This document is a Performance Work Statement (PWS) for a contract to modify the AFSBN-Carson Main Conference Room audio/video system. The key objectives are to integrate a SIPRnet laptop into the existing system while maintaining proper classification separation under DoD TEMPEST regulations, and to provide a 2-year onsite warranty for the entire audio/video system.
The PWS requires the contractor to move the existing VTC equipment rack to a separate room, add a new PTZ camera, USB extensions, physical separation between SIPR and NIPR equipment, and other modifications to accommodate the SIPRnet laptop. The contractor must also provide system schematics, conduct a walkthrough demonstration, and comply with various security and safety requirements. Contractor personnel must have an active SECRET or higher security clearance. The place of performance is at Fort Carson, Colorado.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) (Includes associated Performance Requirements Summary (PRS))
PERFORMANCE WORK STATEMENT (PWS)
AFSBN-Carson Conference Room Audio/Video System Modification 10 Sep 24
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide AFSBN-Carson Conference Room Audio/Video System Modification.
1.2 Background: AFSBN Carson needs to integrate a SIPRnet (classified) laptop into the Main Conference Room (MCR) Audio/Video equipment while maintaining capability to keep separation from NIPRnet (unclassified). Currently the MCR has the following capabilities: NIPR & SIPR VTC codec capabilities that cleanse conferences between the two systems on a dual LCD display setup, access to NIPRnet PC Microsoft Teams meetings, projector access for larger presentations, touch panel (tablet) access to a robust user interface that can access all cameras, LCD and projector displays, spider microphones, in-ceiling speakers, and automation of Classified and Unclassified briefing signs internal and external to the MCR.
1.3 Scope: The Contractor shall provide non-personal service(s). The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.
1.4 Objectives: The objective of this contract is to provide AFSBN-Carson the capability to use both SIPRnet and NIPRnet laptops fully integrated into the organization’s Main Conference Room audio/video equipment while maintaining proper classification separation under DoD TEMPEST regulations and guidances. The primary focused objective is to modify the current system to integrate a SIPRnet laptop into the existing equipment with minimal modifications and user touch panel configuration changes. The secondary focus is to warranty the entire audio/video system. The contractor will, for a period of 2-years, provide any onsite parts and labor work needed to keep the audio/video system operational for the Army Field Support Battalion at Fort Carson.
After collaboration with the Army Network Enterprise Center’s (NEC) Cyber team, AFSBN was informed that to integrate a SIPR laptop into the current system, major changes are required. The current VTC equipment rack system will need to be moved to the room behind the two wall mounted screens so that the SIPR laptop will be properly distanced from the rack equipment and visible and adjacent to the SIPR distribution box (PDS). This will require pulling all cabling from the wall and ceiling at the current rack location and reinstalling wiring in the room behind the dual LCD displays (approx. 10 feet away from current location. With the addition of the SIPR laptop being added to the system, a user interface program will need to be reprogrammed to allow users to easily manage on demand laptop access from the touch panel tablet and trigger the Classified briefing signs to turn on when selected. In addition to electrical separation between the SIPR laptop and the NIPRnet equipment, it is required that there be a physical ability for a human to manually disconnect NIPR equipment access while using the SIPR laptop. This disconnect will be on the display wall nearest the PDS. Vendor will provide full design schematics and operational user manuals for complete system functionality that includes the modifications in this contract work.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): This acquisition is for commercial services and will be performed using FAR Part 12. The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within 10 days after date of contract award.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 5 business days. If the Government has provided comments, the Contractor shall then have 3 business days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 10 prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) Reserved
(f) Reserved
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) Reserved
1.5.1.1 (Optional addendum to the QCP) Reserved
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 2 clock hours of identifying those issues. Verbal reports shall be followed up by written reports within 1 business day.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
| New Year’s Day January 1st | M. L. King Memorial Day 3rd Monday in Jan | |
| Presidents Day 3rd Monday in February | Memorial Day last Monday in May |
Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.3.2 RESERVED
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0800 to 1600, Monday through Friday, except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0800 to 1600, Monday through Friday. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0800 to 1600, Monday through Friday. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 RESERVED.
1.5.5 RESERVED.
1.5.6 Place of Performance: The work to be performed under this contract will be performed at the following government facility: Building 8000, Room 208, Main Conference Room, 2400 O’Connell Blvd, Fort Carson, Colorado 80913.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: Reserved
1.6.2 Personnel Security Clearance Requirements: Contractor personnel performing work under this contract must have an active personnel security clearance at the SECRET or higher level in the Defense Information System for Security (DISS) at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are IAW the DoD Contract Security Classification Specification DD Form 254. The Contractor shall ensure that Contractor employees and subcontractor employees performing services under this contract comply with FAR 52.204-2 Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contractor shall ensure the employee complies with the DoD Security Agreement (DD Form 441), and the NISPOM rule at 32 Code of Federal Regulation (CFR) Part 117, effective 24 Feb 2021. The NISPOM is the National Industrial Security Program Operating Manual to which contractors must implement and comply.
