Main Street Redevelopment RFP - Document 3 of 3.pdf
PDF 14 MB Posted
- Attached to
- Main Street Redevelopment Request for Proposals
- Solicitation number
- S-KS0050-00018454
- Issued by
- Marion County, Oregon
About this file
This is a Geotechnical Engineering Report prepared by GeoEngineers, Inc. for MacKay Sposito, LLC and the City of Silverton for the Main Street Redevelopment and Downtown Plaza Park projects in Silverton, Oregon. The report documents subsurface explorations, laboratory testing, and engineering analyses conducted between January 7 and January 22, 2026, to provide geotechnical recommendations for design and construction of proposed improvements. Main Street improvements include underground utility upgrades, basement fill, concrete surfaced roadway, new pavers for on-street parking, stormwater runoff infiltration measures, and light masts. Downtown Plaza Park improvements include site grading, a single-story structure, restroom facilities, landscaping, paved pathways, expanded hardscapes, curbless street parking stalls, new light poles, and stormwater facilities. The scope of services included eight geotechnical borings, two dynamic cone penetrometer tests, two infiltration tests, soil sampling, and laboratory testing including moisture content analysis, sieve analysis, Atterberg limits testing, and unconfined compressive strength testing.
The report provides comprehensive geotechnical design and construction recommendations for both projects, including shallow foundation support with an allowable bearing pressure of 3,000 pounds per square foot, slab-on-grade floor specifications, retaining wall design parameters, luminaire pole foundation guidance, and detailed earthwork requirements for fill placement and compaction. Subsurface conditions consist of fill overlying residual soil and conglomerate rock, with groundwater encountered at approximately 8 feet depth. The site is classified as Seismic Site Class C with liquefaction risk determined to be low. The report recommends asphalt pavement sections with minimum 6-inch thickness and 18-inch base rock for Main Street arterial streets, paver section specifications for parking and sidewalk areas, and specific infiltration rates for stormwater management. Additional recommended services include plan review and construction phase observation by GeoEngineers to verify subsurface conditions and confirm proper implementation of design recommendations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Geotechnical Engineering Report Main Street and Downtown Plaza Park
Silverton, Oregon for MacKay Sposito and City of Silverton
April 24, 2026
5711 South Hood Avenue, Suite A Portland, Oregon 97239
503.624.9274
Geotechnical Engineering Report
Main Street and Downtown Plaza Park Silverton, Oregon
File No. 3611-008-00 April 24, 2026
Prepared for:
MacKay Sposito, LLC 18405 SE Mill Plain Boulevard, Suite 100 Vancouver, Washington 98683
Attention: Elise Steffen, PE
Prepared by:
GeoEngineers, Inc.
5711 South Hood Avenue, Suite A Portland, Oregon 97239 503.624.9274
Valerie R. Yanez, PE Staff Geotechnical Engineer
Kyle M. Smith, PE Associate Geotechnical Engineer
PEM:VRY:KMS:leh
Disclaimer: Any electronic form, facsimile, or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record.
MacKay Sposito | April 24, 2026 Page i
File No. 3611-008-00
Table of Contents
1.0 Introduction
2.0 Purpose and Scope
3.0 Field Explorations and Laboratory Testing
3.1 Field Explorations
3.1.1 Main Street Field Explorations
3.1.2 Downtown Plaza Park Field Explorations
3.2 Laboratory Testing
4.0 Site Description
4.1 Site Geology
4.2 Surface Conditions
4.3 Subsurface Conditions
4.3.1 Main Street
4.3.2 Park Plaza
4.4 Groundwater Conditions
4.5 Infiltration Test Procedure
5.0 Conclusions and Recommendations
5.1 Earthquake Engineering
5.1.1 Liquefaction Potential
5.2 Shallow Foundation Support
5.2.1 Minimum Width and Depth Criteria
5.2.2 Allowable Bearing Pressure
5.2.3 Foundation Subgrade Preparation
5.2.4 Settlement
5.2.5 Lateral Resistance
5.2.6 Construction Considerations
5.3 Slab-On-Grade Floors
5.3.1 Subgrade Preparation
5.3.2 Design Parameters
5.4 Retaining Walls
5.4.1 Basement Wall Earth Pressures
5.4.2 Wall Drainage
5.5 Luminare Pole Foundation Design
5.5.1 Luminar Pole Foundation Construction and Additional Design Considerations
5.6 Earthwork
5.6.1 Site Preparation
5.6.2 Subgrade Preparation and Evaluation
5.6.3 Subgrade Protection
5.6.4 Wet Weather Construction
MacKay Sposito | April 24, 2026 Page ii
5.6.5 Excavation Considerations
5.6.6 Temporary Excavation Support
5.6.7 Temporary Dewatering
5.6.8 Structural Fill and Backfill
5.6.9 Slopes
5.7 Drainage Considerations
5.8 Stormwater Infiltration
5.9 Pavement Recommendations
5.9.1 Dynamic Cone Penetrometer (DCP) Field Testing and Resilient Modulus (MR)
5.9.2 Drainage
5.9.3 Asphalt (AC) Pavement Recommendations
5.9.4 Portland Cement Concrete (PCC)
5.9.5 Paver Recommendations
5.10 Recommended Additional Geotechnical Services
6.0 Limitations
7.0 References
List of Figures Figure 1. Vicinity Map Figure 2. Site Plan - Downtown Plaza Park Figure 3. Site Plan - Main Street
Appendices Appendix A. Field Explorations, Exploration Logs and Geotechnical Laboratory Testing
Figure A-1. Key to Exploration Logs Figure A-2. Explaination of Bedrock Terms Figures A-3 through A-11. Logs of Borings
Appendix B. Laboratory Testing Figure B-1. Sieve Analysis Results Figure B-2. Atterberg Limits Test Results
Appendix C. Report Limitations and Guidelines for Use
MacKay Sposito, LLC | April 24, 2026 Page 1
1.0 Introduction
This report presents the results of our geotechnical engineering evaluation for the Main Street and Downtown Plaza Park projects in Silverton, Oregon. The Main Street project is located between North Water Street and North 1st Street, and the proposed Downtown Plaza Park is located south of the Silverton Civic Center. The sites are three blocks away from each other as shown in the Vicinity Map, Figure 1.
