AS TO SMOTHER OR RETARD THE NORMAL GROWTH OF GRASS WILL NOT BE ACCEPTED. CONWEB FIBER MULCH, PREVIOUSLY SPECIFIED, SHALL BE APPLIED AT A RATE OF 1500 LBS./ACRE. HAY OR STRAW SHALL BE APPLIED IN A UNIFORM MANNER AT A RATE OF 1.5 TONS/ACRE. 4. PROVIDE EROSION CONTROL BLANKET ON ALL SLOPES OF 2:1 OR STEEPER. PROVIDE EROSION CONTROL BLANKET ON ALL SLOPES OF 2:1 OR STEEPER. 5. PRIOR TO REVEGETATION, PLANTING OR TOPSOIL PLACEMENT, ALL CUT OR FILL SLOPES WILL BE CONTOURED PRIOR TO REVEGETATION, PLANTING OR TOPSOIL PLACEMENT, ALL CUT OR FILL SLOPES WILL BE CONTOURED TO BLEND WITH ADJACENT TERRAIN. VARIOUS SLOPE MOLDING TECHNIQUES WILL BE USED TO ENHANCE THE AESTHETIC QUALITY OF THE SLOPE, WHILE MAXIMIZING THE REVEGETATION POTENTIAL. ALL CUT AND FILL SLOPES ALSO BEING ROUNDED AT THE TOE TO BLEND WITH THE EXISTING TERRAIN. ADDITIONALLY, WHERE SOILS AND STEEPNESS OF SLOPES PERMIT, TERRACES WILL BE CONSTRUCTED TO AID THE REVEGETATION PROCESS. 6. SEEDING SHALL BE DONE BY HYDROSEEDING, DRILLING, OR HAND BROADCASTING. HYDROSEED SHALL BE SEEDING SHALL BE DONE BY HYDROSEEDING, DRILLING, OR HAND BROADCASTING. HYDROSEED SHALL BE APPLIED IN A WATER AND LIGHT MULCH SLURRY AFTER WHICH MULCH WILL BE APPLIED TO COVER THE SEED. ANY AREAS THAT CANNOT BE REACHED BY HYDROSEEDING OR DRILL SEEDING SHALL BE HAND BROADCAST. AREAS SEEDED BY HAND BROADCASTING SHALL BE LIGHTLY RAKED. 7. DRYLAND SEEDING SHALL BE PERFORMED AS SOON AS PRACTICAL AFTER COMPLETING OF CONSTRUCTION, DRYLAND SEEDING SHALL BE PERFORMED AS SOON AS PRACTICAL AFTER COMPLETING OF CONSTRUCTION, WITHIN THE APPROPRIATE SEASON. SEEDING SHALL BE PERFORMED AFTER SPRING THAW UNTIL JUNE 30TH, OR AFTER SEPTEMBER 1 UNTIL CONSISTENT GROUND FREEZE. CONTRACTOR SHALL BE RESPONSIBLE FOR REGULAR WATERING UNTIL ESTABLISHED.
is io n
Dwg No.
Job No.
Drawn by:
Date:
File:
PE:QC:
D at e By
Pr oj ec t M ile st on e:
2013-471.013
SF
03.18.25
BB
2MG Tank Rehabilitation
XX
S1
BI
D
D R
AW
IN
G S
Title:
2M G
T an k R eh ab ilit at io n
Tank Rehabilitation Plan
To w n of
P ao ni a
W es t S ixt h St re et
, S ui te
G le nw oo d
Sp rin gs , C
O
0.
5.
w
.s gm
-in c.
