Performance Work Statement (PWS)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MiamiHarbor_Factsheet_Jan2019.pdf | ||
| Solicitation_Q&A_Final.pdf | ||
| Combo_SE_FL_Sediment_Morphodynamics.pdf | ||
| WD_15-4535_Broward_County.docx | DOCX document | |
| WD_07-0134_FL_Diver_Services.docx | DOCX document | |
| WD_15-4543_Miami-Dade_County.docx | DOCX document | |
| WD_15-4573_Palm_Beach_County.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Southeast Florida Sediment Morphodynamics
PART 1
GENERAL INFORMATION
1. GENERAL:
This is a non-personnel services contract to perform the measurement, analysis, and forecasting of sediment transport and pathways in order to develop conceptual models that support management decisions for southeast Florida inlets, beaches, and nearshore coastal waters. The tasks include the study and development of three project site specific sand, silt, and/or clay fraction sediment tracer studies, which require interpretative analysis and reporting to enhance understanding of sediment morphodynamics in the project areas. The tasks require the contractor to integrate sediment tracer results into a Delft3D or equivalent model framework for calibration and validation purposes, in addition to the development and production of the Delft3D or equivalent model along with supporting metocean data.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction:
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform a Southeast Florida sediment morphodynamics investigation as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Background:
The U.S. Army Corps of Engineers (USACE), Jacksonville District office, has a requirement for technical services to support missions of operation and maintenance (O&M) for navigation and flood risk management (FRM) to identify solutions for long term sediment management and resiliency in southeast Florida. USACE has specific flood risk management and navigation missions which require analysis of sediment movement around inlets and harbors and management of sediments to maintain safe navigation and bolster shoreline storm protection projects. Dredging is the primary technique for management of sediment in USACE mission areas. In addition to knowing where and how sediment is moving naturally, the projects also require an understanding of sediment movement during or as a result of dredging, how dredged sediment secondarily dispersed into the water column behaves, and optimal channel features and beach placement design. Southeast Florida has nearshore and offshore hardbottom habitat ecosystems, and USACE’s goal is to avoid, minimize and evaluate potential impacts of displaced sediment to these resources. In addition to ensuring the environment is protected during operations, another challenge is the lack of sediment resources for FRM projects. Given the scarcity of resources, extraction and relocation of existing sediment resources must be evaluated to determine secondary and long term effects and ensure the sustainability of FRM projects. Numerical modeling is needed to fill the gaps between existing and planned monitoring data and allow for developing and simulating scenarios under different hydrodynamic conditions within the study area. Hydrodynamic, sediment transport, and morphology change monitoring and modeling that includes a large area will provide the Government requisite information to evaluate multiple missions and authorized projects in the area. The services required under this contract will result in delivery of this asset to the Government.
Project Area 1: Lake Worth Inlet (LWI)
Problem Statement: LWI suffers from chronic shoaling with material typically encroaching into the channel from the north, filling the existing sediment trap(s), and eventually impacting navigation in the channel.
Goal: To understand ambient sediment transport and suggest engineering solutions to minimize shoaling within the channel.
Objectives:
1) To collect measurements to describe the ambient sediment transport processes in and around LWI via metocean field work and utilizing sediment tracers.
2) To identify where shoaled material that ends up inside the channel is originating from via direct measurement utilizing sediment tracers.
3) To suggest specific improvements such as the optimal location(s) for additional sediment traps and/or other advanced maintenance measures that could be implemented to prolong dredging requirements and to decrease shoaling within the channel based on conceptual understanding of the sediment transport in the area supplemented with numerical modeling as necessary.
Project Area 2: Port Everglades (PE) Harbor
Problem Statement: PE requires routine operation and maintenance dredging in 2019 and is undergoing final review and assessment for authorized capital improvements (deepening and widening portions of the channel). Additionally, a non-federal sand bypass project is planned and undergoing regulatory review.
Any dredging project in PE will introduce suspended sediment into the water column that could deposit on or otherwise harm nearby hardbottom resources. A better understanding of dredge plume dynamics in this area is needed to best inform planning for the capital dredging project leveraging the ability to collect data during other dredging events.
Goal: To understand dredge plume behavior within PE Harbor to inform capital dredging operations.
Objectives:
1) Collect measurements to describe the overall circulation and to identify ambient sediment transport processes, including fine grained material which may be released during the dredging process, in and around PE utilizing metocean instrumentation for hydrodynamic and sediment transport data collection and sediment tracers.