We understand the city of Silverton currently owns the undeveloped parcel for the proposed park and East Main Street. Schematic drawings indicate that proposed park improvements could include site grading, a single-story structure, restroom facilities, landscaping, paved pathways, and expanded hardscapes, curbless street parking stalls, new light poles, and stormwater facilities. Proposed Main Street improvements include underground utility improvements, basement fill, concrete surfaced roadway, new pavers for on-street parking, stormwater runoff infiltration measures, and light masts. The proposed improvements are shown in Figures 2 and 3.
2.0 Purpose and Scope
Our services were completed in accordance with our proposal dated August 27, 2025. A Subconsultant Agreement for Professional Services executing our full proposal was authorized by MacKay Sposito on October 22, 2025. The purpose of our geotechnical engineering evaluation is to provide geotechnical recommendations for the design and construction of the proposed Main Street and Downtown Plaza Park projects, based on subsurface explorations, laboratory testing, and engineering analyses.
In general, our scope of services included reviewing relevant geotechnical-related information; exploring subsurface soil and groundwater conditions; collecting representative soil samples; completing relevant laboratory testing; conducting geotechnical analyses; and preparing this geotechnical report with our findings, conclusions, and design recommendations.
3.0 Field Explorations and Laboratory Testing
3.1 FIELD EXPLORATIONS
The subsurface soil and groundwater conditions at the site were evaluated by completing eight geotechnical borings, two dynamic cone penetrometer tests and performing two infiltration tests. The locations of the field explorations completed for this project are presented in Figures 2 and 3. Details of the field exploration program and logs of the explorations are presented in Appendix A.
3.1.1 Main Street Field Explorations
We completed two geotechnical borings (B-1 and B-2) and two dynamic cone penetrometer tests in East Main Street. Boring B-1 was completed in the eastbound lane near the intersection of East Main Street and North Water Street. Boring B-2 was completed in the eastbound lane near the intersection of East Main Street and South 1st Street. One dynamic cone penetrometer test was performed from the below the pavement section at each boring after the asphalt concrete core was removed, but before drilling commenced. The borings were terminated at depths ranging from approximately 7 to 9 feet below ground surface (bgs). Dynamic cone penetration tests (DCP- 1 and DCP-2) were conducted throughout the site
MacKay Sposito, LLC | April 24, 2026 Page 2 using an 8 kilogram and 4.6 kilogram hammer, respectively. The exploration depths for the DCP tests ranged from approximately 19 to 27 inches bgs.
3.1.2 Downtown Plaza Park Field Explorations
We completed six geotechnical borings (B-3 through B-6, B5A and B-6A) and two infiltration tests (B-5-INF) within the Downtown Plaza Park site. The borings were terminated at depths ranging from approximately 7½ to 20¾ feet bgs. The two falling head infiltration tests were completed at different depths in B-5-INF.
The first infiltration test was performed at approximately 4.8 feet bgs and the second at approximately
6.8 feet bgs.
3.2 LABORATORY TESTING
Soil samples obtained from the borings were transported to our laboratory and evaluated to confirm or modify field classifications, as well as to evaluate engineering properties of the soil. Representative samples were selected for laboratory testing consisting of moisture content, percent passing the U.S. No. 200 sieve, sieve analyses, Atterberg limits and unconfined compressive strength of rock. The tests were performed in general accordance with test methods of ASTM International (ASTM) or other applicable procedures. A discussion of the laboratory tests and test results are presented in Appendix B.
4.0 Site Description
4.1 SITE GEOLOGY
The United States Geological Survey identifies two major rock formations in the site vicinity. Conglomerate rock is mapped throughout the site areas and consists of older alluvial terrace deposits, including poorly to moderately indurated silt and sand. The surficial layer of the conglomerate rock is deeply weathered or decomposed and gradually becomes less weathered with increased depth. Grande Ronde Basalt is mapped east and west of the site areas and generally consists of reddish brown to black medium to coarse-grained basalt. Based on the United States Geological Survey (USGS) Quaternary Fault mapping tool, the sites are located to the southwest of Mount Angel Fault.
4.2 SURFACE CONDITIONS
The proposed improvements to Main Street are planned between North Water Street and North 1st Street.
Street grades are generally flat, with a surface elevation at approximate Elevation 256 feet. Surface conditions consist of asphalt-paved roadway with concrete curbs and sidewalks on either side of the street.
The sidewalks include mature street trees present along both sides of the roadway, with adjacent commercial/retail development.
