SEE ADDENDUM

(No Collect Calls)

W912CN19Q0070 23-Aug-2019

b. TELEPHONE NUMBER

808.656.0940

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 06 Sep 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912CN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ANGELA U. MCCOLOR

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011331375

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

EXPEDITIONARY CONTRACTING COMMAND

413TH CSB, RCO-HAWAII,

742 SANTOS DUMONT AVENUE

BLDG 108, 3RD FLOOR (WAAF)

SCHOFIELD BARRACKS HI 96857-5026

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE WX3JN3 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

US ARMY GARRISON HI DIR OF PUB WKS DPW

JONATHAN CHONG

BLDG 104 947 WRIGHT AVE WAAF SERVICE CO

SCHOFIELD BARRACKS HI 96857-5013

TEL: 8086560387 FAX: 8086567771

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000.00

NAICS:

562998

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF66

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

SITE VISIT

SITE VISIT

Date/Time: Wednesday, August 28, 2019 at 9:30a.m. Hawaii Standard Time

RSVP no later than: Tuesday, August 27, 2019 at 2:00p.m. Hawaii Standard Time

The purpose of this site visit is to provide clarity on any questions that may arise for this requirement. Offerors and/or respresentatives are encouraged to attend the site visit. If you are interested in attending, submit all attendee's names, e-mail addresses, cell phone and work telephone numbers to angela.u.mccolor.civ@mail.mil no later than Tuesday, August 27, 2019 at 2:00p.m. Hawaii Standard Time. If no interest is received by this time, the Government will cancel the planned site visit. If cancelled, no other site visit will be scheduled. Picture taking will be allowed during the site visit only for materials/subjects directly related to this requirement.

Attendance constitutes agreement to release the Government of liabilities due to any accidents or injury occurring during the site visit. Any discussions, remarks, and explanations that may be made by any Government representative during the site visit will not change the terms of the solicitation and the technical specifications unless the solicitation is amended in writing.

DIRECTIONS TO SCHOFIELD BARRACKS BLDG 1580 (WATER STORAGE TANK) AT

THE WATER TREATMENT PLANT

Schofield Barracks Bldg. 1580 (Water Storage Tank) Water Treatment Plant is located directly across the main gate (Kawamura Gate) from Wheeler Army Airfield (AAF). To reach the facility, go north toward Wahiawa, take exit 7, HI-99 N/Mililani Tech Park, Wheeler AAF, keep left at the fork, follow signs for Wheeler AAF, turn left at Leilehua Road/Wikao Street, turn right at HI-99 N/Kamehameha Highway, turn right at Higgins Road, and immediately take first left into the driveway leading into the facility. There will be a call box, please inform that you are there for the site visit.

Please call Nathan Garcia at 808-864-1412 if further assistance is needed to get to the site visit location.

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS)

CLEAN/INSPECT/ASSESSMENT & DEBRIS

REMOVAL OF 19 WATER STORAGE TANKS

ON VARIOUS ARMY INSTALLATIONS,

ISLAND OF OAHU, HAWAII

08/01/2019 Version 1.0

VISION STATEMENT

1.0 GENERAL INFORMATION 3

1.1 Overview 3

1.2 Non‐Personal Services 3

1.3 Business Relations 3

1.4 Contract Administration and Management 3

1.4.1 Contract Management 3

1.4.2 Contract Administration 4

1.5 Contractor Personnel, Disciplines, and Specialties

1.6 Subcontract Management 4

1.7 Location and Hours of Work 4

2.0 DESCRIPTION OF SERVICES 4

2.1 Clean/Inspec and Assess 19 Water Storage Tanks 5

2.1.1 Remove Sedimentation and Debris 5

2.1.2 Remove Galvanized Piping 5

2.1.3 Repair, Sealing, & Coating 5

2.2 Special Requirements 5

2.2.1 Divers Regulations & Standards 5

2.2.2 Diver & Equipment Disinfection 6

2.2.3 Diver Clothing 6

2.3 Documentation (Pictures/Video, Report) 6

3.0

PERFORMANCE REQUIREMENTS SUMMARY

(PRS)

4.0 MANDATORY REQUIREMENTS 8

4.1 Security and Safety 8

4.2 iWatch Training 8

4.3 Government Furnished Materials 8

5.0 DELIVERABLES 8

5.1 Enterprise‐Wide Contractor Manpower Reporting

5.2 Quality Control Plan 9

5.3 Deliverables Listing 9

W912CN19Q0070

Performance Work Statement (PWS)

CLEAN/INSPECT/REPAIR & REMOVE DEBRIS FOR 19 WATER

STORAGE TANKS, VARIOUS ARMY INSTALLATIONS, ISLAND OF

OAHU, HAWAII

Vision Statement Provide sustainable facilities and services to support and improve the quality of Hawaii's Military community and enhance War Fighter readiness and well-being.