2) Leverage any dredging events within the area to collect information on the dredge plume dispersal and spillage via metocean observation and sediment tracers.
3) To develop a calibrated and validated sediment transport model for PE and to use that model to simulate sediment dispersal for proposed dredge events, and develop a conceptual understanding of sediment movement and dredge plume dispersal potentials.
4) To utilize numerical modeling to suggest mitigative strategies to avoid deposition on (or other impacts to) adjacent resources.
Project Area 3: Miami-Dade County (M-D)
Problem Statement: M-D suffers from beach erosion, which degrades the barrier island’s main storm protection feature, and the Government has been routinely renourishing the Beach Erosion Control and Hurricane Protection Project (BEC&HPP) over the last 40 + years. Recently, known offshore sediment sources have been depleted requiring sand to be trucked in and deposited on the beach. This has increased costs of the project exponentially, and does not provide for a long-term sustainable solution. The Government needs to know where and why the sand is eroding, where is it going, and what sustainable management techniques can be implemented to better manage current sediment resources without causing negative morphological change. In addition, Baker’s Haulover Inlet and Government Cut Inlet require maintenance dredging to remove shoaled material, and little is known about how these two inlets are hydrodynamically connected and how those dynamics may be influencing the County’s sediment transport.
Goal: To produce an M-D County sediment resource atlas which details sediment pathways, known and possible sediment resources, a model of countywide hydrodynamics, and offers sustainable management techniques.
Objectives:
1) Collect measurements to describe the overall county-wide circulation and wave climate as well as to identify ambient sediment transport processes in and around the inlets and beaches utilizing metocean instrumentation and sediment tracers.
2) Develop a sediment transport and morphology model for the county and project scale including;
a) An understanding of regional natural sediment dynamics.
b) Identify localized sediment dynamics associated from labeled sources of sediment.
c) Conclude spatial assessment of sediment contributions from each labeled source.
d) Quantify the relative portion contributed by natural sources and that contributed from adjacent beach nourishment projects.
e) Identify wave transmission patterns over the continental shelf and subsequent impacts on sediment dynamics.
3) Identify and report on any previously released sediment tracers from Miami Harbor to further conclude sediment transport dynamics from the inlet.
4) Evaluate best management techniques (i.e. nearshore berms, coastal structures, inlet management, backpassing, etc.) to reduce the nourishments needs / interval / costs via numerical modeling and other analysis.
1.3. Scope:
This scope includes metocean and sediment transport and morphology measurements, Delft3D or equivalent model development and application, sediment tracing and sediment sample assessments.
Services include; sediment sampling, metocean measurements of hydrodynamics, waves, and meteorological variables, sediment transport measurements using sediment tracers and a range of instruments over a wide area to define meso, macro and micro-scale processes, data analysis and interpretation, and numerical modeling of hydrodynamics, waves, sediment transport, and morphology change of beaches, inlets, and coastline on the regional, county, and project level scale.
1.4. General Information
1.4.1. Quality Control
The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which it assures itself that its work complies with the requirement of the contract. Within 30 days after contract award, the contractor’s standard quality control plan with amendment as necessary shall be submitted to the PM, KO, and COR. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.4.2. Quality Assurance:
The government shall evaluate the contractor’s performance under this contract in accordance with the Performance Requirement Summary (PRS). Additionally, the government will use a Quality Assurance Surveillance Plan (QASP), in the inspection of the services. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.3. Recognized Holidays:
The contractor is not required to perform services on holidays.
New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Independence Day
Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
1.4.4. Hours of Operation:
The contractor is responsible for conducting business, between the hours of 0800 to 1700 hrs. Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor shall not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.4.5. Place of Performance: The work to be performed under this contract will be performed at the contractor’s facility or government facilities for purposes of meetings, and in Southeast Florida as it relates to performance of the PWS.
1.4.6. Period of Performance: The contractor shall submit all deliverables as specified in Section 5.7.
within 24 months of award
1.4.7. Utilities: Not applicable
1.4.7.1. Security Requirements: Not applicable.
1.4.7.2. Physical Security:
The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.4.7.3. Key Control
The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
1.4.7.3.1.
In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
1.4.7.3.2.
The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.4.7.4.
Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.