REMOVE EXISTING VENT AND INSTALL NEW 24" RISER AND AST-VENT, RE:DETAIL 3, SHEET S2
AutoCAD SHX Text
TANK REPAIR PLAN
AutoCAD SHX Text
EX. 30" SHELL MANWAY
AutoCAD SHX Text
REMOVE AND REPLACE 24" MANWAY WITH 36"X36" BILCO TYPE E HATCH AND 6" RISER
AutoCAD SHX Text DEMOLISH E. LADDER SAFETY CAGE AND INSTALL OSHA COMPLIANT PERSONAL FALL PROTECTION SYSTEM
AutoCAD SHX Text R52.00±
AutoCAD SHX Text
EX. 8" INLET
AutoCAD SHX Text
ROOF FRAMING /FLOOR VIEW
AutoCAD SHX Text
ROOF SHELL /FLOOR VIEW
AutoCAD SHX Text
ROOF SHELL /FLOOR VIEW
AutoCAD SHX Text
INSTALL NEW CENTER COLUMN CAPITAL RE: DETAIL 2, SHEET S2
AutoCAD SHX Text
ROOF FRAMING /FLOOR VIEW
AutoCAD SHX Text
EX. OUTER C-CHANNEL RAFTERS (ASSUMES C9X20 SECTION), QTY 45
AutoCAD SHX Text
EX. LATERAL BRACING
AutoCAD SHX Text 90°
AutoCAD SHX Text
EX. INNER C-CHANNEL RAFTERS (ASSUMES C9X20 SECTION), QTY 30
AutoCAD SHX Text
EX. 30" SHELLMANWAY
AutoCAD SHX Text
INSTALL 6" OVERFLOWRE: DETAIL 1, SHEET S2
AutoCAD SHX Text
EX. 8" OUTLET
AutoCAD SHX Text
EX. DRAIN LINE
AutoCAD SHX Text
CUT EXISTING C-CHANNEL RAFTERS BACK TO PROVIDE 3' CLEARANCE FROM CENTER OF TANK
AutoCAD SHX Text 98.00'
AutoCAD SHX Text STEEL HANDRAIL PER DETAIL, SHEET S2. WELD BASES TO TANK. TYP. OF BOTH SIDES OF ACCESS HATCH.
AutoCAD SHX Text i:\2013\2013-471 town of paonia\013-2mg tank coating\H-Dwgs\Civil\PS-Sheetset\2MG Tank Rehabilitation.dwg Plotted: 3/19/2025 9:40 AM By: Scott Forrester Plotted: 3/19/2025 9:40 AM By: Scott Forrester3/19/2025 9:40 AM By: Scott Forrester By: Scott ForresterScott Forrester
AutoCAD SHX Text
AutoCAD SHX Text is io n
Dwg No.
Job No.
Drawn by:
Date:
File:
PE:QC:
D at e By
Pr oj ec t M ile st on e:
2013-471.013
SF
03.18.25
BB
2MG Tank Rehabilitation
XX
S2
BI
D
D R
AW
IN
G S
Title:
2M G
T an k R eh ab ilit at io n
Tank Rehabilitation Details
To w n of
P ao ni a
W es t S ixt h St re et
, S ui te
G le nw oo d
Sp rin gs , C
O
0.
5.
w
.s gm
-in c.
T.O. BASE SLAB 6517.2'
AutoCAD SHX Text NOTES: 1. CARBON PIPE SHALL CONFORM TO AWWA CARBON PIPE SHALL CONFORM TO AWWA C200-17 AND SHALL BE COATED PER SPECIFICATION 09713. 2. ALL WETTED MATERIALS SHALL BE ALL WETTED MATERIALS SHALL BE NSF-600 CERTIFIED FOR POTABLE WATER CONTACT AND SHALL BE CERTIFIED LEAD FREE.
AutoCAD SHX Text
1:12 ROOF SLOPE
AutoCAD SHX Text
OVERFLOW 6547.45'
AutoCAD SHX Text
12" BELOW BOTTOM OF BEAM
AutoCAD SHX Text 12"x6" WELDED STEEL FLARED FITTING
AutoCAD SHX Text INSTALL NEW 6" WELDED STEEL OVERFLOW PIPE & FITTINGS TO ESTABLISH 1' OF FREEBOARD ABOVE WEIR
AutoCAD SHX Text
INSTALL OVERFLOW PIPE SUPPORT, SEE DETAIL A THIS SHEET
AutoCAD SHX Text 1/4
AutoCAD SHX Text
TYP.
AutoCAD SHX Text 14" x 36" DIAM. PATCH PLATE AT PIPE PENETRATION
AutoCAD SHX Text CHANNEL C6x8.2 (2 PER SUPPORT)
AutoCAD SHX Text 30°
AutoCAD SHX Text
BENT PLATE 3/8", 2 PER SUPPORT
AutoCAD SHX Text
PLATE 3/8", TYP.
AutoCAD SHX Text
PIPE
AutoCAD SHX Text 1/4
AutoCAD SHX Text
TYP.
AutoCAD SHX Text 1/4
AutoCAD SHX Text
TYP.
AutoCAD SHX Text 1/4
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
EXIST. ROOF PLATE. REMOVE AND REPLACE ROOF PLATE AS NEEDED
AutoCAD SHX Text 2'-0" I.D.