The proposed Downtown Plaza Park site is located south of the Silverton Civic Center. Surface conditions consist of short grass and large deciduous trees within planting strips along the sidewalk on the east and south sides of the site. Concrete sidewalks surround the site along the west, south, and east sides, and parking stalls associated with the Civic Center are located to the north. Ground surface elevations generally slope down across the site from Elevation 248 feet to Elevation 245 feet from southeast to northwest.
MacKay Sposito, LLC | April 24, 2026 Page 3
4.3 SUBSURFACE CONDITIONS
Subsurface conditions generally consist of fill overlying residual soil and conglomerate rock. Residual soil is interpreted to have been formed from weathering processes over time from the underlying parent rock formation.
4.3.1 Main Street
Subsurface conditions at B-1 and B-2 generally consist of fill overlying residual soil and conglomerate rock.
The fill observed in samples collected from these borings generally consists of silty sand with gravel and silty gravel with sand (SM, GM) and extends to depths of approximately 2 to 3 feet bgs. Residual soil was encountered beneath the fill. The residual soil generally consists of sandy silt with gravel and silty gravel with sand (ML, GM) and extends to depths of approximately 7 to 8½ feet bgs. Beneath the residual soil we encountered decomposed conglomerate rock. Borings were terminated in the conglomerate rock layer due to auger refusal at a depth of 9¾ feet at B-1 and 8 feet at B-2.
4.3.2 Park Plaza
Subsurface conditions at B-3 through B-6 and B-5A and B-6A generally consist of fill overlying residual soil and conglomerate rock. The fill observed in samples collected from these borings generally consists of silt, sandy silt, silt with gravel, silty sand with gravel (ML, SM) with occasional brick fragments. The fill extended to depths of approximately 4½ to 6½ feet bgs.
Residual soil was encountered beneath the fill in borings B-3, B-4, B-5 and B-5A. The residual soil generally consists of silty gravel with sand, poorly graded gravel with silt and sand (GM, GP-GM) this layer extended to depths of approximately 9 to 14 feet bgs. B-5 terminated in the residual soil unit at a depth of 13 feet due to auger refusal. Beneath the residual soil we encountered conglomerate rock. The upper portion of the rock is decomposed. Rock cores were recovered in the conglomerate unit at B-6A from 6½ feet to 20 feet bgs. The rock quality ranges from predominantly decomposed to moderately weather and generally becomes less weathered with depth. Borings are terminated in the conglomerate at depths between 7½ feet to 20 feet.
4.4 GROUNDWATER CONDITIONS
Groundwater was observed at a depth of approximately 8½ feet in boring B-5. We did not observe indications of groundwater during drilling of B-1 through B-4, B-6, B-5A and B-6A. Water well logs in the site vicinity report a static groundwater level around 8 feet deep. While not observed, we anticipate that perched groundwater could be encountered at depths above 8 feet bgs in the project area. During the wet season, perched groundwater should be anticipated at the contact between the less dense residual soil and more intact conglomerate rock. Groundwater conditions at the site are expected to vary seasonally due to rainfall events, river level, and other factors.
4.5 INFILTRATION TEST PROCEDURE
Infiltration was evaluated southeast area of Park Plaza by performing two encased falling head infiltration tests at B-5-INF shown in Figure 2. The infiltration tests were both completed within the same borehole at depth of 4.8 feet bgs and 6.8 feet bgs (approximate Elevation 243 feet and 241 feet NAVD88). The testing was performed in general accordance with the 2020 City of Portland Stormwater Management Manual, MacKay Sposito, LLC | April 24, 2026 Page 4
Chapter 2. The infiltration tests were performed within 6-inch-diameter augers. To perform the tests, the auger was filled with clean water 12 inches above the bottom of the excavation and maintained at this depth of water for a 1-hour soak period. Infiltration testing was conducted after the soak period was complete. During infiltration testing, water levels were recorded at 10-minute intervals over two 1-hour trial periods or until the water fully drained from the auger. See section 5.8 for stormwater infiltration results and recommendations.
5.0 Conclusions and Recommendations
In our opinion, the proposed improvements are feasible from a geotechnical perspective, provided that the site is prepared and foundations are designed consistent with our recommendations. Our conclusions and recommendations are presented in the following sections.
5.1 EARTHQUAKE ENGINEERING
Based on the results of our explorations and review of available information, it is our opinion that the site classifies as a seismic Site Class C. Table 1 below presents seismic design parameters based on the 2024 International Building Code (IBC), which references the 2022 Minimum Design Loads for Buildings and Other Structures (American Society of Civil Engineers [ASCE] 7-22).
TABLE 1. MAPPED 2024 IBC SEISMIC DESIGN PARAMETERS
SEISMIC DESIGN PARAMETERS RECOMMENDED PARAMETERS
Site Class C
Mapped Spectral Response Acceleration at Short Periods (Ss) 0.87
Mapped Spectral Response Acceleration at 1 Second Period (S1) 0.34
MCER Spectral Acceleration at Short Periods (SMS) 0.99
MCER Spectral Acceleration at 1 Second Period (SM1) 0.48
Design Spectral Acceleration at 0.2 Second Period (SDS) 0.66
Design Spectral Acceleration at 1 Second Period (SD1) 0.32
Site Modified Peak Ground Acceleration (PGAm) 0.44
Note:
Parameters developed based on Latitude 45.007135 and Longitude -122.783872 using the online ASCE Hazard Tool
(https://ascehazardtool.org/).