1.4.8. Special Qualifications: None.
1.4.9. Post Award Conference/Periodic Progress Meetings:
The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.4.10. Contracting Officer Representative (COR):
The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.4.11. Key Personnel:
The follow personnel are considered key personnel by the government: the Project Manager, Technical Manager, Operations Manager, the Lead Modeler, the Model Instructor, and the Quality Assurance Manager. The contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The Contract Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 5:00 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
1.4.10.1 The Project Manager
The Project Manager must have experience managing large scale complex projects with tight timeframes with multiple concurrent deliverable requirements. The Project Manager will be expected to provide weekly briefings to the Government regarding status on all aspects of the project, and will serve as the main point of contact for the Government’s Project Manager. The Project Manager must be intimately involved in all aspects of the project and be well experienced in leading meetings, providing briefings, and managing the project’s overall schedule and deliverable timetables. The Project Manager must demonstrate 10+ years of experience in managing projects with similar requirements.
1.4.10.2 The Technical Manager
The Technical Manager must have demonstrated experience with managing large scale metocean and sediment transport monitoring and numerical modeling projects and experience performing sand and silt regional and localized sediment transport studies.
1.4.10.3 The Operations Manager
The Operations Manager is responsible for overseeing, organizing, and managing required field operations, logistics of field personnel, all necessary equipment, and data acquisition operations.
1.4.10.4 The Lead Modeler
The Lead Modeler must demonstrate expertise in the development and application of the Delft3D modeling suite. The lead modeler must have 10+ years’ experience utilizing Delft3D to demonstrate specific experience applying the model to determine sediment transport, morphological change, and hydrodynamics of beaches, inlets, and coastline environments.
1.4.10.5 The Model Instructor
The Model Instructor must have a high degree of expertise in the development, application, and training of users of the Delft3D modeling suite. The model instructor is expected to have experience in teaching Delft3D training courses and the ability to provide custom training specific to this project.
1.4.10.6 The Quality Assurance Manager
The Quality Assurance Manager shall ensure that the contractor meets the performance under this contract in accordance with the Performance Requirement Summary (PRS).
1.4.12. Identification of Contractor Employees:
All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.4.13. Contractor Travel
The Contractor shall be required to travel to the project site during the performance of this contract to attend meetings, and site visits. Contractor shall be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval/authorization and notification to the COR. Travel, outside of the required field work related efforts is estimated not to exceed twenty (20) - two day site visits to the Jacksonville District Office for meetings, or to Southeast Florida Project Sites for project briefings with the sponsors, site visits with the Government’s Project Team or related meetings to discuss the project. The weekly required briefings can be held via conference call. Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract.
1.4.14. Other Direct Costs (ODC): N/A
1.4.15. Data Rights:
The Government has unlimited rights to all documents and material produced under this contract. All documents and materials, all final model input and output files, final model grid/boundary files, all final model initial condition files, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. Documents and materials exclusively developed for the Government may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.4.16. Organizational Conflict of Interest:
Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.17. Phase In/Phase Out Period: N/A
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1. Contractor.
A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. Contracting Officer.
A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. Contracting Officer's Representative (COR).
An employee of the U.S. Government appointed by the contracting officer to administer the contract.
Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. Defective Service.
A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. Deliverable.
Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. Key Personnel.
Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. Physical Security.
Actions that prevent the loss or damage of Government property.
2.1.8. Quality Assurance.
The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. Quality Assurance Surveillance Plan (QASP).
An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. Quality Control.
All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. Subcontractor.
One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. Work Day.
The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13. Work Week.
Monday through Friday, unless specified otherwise.
2.2. Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: N/A
3.2. Facilities: N/A
3.3. Equipment: N/A
3.4. Materials:
The Government will provide all existing readily available public reports currently in its possession, to support the PWS. The government will furnish geotechnical reports and data, bathymetric survey data, and any other previously collected hydrodynamic data in its possession.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General:
The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2. Secret Facility Clearance: N/A
4.3. Materials: N/A
4.4. Equipment: N/A
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Basic Services.