1. General Information

1.1 Overview. The Contractor shall provide all labor and material to clean, inspect, assess, and remove debris from 19 water storage tanks at various Army installations on the Island of Oahu, Hawaii. The Contractor shall perform all work in accordance with Occupational, Safety, and Health Administration (OSHA), Federal, State, and County regulations and commercial standards. This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.

1.2 Non-Personal Services

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

1.3 Business Relations

The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

1.4 Contract Administration and Management

The following subsections specify requirements for contract, management, and personnel administration.

1.4.1 Contract Management

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at the Directorate of Public Works (DPW) Service Contract Branch and the contractor's corporate offices.

1.4.2 Contract Administration

The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

1.5 Contractor Personnel, Disciplines, and Specialties.

The contractor shall provide the following management and support as required. The contractor shall provide for employees during designated Government non-work days or other periods where Government offices are closed due to weather or security conditions. The Contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The Contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The Contractor shall ensure the labor categories as defined in the Labor Categories document (see attachment), labor rates, and man-hours utilized in the performance of each Task Order issued hereunder will be the minimum necessary to accomplish the task. The Contractor shall provide the necessary resources and infrastructure to perform, manage and administer the contract. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure to support contract tasks. The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs).

1.6 Subcontract Management

The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Contracting Officer Representative (COR).

Cross teaming may or may not be permitted.

1.7 Location and Hours of Work

Accomplishment of the results contained in this PWS requires work at various Army Installations on Oahu, Hawaii, Monday through Friday between the hours 7:30 a.m. to 4:00 p.m.

except US Federal Holidays.

2.0 Description of Services

The following section specifies the Performance Objectives and Performance Elements for the contract.

2.1 Clean/Inspect and Assess 19 Water Storage Tanks on Various Army installations The following facilities make up 19 water storage tanks requiring inspection, assessment, cleaning, and decontamination:

1. Schofield Barracks: Bldgs. 1580, 1661, 1662, 2300, 2301, South Range (6 tanks)

2. East Range: Bldg. 006, BPS #3 and #4 (2 tanks)

3. Fort Shafter: Bldgs. 700, 701, 1125, 1150 (4 tanks)

4. Tripler Army Medical Center: Bldgs. 242, 600 (2 tanks)

5. Aliamanu Military Reservation: Bldgs. 681, 682 (3 tanks; north, middle, and south)

6. Helemano Military Reservation: ½ mi (2 tanks)

Please note that some facilities feature more than one water storage tank. Ladders are not accessible.

2.1.1 The Contractor shall remove sedimentation and debris from the interior of the water storage tanks, tank bottom, walls, interior of the tank top, and to check for cracks, voids, and corrosion.

Provide assessment of each tanks integrity and note all damages and recommended repairs during the inspection/cleaning to include hatches, screens, ladders, etc. Upon completion of these described tasks, the Contractor shall sanitize all areas worked on and provide the designated COR a report of all findings within 10 days after assessment/completion of each storage tank, to include recommended repairs.

2.1.2 The Contractor shall remove galvanizing piping from inside Schofield Barracks Area BB Building 2300 water storage tank. Galvanizing piping was originally installed to aerate water but was never removed. The 1-6” – 2” line branches out to 1” lateral lines.

2.1.3 All repair, sealing, and coating materials shall meet or exceed the following standards:

a. EPA – Approved for use in potable water

b. FDA – Approved for human consumption

c. USDA – Approved for incidental contact with food

d. NSF 60 & 61 – Approved for use in potable water

All applications of materials shall follow the standards for drinking water.

Performance Standards:

a) STD: Completes all actions within Contract specification and deadlines

b) STD: Meet or exceed all standards as specified in paragraph 2.1.3

AQL: 100%

Deliverables:

A001 Assessment Report

2.2 Special Requirements.

2.2.1 Divers must meet the following regulations and standards:

a. OSHA Commercial Diving Regulations: 29 CFR1910.401 – 1910.441.

b. ADC Standard 12: Commercial Diving in Potable Water Facilities

c. ANSI/AWWA C652-02: Conducting Underwater Inspections of Potable Water Storage

Facilities

d. NFPA 25 Section 9.2: Water Storage Tanks – Inspection

e. Association of Commercial Diving Educators (ACDE) certification

2.2.2 Diver and equipment must be disinfected prior to entering tank. All equipment shall be stored in a manner that prevents both chemical and bacteriological contamination. Equipment shall be constructed and maintained so that water quality is not affected.

2.2.3 Diver clothing shall be of the dry-suit type, in good condition, and free from tears or other imperfections that may impair the integrity of the suit. All personnel entering water storage tanks shall be free of communicable disease and shall not have been under a physician’s care within the previous 7 day period. No person who knowingly has an abnormal temperature or symptoms of illness shall work in the water storage tank.

