About this file

Main Street Redevelopment Project RFP Summary

This Request for Proposals (RFP) document is issued by the City of Silverton, Oregon, Public Works Department for the Main Street Redevelopment Project (PN24-1110). The City is seeking qualified contractors to execute a comprehensive downtown revitalization initiative encompassing water main upgrades, stormwater system improvements, sanitary sewer replacement, overhead utility undergrounding, roadway pavement reconstruction, sidewalk widening, intersection curb extensions, street furnishings, decorative lighting, landscape and irrigation systems including street trees, and modifications to existing basements and accesses within the right-of-way. The project site is located on Main Street between North Water Street and First Street in Silverton, Oregon. A mandatory pre-proposal meeting is scheduled for December 3, 2026, at 11:00 a.m. at City Hall. Proposals are due December 17, 2026, at 2:00 p.m., with an anticipated Notice of Intent to Award on January 6, 2027. The project must be substantially completed by May 28, 2027, and fully completed by June 27, 2027. Project Manager Mike Dahlberg (mdahlberg@silverton.or.us, 503-874-2209) is the primary contact for all inquiries, with a deadline of December 10, 2026, at 2:00 p.m. for submission of pre-proposal questions.

The evaluation process awards the contract to the highest-ranked proposer based on a combination of bid price (60 points) and contractor qualifications (40 points across five evaluation criteria addressing project experience, business relations, staging logistics, schedule management, and risk mitigation). Proposers must submit a 10% proposal security bond or certified check and provide three references of comparable completed projects. The City will retain 5% from progress payments, releasing retainage upon final project acceptance. The successful contractor must furnish performance and payment bonds each equal to 100% of the contract price and a warranty bond of 20% of the contract amount covering defects for two years following acceptance. All contractors must comply with Oregon prevailing wage requirements (ORS 279C.838 and 279C.840), hold current Construction Contractors Board licensing, maintain qualified drug testing programs, and obtain a public works bond filed with the CCB before commencing work. Liquidated damages are assessed at $1,000 per day for failure to achieve substantial completion and $1,200 per day for failure to achieve final completion. The contract is subject to Oregon public contracting laws, environmental regulations, and coordination requirements with the Oregon Department of Transportation for work affecting state rights-of-way.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PN24-1110 November 19, 2026

Main Street Redevelopment Request for Proposals

PROJECT DOCUMENTS

PROJECT NO: PN24-1110

DATE OF ISSUANCE: November 19, 2026

PROJECT TYPE: Street Improvement

PROPOSALS DUE BY: December 17, 2026, 2:00 PM

CITY PROJECT MANAGER: Mike Dahlberg, Public Works Operations Manager

PM CONTACT INFORMATION: mdahlberg@silverton.or.us , 503-874-2209

CITY OF SILVERTON

Public Works Department

410 N. Water Street Silverton, Oregon 97381 mailto:mdahlberg@silverton.or.us

TABLE OF CONTENTS

Section Title Page Number

SECTION 1 REQUEST FOR PROPOSALSPROPOSAL 3

SECTION 2 INSTRUCTIONS TO PROPOSERS 6

SECTION 3 PROPOSALPROPOSAL FORM 12

SECTION 4 PROPOSALPROPOSAL BOND 25

SECTION 5 AGREEMENT 26

SECTION 6 PERFORMANCE BOND, PAYMENT BOND 34

SECTION 7 CERTIFICATE OF INSURANCE 41

SECTION 8 BOLI 42

SECTION 9 SPECIAL PROVISIONS 43

SECTION 10 GENERAL CONDITIONS 266

SECTION 11 DRAWINGS 341

SECTION 12 GEOTECHINCAL REPORT After Previous Section

SECTION 13 HIST. RESOURCES AND SHPO PERMIT After Previous Section

SECTION 1 REQUEST FOR PROPOSALSPROPOSAL

I. REQUEST FOR PROPOSALSPROPOSAL

• The Main Street Redevelopment Project will set the tone for a complete downtown upgrade enhancing destination development and a sense of place. Improvements will include:

• Water main upgrade

• Stormwater system improvements

• Sanitary sewer replacement

• Undergrounding of overhead utilities

• Roadway pavement reconstruction

• Widening sidewalks and intersection curb extensions

• New street furnishings and decorative lighting

• New landscape and irrigation system, including street trees

• New street lighting

• Modifications to existing basements and accesses within right-of-way

• The corridor will be designed as “curbless,” with no vertical relief at curbs on Main Street. ADA ramps will be installed at all corners of the N Water Street / Main Street and N 1st Street / Main Street intersections. Main Street is under the City of Silverton's jurisdiction. N Water Street and N 1st Street are under ODOT's jurisdiction, and coordination with ODOT will be required.

The City Council approved a Resolution adopting findings to support an exemption from the formal Invitation To Bid (ITB) process for the reconstruction of main street, declaring such exemption, and authorizing staff to conduct a formal Request For Proposals (RFP).

All proposers should read this RFP carefully to understand the requirements for submitting a proposal and bid for the Project.

The intent of the RFP is to use the elements of an ITB to have contractors submit a binding Bid for the project in addition to submitting answers to the questions in the RFP that will be scored by a review committee to score the qualifications of the contractor. Both the submitted Bid price and contractor qualifications will be used to determine the top ranked contractor. Submitting the lowest bid does not by itself guarantee a contract award.

II. SCHEDULE

Documents Available November 19, 2026 Pre-Proposal Meeting (Mandatory) December 3, 2026 11:00 a.m. 410 N Water Street

Silverton OR 97381 – First Floor Conference Room Proposals Due December 17, 2026 2:00 p.m.

Intent to Award January 6, 2027 Project Completion May 28, 2027

NOTE: The City reserves the right to modify this schedule at the City’s discretion. Proper notification of changes will be made to all interested parties via the City’s website www.silverton.or.us. It is all interested parties’ sole responsibility to check the City’s website for updates.

http://www.silverton.or.us/

III. CONTRACTOR RESPONSIBILITIES AND DUTIES

All Proposers/Proposers must be qualified and licensed to provide the goods and construction services requested in this document. Proposers shall have provided products and services similar to those listed in Scope of Work section for commercial and/or municipal customers. Proposers are required to submit documentation as outlined in this document, related to their ability to provide quality products and services for the identified Scope of Work.

