Attachments B and C.pdf

PDF 661 KB Posted

Attached to
Green Zone ECP, Iraq Federal contract opportunity
Solicitation number
PANTAD-21-P-0000-000635
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

This sources sought notice from the U.S. Army Corps of Engineers seeks information from companies interested in providing security systems along the perimeter of the International Zone in Baghdad, Iraq. The security systems include hydraulic road blockers with control systems, steel gates, road spikes, and generator sets to power the security equipment at each location. An anticipated single firm fixed price contract will have a period of performance of 270 days. Interested parties are invited to submit a statement of capability by October 15, 2021 to the listed contracting officer. The statement of capability is limited to ten pages and must include company information and proof of SAM registration. Questions from interested parties regarding experience with similar installations, working in contingency environments, logistics in Iraq, and partnering with local firms should be directed to the contracting officer.

View the file

Other files for this federal contract opportunity

Other files attached to Green Zone ECP, Iraq, newest first.
File Type Posted
Draft PWS Green Zone ECP 2021-09-28.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B Wedge Blockers and Road Spikes Sizes, Quantities, and Locations

NO Gate Number

Street Width at Road Blockers Location

Road Blockers Number

Length of the Road blockers

Length of Traffic Spikes

Number of Traffic Spikes

Remarks

1 G.1 2way, 4.50M each 2 2.25M

2.74M 2

2 G.2 17M / 8M / 16M 5 3.2M

8.2M for 3 exit lanes and 3.7M for other two exit lanes

2 5 Exit Lanes

3 G.3 2 Way, 7M each 2 3.5M 3.5M 2

4 G.4 11 M / 15.7 M 3 3.5M

7.31M 2 Two exit lanes.

Stagger Blockers to fit within existing space

5 G.5 2Way, 7M each 4 3.20M

6.4M 2 Two entrance and two exit lanes

6 G.6 2way, 7.5M each 2 3.50M

None required No spikes required at this location

7 G.7 9 M 3 3M/3.50M None required One entrance lane 9M

8 G.8 2 Way, 10M each 3 3.20M

2.74M 3 3 entrance and 3 exit lanes

9 G.9 11M/12 M 3 3.9M 5.4M 2 2 entrance and 3 exit lanes

10 G.10 11M/15M 3 3.60M 7.31M 2 3 entrance and 4 exit lanes T1 1 way, 7.2M 2 3.5M None T2 1 way 8.0M 2 3.7M None T3 1 way 6.0M 2 3.0M None T4 1 way, 5M 2 2.5M None T5 1 way, 7.7M 2 3.6M None

Attachment C

Steel Gate, Sizes, Type, Quantities, and Locations

Gate Number

Gate Width Gate Widths with 3.0M height Remarks

1 2.7x2.0M 2 17M exit road;

8M exit road;

16M entrance road

Two double lift gates (four 4.2M lift gates total); One double lift gate (two 4.2M lift gates total; Two double lift gates (four 4.2M lift gates total).

Ten total 4.2M wide vertical gates

3 Entrance Lanes: One double (two 3.5 lift gates); Exit: One double lift gate (two 3.5M lift gates total).

Four 3.5M wide vertical gates total

4 Entrance Lanes: Four 3.1M vertical gates (two double lift gates); Exit Lanes: Four4.25M (two double lift gates)

Gate has two entrance and two exit lanes

5 Two entrance and exit lanes, both 7.0M wide

Entrance Lanes: Two 3.9M (one double lift gates); Exit Lanes: Two 3.6M (one double lift gates)

6 Total 2x7.50M = 15.0M

Sliding type at this location only

7 One entrance lane, 9.0M wide

Two 4.5M vertical lift gates (one double lift gate)

8 Total 20M entrance and exit lanes

Entrance: Two 5.2M wide vertical lift gate

9 2-way gate;

7.5M each

Entrance: One gate 7.5M wide; Exit lanes: 7.5M

10 Entrance 11M;

Exit 15M

Entrance: Two 5.75M (one double lift gate(; Exit: Three 5.18M (one double lift gates and one single lift gate)

Five vertical lift gates total

Tunnel 1 One 7.2M vertical lift gate Tunnel 2 One 8.0M vertical lift gate Tunnel 3 One 6.0M vertical lift gate Tunnel 4 One 5.0M vertical lift gate Tunnel 5 One 7.7M vertical lift gate