B08-RFQ_Amd_1_Atch1-Salient_Characteristics.docx

DOCX document 23 KB Posted

Attached to
Pressure Reducing Valves
Solicitation number
PAN414-19-P-4793
Issued by

About this file

Revised Salient Characteristics

View the file

Other files

File Type Posted
RFQ_Atch1-Salient_Characteristics.docx DOCX document
RFQ_Atch2-Drawing_Example.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Salient Characteristics (23 Sep 2019):

These must be included:

1) Commercial warranty.

2) Technical Manual Operator - English and Italian (preferred if in DVC or CD).

3) Technical Manual Parts English and Italian (preferred if in DVC or CD).

4) Technical Manual Maintenance English and Italian (preferred if in DVC or CD).

THE EQUIPMENT SHALL BE CE - or it will be found to not meet the technical specifications and rejected.

CLIN #
Qty
Description
Technical specification
0001
2 each
Dorot Pressure Reducing valves model 30 DE/PR OR EQUAL

UL Listed Globe / Globe-type, Direct-sealing Diaphragm valve, Straight Flow Pattern, Flanged Connections DN 300 (12"). Hydraulic controlled pressure reducing valve, actuated by the pipeline pressure. The technical specifications are indicated in drawing F 504 B.

Delivery must be no later than: 20 December 2019 Body and cover: Cast steel ASTM A 216 WCB Elastomer: Neoprene Pilot Model: CXPR SS 316 Flanges: ANSI 150 RF Coating: Epoxy coating Protect 300/400 micron RAL 3020 Pressure gauge: 2 each 0-25 bar SS 316 case, process connection made in SS 63 mm 1/4” NPT Fittings: SS 316 Tubing: SS 316

0002
2 each
Dorot Pressure Reducing valves model 30 DE/PR OR EQUAL

UL Listed Globe / Globe-type, Direct-sealing Diaphragm valve, Straight Flow Pattern, Flanged Connections DN 150 (6"). Hydraulic controlled pressure reducing valve, actuated by the pipeline pressure. The technical specifications are indicated in drawing F 504 B.

Delivery must be no later than: 1 November 2019 Body and cover: Cast steel ASTM A 216 WCB Elastomer: Neoprene Pilot Model: CXPR SS 316 Flanges: ANSI 150 RF Coating: Epoxy coating Protect 300/400 micron RAL 3020 Pressure gauge: 2 each 0-25 bar SS 316 case, process connection made in SS 63 mm 1/4” NPT Fittings: SS 316 Tubing: SS 316

0003
2 each
Dorot pressure relief valve, model 30 DE/PS OR EQUAL

Cast steel, globe type, direct sealing diaphragm valve, straight flow pattern, and flanged connections. DN 100 (4"). The technical specification are indicated in drawing F 504 B.

Delivery must be no later than: 20 December 2019 Body and cover: Cast steel ASTM A 216 WCB Elastomer: Neoprene Pilot Model: CXPS SS 316 Flanges: ANSI 150 RF Coating: Epoxy Protect 300/400 micron RAL 3020 Pressure gauge: 1 each 0-25 bar SS 316 case, process connection made in SS 63 mm 1/4” NPT Fittings: SS 316 Tubing: SS 316

2 each Dorot pressure relief valve, model 30 DE/PS OR EQUAL

Cast steel, globe type, direct sealing diaphragm valve, straight flow pattern, and flanged connections. DN 80 (3"). The technical specification are indicated in drawing F 504 B.

Delivery must be no later than: 1 November 2019 Body and cover: Cast steel ASTM A 216 WCB Elastomer: Neoprene Pilot Model: CXPS SS 316 Flanges: ANSI 150 RF Coating: Epoxy Protect 300/400 micron RAL 3020 Pressure gauge: 1 each 0-25 bar SS 316 case, process connection made in SS 63 mm 1/4” NPT Fittings: SS 316 Tubing: SS 316

0005
1 each
Dorot Y filter, UL Listed ductile cast iron, globe type, straight flow pattern, flanged connections.

