Paint Coating Form (Attachment 3).pdf

PDF 274 KB Posted

Attached to
Pike Island and Allegheny Hydraulic Cylinders
Solicitation number
W911WN24R0002
Issued by

About this file

The provided document appears to be an attachment titled "Paint Coating Form" that is likely related to a federal contract opportunity. The attachment outlines detailed requirements and specifications for the painting and coating process, including surface preparation, application monitoring, and inspection procedures. It includes sections for recording ambient conditions, materials used, and results of quality control tests.

The related federal contract opportunity is a solicitation from the U.S. Army Corps of Engineers Pittsburgh District for "Gate Operating Hydraulic Cylinders at Pike Island and Allegheny, Pennsylvania". The solicitation number is W911WN-24-R-0902, and responses should be submitted via email to the specified points of contact. The solicitation is for a commercial product requirement, issued as a Request for Proposal (RFP).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: / / M T W Th F S Su

Project #:

Inspector:

QC Mgr Owner

Project/Client: Contr

Location:

Description: DFT Sheet NCR/CAR

Requirements:

Contractor: Spec # Revision #

1 Pre Surface Pep/Condition & Cleanliness 2 Surface Preparation Monitoring 3 Post Surface Preparation/Cleanliness & Profile 4 Pre Application Prep/Surface Cleanliness 5 Application Monitoring/Wet Film Thickness (WFT) 6 Post Application/Application Defects 7 Post Cure/Dry Film Thickness (DFT) 8 Nonconformance/Corrective Actions Follow-up 9 Final Inspection

Approved By:

New Maint Primer/Paint Age/Dry/Cure Time (Indicate AM or PM) : : : :

Steel Galvanize Concrete Other Dry Bulb Temp0 (C/F)

Hazard Sample Report # Wet Bulb Temp0 (C/F)

Degree of contamination: % Relative Humidity % % % % Test: Cl µg/cm2 / ppm Fe ppm pH Surface Temp0

(C/F) Min/Max / / / / Degree of Corrosion: Dew Point Temp0 (C/F)

Scale Pitting/Holes Crevices Sharp Edges Wind Direction/Speed Weld Moisture Oils Other Weather Conditions:

Painted Surface Condition:

Dry to: Touch Handle Recoat Start Time : Finish Time : Est. Sq/ft.

Dry/Over Spray Runs/Sags Pinholes Holidays Abrasion Fall Out Other Generic Type: Qty Mixed:

Manuf.: Mix Ratio:

Prod Name: Mix Method:

Solvent Clean Hand Tool Power Tool Prod #: Strain/Screen:

HP Wash PSI Other Color: Material Temp: F Abrasive Blast Abrasive Type Sample Kit Sz/Cond.: Sweat-in Time: Min/Hrs

Blast Hose Size Nozzle Size / PSI Shelf Life: Pot Life: Min/Hrs

Air Supply CFM Air Supply Cleanliness Reducer #:

Water/Oil Trap Check Equipment Condition Check (A) Qty Added: Pt/Qt/Gal

(B) % by Vol: %

(C) Specified WFT Avg: Mils

Job Specification SSPC/NACE - SP- Reducer: Achieved WFT Avg: Mils

SSPC/NACE Spec / Visual Stds Profile Check: Disc Tape Gauge Pump Pot Hose Dia. Air Check Specified mils avg. / Achieved mils Ratio/Size Hose Lng. SEP/Trap Surface effect on DFT Gauge/BMR mils GPM/CFM Spray Gun Filter

PSI Tip Sz. Agitator

Total Avg

DFT

Inspector's Signature Date

Airless/Conv. Spray Brush Roller Other

Dry Film Thickness DFT Last

Coat DFT This

Coat Spec Avg.

DFT

Gage Type /

Model Gage

Serial #

Batch #'s

Gage Calib.

Verified

Pg. Of COPY To:

Hold Point Inspections Performed

Ambient Conditions

Surface Cleanliness & Profile Measurement

Surface Preparation

Description of Areas & Work Performed

Attachments:

Paint Inspection:

Daily Coating Inspection Report

Primer Intermediate Topcoat Touch-up

Surface Conditions

Start Time: Finish Time: Est Sq/ft:

Application o o o o o o o o o o o o o o o o o

H4TSTJPP

Typewritten Text

ATTACHMENT 1

H4TSTJPP

Typewritten Text

File details come from the government source that posted it. Updated .