Performance Standards

a) STD: Divers must meet all regulations and standards per 2.2.1

b) STD: All requirements must be as specified in Contract (2.2.2 and 2.2.3)

AQL: 100%

2.3 The Contractor shall document via pictures/video before and after interior conditions (corrosion, pit depths, sediment level) of water storage tanks. Report should include quality DVD or color photographs documenting findings. Report should be detailed and cover all conditions, not just deficiencies under the following categories:

a. Structural Conditions

b. Safety Conditions

c. Sanitary Conditions

d. Coating Systems Conditions

e. Security Conditions

f. General Details

Performance Standards

a) STD: Completes all actions within Contract specification

AQL: 95%

Deliverables A002 Operational Condition Report (Detailed) A003 Pictures/Video (before and after conditions)

3.0 Performance Requirement Summary (PRS)

Statements Standards/AQLs Incentive/Remedy

2.1.1, 2.1.2, 2.1.3

Completes all actions within Contract specification;

meeting or exceeding standards

Deliverables:

A001 Assessment Report

a) Per Contract specifications.

AQL: 100%

Standard: Completes actions within specified deadlines.

Responsive to re-tasking

Statements Standards/AQLs Incentive/Remedy 2.2.1, 2.2.2, 2.2.3

Contractor must meet regulations & standards as stated; Contractor must adhere to all task requirements as stated.

a) Divers must meet all regulations and standards

b) All requirements must be as specified in Contract

AQL: 100%

Standard: Requirements as specified in Contract.

Responsive to re-tasking

Statements Standards/AQLs Incentive/Remedy

2.3 The Contractor shall document

water storage tank condition as specified.

Deliverables:

A002 Operational Condition Report A003 Pictures/Videos

a) Report should be detailed and cover all conditions

AQL: 95%

Standard: Completes all actions within Contract specification

Responsive to re-tasking

5.1 The Contractor shall provide

data entry for Manpower Reporting.

Deliverables:

A004 Contractor’s Manpower Report

a) Reports are completed within contract specifications.

AQL: 95%

5.2 The Contractor shall provide

a Quality Control Plan.

Deliverables:

A005 Quality Control Plan

a) Identifies trends and corrects deficiencies.

AQL: 95% accurate 100% of the time.

Responsive to re-tasking

4.0 Mandatory Requirements

4.1 Security and Safety

ANTI-TERRORISM (AT) AND OPERATIONAL SECURITY (OPSEC)

Level I Antiterrorism (AT) Standards

SEE RCO-HI LOCAL CLAUSES, SAFETY/INSTALLATION RULES, 52.242-5001DOD

LEVEL I ANTITERRORISM (AT) STANDARDS

ACCESS TO ARMY INSTALLATIONS PERSONNEL and VEHICLES

SEE RCO-HI LOCAL CLAUSES, SAFETY/INSTALLATION RULES 52.242-5000 ACCESS

TO ARMY INSTALLATIONS-PERSONNEL AND VEHICLES

4.2 IWATCH TRAINING

IWATCH within the Army is a nation-wide modern version of a neighborhood watch program focused on the threat of terrorist activity. It is an antiterrorism awareness program that the contractors' workforce, while on Army installations, must be all familiar with to promote and enhance reporting suspicious activity or behavior. The program has two elements: "passive" and "active". The passive element is an individual's situational awareness of his or her surroundings. The active element of IWATCH involves individuals taking action to report suspicious behavior or activities to law enforcement for more investigation.

Contractor personnel, to include subcontractors, performing on or within an Army controlled facility, area or on an Army installation are required to brief and train their personnel on line at IWATCH Training US Army. Contractor personnel shall train all personnel within 5 days of contract award or within 5 days of hiring action. Contractors shall report all completed training to the COR within 7 days of contract award or hiring action.

4.3 Government Furnished Materials

Water and electricity required for the performance of the work covered by this contract will be furnished to the Contractor at no additional cost. Utilities required will be obtained by utilizing existing outlets located throughout the facilities.

5.0 Deliverables

5.1 Enterprise Contractor Manpower Reporting Application (ECMRA) The ECMRA is a business process that has been approved by the Army as a means for collecting information on contracts that provide services to the Department of the Army. Contractors are required to register and report information via the CMRA website located at Error! Hyperlink reference not valid.. Additional information such as links to user guides, frequently asked question and help desk information is available via the CMRA website.

For this requirements type contract, reporting is required for each task order issued, and shall be entered via the ECMRA website. Completed report(s) may be submitted at any time after a completion of each task order but no later than Oct 30 of each year. Data must be accurate and complete and shall be reported separately for each fiscal year that falls within the period of performance. The Federal Government's Fiscal Year is Oct 1 through September 30.

Performance Standards

a) STD: Reports are completed within contract specifications.

AQL: 95%

Deliverables A004 Contractor's Manpower Report.