DN 300 (12") OR EQUAL

Delivery must be no later than: 20 December 2019 Body and cover: Ductile cast iron ASTM A 536

Flanges: ANSI 150 RF

Coating: Epoxy Protect 300/400 micron RAL 3020

0006
1 each
Dorot Y filter, UL Listed ductile cast iron, globe type, straight flow pattern, flanged connections.

DN 150 (6") OR EQUAL

Delivery must be no later than: 1 November 2019 Body and cover: Ductile cast iron ASTM A 536

Flanges: ANSI 150 RF

Coating: Epoxy Protect 300/400 micron RAL 3020

0007
4 each
Dorot butterfly valve, ductile cast iron, UL Listed, LUG connections. Actuated by the gear box (including 2 micro switches).

DN 300 (12") OR EQUAL

Delivery must be no later than: 20 December 2019 Body and disc: Ductile cast iron ASTM A 536

Elastomer: Neoprene

Insert to flanges: ANSI 150 RF

Coating: Epoxy Protect 300/400 micron RAL 3020

0008
4 each
Dorot butterfly valve, ductile cast iron, UL Listed, LUG connections. Actuated by the gear box (including 2 micro switches).

DN 150 (6") OR EQUAL

Delivery must be no later than: 1 November 2019 Body and disc: Ductile cast iron ASTM A 536

Elastomer: Neoprene

Insert to flanges: ANSI 150 RF

Coating: Epoxy Protect 300/400 micron RAL 3020

0009
4 each
Dorot air valve, cast steel, connection PN 16.

DN (2") OR EQUAL

Delivery must be no later than: 1 November 2019 Cast steel ASTM A 216 WCB

0010
1 each
Auxiliary Services for CLIN 0002 (2 each), 0004 (2 each), 0006 (1 each), 0008 (4 each), and 0009 (4 each):

-Start-up test (date mutually agreed upon by vendor and DPW) -Hydraulic test certification UNI/DIN -Certification of conformity (Each under the Unit of Measure means the lot of all tests and certifications listed here.)

0011
1 each
Auxiliary Services for CLIN 0001 (2 each), 0003 (2 each), 0005 (1 each), and 0007 (4 each):

-Start-up test (date mutually agreed upon by vendor and DPW) -Hydraulic test certification UNI/DIN -Certification of conformity (Each under the Unit of Measure means the lot of all tests and certifications listed here.)

Auxiliary Services (18 September 2019)

The contractor will deliver the valves and associated hardware to Directorate of Public Works - Bldg. 5155 at the Livorno Depot. After US Government installation of pressure reducing valve (PRV) assemblies, the contractor will conduct calibration of the PRVs to provide for correct pressure setting. The valve calibration procedure shall be performed following valve installation, within 5 days after notification by US Government.

The contractor is required to provide Hydraulic test certification, which consists of a hydraulic test at the factory to ensure compliance with product specifications. Certification of conformity is also required which consists of a materials test at the factory to ensure compliance with product specifications. All documentation regarding certification shall be send to the Technical Representative (TR) listed below at the time of product delivery.

General Information:

The contractor shall coordinate with the Technical Representatives for delivery coordination and auxiliary services under this effort:

Primary TR: Giovanni Salvatori, phone: +39-050-54-7734, e-mail: giovanni.salvatori2.ln@mail.mil Alternate TR: Sharon Koenigstein, phone: 0444-71-2693, e-mail: sharon.l.koenigstrin.civ@mail.mil

The Contractor shall notify the TR within 5 workdays prior to product shipment to coordinate delivery. The Contractor shall ensure they fully understand all site security regulations stated and initiate any required procedures to minimize the impact on installation personnel.

This effort is FOB Destination. The Contractor is responsible for all documentation associated with all shipments.

Security Requirement:

Access and general protection/security policy and procedures. All Contractor and subcontractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy or installation. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes

For Contractors that do not require Common Access Card (CAC), but require access to a DoD facility or installation. Contractor and all associated subcontractors employees are required to follow the procedures for admittance of uncleared personnel. Contractor and all associated subcontractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.