AutoCAD SHX Text 1/4
AutoCAD SHX Text
PLATE 1/4" STEEL RISER (BOLT PATTERN TO MATCH VENT FLANGE)
AutoCAD SHX Text
1/4" PLATE. I.D. AND O.D. PER VENT MANUFACTURER FLANGE
AutoCAD SHX Text
GASKET
AutoCAD SHX Text
24" ALLUMINUMAST-VENT, AS MANUFACTURED BY ADVANCED TANK AND CONSTRUCTION
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text 1/4
AutoCAD SHX Text
TANK
AutoCAD SHX Text
1/2" HOLE FOROWNER FURNISHED PADLOCK
AutoCAD SHX Text 3/4" x2" SS BOLTS, BOLT PATTERN PERVENT MANUFACTURER
AutoCAD SHX Text
NOTE: 1. GASKET AND BOLTS PROVIDED GASKET AND BOLTS PROVIDED WITH VENT.
AutoCAD SHX Text 1/4
AutoCAD SHX Text CURVED 4x4x1/2 SEAM WELD ENDS TOGETHER TO MAKE CONTINUOUS
AutoCAD SHX Text
EXISTING RAFTER SECTION SEE PLAN
AutoCAD SHX Text 5/16
AutoCAD SHX Text
EX. 1' CYLINDRICAL STEEL COLUMN
AutoCAD SHX Text PLATE 1" x 1'-10" (A36)
AutoCAD SHX Text 1/4
AutoCAD SHX Text PLATE 1" x 1'-10" (A36)
AutoCAD SHX Text 3/16
AutoCAD SHX Text 45°
AutoCAD SHX Text
AS NEEDED
AutoCAD SHX Text
(2)-5/8" A325-N BOLTS @ 2 1/4"GA IN SHORT SLOTTED HOLES, TYP EA C9 RAFTER
AutoCAD SHX Text R=4'-0"
AutoCAD SHX Text
NOTE 2
AutoCAD SHX Text NOTES: 1. ALL CUT AND SHEARED EDGES OF NEW ALL CUT AND SHEARED EDGES OF NEW FRAMING AND CONNECTIONS SHALL BE GROUND TO A MINIMUM OF " RADIUS. 14" RADIUS. 2. PROVIDE " THICK x 72" DIAM. DOUBLER PROVIDE " THICK x 72" DIAM. DOUBLER 14" THICK x 72" DIAM. DOUBLER OVER EXISTING ROOF SHELL TO MATCH EXISTING OPENING TO NEW VENT OPENING. ATTACH DOUBLER W/CONTINUOUS WELD AT ALL EDGES.
AutoCAD SHX Text
3/4" HOLES(TYP.)
AutoCAD SHX Text
8 SPACES ON ANGLE
AutoCAD SHX Text
FOR SQ. TUBES
AutoCAD SHX Text TUBE 2" x 2" x 1/4" WALL (A500B)
AutoCAD SHX Text ANGLE 4" x 4" x 1/2" (A36) 4'-0" INSIDE RADIUS
AutoCAD SHX Text
6'-0" MAX BETWEEN POSTS
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text
1 " STEEL PIPE 12" STEEL PIPE RAILS (TYP 2)
AutoCAD SHX Text
1 " STEEL 12" STEEL PIPE POSTS
AutoCAD SHX Text
4" TOE
AutoCAD SHX Text
WELD OR FITTINGS @ ALL JOINTS
END CAPS ON ALL RAILS
AutoCAD SHX Text
21" (MAX)
AutoCAD SHX Text i:\2013\2013-471 town of paonia\013-2mg tank coating\H-Dwgs\Civil\PS-Sheetset\2MG Tank Rehabilitation.dwg Plotted: 3/19/2025 9:40 AM By: Scott Forrester Plotted: 3/19/2025 9:40 AM By: Scott Forrester3/19/2025 9:40 AM By: Scott Forrester By: Scott ForresterScott Forrester
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S2
AutoCAD SHX Text
OVERFLOW DETAIL
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text A
AutoCAD SHX Text S2
AutoCAD SHX Text A
AutoCAD SHX Text S2
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
SCALE: 3/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text S2
AutoCAD SHX Text
ROOF VENT DETAIL
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text S2
AutoCAD SHX Text
ROOF SUPPORT DETAIL
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text B
AutoCAD SHX Text S2
AutoCAD SHX Text
ROOF SUPPORT SECTION
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text B
AutoCAD SHX Text S2
AutoCAD SHX Text
AutoCAD SHX Text S2
AutoCAD SHX Text
HANDRAIL DETAIL
SCALE: 1/2" = 1'-0"
| Sheets and Views |
| Cover |
| G1 General Notes |
| S1 Tank Rehabilitation Plan |
| S2 Tank Rehabilitation Details |
File details come from the government source that posted it. Updated .