The contractor shall collect metocean and sediment transport / morphology measurements, develop and apply a Delft3D or equivalent model, perform sediment tracing and sediment sample assessments to address the objectives and meet the goals outlined in Section 1.2 of this document. Services include;
sediment sampling, metocean measurements of hydrodynamics, waves, and meteorological variables, sediment transport measurements using sediment tracers and a range of instruments over a wide area to define meso, macro and micro-scale processes, data analysis and interpretation, and numerical modeling of hydrodynamics, waves, sediment transport, and morphology change of beaches, inlets, and coastline on the regional, county, and project level scale. The overall project area for these services is shown in Figure
1. Figure 2 details specific project areas Lake Worth Inlet/Port of Palm Beach, Port Everglades Harbor, and Miami-Dade County.
Figure 1: Overall project area subject to literature and data review
Figure 2: Specific Project Areas
5.1 Task 1: Dive Safety Plan
The Contractor shall prepare a Dive Safety Plan and submit to the COR for approval and prior to commencement of the first dive.
1) The Contractor's diving operations shall comply with all the requirements of Section 30 of the U.S.
Army Corps of Engineers' "Safety and Health Requirements Manual", EM 385-1-1 (3 September 1996) and paragraphs 3 and 11 of Appendix P, "Contract Diving Operations" of Jacksonville District Regulation CESAJR 385-1-1, dated 1 September 1998. A diving operations plan and the other submittal items specified below must be reviewed and accepted by the District Diving Coordinator and the Safety Office prior to the commencement of any diving operations.
2) The appropriate number of personnel shall be furnished for each dive, as required by paragraph 7, Dive Teams, of Appendix P to CESAJR 385-1-1.
3) All diving shall be performed and conducted in accordance with the requirements of the following documents:
a) U.S. Army Corps of Engineers, Safety and Health Requirements Manual, EM 385-1-1, Section
30.
b) U.S. Army Corps of Engineers, Jacksonville District Regulation CESAJR 385-1-1, Appendix
P "Contract Diving Operations".
c) U.S. Navy Diving Manual, Volumes I and II (NAVSEA 0994-LP-001-9010 and NAVSEA
0994-LP-001-9020).
d) 29 CFR, Part 1910, Subpart T, OSHA Regulations.
4) The contractor shall submit the following items for review by the District Diving Coordinator and prior to performing the first dive:
a) A safe diving practices manual as specified in paragraph 30.A.11 of EM 385-1-1.
b) Dive Operations Plan; to include all the items specified in paragraph 30.A.13 of EM 385-1-1.
This plan shall contain information specific to the diving operations to be performed on each dive. A Dive Log shall be maintained for each dive undertaken to include name of diver, name of dive team members, diving mode, surface and underwater conditions, water depth and bottom time, and nature and description of work performed. A generalized, philosophical discussion of diving, or an enumeration of diving-related theory will NOT be accepted for the Dive Operations Plan.
c) Activity Hazard Analysis, pursuant to Appendix P, paragraph 3.c. will be submitted. This must address specific hazards anticipated for each diving operation to be performed, and must specifically address other work of any kind being performed concurrently that could interface with or affect the diving operations. Applicable lock out, tag out, and safe clearance procedures must also be included in the Analysis.
d) Up-to-date resume denoting diving-related training and experience for each diver.
e) Medical certification from a physician as to each diver's fitness/suitability for diving, as required by paragraph 30.A.12 of EM 385-1-1. This certification must be from a licensed physician within the 12 months immediately preceding any dive performed under the contract, and must be renewed at 12-month intervals.
f) Proof of current CPR and First-Aid training for each member of the dive team, as required by paragraph 30.A.08 of EM 385-1-1.
g) Copies of certifications and/or documentation to demonstrate that any pressurized air tanks (SCUBA, Surface supplied air systems, "bail-out bottles", etc.) to be used by the divers have been visually inspected at 12-month intervals and hydrostatically tested at 5-year (60-month) intervals, as required by paragraph 30.B.03.f. (3) of EM 385-1-1. Breathing air supply hoses, helmets, and masks shall be visually inspected and meet specifications contained in paragraphs 30.E.06 and 30.E.07.
h) Copies of certifications and/or documentation to demonstrate that the compressor(s) used to provide breathing air for the divers have been tested at six-month intervals, and meet the air purity requirements specified in paragraph 30.E.05 of EM 385-1-1.
i) Identification of emergency and first aid equipment (first aid kit, oxygen resuscitation system, backboard) to be available at the dive location during any diving operations, pursuant to paragraph 30.E.11 of EM 385-1-1.
j) Emergency Management Plan, pursuant to paragraph 30.A.13.a.(8). This must address emergency procedures, to include a means of notification, telephone numbers (for law enforcement, ambulance, hospital, doctors, and recompression chamber), nearest USCG emergency assistance and rescue center, and location of evacuation routes.