5.2 Quality Control Plan. The Contractor shall develop a Quality Control Plan (QCP) and implement a quality control program to satisfy the specific requirements of the contract. The QCP shall initially identify potential problem areas and trends to correct deficiencies experienced and strive to develop an optimal QCP. The QCP shall document that all OWS workers are properly trained and certified for the equipment they work on as well as ensure all work areas are cleaned up after work is completed. A copy of the QCP shall be provided to the KO and COR.

The Contractor shall update the QCP, as required, and provide copies to the KO and COR.

Performance Standards

a) STD: Identified trends and corrects deficiencies AQL: 95% accurate 100% of the time and improved to 100% within 30 days of government notice.

b) All work areas shall be cleaned up after work is completed

AQL: 100% of the time and improved to 100% within 2 days of government notice

Deliverable A005 Quality Control Plan

5.3 Deliverables Listing

A001 Assessment Report A002 Operational Condition Report (Detailed) A003 Pictures/Video (before and after conditions) A004 Contractor's Manpower Report A005 Quality Control Plan

OTHER INFORMATION

1. ISSUANCE OF TASK ORDERS

(a) The work to be accomplished under this contract will be performed upon receipt of a task order. The Contractor shall coordinate all work with the Contracting Officer Representative in order that there will be a minimum of interruption and inconvenience to the Government.

2. WORK UNDER ESTIMATED QUANTITY LINE ITEMS - NOT APPLICABLE

This clause applies to line items XXX.

Prior to commencement of work, the Contractor shall coordinate with the authorized representative of the Contracting Officer for mutual agreement as to the quantity of additional work required. Work performed shall not exceed the estimated quantities unless the Contracting Officer executes a modification to the contract.

3. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK ORDERED - NOT

APPLICABLE

(a) The Contractor shall only commence work under this contract upon receipt of a task order. The task order shall specify the building in which work is to be performed and sequence in which the work shall be performed.

(b) The Contractor shall be required to commence, prosecute and complete all work in accordance with the said task order, unless changed and mutually agreed to between the parties.

(c) The Contractor shall be verbally notified that work is required. The Contractor shall be available from 7:30 a.m.

to 4:30 p.m., Monday through Friday, excluding Federal holidays, to receive such notification. Upon receipt of notification, the Contractor shall be at the work site within two working days for preparation and signing of an agreement sheet. The Contractor may be required to remove, cut, alter, replace or repair existing work as necessary to perform work. Except as specified, the Contractor shall not disturb, cut, alter or remove any structural work and shall not disturb any ducts, plumbing, steam, gas or electrical work without prior approval of the Contracting Officer’s Representative (COR). When ordered on a task order, any walls, ceiling or partitions disturbed or removed as a result of performing the required work shall be repaired or replaced. Materials and workmanship used in restoring work shall conform in type and quality to that of existing construction. All work shall be ordered in accordance with the unit pricing schedule. Notification to Federal and State agencies shall be done no later than the following working day that the task order is received.

(d) Work called for under a specific task order shall commence and be diligently prosecuted and completed.

4. GENERAL ENVIRONMENTAL STANDARDS

(a) While performing work on any US Army Garrison, Hawaii (USAG-HI) installations, the contractor will comply with Executive Orders 13423 “Strengthening Federal Environmental, Energy, and Transportation Management” signed by the President on 24 Jan 2007 and 13514, “Federal Leadership in Environmental, Energy, and Economic Performance” signed by the President on 8 Oct 2009 requiring the acquisition of environmentally preferable goods and services, use of sustainable environmental practices, purchase of bio based, energy efficient and recycled content products. More specifically, the Contractor will strive to improve upon their sustainability performance by taking actions to:

(1) Reduce energy consumption

(2) Reduce greenhouse gas emissions

(3) Conserve and protect water resources

(4) Eliminate waste, recycle, and prevent pollution

(5) Adopt sustainable technologies

(6) Procure environmentally preferable materials, products and services

(7) Maintain sustainable buildings

(8) Strengthen livability of the local community

(9) Inform and involve personnel in the achievement of these goals.

(b) The contractor will comply with the Government directives, permit conditions, installation policies and plans as administered by the Government. The Contractor will be held liable to pay for any environmental fines resulting from his operations, waste generated or other operational environmental requirements. As applicable, the Contractor will obtain environmental permits required for wastewater pretreatment, underground tanks, hazardous waste identification numbers, air pollution permit for temporary sources, storm water permits or other pertinent environmental permits.

(c) The contractor will review and comply with applicable policies, program documents and regulatory requirements as stipulated under each environmental program media below.