5.1.1 Liquefaction Potential
Liquefaction is a phenomenon where soils experience a rapid loss of internal strength as a consequence of strong ground shaking. Ground settlement, lateral spreading and sand boils may result from liquefaction.
In general, the soil that is susceptible to liquefaction includes very loose to medium dense, clean to silty sands and low plasticity silts that are below the groundwater level.
Structures supported on liquefied soils could suffer foundation settlement, downdrag loads or lateral movement that could be severely damaging to the structures. The evaluation of liquefaction potential is complex and dependent on numerous parameters, including soil type, grain distribution, soil density, depth to groundwater, in-situ static ground stresses, earthquake-induced ground stresses, and excess pore water https://ascehazardtool.org/
MacKay Sposito, LLC | April 24, 2026 Page 5 pressure generated during seismic shaking. Typically, the liquefaction potential of a site is evaluated by comparing the cyclic stress ratio (CSR), which is the ratio of the cyclic shear stress induced by an earthquake to the initial effective overburden stress, to the cyclic resistance ratio (CRR), which is the soil’s resistance to liquefaction.
Estimation of the CSR and the CRR were completed using empirical methods (Boulanger and Idriss 2014).
Given the density of the soils below the ground water level encountered during drilling and the high fines content of soil present at the site, in our opinion, liquefaction is not anticipated to occur at the sited during the design earthquake.
5.2 SHALLOW FOUNDATION SUPPORT
The following design parameters for shallow spread foundations are based on the condition that foundation preparation recommendations presented in following sections of this report are accurately relayed to the earthwork and general contractors in the bid documents and are followed during construction.
5.2.1 Minimum Width and Depth Criteria
We recommend individual (column) and continuous (wall) spread footings be designed with minimum dimensions of 24 and 16 inches, respectively. We further recommend foundations (bottom of footing) be constructed at a minimum depth of at least 24 inches below the nearest adjacent exterior finished grade to protect against frost heave. Interior foundations within heated portions of buildings may be constructed at a minimum depth of at least 12 inches below interior grade.
5.2.2 Allowable Bearing Pressure
Determination of allowable bearing pressures for shallow spread foundation design includes considerations for both bearing capacity (ability of supporting soil to resist applied foundation loads without undergoing shear failure) and serviceability (ability of supporting soil to resist applied foundation loads while staying within allowable parameters for total and differential settlement). Bearing capacity is a function of several parameters including, but not limited to, shear strength and unit weight of supporting soil, depth of footing embedment, footing dimensions (length and width); and depth to the groundwater table in relation to the footing depth and dimensions. Serviceability (foundation settlement) is primarily a function of the compressibility of the soil within the zone of significant stress influence below the footing (the zone of stress influence typically extends to a depth of about 2 to 4 times the footing width), and the magnitude of the foundation load. Based on the results of our analysis, we recommend an allowable bearing pressure of 3,000 pounds per square foot (psf).
The allowable bearing pressure is net allowable bearing pressures for the total of dead plus real live loads, and exclusive of the weight of backfill above the foundation. The allowable bearing pressure may be increased by one-third to account for short-term loads, such as from wind or seismic conditions.
5.2.3 Foundation Subgrade Preparation
An allowable bearing pressure of 3,000 psf is appropriate for shallow foundations that are supported on a minimum of 2 feet of properly compacted structural fill or approved onsite soils. During construction, we recommend that GeoEngineers evaluate the subgrade conditions at a depth of 1 foot below bottom of footing elevation. If the subgrade soils are acceptable at this depth, the bearing surface should be compacted to 95 percent of maximum dry density (MDD). If subgrade soils are unsuitable due to loose fill
MacKay Sposito, LLC | April 24, 2026 Page 6 or soft fine-grained soils, the excavation should be continued to a depth of 2 feet below the bottom of footing elevation and replaced with approved onsite soils or structural fill compacted to 95 percent of MDD.
The remaining 1-foot deep footing overexcavation should be replaced with either approved onsite soils or structural fill and compacted to 95 percent of MDD. The width of the overexcavation and placement of structural fill should extend beyond the edge of the footing a distance equal to the depth of the overexcavation below the base of the footing (minimum 2 feet).
5.2.4 Settlement
Based on the assumed column and wall loads noted previously in this report, we estimate that settlement of footings, designed and constructed as recommended in this report, should be less than about 1 inch.
Differential settlement between columns or along approximately 50 feet of continuous wall footing should be less than about ½ inch. Settlement should occur essentially as loads are applied. Post-construction settlement should be minor. Loose soil not removed from footing excavations, or disturbance of soil at foundation grade during construction, could result in larger settlements than estimated.
5.2.5 Lateral Resistance
The soil pressure available to resist lateral foundation loads is a function of the frictional resistance against the foundation base and the passive resistance, which can develop on the face of below-grade elements of the structure as those elements move horizontally into the soil. For foundations bearing in soil prepared as recommended, the allowable frictional resistance may be computed using a coefficient of friction of 0.40 applied to vertical dead-load forces for the contact between concrete and properly prepared site gravel or structural fill.