IV. PROPOSAL REQUIREMENTS AND SELECTION PROCESS

Pre-Proposal Meeting

• A Mandatory Pre-Proposal meeting will be held December 3, 2026 at 11:00 a.m. on the first floor of City Hall at 410 N Water Street, Silverton OR, 97381 statements made by the City’s representatives at the meeting are not binding upon the City unless confirmed by written Addendum.

Pre-Submission Questions All questions related to the project must be directed to the Project Manager no later than December 10, 2026 at 2:00 p.m. Questions must be submitted via e-mail to mdahlberg@silverton.or.us. Questions will be answered by December 14, 2026.

Contact with City Staff The City’s Project Manager is Mike Dahlberg and may be contacted at mdahlberg@silverton.or.us , or 503- 874-2209. Communicating with other City staff or authority for information other than the Project Manager or assigned Designee may result in disqualification of Proposal.

Addenda Addenda are incorporated with the original solicitation as an attachment and can be viewed and downloaded by registered suppliers. Proposers should consult the City of Silverton website, www.silverton.or.us, regularly until closing to avoid missing any Addenda.

Proposal Withdrawal Any Proposal may be withdrawn at any time before the “Proposals Due” date and time specified in the Schedule, by providing written request for the withdrawal of the Proposal to the City. The request shall be executed by a duly authorized representative of the firm. Withdrawal of a Proposal will not prejudice the right of the Proposer to file a new Proposal prior to the Proposal submission deadline.

Proposal Content Requirements The Proposal consists of two elements, the Contractor’s Qualifications and the Bid (collectively, the “Proposal”). Both the Contractors Qualifications and the Bid will be used to determine the top ranked Proposal. Submitting the lowest bid does not by itself guarantee a contract award.

In addition to the minimum required contents, Proposals must include, without limitation, the answers to the questions listed below to determine the Contractor’s Qualifications. Concise Proposals without needless duplication are encouraged. Emphasis should be on completeness and clarity of content of the Proposal.

Proposals should be prepared generally in the following format for the ease of the selection committee in reviewing multiple proposals. The Contractor’s Qualification section must not exceed 10 pages of at least 11 point font. Each 8 ½” x 11” side of a page will be counted as one page. Each side of an 11” x 17” page will be counted as two pages.

mailto:mdahlberg@silverton.or.us

Contractor Qualifications – Please answer the below questions that describes the proposer’s ability to effectively accomplish the project on time, with minimal disruptions to the businesses, and on budget.

1. Describe your experience in completing similar large roadway and utility projects that included roadway work, utility replacement, undergrounding overhead utilities, re-serving electricity in buildings with new distribution panels in the last 5 years. Include how you were able to manage a constrained working environment while keeping business access, deliveries, and customers in mind. Please list the experience of the key personnel that will be working on the project throughout construction.

2. Describe how you worked with businesses directly adjacent and impacted by the infrastructure improvements and how you communicated with the business and property owners for items such as scheduled updates, utility outages/switchover, traffic control changes, business deliveries, customers visiting the business, etc. Please share the experience and resume of who will be the project ambassador and what their approach to business relations will be throughout the project. Describe how you will minimize utility outages during switchover.

3. Describe your experience and ability with construction staging and logistics for projects that are within dense downtown areas that require business access at all times. Describe experience on what you found worked well on other similar projects where impacts to businesses are of paramount concern and what you did to make the project as smooth as possible for the impacted businesses. Describe your approach to completing the utility work in the Main Street/Water Street intersection and how you would minimize traffic closures and impacts and what closures and length of time you expect.

4. Describe your experience delivering similar projects on time within a tight timeline. Detail any projects that exceeded the original timeline and/or budget and what factors lead to the delayed finishing of the project and/or increase in cost. List any liquidated damages that have been assessed or any warranty claims.

5. Describe how you will proactively manage and work with all the moving parts to deliver the project on time and on budget given the winter/spring construction timeline. What concerns do you have that may impact your ability to deliver the project and how you will work to overcome them.

Evaluation Committee. City will establish a committee of at least four individuals to review, score and rank Proposals according to the evaluation criteria set forth in this RFP. City may appoint to the evaluation committee consultants, City employees, City volunteers, and/or employees of other public agencies with relevant experience. At least one member of the evaluation committee must be a City employee.

Evaluation Criteria. City will score each Proposal by reviewing and evaluating the Proposal content requirements outlined above and the Proposal requirements outlined below. The following table indicates how the total points in the scoring will be assigned by required Proposal item. Failure to meet minimum requirements for any individual item may disqualify the Proposal regardless of the total points scored for the other items.

Each item will be evaluated as follows:

Requirement Maximum Points Q1 8 Q2 8 Q3 8 Q4 8 Q5 8 Bid Price 60 Total 100 maximum points

City reserves the right to modify or incorporate additional steps in the evaluation process in the interest of having a thorough and comprehensive body of information to make a recommendation.

City will award the contract to the highest ranked Proposer, whose Proposal will best serve the interests of City and is in compliance with applicable law. Upon completion of the evaluation process by the evaluation committee, City will advise the Proposers of the selection.

Proposals must be sealed and identified per the “Proposal Submission” requirements. Please list any Proposal content requirements i.e. list of previous jobs, cover letter, using an attached Proposal form, etc.

Proposal Submission Proposals shall be delivered by mail (prior to Proposal closing date and time) or hand carried.

Main Street Redevelopment PN24-1110 City of Silverton 410 N. Water St.

Silverton, OR 97381

The City shall not be responsible for the proper handling of any proposal not properly identified, marked and submitted in a timely manner. Proposals received after the date/time for Closing will not be considered for award.

The City will do the Proposal opening at the Silverton City Hall on December 17, 2026 at 2:00 PM located at 410 N. Water Street, Silverton, OR 97381. At the time and place fixed for opening of Proposals, the contents of all Proposals will not be made public. Instead, proposal contents shall become public upon contract award.