(1) Environmental program documents include, but are not limited to; the Installation Hazardous Waste Management Plan – USAG-HI Regulation 200-4, Asbestos Management Plan, Lead-based Paint Management Plan, Installation Spill Prevention, Control, and Countermeasures (SPCC) Plan, Integrated Natural Resources Management Plan, Integrated Cultural Resources Management Plan, Pollution Prevention Plan, and the Storm Water Pollution Prevention Plan available at the DPW Environmental Division. Environmental program documents can be downloaded from the installation sustainability and environmental management website at:

http://www.garrison.hawaii.army.mil/sustainability/Environmental.aspx.

(2) Installation policies include, but are not limited to; the Environmental Compliance and Protection Program Policy Memorandum USAG-HI-4; Environmental Policy Memorandum USAG-HI-10; Authorized Use List Policy Memorandum USAG-HI-19, Waste Reduction and Recycling Policy Memorandum USAG-HI-25; Open Burn Policy Memorandum USAG-HI-51; Generator Control Policy Memorandum USAG-HI-55; Illicit Discharge Detection and Elimination Policy Memorandum USAG-HI-59; and the Joint USARPAC and IMCOM-Pacific Energy Conservation Policy Guidance. Installation Policy Memorandums are available for download at:

http://www.garrison.hawaii.army.mil/command/documents.htm

(3) The contractor is also encouraged to view the online A to Z sustainability and environmental management guide for instructions on managing common environmental issues. The A to Z sustainability and environmental management guide is available at:

http://www.garrison.hawaii.army.mil/sustainability/AtoZ.aspx.

(d) The Contractor shall at all times keep the work area, including storage areas used by him, free from accumulations of waste material or rubbish and prior to completion of the work remove any rubbish from the premises and all tools, scaffolding, equipment and materials not the property of the Government. Upon completion of the work, the Contractor shall leave the work and premises in a clean, neat and workmanlike condition satisfactory to the Contracting Officer. If debris is not disposed of properly or the site is not left clean, the Government will clean the site at the expense of the contractor. The contractor will also be held liable for damages done to the environment as a result of disposal and/or cleanup.

(e) The contractor may be subject to unannounced Environmental Compliance Inspections by the DPW Environmental Division.

(f) Environmental and Safety Noncompliance Fees. The contractor shall be solely responsible for remedying all Federal, State and local environmental and safety violations or noncompliance and any payment of fines, penalties and fees levied as a result of the violations or noncompliance. The government reserves the right to withhold payment in the amount of the fines, penalties and fees levied if not paid by the contractor.

5. EMERGENCY PLANNING COMMUNITY RIGHT TO KNOW ACT (EPCRA) HAZARDOUS

SUBSTANCES (HS)

(a) Contractors using EPCRA HS in the performance of any work while on USAG-HI installations are responsible for complying with the provisions of EPCRA regulations and submitting applicable reports (TIER II/TRI) to Federal and State regulatory agencies as applicable.

(b) Copies of reports for substances used in connection with work performed on USAG-HI installations shall be provided to the DPW Environmental Division, Attention: EPCRA Program Manager, STOP 253, 3rd Floor, 948 Santos Dumont Ave., Wheeler Army Airfield, phone 656-2878.

(c) Chemicals regulated under EPCRA HS are defined in EPA document EPA 550-B-98-017, Title III List of List, Consolidated List of Chemicals Subject to the Emergency Planning and Community Right to Know Act and Section 112(r) of the Clean Air Act Amended.

(d) The contractor is responsible for knowing which chemicals it uses or transports that are contained on the list.

For convenience, the contractor may review a copy of the EPA document at the Directorate of Public Works (DPW) Environmental Division. The document can also be downloaded from the U.S. Environmental Protection Agency (EPA) at: http://www.epa.gov/oppt/pubs/genpub.htm.

(e) The contractor must maintain copies of Material Safety Data Sheets (MSDS’s) of all chemicals used in the performance of any work while on USAG-HI installations. MSDSs must be readily available at the site location where the work is being performed.

(f) The contractor can request the list and locations of EPCRA HS currently utilized on USAG-HI installations by contacting the DPW Environmental Division EPCRA Program Manager. The contractor must provide name, company, contract number, date the contract was awarded and provide a description of the contract. A database of locations of chemicals will then be forwarded upon review and approval of request. Contractors working on USAG- HI installations are encouraged to review this database, which will provide information where potentially hazardous chemicals are stored.

(g) All spills of substances containing EPCRA HS will be immediately reported to the Directorate of Public Works Spill Response line at 656-1111 and the USAG-HI, Public Affairs Office at 656-3160 or 542-9489 (after hours). The Contracting Officer must be notified during the first business hour immediately after. All waste generated from EPCRA HS being utilized will be immediately reported to the DPW Environmental Office, phone: 656-2878.

(h) All Contractors utilizing substances containing EPCRA HS will perform the following prior to contract start.

(1) Review the Installation Spill Prevention, Control, and Countermeasures (SPCC) Plan and the Installation Hazardous Waste Management Plan – USAG-HI Regulation 200-4 available at the DPW Environmental Division or from the from the installation sustainability and environmental management website at:

http://www.garrison.hawaii.army.mil/sustainability/Environmental.aspx. Upon review, the contractor or designated responsible employee shall sign a certification statement that they have reviewed and understand the contents of these documents.