The allowable passive resistance on the face of footings, grade beams or other embedded foundation elements may be computed using an equivalent fluid density of 300 pounds per cubic foot (pcf), triangular distribution, for on-site soil or structural fill. Mobilization of passive resistance will require lateral foundation movement into the soil. The magnitude of lateral movement required to mobilize passive resistance depends on foundation embedment. We estimate that lateral movement required to mobilize the allowable passive resistance could be about 0.02D (where D is the depth of embedment of the foundation element).
For footings embedded 2 feet below exterior grade, this equates to a lateral movement of about ½ inch.
The above values include a factor of safety of about 1.5 and assumes that backfill placed against embedded elements is compacted in accordance with the following sections of this report.
5.2.6 Construction Considerations
Immediately prior to placing concrete, all debris and loose soils that accumulated in the footing excavations during forming and steel placement must be removed. Debris or loose soils not removed from the footing excavations will result in increased settlement.
5.3 SLAB-ON-GRADE FLOORS
Conventional slab-on-grade is appropriate where located over a minimum of 6-inch thick layer of compacted aggregate base.
MacKay Sposito, LLC | April 24, 2026 Page 7
5.3.1 Subgrade Preparation
Exposed subgrade should be evaluated after site grading is complete. Proof-rolling with heavy, rubber-tired construction equipment should be used for this purpose during dry weather and if access for this equipment is practical. Probing should be used to evaluate the subgrade during periods of wet weather or if access is not feasible for construction equipment. Proof-rolling during wet weather will disturb wet subgrade soils and require repair of the soils; therefore, we do not recommend proof-rolling during wet weather.
The exposed soil should be firm and unyielding, and without significant groundwater. If topsoil or existing soft soils are present at the slab-on-grade subgrade, these materials should be removed and replaced with at least 12 inches of structural fill prepared as recommended under “Earthwork.” We recommend that structural fill placed within the building footprint be compacted to the same density. Disturbed areas should be recompacted if possible or removed and replaced with compacted structural fill. The site should be rough graded to approximately 1 foot above the slab subgrade elevation prior to foundation construction to protect the slab subgrade soils from deterioration from wet weather or construction traffic. After the foundations and below slab drainage system have been constructed, the remaining soil can be removed to final subgrade elevation followed by immediate placement of the capillary break material.
5.3.2 Design Parameters
Conventional slabs may be supported on-grade, provided that the subgrade soils are properly prepared as recommended. For slabs designed as a beam on an elastic foundation, a modulus of subgrade reaction of 150 pounds per cubic inch (pci) may be used for subgrade soils prepared as recommended.
We recommend that the slab-on-grade floors be underlain by a 6-inch-thick capillary break consisting of crushed rock aggregate base material, as described in Section 5.6. Where moisture-sensitive floor coverings or moisture-sensitive equipment will be present above the slab-on-grade, we recommend the installation of a vapor barrier consisting of 10-mil plastic sheeting below the slab to reduce the potential for migration of moisture. It may also be prudent to apply a sealer to the slab to further retard the migration of moisture through the slab. The contractor should exercise care to avoid damaging the vapor barrier during slab construction.
5.4 RETAINING WALLS
Foundation subgrade for retaining walls should be prepared in accordance with section 5.2 Shallow Foundation Support.
5.4.1 Basement Wall Earth Pressures
For walls that are free to yield at the top at least 0.1 percent of the height of the wall, soil pressures will be less than if movement is limited by such factors as wall stiffness or bracing. Assuming that the walls are backfilled and drainage is provided as outlined in the following paragraphs, we recommend that yielding walls supporting horizontal backfill be designed using an equivalent fluid density of 35 pcf (triangular distribution), while non-yielding walls supporting horizontal backfill be designed using an equivalent fluid density of 55 pcf (triangular distribution). For seismic loading conditions applied to the yielding walls, a rectangular earth pressure equal to 7H psf (where H is the height of the wall in feet) should be added to the active pressures. Other surcharge loading should be applied as appropriate.
MacKay Sposito, LLC | April 24, 2026 Page 8
Lateral resistance for conventional cast-in-place walls can be provided by frictional resistance along the base of the wall and passive resistance in front of the wall. The allowable frictional resistance may be computed using a coefficient of friction of 0.40 applied to vertical dead-load forces. The allowable passive resistance may be computed using an equivalent fluid density of 300 pcf (triangular distribution). The above coefficient of friction and passive equivalent fluid density values incorporate a factor of safety of about 1.5.
Walls located in level ground areas should be founded at a depth of 18 inches below the adjacent grade.
The above soil pressures assume that wall drains will be installed to prevent the buildup of hydrostatic pressure behind the walls, as discussed below.
5.4.2 Wall Drainage
Positive drainage should also be provided behind cast-in-place retaining walls by backfilling the wall with Open-Graded Aggregate, Oregon Department of Transportation (ODOT) Standard Specification 2630.11. A perforated or slotted drainpipe should be placed near the base of the retaining wall to provide drainage.
The drainpipe should be surrounded by a minimum of 6 inches of clean ¾-inch washed drainage gravel.
The drainage gravel should be wrapped with a non-woven geotextile such as Mirafi 140N or approved equivalent. The wall drainpipe should be connected to a header pipe and routed to a sump or gravity drain.
Appropriate cleanouts for drainpipe maintenance should be installed.
5.5 LUMINARE POLE FOUNDATION DESIGN
We recommend luminaire pole foundations be designed in accordance with ODOT Standard Drawings TM631. It is our opinion that the soil conditions at both Main Street and Downtown Plaza Park sites meet or exceed the assumed soil properties used in ODOT Standard Drawings TM631. We recommend a maximum allowable lateral bearing pressure of 2,000 psf. Bearing pressures are based on correlations between blow count and lateral bearing pressure values.