V. GENERAL INFORMATION

Public Records

This Proposal will be made a part of a file open to public inspection. If a Proposal contains any information that is considered a trade secret under ORS 192.501(2), each sheet of such information must be marked with the following legend:

“This data constitutes a trade secret and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS Chapter 192.”

Nondisclosure of documents or any portion of a document submitted as part of a Proposal may depend upon official or judicial determinations made pursuant to the Oregon Public Records Law. The above restriction may not include cost or price information, which must be open to public inspection.

Identifying the Proposal in whole as a trade secret is not acceptable. Failure to identify a portion of the Proposal as a trade secret shall be deemed a waiver of any future claim of that information as a trade secret.

Reimbursement

All costs for Proposals and interviews to secure this project are the Proposer’s responsibility.

Contract Award

The City will award a contract to the highest ranked proposer. The selected proposer will be required to assume responsibility for all services outlined in the ITB, whether the Proposer or a representative of the Proposer produces them. The City considers the selected Proposer responsible for any and all contractual matters. The successful Proposer shall be required to execute a Public Works Contract. An example is in Section 5.

VI. SCOPE OF WORK

Project Completion Date The project must be completed no later than put May 28, 2027, unless otherwise agreed upon, in writing, by the City and the Successful Proposer.

Examination of Contract Documents and Project Site Project Site is located at Main Street between the intersections of North Water Street and First Street within Silverton, Oregon, 97381. Each Proposer is solely responsible for all of the Invitation to Proposal documents and the examination of the Project Site prior to submittal of Proposal. Documents are available for download on the City of Silverton website, www.silverton.or.us, or for viewing by appointment only by contacting the Public Works Coordinator at 503-874-2206.

City obligations under this contract include:

• Project inspections.

Contractor Project Scope:

• Build and construct project to its entirety.

• Water main upgrade

• Stormwater system improvements

• Sanitary sewer replacement

• Undergrounding of overhead utilities

• Roadway pavement reconstruction

• Widening sidewalks and intersection curb extensions

• New street furnishings and decorative lighting

• New landscape and irrigation system, including street trees

• New street lighting

• Modifications to existing basements and accesses within right-of-way

• The contractor must obtain City of Silverton business license.

• Place final order from manufacturers, obtain permit drawings and submittals for all equipment

• Obtain all trade permits.

• Coordinate with PGE for electrical service work and inspections.

• Provide copies of field drawing for as builts.

Warranty:

Successful Proposer shall warranty work product to be free from defects due to poor craftsmanship or materials for a minimum of two (2) years, or the duration of the Vendor’s standard warranty, whichever is greater. The Vendor’s craftsmanship warranty is in addition to any material warranty provided by manufacturer of materials used in construction. All warranty work will be provided without transportation charges. Warranty period begins after project goods are accepted by the City.

Bonds and Insurance The Proposer shall furnish performance and payment bonds, each in an amount at least equal to 100 percent (100%) of the contract price as security for the faithful performance and payment of all Proposer obligations.

These bonds shall remain in effect at least one year after the date when final payment is due. The Proposer shall deliver to the City certificates of insurance as specified in Section 7. The City including respective agents, officers and employees shall be named additional insured.

References The Proposer shall furnish at least three (3) references of comparable and previously completed projects, including the project owner’s name and phone number.

SECTION 2 -INSTRUCTIONS TO PROPOSERS

2.1 PROPOSER’S QUALIFICATIONS:

No Proposals for construction contracts shall be received or considered by the City unless the Proposer is licensed with the Construction Contractors Board or licensed by the State Landscape Contractors Board as required by ORS 671.530. Further, the City will not receive or consider a proposal unless the proposal contains a statement by the proposer that the proposer will comply with ORS 279C.838 or 279C.840.

The Contractor shall have a public work bond filed with the Construction Contractors Board prior to starting work on the project, in accordance with ORS 279C.830. Additionally, the Contractor shall include in every subcontract a provision requiring the subcontractor to have a public works bond filed with the Construction Contractors Board before starting work, in accordance with ORS 279C.830, and submit it to the City for proof of Bonding.

2.2 EXAMINATION OF THE CONTRACT DOCUMENTS AND WORK SITE:

Proposers should carefully examine the Proposal and contract documents and familiarize themselves with the work site to fully acquaint themselves with all the conditions and matters which can in any way affect the work or the cost thereof.

Each Proposer shall thoroughly examine and be familiar with legal and procedural documents, general conditions, specifications, drawings, plans, addenda (if any), any tests and/or reports, and all other Contract Documents. The submission of a Proposal shall constitute an acknowledgment upon which the City may rely, that the Proposer is experienced in the uses and interpretation of plans and specifications such as those included in the Contract Documents and has thoroughly examined and is familiar with the Contract Documents.

The failure or neglect of a Proposer to receive or examine any of the Contract Documents, perform site investigations and/or other investigations or examinations shall in no way relieve the Proposer from any obligations with respect to the Proposal or the contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge of any Contract Documents or existing site conditions.

All questions about the meaning or intent of these Procurement Documents are to be submitted to the Project Manager, listed in the RFP, in writing. Interpretations or clarifications considered necessary by the Project Manager in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Procurement Documents. Questions received less than seven days prior to the date for opening of Proposals may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

2.3 CONTRACTOR'S RESPONSIBILITY:

It is understood that the specifications and other contract documents do not purport to control the method of performing the work, but only the requirements as to the nature of the completed work.

The Contractor assumes the entire responsibility for the method of performing and installing the work. Suggestions as to the method included in the contract documents shall be deemed advisory only and the feasibility of such methods or the lack thereof shall not affect the Contractor's liability or status as an independent Contractor to complete the work under this contract.

2.4 LAWS AND REGULATIONS:

The Proposer is assumed to be familiar with all Federal, State, County or City laws or regulations, which in any manner affect those engaged or employed in the work or the materials or equipment used in the proposed construction, or which in any way affect the conduct of the work, and no plea of misunderstanding will be considered on account of ignorance thereof. If the Proposer shall discover any provision in these specifications, plans or contract documents which is contrary to or inconsistent with any law or regulations, he or she shall report it to the City in writing.