5.2 Task 2: Metocean Monitoring
The contractor shall submit a metocean monitoring plan for approval and subsequently perform monitoring to meet the objectives and address the Project Area goals and objectives as identified in Section 1.2. An estimate of total effort is provided as Technical Exhibit 3. The contractor’s submitted plan should detail instrumentation type, location, duration of deployment, data to be collected, and how they intend to use data to meet the objectives and goals. Upon acceptance the contractor shall execute their monitoring plan and all collected metocean (wind, waves, water levels, current, rainfall, turbidity, TSS, etc.) data shall be provided to the Government in draft format throughout the period of performance and as a final product upon contract completion on a separate hard drive.
5.3 Task 3: Sediment Tracing
The contractor shall provide the proposed locations, type, quantity, color for unique sediment (sand, silt and/or clay) tracers for each project area to address the project specific PWS requirements (Sections 1.2 and 5.5). The contractor shall ensure that the sediment tracers assimilate the properties of the native sediment particles and act as native sediment under the influence of wind, waves, and tidal currents. All particles need to be environmentally inert and may not contain any substances that are considered a health hazard. Tracer particles shall have the same physical properties and characteristics as the target natural sediment, and to each other and be sufficient for long –term tracking without abrasion, or coloration loss that would lead to misclassification of end results. The contractor shall perform laboratory testing to ensure that size, density, and settling velocity are properly represented for each project area. This includes the very fine grained material anticipated to be released during dredging of rock at PE which may not be present in the ambient sea bed. An ISO-9001 certified laboratory (or comparable equivalent) is required to process sediment tracer concentration and tracer particle sizing to ensure continuity of interpretation and analysis for all sediment tracer samples.
The contractor shall provide a separate report for each project area following completion of the sediment tracing studies to be submitted in draft form word and .pdf, refer to Exhibit B. The contractor will provide two (2) hard copies to the Corps for draft versions. Each hard copy of the report will also include a CD with all data and text of the report in electronic format, including, but not limited to: photographs, videos, sub-surface graphic representation, and/or GIS mapping, as applicable. The Government will review and provide comments and the final report shall be submitted as part of the Final Report Package in Task 5.
5.4 Task 4: Delft3D (or equivalent) Model Package
The contractor will develop, apply, and deliver a 3D synoptic scale model (coupled hydrodynamic and wave Delft3D or equivalent model) covering Southeast Florida (approximate area of coverage in Figure 1). The model will use existing large scale wave and circulation models (i.e. WAM, WWIII, COAWST, HYCOM etc.) to drive the boundaries. Nested within the synoptic scale model shall be a higher resolution Delft3D (or equivalent) model at the sub-regional (covering Broward and Miami-Dade Counties) calibrated for hydrodynamics, waves and sediment transport and at the inlet / project scale (for LWI, PE and M-D) model calibrated to study dredge plume dispersal (PE) and sediment transport, cross shore transport and morphology (M-D). The model development will include but not be limited to: setup and development of all model grids; assimilation of all relevant elevation data to define the model bathymetry; derivation of appropriate boundary forcings; calibration of the sediment characteristics;
determination of appropriate bottom roughness as a result of calibration of the hydrodynamics and consideration of local coral effects; coupling across all model components; sensitivity testing of appropriate parameters and sediment characteristics including calibration within a range that does not violate acceptable limits for the physical environment; and routines and procedures to ingest readily available boundary forcing data to drive the model.
The calibration and validation of all models will be documented for each project area prior to production runs and alternative analysis. Upon acceptance production runs and alternative analysis will proceed.
All production and alternative simulations will also be documented and provided as a part of an updated deliverable. All model input and output files, source code, and executables will be provided as a deliverable, refer to Exhibit B. The contractor’s Model Instructor shall deliver the modeling package with up to five (5) days of training to cover; model development, application, how to perform modifications of the model, and simulated scenario testing with the Government. The contractor must show documentation of the development of and application of both regional models coupled with larger scale models that depict large scale physical oceanography features and high resolution, 3D, project scale sediment transport and morphology change models. Appropriate computational resources should be identified.