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.6.3.1 RESERVED
1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within five (5) days.
1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within (3) business days.
1.6.3.4 RESERVED
1.6.4 RESERVED
1.6.4.1 RESERVED
1.6.4.2 RESERVED
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.7 RESERVED
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: Reserved
a. Contract Manager and Alternate Contract Manager: Reserved
b. Quality Control Manager: Reserved
c. Systems Administrator: Reserved
d. Special Qualifications: Reserved
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 RESERVED
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.)
1.13 RESERVED
1.14 RESERVED
1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 RESERVED
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 RESERVED
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel. Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen (15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt;
(ii) Long trousers;
(iii) Steel-toed safety boots; and
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.
1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than 5 days that such notifications were made.
1.21.1.3 RESERVED
1.22 Environmental Compliance: The following provides information on Environmental Compliance.
1.22.1 Environmental Compliance Plan and Program: Reserved
1.23 RESERVED
1.23.4 RESERVED
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract
Government Property - means all property owned or leased by the Government.Government property includes both Government-furnishedand Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
TEMPEST - (Telecommunications Electronics Materials Protected from Emanating Spurious Transmissions) is a U.S. National Security Agency specification and a NATO certification referring to spying on information systems through leaking emanations, including unintentional radio or electrical signals, sounds, and vibrations. TEMPEST covers both methods to spy upon others and how to shield equipment against such spying. The protection efforts are also known as emission security (EMSEC), which is a subset of communications security (COMSEC).
Trade Agreement Act (TAA) - TAA compliance refers to the Trade Agreements Act, a federal law that sets guidelines for government contracts and procurement. The purpose of this act is to promote fair and open international trade and to ensure that the products purchased by the U.S. government are manufactured in designated TAA-compliant countries.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
| ACOR | Alternate Contracting Officer's Representative | |
| AE | Army in Europe | |
| AFARS | Army Federal Acquisition Regulation Supplement | |
| AHA | Activity Hazard Analysis | |
| AOR | Area of Responsibility | |
| AR | Army Regulation | |
| AT | Anti-terrorism | |
| ATCTS | Army Training Certification Tracking System | |
| CAC | Common Access Card | |
| CCE | Contracting Center of Excellence | |
| CFE | Conventional Forces Europe | |
| CFR | Code of Federal Regulations | |
| CONUS | Continental United States (excludes Alaska and Hawaii) | |
| COR | Contracting Officer’s Representative | |
| COTS | Commercial-Off-the-Shelf | |
| DA | Department of the Army | |
| DD250 | Department of Defense Form 250 (Receiving Report) | |
| DD254 | Department of Defense Contract Security Requirement List | |
| DFARS | Defense Federal Acquisition Regulation Supplement | |
| DMDC | Defense Manpower Data Center | |
| DoD | Department of Defense | |
| EMSEC | Emissions Security | |
| FAR | Federal Acquisition Regulation | |
| FRG | Federal Republic of Germany | |
| GFP | Government Furnished Property | |
| HLO | High Level Objective | |
| HIPAA | Health Insurance Portability and Accountability Act of 1996 | |
| IA | Information Awareness | |
| IAC | Installation Access Control | |
| IACO | Installation Access Control Office | |
| ID | Identification | |
| IGCE | Independent Government Cost Estimate | |
| IT | Information Technology | |
| JTR | Joint Travel Regulation | |
| JPAS | Joint Personnel Adjudication System | |
| KO | Contracting Officer | |
| NIPRNET | Non-Secure Internet Protocol Router Network | |
| OCI | Organizational Conflict of Interest | |
| OCONUS | Outside Continental United States (includes Alaska and Hawaii) | |
| ODC | Other Direct Costs | |
| OPSEC | Operations Security | |
| PA | Property Administrator | |
| PII | Personally Identifiable Information | |
| PIPO | Phase In/Phase Out | |
| POC | Point of Contact | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QAP | Quality Assurance Program | |
| QASP | Quality Assurance Surveillance Plan | |
| QC | Quality Control | |
| QCP | Quality Control Program | |
| RA | Requiring Activity | |
| RCO | Regional Contracting Office | |
| SOW | Statement Of Work | |
| SIGE | Safety and Health Protection Plan | |
| SIPRNET | Secret Internet Protocol Router Network | |
| TAA | Trade Agreement Act | |
| TE | Technical Exhibit |
TEMPEST Telecommunications Electronics Materials Protected from Emanating Spurious Transmissions USAG United States Army Garrison
| USAREUR | United States Army Europe | |
| UOM | Unit of Measure |
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICES
3. Government Property and Services
3.1 Services: The Government will provide access to Information Technology (IT) specialist support when questions arise about placement of equipment items stated in the contract work. The RA will coordinate with the installation IT Cyber Security team to answer any questions about the install requirements or TEMPEST/EMSEC concerns.