(2) Provide a listing and MSDS copies of oil and Hazardous Substance (HS) products projected to be utilized in the performance of any work while on USAG-HI installations to the DPW Environmental Division. The estimated average and maximum quantities of each material anticipated to be on-site at any given time shall also be provided to the DPW Environmental Division EPCRA Program Manager, STOP 253, 3rd Floor, 948 Santos Dumont Ave., Wheeler Army Airfield, phone 656-2878 and to building 6040 East Range for material to be bar-coded. The contractor must ensure the product listing is current and updated as frequently as necessary and/or at a minimum, on an annual basis by 1 January of each year.

(3) Provide the name, office phone number, and cellular phone number of a company spill response point of contact. The point of contact must be trained in spill response.

(4) Provide a copy of an agreement with a hazardous materials spill response company in the event of a spill.

(5) Provide copies of employees training certificates on environmental and spill response training.

(6) Appoint a primary and alternate Environmental Compliance Officer in writing.

(7) Develop a notification procedure in the event of a spill to include phone numbers of response personnel, support agencies, National Response Center, State Hazard Evaluation Emergency Response Office and Civil Defense.

(8) Accomplish all spill notifications as required by the U.S. Environmental Protection Agency and State of Hawaii to the Hazard Evaluation Emergency Response Office, Local Emergency Response Commission and National Response Center. Copies of written spill notifications shall be provided to the DPW Environmental Division.

(9) All spills caused by the contractor will be cleaned up under supervision of the contractor and a qualified hazardous materials spill response company, at no cost to the government, in accordance with all applicable laws and regulations and to the satisfaction of the DPW Environmental Division.

(10) The contractor shall pay for disposal cost of all contaminated materials to include but not limited to soil, sorbent materials, disposable equipment and other materials contaminated by the spill. Ensure all disposals are in accordance with all applicable laws and regulations at authorized disposal facilities.

6. SPILLS OF PETROLEUM/OIL/LUBRICANTS OR HAZARDOUS MATERIALS/HAZARDOUS

WASTE

(a) The contractor will prepare and maintain a site-specific spill plan, including notification procedures for spills/releases. The spill plan will include phone numbers of response personnel, support agencies, National Response Center, State Hazard Evaluation Emergency Response Office and Civil Defense. The contractor will provide a copy of the spill plan to DPW Environmental Division upon request.

(b) The contractor shall provide immediate response to stop, contain, and clean-up all spills of oil and other hazardous substances that result from his performance under this contract.

(c) The contractor must report all spills immediately to the DPW Spill Response line at (808) 656-1111 in accordance with the Installation SPCC Plan. Additionally, the contractor shall notify the COR of the incident during normal business hour or the first business hour following the incident.

(d) The contractor will accomplish all spill notifications and written spill reports as required by the U.S.

Environmental Protection Agency, State of Hawaii Hazardous Evaluation Response Office, Local Emergency Planning Commission and National Response Center, in accordance with applicable laws and regulations.

(e) The contractor will provide a copy of spill notifications and written reports to the DPW Environmental Division.

(f) All spills caused by the Contractor will be cleaned up under the supervision of the Contractor and/or a qualified hazardous waste/materials spill response company, at no cost to the USAG-HI, in accordance with all applicable laws and regulations and to the satisfaction of the DPW Environmental Division. If cleanup is not accomplished in a timely fashion, or to the satisfaction of the DPW Environmental Division, the Government will assist with the final cleanup, and the Contractor will provide appropriate reimbursement of cleanup costs.

(g) The contractor will pay for all clean up, management, and disposal cost of all contaminated materials to include but not limited to soil, sorbent materials, disposable equipment and other materials contaminated by the spill. The contractor will ensure waste disposal is accomplished in accordance with all applicable laws and regulations and at an authorized/permitted treatment and disposal facilities.

(h) The contractor will pay any fines or penalty charges associated with a citation issued by federal, state or local officials as a result of the accident.

(i) Contractors handling bulk fuel must be trained to do so, and mobile fuel operations must be approved by the DPW Environmental Division.

(j) Off-Post Spills. The contractor shall be responsible for and pay for cleanup of off-post spills in accordance with directions received from appropriate local authorities (e.g., Honolulu Fire Department, State Civil Defense, etc.).

Off-post spills in connection with work performed under this contract shall also be reported to the DPW Spill Response line at (808) 656-1111 and the COR.

(k) Discovery of other than contractor-caused spills. The contractor shall report any spills of hazardous materials to the DPW Spill Response line at (808) 656-1111 and the COR upon discovery.