2.5 WAGE RATES:

The Contractor shall pay the existing rate of wage which may be paid to workers in each trade or occupation required for such public work employed in the performance of the contract either by the Contractor or subcontractor or other person doing or contracting to do the whole or any part of the work contemplated by the contract, and such workers shall be paid not less than the specified minimum hourly rate of wage as set forth in the latest applicable edition of the Prevailing Wage Rates for Public Works in accordance with ORS 279C.838 and 279C.840.

2.6 CONTRACT TIMES:

The number of days within which, or the dates by which, milestones are to be achieved and the Work is to be substantially completed and ready for final payment are set forth in the Agreement.

2.7 LIQUIDATED DAMAGES:

Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

2.8 PROPOSAL SECURITY:

Proposal security shall be submitted with the Proposal and failure to submit shall be cause for rejection of the Proposal. The Proposer, at his or her option, shall furnish a Proposal bond, cashier's check or a certified check made to the City of Silverton for an amount equal to no less than ten (10) percent of the total amount of the Proposal. Security deposited by unsuccessful Proposer will be returned as soon as practicable after the Proposal opening. Said bonds shall be in the form herein prescribed or approved substitute form and shall be the surety bonds of an incorporated surety company licensed to transact surety business in the State of Oregon, and said bonds shall be in all respects satisfactory and acceptable to ORS 279.C.365(5).

2.9 PREPARATION OF PROPOSALS:

Proposers must submit their proposals on the Proposal Form attached hereto. The blank spaces in the proposal must be filled in correctly where indicated for each and every item for which a quantity is given, and the Proposers must state the unit prices, typed or written in ink. Any correction to entries made on the proposal forms shall be initialed by the person signing the proposal. In case of discrepancy between the unit prices and amounts, the unit prices will govern.

Alternative Proposals will not be considered unless specifically called for. Proposals must be mailed, or hand delivered to City Hall (410 N Water Street, Silverton, OR 97381).

Each Proposer represents that their Proposal is based upon the specific material installation and equipment requirements, described in the Procurement Documents.

No substitutions will be considered unless a written request has been submitted to the Project Manager for approval prior to the closing date for Proposals. Each such request shall include a complete description of the proposed substitute, and any other data or information necessary for a complete evaluation. Substitutions will be accepted only with the understanding that the supplier guarantees substituted material or equipment to be equal or better than that specified and meets all requirements of the Specifications.

Accepted substitutes will be listed in addenda mailed or delivered to each person or firm recorded by the Project Manager as having received the Procurement Documents and will be available for inspection at the City of Silverton, City Hall 410 N. Water St. Silverton, OR 97381.

2.10 SPECIFICATION LIMITING COMPETITION:

Proposers may comment on any specification or requirement contained within this Proposal which they feel limits competition in the selection of a Proposal to perform the services herein defined.

Protests shall detail the reasons and any proposed changes to the specifications. Such comments shall be formal in writing and are to be addressed to Mike Dahlberg, Public Works Operations Manager, at mdahlberg@silverton.or.us .

Such comments shall be submitted no later than 5 days before the Proposal date. No comments will be accepted after that time. Any substitutions for items specified will not be accepted without prior written approval of the Project Manager.

2.11 PROTEST OF AWARD.

The Notice of Intent to Award by the City of Silverton shall constitute a final decision of the City to award the contract if no written protest of the award is filed with the City Project Manager within three (3) working days of issuing the Notice of Intent to Award. If a protest is timely filed, the Notice of Intent to Award is a final decision of the City only upon issuance of a written decision denying the protest and affirming the award. The Notice of Intent to Award and any written decision denying protest shall be sent to every Proposer who provided an address.

2.12 RIGHT TO PROTEST.

Any actual Proposer who is adversely affected or aggrieved by the City's Notice of Intent to Award to another Proposer on the same solicitation shall have three (3) working days after Notice of Intent to Award to submit to the City Project Manager a written protest of the award. The written protest shall specify the grounds upon which the protest is based. In order to be an adversely affected or aggrieved Proposer with a right to submit a written protest, a Proposer must be next in line for award, i.e. the protester must claim that all higher rated Proposers are ineligible for award because they are non-responsive, non-responsible, or otherwise less qualified. The City will not entertain protests submitted after the time period established in this rule.

2.13 SUBMISSION OF PROPOSALS:

Proposals must be submitted at the time and location shown on the Invitation to Proposal to Silverton City Hall (410 N. Water Street, Silverton, OR 97381). All forms required to be submitted are provided.

2.14 BASIS OF PROPOSAL:

Proposers shall submit a Proposal for each item of Work listed in the Schedule of Values in the Proposal Form.

2.15 SUBCONTRACTORS:

Reserved

2.16 RECEIPT AND OPENING OF PROPOSALS:

Proposals shall be submitted prior to the time fixed in the Invitation to Proposal. Proposals received after the time designated will be considered late Proposals and will be returned unopened. No responsibility will be attached to any official of the City for the premature opening of, or the failure to open, a Proposal not properly addressed and identified.

2.17 WITHDRAWAL OF PROPOSALS:

A Proposal may be withdrawn by an appropriate document duly executed in the same manner that a Proposal must be executed and delivered to the place where Proposals are to be submitted prior to the date and time for the opening of Proposals. Upon receipt of such notice, the unopened Proposal will be returned to the Proposer.

If a Proposer wishes to modify its Proposal prior to Proposal opening, Proposer must withdraw its initial Proposal and submit a new Proposal prior to the date and time for the opening of Proposals.

If within 24 hours after Proposals are opened any Proposer files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Proposal, that Proposer may withdraw its Proposal, and the Proposal security will be returned. Thereafter, if the Work is rebid, that Proposer will be disqualified from further bidding on the Work.

2.18 PRESENCE OF PROPOSERS AT OPENING:

At the time and place fixed for opening of Proposals, the contents of all Proposals will not be made public. Instead, proposal contents shall become public upon contract award.

2.19 PROPOSERS INTERESTED IN MORE THAN ONE PROPOSAL:

If more than one Proposal is offered by one party, or by any person or persons representing a party, all such Proposals shall be rejected. A party who has quoted prices to a Proposer is not thereby disqualified from quoting prices to other Proposer or from submitting a direct Proposal on his or her own behalf.

