Draft_Attachment_1_-_Price_List.pdf

PDF 297 KB Posted

Attached to
Telecommunication Installation Services
Solicitation number
PAN41418P0000005357
Issued by

About this file

DRAFT Attachment 1 - Price List

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line Item Description Unit of Issue Unit Price

FIBER

1 Furnish and install a 12 strand SM fiber optic in the existing pipe mt 2 Furnish and install a 24 strand SM fiber optic in the existing pipe mt 3 Furnish and install a 36 strand SM fiber optic in the existing pipe mt

Furnish and install outdoor four cables single mode fiber splice case up to 36 fibers including all the internal accessories n° / each

Furnish and install outdoor single mode fiber splice junction 12 to 12 fibers including all the internal accessories n° / each

Furnish and install outdoor single mode fiber splice junction 24 to 24 fibers including all the internal accessories n° / each

Furnish and install outdoor single mode fiber splice junction 36 to 36 fibers including all the internal accessories n° / each

8 Furnish, install cabling and test Fiber optic cable multimode 2 strands within conduit mt 9 Furnish, install cabling and test Fiber optic cable multimode 4 strands within conduit mt

10 Furnish, install cabling and test Work place with 1 gigabit complete with: n° / each

1 Box With TWO optical connection SC or LC n° / each

11 Furnish, install cabling and test Work place with 1 gigabit complete with: n° / each

1 Box With FOUR optical connection SC or LC n° / each

12 Furnish, install cabling and test Work place with 1 gigabit complete with: n° / each

1 Box With SIX optical connection SC or LC (3 outlets SC duplex or LC duplex) n° / each

13 Furnish, install cabling and test Patch Panel SC Duplex, SingleMode 24 port n° / each

14 Furnish, install cabling and test Patch Panel LC Duplex, Multimode 48 port n° / each

15 Furnish, install cabling and test Patch Panel SC Duplex, SingleMode 48 port n° / each

16 Furnish, install cabling and test Patch Panel LC Duplex, Multimode 24 port n° / each

17 Furnish, install Pig-Teil MultiMode SC or LC Duplex , plastic body n° / each

18 Furnish, install Pig-Teil SingleMode SC Duplex , plastic body n° / each

19 Fiber Patch cable Multimode LC - LC duplex 5 mt ORANGE n° / each

20 Fiber Patch cable Multimode LC - LC duplex 3 mt ORANGE n° / each

21 Fiber Patch cable Multimode LC - LC duplex 2 mt ORANGE n° / each

22 Fiber Patch cable Singlemode SC - LC duplex 5 mt ORANGE n° / each

23 Fiber Patch cable Singlemode SC - LC duplex 3 mt ORANGE n° / each

24 Fiber Patch cable Singlemode SC - LC duplex 2 mt ORANGE n° / each

25 To open an existing fiber splice, remove the fiber 12 cable and reseal the splice. n° / each 26 To open an existing fiber splice, remove the fiber 24 cable and reseal the splice. n° / each

COPPER

27 Furnish and Install PVC dim 120x70 conduit with wall mount tools, curves and all accessories needed n° / each

28 Furnish and Install metal dim 120x70 conduit with wall mount tools, curves and all accessories needed n° / each

Furnish and Install metal dim 120x100 conduit with wall mount tools, curves and all accessories needed n° / each

30 Furnish and Install PVC dim 100x40 conduit with wall mount tools, curves and all accessories needed mt

31 Furnish and Install PVC dim 60x35 conduit with wall mount tools, curves and all accessories needed mt

Furnish and Install PVC dim 120x22 frame conduit with wall mount tools, curves and all accessories needed mt

Furnish and Install PVC dim 120x22 skirting conduit with wall mount tools, curves and all accessories needed mt

34 Furnish and Install PVC pipe Ǿ 25 with wall mount tools, curves and all accessories needed pvc pipe mt

35 Furnish and Install PVC pipe Ǿ 32 with wall mount tools, curves and all accessories needed pvc pipe mt

36 Furnish and Install PVC pipe Ǿ 40 with wall mount tools, curves and all accessories needed pvc pipe mt

37 Furnish and Install PVC pipe Ǿ 50 with wall mount tools, curves and all accessories needed pvc pipe mt

38 Furnish, install cabling and test Patch Panel 24 porte RJ45, 1U, with 24 connectors CAT 6 STP or FTP n° / each

39 Furnish, Install, cabling and test cable CAT6 STP or FTP within the conduit mt 40 Furnish, Install, cabling and test cable CAT7 STP or FTP within the conduit mt 41 Furnish, install, cabling and test Work place complete with: n° / each