7. HAZARDOUS WASTE (HW) and NON-REGULATED WASTE (NRW).

(a) The Contractor will comply with the Environmental Compliance and Protection Program Policy Memorandum

USAG-HI-4.

(b) The Contractor will determine, based on generation of hazardous waste(s) resulting from their operation/activities their respective hazardous waste generator status. The contractor is responsible to manage HW and NRW generated on-site from inception to disposal in accordance with all applicable, federal, state, and local regulations. All costs associated with disposal are borne by the Contractor.

8. RECYCLING PROGRAM

(a) The contractor will comply with USAG-HI Policy Memorandum 25, Waste Reduction and Recycling, requiring diversion of solid waste to the fullest possible. More information can be found on the installation sustainability and environmental management website at: http://www.garrison.hawaii.army.mil/sustainability/Recycling.aspx

(b) Identify a recycling POC to DPW Environmental Division to include name, phone number and email address.

(c) Report quantities of refuse disposed and recycled to DPW Environmental Division as part of the work performed under this contract as applicable.

9. NATURAL AND CULTURAL RESOURCES PROGRAM

(a) The contractor will comply with USAG-HI Range Standard Operating Procedures (SOPs). All personnel who use the ranges must complete a mandatory pre-brief covering issues associated with Natural and Cultural Resources.

(b) The contractor must be cognizant of the potential environmental impact and liability their actions could have, if specified procedures are not followed on Army lands. The contractor must be aware that USAG-HI manages more than 100 threatened and endangered species including plants, snails, birds, bats, insects and their critical habitat and over 1,300 prehistoric archaeological sites, including temple structures, stone markers, fishing shrines, habitation sites, caves, rock shelters, mounds, burial platforms, earth ovens, stone walls and enclosures, agricultural terraces, irrigation canals, petroglyphs and trails.

(c) The contractor shall take every precaution to prevent starting wildfires at training areas and must put them out if they do occur. The contractor must report all wildfires to range control immediately at 808-655-1434.

(d) The contractor must be familiar with the policy and restrictions regarding the types of ammunition that can be used under the different Burn Indices (BI) and on the different ranges.

(e) The contractor must comply with the non-smoking policy at training areas and only allow smoking in designated areas.

(f) The contractor must comply with the range best management practices to prevent the spread of invasive plant species from one training area to another by always washing vehicles, gears and equipment before starting new training activities.

(g) The contractor will stay out of areas marked with Seibert Stakes. Seibert stakes are placed along roads and within vegetated areas to advise personnel of unsafe or hazardous range or training conditions and/or environmentally sensitive off-limit areas.

(h) The contractor will refer to the installation sustainability and environmental management website at:

http://www.garrison.hawaii.army.mil/sustainability/NaturalResources.aspx and http://www.garrison.hawaii.army.mil/sustainability/CulturalResources.aspx for additional information.

10. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA)

As applicable, and upon request by the Government, the contractor will comply with the NEPA process, notify the DPW Environmental Division and complete a Record of Environmental Consideration (REC) for actions such as, but not limited to:

(1) Actions that could impact historic structures, cultural and natural resources

(2) Minor renovation or new construction

(3) Actions that introduce new training vehicles, maneuvers, and weapons

(4) Replacing or removing floor tiles, ceiling tiles, sound proofing material, lighting fixtures, carpet, serving line equipment, natural gas unit

(5) Installing interior doors, windows, partitions, security cameras, rerouting ductwork

11. SUSTAINABLE ENVIRONMENTAL MANAGEMENT (SEM) SYSTEM

(a) The contractor will be familiar with and comply with the installation’s Environmental Policy Memorandum USAG-HI-10 and all 18 components of the installation SEM system manual in conformance with the ISO 14001 standard. The SEM system manual is available for download at:

http://www.garrison.hawaii.army.mil/sustainability/SEM.aspx

(b) In accordance with OPORD IMPC-HI-ZA 02-09, the contractor will train all personnel in SEM awareness provided by DPW Environmental Division upon contract award. Refer to the installation Sustainable and Environmental Management website at http://www.garrison.hawaii.army.mil/sustainability/Training.aspx for information about the online training logging and access procedure.

(c) The contractor will support, as applicable, USAG-HI in achieving the reduction and environmental improvement goals identified in the installation Strategic and Sustainability Plan, as well as Executive Order 13514. The Contractor will strive to accomplish these goals by implementing and promoting green practices to help reduce their environmental footprint, fostering an ethic that takes the Army beyond environmental compliance to sustainability.

(d) Appoint a SEM point of contact to DPW Environmental Division to include Name, phone number and email address upon request by the Government.

12. SELF-HELP PROJECTS - NOT APPLICABLE

(a) While performing work and/or occupying facilities on any US Army Garrison, Hawaii (USAG-HI) installations, the contractor will consult with the DPW Environmental Division before beginning any self-help projects for guidelines on how to comply with historical property requirements and for verification of potential asbestos, lead-based paint and other environmental health hazards associated with the proposed self-help project.