2.20 AWARD OF CONTRACT:

The contract will be awarded as soon as practicable to the highest ranked proposer, price and qualifications considered, provided the Proposal is reasonable and it is to the interest of the City.

Award will be made to one Proposer and one Proposer only.

Contractor or individuals awarded a contract shall provide the City with a correct Department of the Treasury Internal Revenue Service Tax Identification Number (TIN). In the event that the TIN is incorrect or inconsistent with the Contractor's name as described in this contract, the City may withhold taxes as required by law, or cancel or suspend further services under this contract, at the City's option, until the discrepancy is corrected.

The acceptance of a Proposal shall bind the successful Proposer to execute the contract.

2.21 REJECTION OF PROPOSALS:

The City reserves the right to reject any and all Proposals. Proposals may be rejected if they show any alteration of form, admissions not called for, conditions or alternate Proposals, irregularities of any kind, or if they contain a clause in which the Proposer reserves the right to accept or reject a contract awarded to him except as herein provided, or if they do not comply with prescribed public contracting procedures and requirements including the requirement to demonstrate the Proposer responsibility under ORS 279C.375(3)(b). Proposals in which the prices are obviously unbalanced may be rejected.

The City reserves the right to waive any informality in Proposals received when such waiver is in the interest of the City and allowed by state statute.

2.22 SURETY BOND:

To guarantee the faithful performance of the contract, the successful Proposer will be required to furnish a performance bond and a payment bond in an amount equal to the full amount of the contract as amended. Said bonds shall be in the form herein prescribed or approved substitute form and shall be the surety bonds of an incorporated surety company licensed to transact surety business in the State of Oregon and said bonds shall be in all respects satisfactory and acceptable to

ORS 279C.380.

The Contractor also agrees that at the completion of the project and prior to received final acceptance by the City, the Contractor shall provide the City with a Warranty Bond in the amount of 20% of the contracted amount, which covers any defects in either materials or workmanship, for a period of two years from the date of acceptance.

2.23 EXECUTION OF THE CONTRACT:

The successful Proposer shall, within ten calendar days from the date of receiving from the City the contract prepared and ready for execution, furnish the City the corporate surety bonds specified herein and enter into contract with the City. If the successful Proposer fails to comply with any of the requirements herein, the City may, at its option, determine that the Proposer has abandoned the contract and there upon the security accompanying this proposal shall be forfeited and the same shall become the property of the City.

2.24 ENVIRONMENTAL AND NATURAL RESOURCES LAWS

In compliance with ORS 279C.525, lists of federal, state and local agencies of which the City has knowledge that have enacted ordinances or regulations relating to environmental pollution and the preservation of natural resources that may affect the performance of the Contract are listed in the 2021 Oregon Department of Transportation Standard Specifications for Construction, Section 00170.01.

SECTION 3 - PROPOSAL FORM

Submitted by:

Address:

Date: Phone number:

Contractor Contact E-mail Address:

Contractor CCB#:_____________________________________________

Federal Tax I.D. Number or Social Security Number

The undersigned, as a Proposer, declares that he has carefully examined the location of the worksites, that he is aware of the general nature of the work, that he has examined the General and Supplemental Conditions, Special Provisions, Supplemental Special Provisions, Plans and Drawings, read the Instructions to Proposers, read and understood any reports, tests, or addenda that accompany this Proposal, and hereby proposes to furnish all materials and equipment and do all the work required to complete the project entitled Silverton Main Street Redevelopment in accordance with the said Specifications herein for the Proposal prices set forth in the Schedule of Values attached hereto in this form and forming a part of this proposal.

The Proposer hereby acknowledges the receipt of the following addenda:

Addendum No. Addendum Date

This proposal is accompanied by a certified check, cashier's check or Proposal bond in the amount of 10% of the total Proposal.

The Proposer, by his signature below, certifies that he is qualified to perform the work and hereby represents as follows:

A. That no Councilor, officer, agency or employee of the City of Silverton is personally interested directly or indirectly in this contract or the compensation to be paid hereunder, and that no representation, statement or statements, oral or in writing, of the City, its Councilors, officers, agents, or employees had induced him to enter into this contract and the papers made a part hereof by its terms.

B. That this Proposal is made without connection with any person, firm or corporation making a Proposal for the same material, and is in all respects, fair and without collusion or fraud.

C. That the provisions required by ORS 279C.800 through ORS 279C.870 relating to Prevailing Wage Rates shall be complied with.

D. In the event the Proposer is awarded the contract and shall fail to complete the work within the time frame specified, including extensions granted, liquidated damages and engineering expenses shall be paid to the City as outlined in section 00180.85 of the Supplemental Conditions for each day of delay in the completion of the work.

E. Contractor shall not perform any work under this contract until all bonding and insurance requirements have been met and a Notice to Proceed has been issued.

F. I, the undersigned, agree to be bound by the form of agreement and all remaining contract documents, including Instructions to Proposer; Standard Terms and Conditions; Special conditions;

Federal Provisions, if applicable; plans and specifications.

G. Upon receiving notice to proceed from the City, the Contractor shall meet with the City assigned Project Manager for a preconstruction conference at a time mutually agreed upon. At this conference the Contractor shall furnish the Project Manager with a proposed schedule of work, as well as any other required submittals.

H. Contractor shall not perform any work under this contract until the Contractor and every subcontractor has a public works bond filed with the Construction Contractors Board in accordance with ORS279C.830 and all other bonding and insurance requirements have been met and a Notice to Proceed has been issued.

I. I, the undersigned, certify that the Proposer holds current licenses that businesses or services professionals operating in this state must hold in order to undertake or perform the work specified in these contract documents.

J. I, the undersigned, certify that the Proposer is covered by liability insurance and other insurance in the amount(s) required by the Agreement.

K. I, the undersigned, certify that the Proposer qualifies as a carrier insured employer or a self- insured employer under ORS 656.407 or has elected coverage under ORS 656.128.

L. I, the undersigned, certify that the Proposer is legally qualified to contract with the City of Silverton.

M. Proposer has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that

Proposer has discovered in the Procurement Documents, and confirms that the written resolution thereof by Engineer is acceptable to Proposer.