5.5.1 Luminar Pole Foundation Construction and Additional Design Considerations
We present two conditions to consider when designing and constructing luminaire pole foundations (pole foundations):
■ Condition #1, an excavation the same dimension of the designed pole foundation is created and the foundation is cast directly against undisturbed earth, or
■ Condition #2, an excavation the same size or larger than the designed dimension of the pole foundation is created, a corrugated metal pipe is placed into the excavation and the foundation concrete is cast inside the metal pipe. The corrugated metal pipe is left in place after pouring the foundation concrete.
Any overexcavated area outside of the corrugated metal pipe is backfilled with controlled density fill (CDF) or soil.
Construction of foundation Condition #1 requires the sidewalls of the excavation to stay stable and not cave into the excavation. Construction of foundation Condition #2 does not require the sidewalls of the excavation to remain stable. Loose fill soils and areas with perched water will be susceptible to caving whereas dense residual soil and decomposed rock will be less susceptible to caving. Difficult excavation and slow/rough drilling should be expected in the dense to very dense gravelly soils and intact conglomerate rock. The coarse gravels and conglomerate observed in our explorations will likely make creating smooth-faced excavations difficult.
MacKay Sposito, LLC | April 24, 2026 Page 9
If the excavations are located in an area where a larger percentage of gravels and conglomerate are present, it may be impossible to create an excavation that matches the design foundation diameter, in this case, Condition #2 foundation construction technique may be required. We did not encounter large cobbles in our explorations; however, given the nature of the conglomerate unit present, there is potential for cobbles and boulders to be present. Accordingly, the contractor should be prepared to remove oversized material.
In our opinion, subsurface conditions lend themselves to Condition #1 at borings B-1 and B-2 (Main Street).
Condition #1 may apply to intact conglomerate rock provided that drilling equipment is capable of drilling or coring through the rock. The unconfined compressive strength of the matrix between cobbles and boulders in the conglomerate rock is estimated to be 400 to 1,000 pounds per square inch (psi); however, the strength of the intact cobbles and boulders within the conglomerate is anticipated to be higher. We recommend that the contractor be prepared for Condition #2 in the Downtown Plaza Park due to the presence of loose fill and gravel as documented in borings B-3 through B-6.
If excavations are deeper than 4 feet and workers will be required to enter the excavation, the sidewalls of the excavation must be supported or properly graded to a stable slope. Additional details about temporary excavations can be found in the “Temporary Excavations, Support and Dewatering” sections below.
Recommendations regarding backfilling around pole foundations are included in the “Structural Fill and Backfill” section below.
5.6 EARTHWORK
5.6.1 Site Preparation
Areas to be developed or graded should be cleared of surface and subsurface deleterious matter including debris, shrubs, trees and associated stumps and roots. Graded areas should be stripped of organic materials and topsoil. The stripped organic soils can be stockpiled and used later for landscaping purposes or may be spread over non-structural disturbed areas following completion of grading. If spread out, the organic strippings should be placed in a layer less than 1-foot thick, should not be placed on slopes greater than 3H:1V and should be track-rolled to a uniformly compacted condition. Materials that cannot be used for landscaping or protection of non-structural disturbed areas should be removed from the project site.
If present, existing utilities in the construction area should be identified prior to excavation. Live utility lines identified beneath proposed structures should be relocated. Abandoned utility lines beneath structures should be completely removed or filled with grout in order to reduce potential settlement of new structures.
Soft or loose soil encountered in utility line excavations should be removed and replaced with structural fill where it is located within structural areas.
Materials generated during demolition should be transported off site for disposal. Existing voids and new depressions created during site preparation and resulting from removal of existing utilities, or other subsurface elements (such as the abandoned school basement in the Park Plaza site), should be cleaned of loose soil or debris down to firm soil and backfilled with compacted structural fill. Disturbance to a greater depth should be expected if site preparation and earthwork are conducted during periods of wet weather.
MacKay Sposito, LLC | April 24, 2026 Page 10
5.6.2 Subgrade Preparation and Evaluation
Upon completion of site preparation activities, the exposed subgrade should be proof-rolled with a fully loaded dump truck or similar heavy rubber-tired construction equipment to identify soft, loose, or unsuitable areas. Proof-rolling should be conducted prior to placing fill and should be observed by a representative of GeoEngineers who will evaluate the suitability of the subgrade and identify areas of yielding that are indicative of soft or loose soil. If soft or loose zones are identified during proof-rolling, these areas should be excavated to the extent indicated by our on-site representative and replaced with Imported Select Structural Fill as defined in this report.
During wet weather, or when the exposed subgrade is wet, the subgrade should not be evaluated by means of proof-rolling, as this will further disturb the subgrade. Instead, the prepared subgrade should be evaluated by observing excavation activity and probing with a steel foundation probe. Observations, probing and compaction testing should be performed by a member of our staff. Wet soil that has been disturbed due to site preparation activities or soft or loose zones identified during probing should be removed and replaced with Imported Select Structural Fill as defined in this report.