Calibration and validation metrics for all models will be commensurate with industry standards for water levels, currents, wave heights, wave periods, wave directions, sediment transport and bed level change.
The synoptic model will serve as the parent hydrodynamic model to nested project scale models. The model domain will encompass Southeast Florida and cover Palm Beach, Broward, and Miami-Dade counties. The model will include hydrodynamics in three dimensions with a minimum of eight vertical layers, have a maximum horizontal resolution of ~1 km, and be dynamically coupled with a regional wave model. The model will be set up to be forced by large-scale flows and waves using atmospheric models (WAM, WWIII, COAWST, HYCOM, GFS, WRF, etc.,) and must be able to replicate the complex basic characteristics of the physical oceanography off Southeast Florida including the Gulf Stream and the Florida Current, and any break off eddies. The model will be calibrated to the measured water levels, waves and currents and winds collected during the field campaign. Validation metrics and thresholds will be identified and agreed upon prior to initiating model development. These metrics will include comparison between measured and modeled water levels, currents, wave heights, wave periods, and wave direction. Acceptance of the model products will be based upon these metrics which will be derived from past studies, applicable Corps guidance and peer-reviewed literature. Relevant pre- and post-processing scripts used to generate boundary forcing from publically available data sources, generated input files and output plots and data shall be transferred to the Corps in the final package deliverable.
Nested within the synoptic model will be a Delft3D or equivalent coupled hydrodynamics and waves, and sediment transport model for Broward and Miami-Dade Counties. This meso-scale model spanning Broward, and Miami-Dade counties will be driven by the synoptic model. The model shall include Port Everglades Harbor, Baker’s Haulover Inlet, Government Cut, north Biscayne Bay and shall be developed, calibrated and validated for hydrodynamics and waves and regional sediment transport pathways as evidenced by the geomorphology of the region. The model will include hydrodynamics in three dimensions with a minimum of eight vertical layers and an average horizontal resolution of under ~150
m. The goal of the model is to provide a broad overview of circulation in Broward and Miami-Dade counties and to inform sediment movement from Broward County into Miami-Dade County. This model will also serve to downscale synoptic scale results to the project scale.
The contractor will develop, calibrate, validate, and apply a Delft3D or equivalent coupled hydrodynamics, waves, and sediment transport models at the project scale for LWI, PE and M-D.
The LWI model will be developed to address navigation concerns related to rapid infilling of the sediment trap and frequent maintenance dredging of the inlet. Coupled with metocean data and the sediment tracer study this model will be used to identify alternative structural and sediment trap configurations to reduce the amount of shoaling of the navigation channel. The model will likely be a direct child model from the synoptic scale model and be calibrated and validated to collected field measurements.
The PE model will be developed to support the Operations and Maintenance dredging activities at Port Everglades and may be used to inform the Navigation Improvements Project where the Port Everglades Channel is being deepened and widened. The model will be nested within the larger parents models to ensure large scale forcing is captured at the project scale. The model will be calibrated to the measured water levels, waves, currents, and sediment transport and sediment tracer data collected during the field campaign with high emphasis on the vertical current structure as it relates to dispersal and fate of material in the water column. The validated model will be capable of replicating the pre-project conditions. The model will be capable of being applied in production runs to answer questions related to the areal extent and concentation of the plume generated by dredging activites and the suspended sediment within the plume. Nearfield models of plume dispersal (numerical, analytical/empirical, and/or statistical) will need to be coupled with the farfield PE model to accurately capture the behavior of the plume and spillage associated with different dredge equipment.
The M-D County project scale models will be developed with direct consultation with the Corps. Delft3D or equivalent models are anticipated to be developed for at a minimum Bakers Haulover and Government Cut to examine sediment transport within these inlets and to inform better managment. XBeach (or equivalent) models will be developed for portions of the federal beach projects to examine cross-shore and alongshore transport of beach material. Additional modeling scenarios may include examining the effectiveness of nearshore berms and coastal structures in reducing the need for beach nourishment, winnowing of fines from nearshore berms, and overall effects on nearshore circulation and sediment transport. All model results will be combined with information gained from previous tasks to develop a M-D sediment atlas.
The contractor shall submit a final model package deliverable for each project area in electronic medium, to include CD, DVD and/or external hard drive. The Government will not accept USB thumb drives.