N. Proposer has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.

• “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the procurement process;

• “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the Proposer process to the detriment of Owner, (b) to establish Proposal prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

• “collusive practice” means a scheme or arrangement between two or more Proposer, with or without the knowledge of Owner, a purpose of which is to establish Proposal prices at artificial, non-competitive levels; and

• “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

Specific Proposer Instructions

A. The undersigned agrees to comply with the provisions of ORS 279C.800 to 279C.870, the Oregon

Prevailing Wage law. The undersigned, as Proposer, acknowledges that provisions of ORS 279C.800 -279C.870 relating to workers on public works to be paid not less than prevailing rate of wage (BOLI) shall be included in the Agreement, the undersigned Contractor agrees to be bound by and will comply with the provisions of ORS 279C.838, 279C.840.

B. The undersigned certifies that the undersigned Contractor is not ineligible to receive a contract for a public work pursuant to ORS 279C.860. Proposer further agrees, if awarded a contract, that every subcontractor will be eligible to receive a contract for a public work pursuant to ORS 279C.860.

C. The undersigned certifies that the undersigned Contractor has not discriminated against minority, women or emerging small businesses enterprises in obtaining any required subcontracts. The Proposer understands and acknowledges that it may be disqualified from Proposer on this public improvement project as set forth in OAR 137-049-0370, including but not limited to the City’s discovery of a misrepresentation or sham regarding a subcontract or that the Proposer has violated any requirement of ORS 279A.110 or the administrative rules implementing the Statute.

D. The undersigned Proposer is registered with the Oregon Construction Contractors Board (CCB), the registration is current and valid, and the Proposer registration number is stated below. Proposer understands that failure to have a current CCB license shall result in rejection of this Proposal in accordance with OAR 137-049-0230(1).

E. The undersigned Proposer is licensed by the State Landscape Contractors Board, if applicable, the license is current and valid, and the Proposer registration number is stated below. Proposer understands that failure to have a current LCB license shall result in rejection of this Proposal.

RESERVED

F. The undersigned confirms that the Proposer has a Qualified Drug Testing Program for employees in place and will demonstrate this prior to award of contract in accordance with ORS 279C.505(2).

The undersigned represents him/her self in this Proposal to have a drug testing program in place at the time of Proposal by completing the check box below.

Contractor shall check if in compliance:

[ ] Drug Testing Requirement, as defined in ORS 279C.505

G. No Proposal will be received or considered by the City unless the box below is checked, certifying that the Proposal complies with the provisions of ORS 279C.800 through ORS 279C.870.

Contractor shall check if in compliance:

[ ] The Proposer certifies that it shall comply with the provisions of ORS 279C.800 through ORS

279C.870.

H. The undersigned confirms that if this contract involves asbestos abatement or removal, the

Proposer is licensed under ORS 468A.710 for asbestos removal. Asbestos abatement is not implicated in this contract.

I. The Proposer understands that the City will be awarding the contract to the most qualified proposer.

Whether a Proposer is responsible will be determined by ORS 279C.375 and the City's review following the requirements laid out in Section 2.20 of the Instructions to Proposers, and that the Proposer has supplied all the required attachments listed in the “Attachments to this Proposal” section listed on page 6 of the Proposal Form.

J. Proposer agrees that the Work will be substantially complete and will be completed and ready for final payment on or before the dates or within the number of calendar days indicated in the Agreement.

The Proposer further proposes to accept the following amount as full payment for the work proposed herein to complete the project and agrees that the price represents a true measure of the labor and materials required to perform the work, including all allowances for overhead and profit for each type of work called for in these Contract Documents. The total amount shall be shown in both words and figures. In case of a discrepancy, the amount shown in words shall govern.

If the Proposer is awarded a Contract on this proposal, the surety who will provide the Performance Bond will be whose address is .

Proposer acknowledges that (1) each Proposal Unit Price includes an amount considered by Proposer to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Proposals, and final payment for all unit price Proposal items will be based on actual quantities, determined as provided in the Contract Documents.

TOTAL BASE PROPOSAL AMOUNT (Written):

TOTAL BASE AND ADDITIVE PROPOSALS AMOUNT (Written):

Contractor's Name:

Contact Name:

Signature:

Main Street Improvements Bid Schedule

November 19, 2026

BASE BID

ITEM

NO.