If deep pockets of soft silt or pumping soils are encountered outside the building footprints, it may be possible to limit the depth of overexcavation by placing a woven geotextile such as Mirafi 600X (or similar material) on the overexcavated subgrade prior to placing structural fill. The geotextile will provide additional support by bridging over the soft material and will help reduce fines contamination into the structural fill.
This may be performed under pavement areas depending on actual conditions observed during construction.
5.6.3 Subgrade Protection
Based on classification of near surface soils, the fines content (silt/clay) can be upwards of 50 percent and will be susceptible to disturbance under equipment and foot traffic when wet. The contractor should take necessary measures to prevent site subgrade soils from becoming disturbed or unstable. Construction traffic during the wet season should be restricted to specific areas of the site, preferably areas that are surfaced with crushed rock materials or areas with existing pavement which are not susceptible to wet weather disturbance.
5.6.4 Wet Weather Construction
Wet weather construction practices will be necessary if work is performed during periods of wet weather. If site grading occurs during wet weather conditions, it will be necessary to use track-mounted equipment, load material into trucks supported on gravel work pads and employ other methods to reduce ground disturbance. The contractor should be responsible for protecting the subgrade during construction reflective of their proposed means and methods and time of year.
The wet weather season generally begins in October and continues through May in central Oregon; however, periods of wet weather may occur during any month of the year. If wet weather earthwork is unavoidable, we recommend:
■ The ground surface in and around the work area should be sloped so that surface water is directed to a sump or discharge location. The ground surface should be graded such that areas of ponded water do not develop. Measures should be taken by the contractor to prevent surface water from collecting in excavations and trenches. Measures should be implemented to remove surface water from the work area.
MacKay Sposito, LLC | April 24, 2026 Page 11
■ Earthwork activities should not take place during periods of heavy precipitation. Construction activities should be scheduled so that the length of time that soils are left exposed to moisture is reduced to the extent practicable.
■ Slopes with exposed soils should be covered with plastic sheeting or similar means.
■ The site soils should not be left uncompacted and exposed to moisture. Sealing the surficial soils by rolling with a smooth-drum roller prior to periods of precipitation will reduce the extent to which these soils become wet or unstable.
■ Construction traffic should be restricted to specific areas of the site, preferably areas that are surfaced with working pad materials not susceptible to wet weather disturbance such as haul roads and rocked staging areas.
■ When on-site soils with high fines percentages are wet of optimum, they are easily disturbed and will not provide adequate support for construction traffic or the proposed development. The use of granular haul roads and staging areas will be necessary for support of construction traffic. Generally, a 12- to 16-inch-thick mat of imported granular base rock aggregate material is sufficient for light staging areas for the building pad and light staging activities but is not expected to be adequate to support repeated heavy equipment or truck traffic. The granular mat for haul roads and areas with repeated heavy construction traffic should be increased to between 18 and 24 inches. The actual thickness of haul roads and staging areas should be based on the contractor’s approach to site development and the amount and type of construction traffic.
■ During periods of wet weather, concrete should be placed as soon as practical after preparation of the footing excavations. Foundation bearing surfaces should not be exposed to standing water. If water collects in the excavation, it should be removed before placing structural fill or reinforcing steel.
Subgrade protection for foundations consisting of a lean concrete mat may be necessary if footing excavations are exposed to extended wet weather conditions.
During wet weather, or when the exposed subgrade is wet or unsuitable for proof-rolling, the prepared subgrade should be evaluated by observing excavation activity and probing with a steel foundation probe.
Observations, probing and compaction testing should be performed by a member of our staff. Wet soil that has been disturbed due to site preparation activities or soft or loose zones identified during probing should be removed and replaced with compacted structural fill.
5.6.5 Excavation Considerations
The fill and residual soil may be excavated with conventional excavation equipment, such as trackhoes or dozers. We recommend that excavators with smooth edge buckets (i.e., no teeth) be used wherever practical to limit disturbance to the subgrade. The earthwork contractor should be responsible for reviewing this report, including the exploration logs, providing their own assessments, and providing equipment and methods needed to excavate the site soils while protecting subgrades.
We anticipate the underlying conglomerate below the residual soil generally consists of soft rock.
Laboratory testing indicates that the conglomerate rock within the planned excavation depth range for the projects has a compressive strength of approximately 400 psi. The contractor should be prepared with equipment capable of ripping rock of this strength.
MacKay Sposito, LLC | April 24, 2026 Page 12
5.6.6 Temporary Excavation Support
For planning purposes, temporary unsupported cut slopes more than 4 feet high may be inclined at 1½H:1V (horizontal to vertical) maximum steepness. If significant seepage is present on the cut face, then the cut slopes may have to be flattened. However, temporary cuts should be discussed with the geotechnical engineer during final design development to evaluate suitable cut slope inclinations for the various portions of the excavation.
The above guidelines assume that surface loads such as traffic, construction equipment, stockpiles or building supplies will be kept away from the top of the cut slopes a sufficient distance so that the stability of the excavation is not affected. We recommend that this distance be at least 5 feet from the top of the cut for temporary cuts made at 1½H:1V or flatter and less than 10 feet high, and no closer than a distance equal to one half the height of the slope for cuts more than 10 feet high.
Temporary cut slopes should be planned such that they do not encroach on a 1H:1V influence line projected down from the edges of nearby or planned foundation elements. New footings planned at or near existing grades and in temporary cut slope areas for the lower level should extend through wall backfill and be embedded in native soils or otherwise be designed to be supported on structural fill.