1 Box With TWO outlets RJ45 cat 6 STP or FTP n° / each

42 Furnish, install, cabling and test Work place complete with: n° / each

1 Box With FOUR outlets RJ45 cat 6 STP or FTP n° / each

43 Furnish, install, cabling and test Work place complete with: n° / each

1 Box With SIX outlets RJ45 cat 6 STP or FTP n° / each

44 Furnish, install, cabling and test Work place complete with: n° / each

1 Box With EIGHT outlets RJ45 cat 6 STP or FTP n° / each

45 Furnish, install, cabling and test Work place complete with: n° / each

1 Box With TEN outlets RJ45 cat 6 STP or FTP n° / each

46 Patch cord RJ45 cat6/ STP or FTP 1 meters long n° / each

47 Patch cord RJ45 cat6/ STP or FTP 2 meters long n° / each

48 Patch cord RJ45 cat6/ STP or FTP 3 meters long n° / each

49 Patch cord RJ45 cat6/ STP or FTP 5 meters long n° / each

50 Furnish, install and test 25 Pr, Copper cable for telephone within existing conduits / pipe mt 51 Furnish, install and test 30 Pr, Copper cable for telephone within existing conduits / pipe mt 52 Furnish, install and test 50 Pr, Copper cable for telephone within existing conduits / pipe mt 53 Furnish, install and test 100 Pr, Copper cable for telephone within existing conduits / pipe mt 54 To open an existing copper splice, install 30 pair coppers cable and reseal the splice. n° / each

55 To open an existing copper splice, install 50 pair coppers cable and reseal the splice. n° / each

56 To open an existing copper splice, remove coppers cable and reseal the splice. n° / each

57 Furnish, install cabling and test Patch Panel 25 porte RJ45, 1U, with 25 connectors for telephone n° / each 58 Furnish, install cabling and test Patch Panel 50 porte RJ45, 1U, with 50 connectors for telephone n° / each

PDS ACCESSORIES

Furnish and install Security Steel Box (must be certified) with standards accessories and certified support locker and epoxy resin dimension: Large=250 Tall=300 Dip'=200 n° / each

60 Furnish and install a steel pipes with wall mount tools, curves, all accessories needed and epoxy resin mt

- Steel Pipe External Diameter 40 mm

61 Furnish and install a steel pipes with wall mount tools, curves, all accessories needed and epoxy resin mt Steel Pipe External Diameter 32 mm

62 Furnish and install a steel pipes with wall mount tools, curves, all accessories needed and epoxy resin mt Steel Pipe External Diameter 25 mm

63 Furnish and install a steel pipes with wall mount tools, curves, all accessories needed and epoxy resin mt Steel Pipe External Diameter 20 mm

64 Re-Open and Close the existing Steel Duct pipes with Epoxy. mt

SAFE/CABINET INSTALLATION

65 Remove and reinstall the SAFE n° / each 66 Reinforce the floor with adequate wood panel (for the prefabs) n° / each 67 Power connections for safe (16 amp circuit) n° / each 68 Connections new pipes to the safe with epoxy resin n° / each

MISCELLANEOUS

Replacing existing doors with new door for finishing wood complete with masonry and predisposition to lock ANX09 of your supply. n° / each

Replacing existing doors with new door for finishing wood and steel complete with masonry and predisposition to lock ANX09 of your supply. n° / each

71 To dig on the ground and install 2 Ǿ125 mm pipe n° / each 72 To dig on the asphalt and install 2 Ǿ125 mm pipe n° / each 73 Furnish and install four innerduct (2 x 30mm and 2 x 400mm ducts) inside exiting 125 mm pipe mt 74 Autocad Design n° / each 75 To drill hole with special core bit to pass the cable n° / each 76 masonry / paint / cleaning / recostrutions n° / each 77 Opening handhole, emptyng water and closing. n° / each 78 Furnish and install a 120x120x120 cm handhole on the asphalt n° / each 79 Furnish and install a 120x120x120 cm handhole on the ground n° / each 80 Furnish and install a 200x200x200 cm handhole on the asphalt n° / each 81 Furnish and install a 200x200x200 cm handhole on the ground n° / each 82 Furnish and Install building entrance point 2x125mm steel pipes with a proper external box n° / each

Furnish and Install TMGB (Telecommunications Main Ground Busbar) or TGB (Telecommunication Ground Busbar) dedicated to the telecom cabinet n° / each

84 Install anti-static carpet (60 cm by 90 cm), including grounding connection n° / each

85 Furnish and Install standalone AC unit for Telecomunication Room, with hard wire controller, 5 KW. n° / each

86 Furnish and Install metal pole to be installed in open areas for network boxes installation n° / each 87 New filters kit for AC unit top mounted on the rack n° / each 88 Opening and reclosing false ceiling sqm 89 Furnish and install new anti panic bar on the emergency door n° / each 90 cesar lift for elevation/operation day 91 Emergency light fixture n° / each

TELECOM RACK AND EQUIPMENT

Furnish, install and connect to the power (16 amp circuit) a Cabinet Rack RITTAL - Schroff - Knuerr (or equivalent) 60cm (d) x 60cm (w) x 15 U (h) and all accessories.