DESCRIPTION UNIT QNTY UNIT PRICE

TOTAL

PRICE

PART 00200 - TEMPORARY FEATURES & APPURTENANCES

1 Mobilization LS 1 $ Lump Sum $

2 Property Owner Notification Labor HR 20 $ $

3 Project Ambassador MO 5 $ $

4 Temporary Protection and Direction of Traffic LS 1 $ Lump Sum $

5 Temporary Signs SF 359 $ $

6 Temporary Business Signs SF 117 $ $

7 Portable Changeable Message Signs EA 5 $ $

8 Traffic Control Supervisor EA 125 $ $

9 Temporary Barricades, Type III EA 20 $ $

10 Temporary Removable Tape FT 100 $ $

11 Temporary Striping FT 100 $ $

12 Temporary Pavement Legends EA 8 $ $

13 Temporary Pavement Bars SF 60 $ $

14 Stripe Removal FT 50 $ $

15 Legend Removal SF 20 $ $

16 Bar Removal SF 36 $ $

17 Pedestrian Channelizing Devices FT 1,100 $ $

18 Temporary Curb Ramp, Perpendicular EA 8 $ $

19 Temporary Curb Ramp, Parallel EA 20 $ $

20 Temporary Walks SF 440 $ $

21 Staging Area, Lewis Street Parking Lot LS 1 $ Lump Sum $

22 Erosion Control LS 1 $ Lump Sum $

23 Inlet Protection, Type Silt Sack EA 25 $ $

24 Inlet Protection, Type Ditch EA 1 $ $

25 Sediment Fence LF 270 $ $

26 Window Washing SF 16,100 $ $

27 Pollution Control Plan LS 1 $ Lump Sum $

PART 00300 - ROADWORK

28 Construction Survey Work LS 1 $ Lump Sum $

29 Removal of Structures and Obstructions LS 1 $ Lump Sum $

30 Clearing and Grubbing LS 1 $ Lump Sum $

31 General Excavation CY 1,417 $ $

32 Subgrade Geotextile SY 423 $ $

PART 00400 - DRAINAGE AND SEWERS

33 Trench Protection LS 1 $ Lump Sum $

34 Rock Excavation CY 200 $ $

35 Mainline Video Inspection LF 549 $ $

36 Fill Abandoned Pipe with CLSM CY 15 $ $

6-inch 3034 PVC or HDPE Sanitary Service Pipe, 8 Ft Depth

LF 327 $ $

12-inch 3034 PVC Sanitary Sewer Pipe, 8 Ft Depth

LF 419 $ $

6 Inch Ductile Iron Storm Service Lateral Pipe, 0- 5 Ft Depth

LF 224 $ $

8 Inch Ductile Iron Storm Sewer Pipe, 0-5 Ft Depth

LF 114 $ $

10 Inch Corrugated Polyethylene Storm Sewer Pipe, 0-5 Ft Depth

LF 33 $ $

10 Inch Ductile Iron Storm Sewer Pipe, 0-5 Ft Depth

LF 127 $ $

12 Inch Corrugated Polyethylene Storm Sewer Pipe, 0-5 Ft Depth

LF 45 $ $

12 Inch Ductile Iron Storm Sewer Pipe, 0-5 Ft Depth

LF 231 $ $

45 Service Lateral Cleanouts, Sanitary EA 9 $ $

46 Service Lateral Cleanouts, Storm EA 7 $ $

Concrete Sanitary Sewer Manholes, 48 Inch Diameter, 0 - 10 Ft Depth

EA 2 $ $

Concrete Sanitary Sewer Manholes, 72 Inch Diameter, 10 – 15 Ft Depth

EA 1 $ $

49 Concrete Storm Sewer Manholes, Flat-Top EA 5 $ $

Concrete Storm Sewer Manholes, Flat-Top Doghouse

EA 2 $ $

51 Catch Basins, Side-Inlet Grated EA 9 $ $

Concrete Slab Over Sewer Main for Catch Basin Support

EA 2 $ $

53 Thrust and Straddle Blocks EA 31 $ $

54 Minor Adjustment of Manholes EA 1 $ $

55 Extra for Manholes Over Existing Sewers EA 2 $ $

56 Sewer Bypass LS 1 $ Lump Sum $

57 Temporary Trench Resurfacing SY 736 $ $

PART 00600 - BASES

58 1 Inch Aggregate Base TN 1,662 $ $

PART 00700 - WEARING SURFACES

59 Level 2, 1/2 inch ACP Mixture TN 321 $ $

60 Reinforced Concrete Pavement, 8 Inches Thick SY 112 $ $

Plain Concrete Pavement Dowelled, 8 Inches Thick

SY 311 $ $

Plain Concrete Pavement Dowelled, 7 Inches Thick

SY 893 $ $

63 Concrete Curb, Type A FT 454 $ $

64 Concrete Curbs, Narrow Flush FT 553 $ $

65 Concrete Curbs, Wide Flush FT 216 $ $

66 Concrete Curbs, Valley Gutter FT 216 $ $

67 Concrete Curbs, Type C FT 258 $ $

68 Concrete Curbs, Modified Type A FT 203 $ $

69 Concrete Curbs, Transition Curb FT 12 $ $

70 Concrete Walks SF 3,547 $ $

71 Concrete Driveways SF 71 $ $

72 4 inch Reinforced Base Slab Concrete Surfacing SF 8,496 $ $

Monolithic Curb and 8 inch Reinforced Base Slab Concrete Surfacing

SF 2,108 $ $

74 Basement Modifications, 204 E Main St LS 1 $ Lump Sum $

75 Basement Modifications, 206 E Main St LS 1 $ Lump Sum $

76 Unit Pavers, Furnishing Zone Style A SF 1,341 $ $

77 Unit Pavers, Furnishing Zone Style B SF 506 $ $

78 Unit Pavers, Pedestrian Zone Style A SF 3,449 $ $

79 Unit Pavers, Pedestrian Zone Style A - Driveway SF 84 $ $

80 Unit Pavers, Pedestrian Zone Style B SF 875 $ $

81 Unit Pavers, Building Zone Style A SF 993 $ $

82 Unit Pavers, Building Zone Style A - Driveway SF 50 $ $

83 Unit Pavers, Building Zone Style B SF 324 $ $

84 Unit Pavers, Intersection Crosswalk SF 1,678 $ $

85 Unit Pavers, Detectable Warning Surface SF 339 $ $

86 Unit Pavers, Tactile Warning Device FT 539 $ $

PART 00800 - PERMANENT TRAFFIC SAFETY AND GUIDANCE DEVICES

87 Bollards EA 6 $ $

88 Removable Bollards EA 9 $ $

89 Longitudinal Pavement Markings - Paint FT 1,227 $ $

90 Thermoplastic, Extruded, Surface, Non-Profiled FT 464 $ $

91 Pavement Legend, Type B-HS: Arrows EA 10 $ $

92 Pavement Legend, Type B-HS: On-Street Parking EA 24 $ $

93 Pavement Legend, Type B-HS: Disabled Parking EA 2 $ $

Pavement Legend, Type B-HS: Shared Lane Marking

EA 7 $ $

95 Pavement Legend, Type B-HS: "Stop" EA 4 $ $

96 Pavement Bar, Type B-HS SF 431 $ $

97 Pavement Legend, Paint: No Parking EA 2 $ $

98 Pavement Legend, Paint: Compact EA 2 $ $

PART 00900 - PERMANENT TRAFFIC CONTROL AND ILLUMINATION

99 Remove and Reinstall Existing Signs LS 1 $ Lump Sum $

100 Sign Support Footings LS 1 $ Lump Sum $

Perforated Steel Square Tube Anchor Sign Supports

LS 1 $ Lump Sum $

102 Signs, Standard Sheeting, Sheet Aluminum SF 203 $ $

103 Removal of Electrical Systems LS 1 $ Lump Sum $

104 Private Electrical Service Improvements LS 1 $ Lump Sum $

105 Overhead Utility Undergrounding LS 1 $ Lump Sum $

106 Pole Foundations LS 1 $ Lump Sum $

107 Lighting Poles and Arms LS 1 $ Lump Sum $

108 Luminaires, Lamps and Ballasts LS 1 $ Lump Sum $

109 Switching, Conduit, and Wiring LS 1 $ Lump Sum $

110 Decorative String Light System, Complete LS 1 $ Lump Sum $

Future Traffic Signal Equipment, Complete, N Water St

LS 1 $ Lump Sum $

Future Traffic Signal Equipment, Complete, N 1st St

LS 1 $ Lump Sum $

PART 01000 - RIGHT OF WAY DEVELOPMENT AND CONTROL

113 Topsoil CY 68 $ $

Tree: Acer truncatum x platanoides 'JFS-KW187'