5.5 Task 5: Final Report Package
The contractor shall submit a final report package for each of the three project areas that directly addresses the Government’s problem statements, goal, and objectives (refer to Section 1.2). The contractor’s final report shall include the Sediment Tracer Study report and Model calibration/validation report.
For LWI the contractor shall include an assessment of sediment trap optimization that would minimize material encroachment into the channel, and where any additional traps should be located and to what approximate depth, or alternatives for advanced maintenance. The contractor shall provide a review of dredging intervals at LWI and recommendations for how to decrease frequency of dredging needs utilizing results of the sediment tracer study and knowledge and/or data of sediment transport and hydrodynamics of the area.
For PE the contractor shall include a dredge plume dispersal conceptual model and model results for both operational and maintenance dredging and captial improvement dredging scenarios. The report shall recommend mitigative techniques to avoid dredge material deposition on adjacent resources utilizing metocean data and Delft3D model runs to determine optimal dredging windows and techniques.
For M-D the contractor shall include a Sediment Transport and Resource Atlas for the County as part of the final report package. The atlas shall provide information on sediment movement throughout the project with a focus on the inlets and the Federal BEC&HSP project. The atlas shall recommend where and how to find suitable material that may have different end uses (Dune material, beach/intertidal, nearshore, etc.) and where this material may be transported to. The atlas will provide an overall understanding of hydrodynamic and sediment processes within M-D as well as solutions for the successful management of sediment within the inlets and on the beaches. The report shall outline the most optimal renourishment interval approach, where and what quality material should be placed, what structures should be built and where, and how this approach will increase the County’s overall resiliency to storm surge and hurricanes and decrease the need for future renourishment.
The contractor shall provide two (2) hard copies of each project area Final Report Package to the Corps for both draft and final versions. Once the draft reports are submitted, the Corps will provide comments.
The contractor shall then submit the final reports within 30 calendar days of receipt of comments. Each hard copy of the report will also include a CD with all data and text of the report in electronic format, including, but not limited to: photographs, videos, sub-surface graphic representation, and/or GIS mapping, as applicable.
5.6 Schedule:
The project schedule shall be as follows:
1) Submit dive plan within 30 days of award
2) Deploy field instruments within 60 days of award
3) Release sediment tracer within 90 days of award
4) Begin model development and refinement within 30 days of award
5) Submittal of field data within 18 months of award
6) Submittal of draft sediment tracer report within 18 months of award
7) Submittal of Final Report Package within 24 months of award
5.7 Deliverables:
At a minimum, associated deliverables will include:
1) Dive plan as outlined in Section 5.2
2) Monthly field work status reports will be e-mailed to the COR. These are expected to be brief status
(areas worked and general results).
3) All metocean, sediment transport, and morphology change data collected as part of the field campaigns shall be provided within 14 days of collection in draft format in ascii or Matlab readable binary format.
Final processed and QA/QC’d data shall be provided within 30 days following completion of the project specific field campaign in similar format.
4) The contractor shall provide a separate sediment tracer report for each project area following completion of the sediment tracing studies to be submitted in draft form word and .pdf. The contractor will provide two (2) hard copies to the Corps for draft versions. Each hard copy of the report will also include a CD with all data and text of the report in electronic format, including, but not limited to: photographs, videos, sub-surface graphic representation, and/or GIS mapping, as applicable.
5) Upon completion of each sediment tracer sampling event, the contractor shall provide the Corps a brief status update (general description of results and areas of movement) within 14 days of the field work.
6) Following model calibration / validation and prior to any model alternative simulations the contractor shall provide the draft model input/output files detailing the setup for each project area as well as the compiled executables via CD, DVD and/or external hard drive. The Government will not accept USB thumb drives.
7) The contractor shall submit all model files including input/output, source code, and compiled executables via CD, DVD and/or external hard drive upon completion of each project specific modeling study. The Government will not accept USB thumb drives.
8) The contractor shall provide two (2) hard copies of each project area Final Report Package to the Corps for both draft and final versions. Once the draft reports are submitted, the Corps will provide comments. The contractor shall then submit the final reports within 30 calendar days of receipt of comments. Each hard copy of the report will also include a CD with all data and text of the report in electronic format, including, but not limited to: photographs, videos, sub-surface graphic representation, and/or GIS mapping, as applicable.
PART 6
APPLICABLE PUBLICATIONS
6 APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1 The Contractor must abide by all applicable regulations, publications, manuals, and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.