3.2 Facilities: This contract work will take place in Building 8000 Room 208 at 2400 O’Connell Blvd, Fort Carson, Colorado. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
3.3 Utilities: The Government will provide adequate work space for the contractor to complete tasks with access to proper lighting and electrical outlets needed to conduct the contract work. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.
3.4 Equipment: The Government shall not provide any equipment for this contract work.
3.5 Special Tooling and Test Equipment: The Government shall not provide any Tooling or Test equipment for this contract work.
3.6 Materials: The Government shall not provide any materials for this contract work.
3.7 Training: The Government shall not provide any training for this contract work.
3.8 RESERVED
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services.
4.2 RESERVED
4.3 Materials: The Contractor shall provide all materials to complete the contract work. This includes Personal Protective Equipment, PPE, Office supplies and materials such as, paper, printer cartridges, and all other office supplies and materials needed in the performance of this contract; automated data processing equipment (ADPE) such as computers, copy, printer, and fax machines. All ADPE connecting to the Government network shall be reviewed and approved by the Government prior to purchase by the Contractor; office furniture; cellular and desktop telephones, etc. The Contractor may request a letter of authorization from the Contracting Officer to utilize Government supply sources such as Government Services Administration (GSA), UNICOR, etc.
4.4 Vehicles and Equipment: The Contractor will provide, at their own expense, all needed tools and test equipment needed to complete this contract work. The Contractor shall provide all necessary vehicles (no GSA vehicles provided to Contractor for use on this contract) and equipment to perform the work described in this PWS. All Contractor provided vehicles and equipment shall have the company name prominently displayed on both sides of the vehicle or equipment and present a neat, professional appearance. Contractor's vehicles and equipment used in the performance of this contract shall meet all local and Host Nation traffic, safety, and environmental requirements. Vehicles and equipment found to be unsafe shall be removed from the installation and replaced. The Contractor shall not use any Government-owned tools, materials, or parts to maintain Contractor vehicles and equipment without prior written approval of the Contracting Officer. The COR may inspect the Contractor’s vehicles and equipment at any time.
4.5 Background Checks): The Contractor shall provide Background Checks in accordance with this PWS and as determined by the Government.
PART 5
SPECIFIC TASKS
5.1 Basic Services: The Contractor shall provide services for designing and implementing a solution to integrate a SIPRnet laptop into the existing AFSBN Main Conference Room Audio/Video system. This will provided the SIPR laptop access to the dual display monitors, projector screen, spider microphone access from the conference tables, and audio access from the ceiling speakers. The system’s programmed user interface via a touchscreen tablet will be reprogrammed, modified, adjusted to include the addition of the SIPRnet laptop into the system. In addition, to meet TEMPEST requirements and Unclassified and Classified separation, the entire existing equipment rack will be moved/re-wired/re-homed to the adjoining conference room back “storage” room (directly behind the dual diplays) in compliance with current installation cyber security practices. All wires will be re-run from the existing wall location and ceiling locations in order to reach the new rack location. IMPORTANT: All purchased equipment will meet national electrical standards and not violate U.S. international trade regulations or embargos (e.g. TAA Compliances).
5.2 Tasks: Tasks consist of implementing the following:
5.2.1 Existing Equipment move. Existing audio/video equipment rack will be moved to the designated storage closet location. All wiring rehomed to new rack location.
5.2.2 New PTZ camera with bridging: The introduction of the SIPRnet laptop requires a remote controlled camera for teleconferencing via Microsoft Teams on the SIPR laptop. This will be controlled from the rack equipment via the main user interface on the touchscreen tablet at the head of the conference table. Product will meet or exceed industry IT standards for High Definition (HD) performance.
5.2.3 New USB extension for SIPRnet Keyboard and Mouse: This will accommodate the remote access of the laptop’s keyboard and mouse function from the head of the conference table.
5.2.4 New USB switching to separate SIPR/NIPR connections: Implement digital separation of SIPR laptop from NIPR laptop while one or the other is connected to the audio/video outputs to the user; IAW TEMPEST separation guidelines.