- Urban Sunset Maple, 3" Cal.

EA 4 $ $

Tree: Carpinus caroliniana - American Hornbeam, 3" Cal.

EA 1 $ $

Tree: Ulmus americana 'Princeton' - Princeton American Elm, 3" Cal.

EA 8 $ $

Shrub: Berberis aquifolium 'Compacta' - Compact Oregon Grape, 1 Gallon

EA 15 $ $

Shrub: Cornus sericea 'Kelseyi' - Kelsey's Dwarf Red Twig Dogwood, 3 Gal.

EA 27 $ $

Groundcover: Arctostaphylos uva-ursi - Kinnikinnick, 1 Gallon

EA 441 $ $

120 Bark Mulch CY 6 $ $

121 Rock Mulch TON 6 $ $

122 Tree Grates EA 12 $ $

123 Root Barrier FT 312 $ $

124 Root Anchors EA 13 $ $

125 Benches EA 4 $ $

126 Trash Receptacles EA 4 $ $

127 Bicycle Racks EA 6 $ $

128 Wheel Stops EA 12 $ $

129 48" x 24" GFRC Concrete Planters EA 7 $ $

130 36" x 24" GFRC Concrete Planters EA 9 $ $

131 Old Oak Street Emblem Inlays LS 1 $ Lump Sum $

PART 01100 - WATER SUPPLY SYSTEMS

132 Irrigation System LS 1 $ Lump Sum $

6-inch Ductile Iron Potable Water Pipe, Class 50, with Class B Backfill

LF 327 $ $

6-inch Potable Water Pipe, Fittings and Couplings with Class B Backfill

LF 20 $ $

8-inch Ductile Iron Potable Water Pipe, Class 50, with Class B Backfill

LF 30 $ $

8-inch Potable Water Pipe, Fittings and Couplings with Class B Backfill

LF 80 $ $

10-inch Potable Water Pipe, Fittings and Couplings with Class B Backfill

LF 24 $ $

12-inch Ductile Iron Potable Water Pipe, Class 50, with Class B Backfill

LF 50 $ $

12-inch Potable Water Pipe, Fittings and Couplings with Class B Backfill

LF 482 $ $

140 Ductile Iron Pipe Tees, 12-Inch EA 3 $ $

141 Ductile Iron Pipe Tees, 12-Inch x 10-Inch EA 1 $ $

142 Ductile Iron Pipe Tees, 12-Inch x 6-Inch EA 15 $ $

143 Ductile Iron Pipe Tees, 8-Inch x 6-Inch EA 1 $ $

144 Ductile Iron Pipe Cross, 12-Inch x 8-Inch EA 1 $ $

145 Ductile Iron Pipe Bend, 12-Inch 90 Degree EA 1 $ $

146 Ductile Iron Pipe Bend, 12-Inch 11.25 Degree EA 1 $ $

147 Ductile Iron Pipe Bend, 10-Inch 90 Degree EA 1 $ $

148 Ductile Iron Pipe Bend, 6-Inch 90 Degree EA 3 $ $

149 Ductile Iron Pipe Bend, 12-Inch 22.5 Degree EA 1 $ $

150 Ductile Iron Pipe Bend, 10-Inch 22.5 Degree EA 1 $ $

151 Ductile Iron Pipe Bend, 6-Inch 22.5 Degree EA 3 $ $

152 Blowoff Assembly, 2-Inch EA 1 $ $

1-Inch Double Check Backflow Prevention Assembly (Irrigation Services)

EA 2 $ $

154 6-Inch Gate Valve EA 16 $ $

155 8-Inch Gate Valve EA 4 $ $

156 10-Inch Gate Valve EA 2 $ $

157 12-Inch Butterfly Valve EA 10 $ $

158 Hydrant Assemblies EA 4 $ $

159 Remove Fire Hydrant Assembly EA 2 $ $

160 2-Inch Water Meter Assembly EA 10 $ $

161 1-inch Water Meter Assembly EA 2 $ $

162 2-Inch Polyethylene Tubing Water Service Line LF 290 $ $

163 1-Inch Polyethylene Tubing Water Service Line LF 55 $ $

164 Remove Water Meter Assembly EA 8 $ $

TOTAL BASE BID $

ALTERNATE A - PARKING LANE SURFACING

NO.

DESCRIPTION UNIT QNTY UNIT PRICE

TOTAL

PRICE

PART 00600 - BASES

1A CREDIT: 1 Inch Aggregate Base TN -33 $ $

PART 00700 - WEARING SURFACES

2A CREDIT: Plain Concrete Pavement Dowelled, 7 Inches Thick

SY -320 $ $

3A ADD: 4 inch Reinforced Base Slab Concrete Surfacing

SY 320 $ $

4A ADD: Unit Pavers, Parking Zone SF 2,876 $ $

TOTAL ALTERNATE A $

ALTERNATE B - SITE FURNISHINGS

NO.

DESCRIPTION UNIT QNTY UNIT PRICE

TOTAL

PRICE

PART 01000 - RIGHT OF WAY DEVELOPMENT AND CONTROL

1B CREDIT: 36" x 24" GFRC Concrete Planters EA -9 $ $

2B ADD: Chairs EA 14 $ $

3B ADD: Tables EA 7 $ $

TOTAL…