The rack will be equipped with:

- Thermostat controlled ventilation system (consisting of two ventilators)

- Two each, five (5) receptacle power strips, without switches, the receptacles facing towards the middle (not towards the front of the cabinet)

- 2 separate 16 Amp circuit breakers in a circuit breaker box installed, unobstructed,

- lateral cables management,

- vertically grounding bar,

- 20 cm - 14 W fluorescent light

Furnish, install and connect to the power (16 amp circuit) a Cabinet Rack RITTAL - Schroff - Knuerr (or equivalent) 120cm (h) x 80cm (d) x 80cm (w) 24 U.

The rack will be equipped with:

- Thermostat controlled ventilation system (consisting of two ventilators)

- Two each, five (5) receptacle power strips, without switches, the receptacles facing towards the middle (not towards the front of the cabinet)

- 2 separate 16 Amp circuit breakers in a circuit breaker box installed, unobstructed,

- lateral cables management,

- vertically grounding bar,

- 20 cm - 14 W fluorescent light

Furnish, install and connect to the power (16 amp circuit) a Cabinet Rack RITTAL - Schroff - Knuerr (or equivalent) 200cm (h) x 80cm (d) x 80cm (w), 42 U.

The rack will be equipped with:

- Thermostat controlled ventilation system (consisting of two ventilators)

- Two each, five (5) receptacle power strips, without switches, the receptacles facing towards the middle (not towards the front of the cabinet)

- 2 separate 16 Amp circuit breakers in a circuit breaker box installed, unobstructed,

- lateral cables management,

- vertically grounding bar,

- 20 cm - 14 W fluorescent light

Furnish, install and connect to the power (16 amp circuit) a Cabinet Rack RITTAL - Schroff - Knuerr (or equivalent) 60cm (d) x 60cm (w) x 15 U (h) and all accessories.

The rack will be equipped with:

- Two each, five (5) receptacle power strips, without switches, the receptacles facing towards the middle (not towards the front of the cabinet)

- 3 separate 16 Amp circuit breakers in a circuit breaker box installed, unobstructed,

- lateral cables management,

- vertically grounding bar,

- 20 cm - 14 W fluorescent light

Furnish, install and connect to the power (16 amp circuit) a Cabinet Rack RITTAL - Schroff - Knuerr (or equivalent) 200cm (h) x 80cm (d) x 80cm (w), 42 U.

The rack will be equipped with:

- Two each, five (5) receptacle power strips, without switches, the receptacles facing towards the middle (not towards the front of the cabinet)

- 3 separate 16 Amp circuit breakers in a circuit breaker box installed, unobstructed,

- lateral cables management,

- vertically grounding bar,

- 20 cm - 14 W fluorescent light

97 Orizontal cable management with rings n° / each 98 AC Unit 3kw to be mounted on the roof of the cabinet n° / each 99 AC Unit 2kw to be mounted on the roof of the cabinet n° / each

100 AC Unit 1kw to be mounted on the roof of the cabinet n° / each

96 n° / each

94 n° / each

95 n° / each

92 n° / each

93 n° / each

101 AC Unit 0,75 kw to be mounted on the roof of the cabinet n° / each 102 Water tank for AC rack units n° / each 103 Channels and accessories for Rack AC unit n° / each 104 Circular air filters n° / each 105 Grounding bar n° / each 106 Rack light fixture with sensor n° / each 107 Sliding Shelf n° / each 108 3 Fans ventilator unit n° / each

SERVER RACK AND EQUIPMENT

Furnish, install and connect to the power (16 amp circuit) a Cabinet Rack Rack for servers 200cm (h) x 100cm (d) x 60cm (w), 42 U. n° / each

Furnish, install and connect to the power (16 amp circuit) a Cabinet Rack Rack for servers 200cm (h) x 100cm (d) x 80cm (w), 42 U. n° / each

Furnish and Install a PDU (Power Distribution Units) with 10 (ten) outlets standard IEC C13 and 2 (two) standard IEC C19 n° / each

PDS HOLOCOM

Furnish and Install security Box HOLOCOM or equivalent (must be certified) with standard accessories and Epoxy where needed n° / each

113 Furnish and Install HOLOCOM 6"x3,4"(must be certified) with accessories mt 114 Furnish and Install HOLOCOM 2"x2" or 1,5"x0,75" (must be certified) with accessories mt 115 Furnish and install pull box for Holocom 6"x3,4" n° / each 116 Open and close existing HOLOCOM (must be certified) or equivalent conduits mt 117 Furnish and Install Epoxy Resin for conduit with accessories HOLOCOM mt

File details come from the government source that posted it.