(b) You can read more about asbestos and lead-based paint at:

http://www.garrison.hawaii.army.mil/sustainability/AsbestosLead.aspx

13. ENERGY AND WATER CONSERVATION

(a) Upon request by the Government, the contractor will appoint a Unit Energy Conservation Officer (UECO) and Building Energy Monitor (BEM) and fully participate in the Garrison's energy and water conservation program.

(b) Appointed BEM and UECO must attend the training class provided by the DPW Engineering Branch.

(c) The appointed UECOs and BEMs are responsible for ensuring energy-saving measures are being enforced in each building and to provide regular reports to DPW Engineering Branch showing how well the contractor is doing at conserving energy.

(d) More information can be found on the installation sustainability and environmental management website at:

http://www.garrison.hawaii.army.mil/sustainability/Energy.aspx

14. PRECAUTIONS FOR THE PROTECTION OF EXISTING UTILITIES (INCLUDES

COMMUNICATIONS) AND FACILITIES.

(a) Contractors are required to ensure necessary precautions and obtain required permits to protect government utilities and facilities. Contracts involving dredging, excavating, blasting and grading operations, demolition of structure and the moving of heavy and/or bulky equipment shall be subject to the following procedures and conditions:

(1) The Contractor shall obtain a written concurrence of the existing conditions and locations of utilities for his operations from the COR prior to beginning work and request the best information available on the location of Engineer facilities. Contractor shall verify locations of all utilities identified by the Government which affect his work.

(2) The Contractor shall be required to obtain a written clearance for his operations prior to beginning work and shall have locations of signal underground facilities staked out in the field from the 30th Signal Battalion/Network Enterprise Center-Hawaii (NEC-HI), EMC, IMG (Army Telephone, Data/LAN): Bldg. 600, Room 157, 148 Curtis Loop, Wheeler Army Air Field. Mr. Eugene Brown, (Primary AO) (808) 656-6656; Marion F. Robinson, Jr., (808) 656-1765 (Alt AO). Business Hours: Mon - Fri. 0830-1700.

(3) If any cable/conduit is uncovered or damaged during excavation process, immediately contact:

(i) the JHITS trouble desk, (808) 659-1444

(ii) the NEC-HI RNOSC, (808) 655-2999, with detailed information on situation, and

(iii) the NEC-HI POCs (above) with reported dates, times and details.

(4) The Contractor shall also obtain a written clearance for gas line for this operations from The Gas Company (Tel:

594-5575) prior to beginning work and shall have locations for underground facilities staked out in the field by Gas Company personnel.

(5) Additional Digging Information: At least five days prior to digging please call the number below. Government Agency and Contact Person: Hawaii One Call Center Phone Number: 1- 866-423-7287.

(b) The Contractor shall be liable for damages resulting from his failure to comply with (1), (2), (3) or (4) above.

15. AMC-LEVEL PROTEST PROGRAM

(a) If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC.

(b) The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO.

(c) The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to:

Headquarters U.S. Army Materiel Command Office of Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000

Fax: (256)450-8840

(d) The AMC-level protest procedures are found at: http://www.amc.army.mil/amc/commandcounsel.html. If Internet access is not available, contact the Contracting Officer or HQ, AMC, to obtain the AMC-Level Protest Procedures.

16. ACCESS TO ARMY INSTALLATIONS – PERSONNEL AND VEHICLES

We recognize the important roles companies like you play in our day-to-day operations. That is why USAG-Hawaii is enhancing the current access control solution called the RAPIDGate Program. This program supports the security requirements while offering a streamline access procedure for vendors, contractors, sub-contractors, suppliers, and service providers. This voluntary program is available by installation approval to new and existing personnel who require routine access to USAG-Hawaii and are not authorized to receive a Department of Defense CAC and desire streamlined entry into the installation. Separate sponsorship and participation at each USAG-Hawaii location (e.g., Schofield Barracks, Wheeler Army Airfield, Fort Shafter, Tripler Army Medical Center, Pililiaau Army Recreation Center and Pohakuloa Training Area) is required.

1) Access Privilege Management options*

a) RAPIDGate Credential holders may access the installation through any of the USAG-Hawaii Gates that size allows and will only be subject to random inspections.

b) Companies that choose not to participate in the RAPIDGate Program will have limited access through the Schofield Barracks Lyman gate, Fort Shafter’s Buckner Gate and Tripler Army Medical Center Main Gate. All employees will be required to go through the inspection area and will be subject to the standard access control procedures, security screenings, and/or vehicle inspections.

SUBJECT: RAPIDGate Access Control Program for Vendors, Suppliers, Contractors, Sub-Contractors, and Service Providers.

2) Key Dates*

a) Effective August 15, 2019, Contractor Access Pass (CAP) badges will no longer be issued for long term access.