5.2.5 New Physical SIPR/NIPR separation (human contact): Implement a human physical cable disconnect for NIPR side equipment to be disconnected from audio/video system during SIPR laptop operations. Must be accessible on conference room wall side at a natural ergonomic height; near right main display monitor.
5.2.6 New SIPR Video and USB docking station extension: This will allow for the SIPRnet laptop to connect directly to a docking station that will then be interfaced into the rack equipment system for audio and video transfer to displays, microphones, and speakers.
5.2.7 New guest laptop access port: HDMI transmitter access port will be installed at head of conference table to accommodate a guest NIPRnet laptop to be able to access the conference room system for adhoc guest briefings.
5.2.8 New floor cable raceway: Professional cable raceway will be implemented to hide/protect cables from rack equipment to the head of the conference room table. This will meet standard safety requirements as well as cable management requirements.
5.2.9 New System Schematics: Contractor will provide full diagrams/schematics of system modifications and integrations into the existing audio/video conference system to the government.
5.2.10 System Walkthrough: Contractor will provide functionality walk-through and familiarization of implemented changes to the audio/video system. Specific focus on confirmation of SIPR laptop audio/video controls via keyboard/mouse, manual NIPR disconnect function, touch panel access selections, and SIPR sign illuminations when in use. Key staff will be present for a functional demonstration and Q&A session with the contractor.
5.3 Service Contract Reporting
5.3.1 System for Award Management (SAM) Service Contract Report (SCR): Reserved
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
| 6.1.1 | Department Of Defense Contract Security Classification Specification (DD Form 254) |
| 6.1.2 | Department of Defense Security Agreement (DD Form 441) |
| 6.1.3 | National Industrial Security Program Operating Manual (DoD 5220.22-M) |
| 6.1.4 | Installation Access Control (AE Reg 190-16) |
| 6.1.5 | The Army Physical Security Program (AR 190-13) |
| 6.1.6 | Contractor Identification (AE Reg 27-715) |
| 6.1.7 | U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) |
| 6.1.8 | Information Assurance Workforce Improvement Program (DoD 8570-M) |
| 6.1.9 | Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01) |
| 6.1.10 | Information Assurance (AR 25-2) |
| 6.1.11 | Electromagnetic Compatibility Directive (2004/108/EC) |
| 6.1.12 | Policies and Procedures for Property Accountability (AR 735-5) |
PART 7
ATTACHMENT AND TECHNICAL EXHIBIT LISTING
7. Attachment and Technical Exhibit List
7.1 Technical Exhibit A – Performance Requirements Summary
7.2 Technical Exhibit B – Deliverables Schedule
TECHNICAL EXHIBIT A
Performance Requirements Summary (PRS)
| PERFORMANCE OBJECTIVE |
| STANDARD |
| PERFORMANCE THRESHOLD ACCEPTABLE QUALITY LEVELS (AQLs) |
| METHOD OF SURVEILLANCE |
PRS#1 - PWS para (5.2.1)
Move existing audio/video equipment to new location
All expected functions of original system tested
100% compliance with national electrical standards and TAA compliance
100% Inspection
PRS#2 - PWS para (5.2.2 thru 5.2.8)
Install and test equipment modifications All expected functions of new modifications to system tested
100% compliance
100% Inspection
PRS#3 - PWS para (5.2.9)
System Diagrams
| All modifications with be presented clearly on a system diagram(s) and explained to the COR (RA); AKA S6 office |
| 100% compliance |
100% Inspection
PRS#4 - PWS para (5.2.10)
System Walkthrough
| Entire system functionally demonstration performed for select AFSBN Staff; provide Q&A session |
| 100% compliance |
100% Inspection
PRS #X - Service Contract Reporting (SCR)
| N/A |
| N/A |
| N/A |
TECHNICAL EXHIBIT B
DELIVERABLES SCHEDULE
| Deliverable |
| Frequency |
| # of Copies |
| Medium/Format |
| Submit To |
D01: Provide schedule of planned work with daily timeline
Within 10 days after contract award
| 2 |
KO & COR (RA)
| D02: Provide parts list of specific equipment to be purchased and integrated into existing audio/video system |
| Within 10 days after contract award |
| 1 |
| COR (RA) |
| D03: Provide full diagrams of mods showing integration into existing audio/video system |
| Within 10 days after contract award |
| 1 |
| COR (RA) |
| D04: Provide 2-year onsite warranty agreement docs with POC information |
| On or before final installation day |
| 2 |
| KO & COR (RA) |
| D05: Provide user functionality walkthrough session |
| Final day of installation |
| 0 |
| In-person with organizational staff |
| N/A |