Water that enters the excavations must be collected and routed away from prepared subgrade areas. We expect that this may be accomplished by installing a system of drainage ditches and sumps along the toe of the cut slopes. Some sloughing and raveling of the cut slopes should be expected. If excessive groundwater is observed while making cuts, then alternative groundwater control systems will be necessary, such as well points or wells. Temporary covering, such as heavy plastic sheeting with appropriate ballast, should be used to protect these slopes during periods of wet weather. Surface water runoff from above cut slopes should be prevented from flowing over the slope face by using berms, drainage ditches, swales, or other appropriate methods.
If temporary cut slopes experience excessive sloughing or raveling during construction, it may become necessary to modify the cut slopes to maintain safe working conditions. Slopes experiencing problems can be flattened, regraded to add intermediate slope benches, or additional dewatering can be provided if the poor slope performance is related to groundwater seepage.
5.6.7 Temporary Dewatering
Groundwater was encountered in one exploration completed for this project and regional groundwater table is anticipated to be 7 to 8 feet bgs. The earthwork contractor should be prepared to encounter groundwater if excavations are planned greater than 6 feet deep.
If groundwater is encountered within an excavation for footings or utility trenches, saturated/wet soils should be dewatered. Sump pumps are expected to adequately address perched groundwater encountered in shallow excavations. In addition to groundwater seepage, surface water inflow to the excavations during the wet season can be problematic. Provisions for surface water control during earthwork and excavations should be included in the project plans and should be installed prior to commencing earthwork.
5.6.8 Structural Fill and Backfill
Structural areas include areas beneath foundations, floor slabs, retaining walls, hardscape, pavements, and any other areas intended to support structures or within the influence zone of structures.
MacKay Sposito, LLC | April 24, 2026 Page 13
All structural fill soils should be free of debris, clay balls, roots, organic matter, frozen soil, man-made contaminants, particles with greatest dimension exceeding 4 inches, and other deleterious materials.
The suitability of soil for use as structural fill will depend on the gradation and moisture content of the soil.
As the amount of fines in the soil matrix increases, the soil becomes increasingly more sensitive to small changes in moisture content and achieving the required degree of compaction becomes more difficult or impossible. Recommendations for suitable fill material are provided in the following sections.
5.6.8.1 ON-SITE SOILS
The soils within the anticipated excavation depths (generally upper 5 feet) consist of silt, sandy silt with gravel, and silty gravel with sand. Moisture contents range from 22 to 42 percent, which are over the optimum moisture content for these soils. Consequently, the onsite soils need to be dried out before re-use as structural fill. If earthwork is performed during the wet season or under wet weather conditions, the on-site soil will be unsuitable for structural fill; therefore, structural fill should consist of Select Granular Fill.
Re-using onsite soils as structural fill may be possible during the dry season (June through September) provided that GeoEngineers confirms that the moisture content is within 2 percent of optimum moisture content. If the contractor wishes to re-use onsite soils as structural fill, GeoEngineers should coordinate with the contractor and obtain representative proctor samples during construction. Soils with high fines content, such as silt and clay layers will not be suitable for reuse as structural fill and should be exported from the site or used in landscape areas if encountered during construction.
5.6.8.2 IMPORTED SELECT STRUCTURAL FILL
Imported select granular material may be used as structural fill. Imported select structural fill should consist of pit or quarry run rock, crushed rock, or crushed gravel and sand that is well-graded between coarse and fine sizes with approximately 25 to 65 percent passing the U.S. No. 4 sieve. It should have less than 5 percent passing the U.S. No. 200 sieve and have a minimum of two mechanically fractured faces. During dry weather, the fines content can be increased to a maximum of 12 percent.
5.6.8.3 AGGREGATE BASE
Aggregate base material located under floor slabs and pavements, and crushed rock used in footing overexcavations, should consist of imported clean, durable, crushed angular rock. Such rock should be well-graded, have a maximum particle size of 1 inch, and have less than 5 percent passing the U.S. No. 200 sieve. In addition, aggregate base shall have a minimum of 75 percent fractured particles according to American Association of State Highway and Transportation Officials (AASHTO) TP-61 and a sand equivalent of not less than 30 percent based on AASHTO T-176.
5.6.8.4 TRENCH BACKFILL
Backfill for pipe bedding and in the pipe zone should consist of well-graded granular material with a maximum particle size of ¾-inch and less than 5 percent passing the U.S. No. 200 sieve. The material should be free of organic matter and other deleterious materials. Further, the backfill should meet the pipe manufacturer’s recommendations. Above the pipe zone Imported Select Structural Fill may be used as described above.
MacKay Sposito, LLC | April 24, 2026 Page 14
5.6.8.5 DRAINAGE GRAVEL
Structural fill placed around perimeter footing drains, underslab drains and cast-in-place wall drains should consist of ¾- or 1-inch clean washed gravel.
5.6.8.6 FILL PLACEMENT AND COMPACTION
Structural fill should be mechanically compacted to a firm condition. Structural fill should be placed in loose lifts not exceeding 12 inches in thickness if using heavy compactors and 6 inches if using hand operated compaction equipment. The actual lift thickness will be dependent on the structural fill material used and the type and size of compaction equipment. Each lift should be moisture conditioned to within 2 percent of the optimum moisture content and compacted to the specified density before placing subsequent lifts.
Compaction of all structural fill at the site should be in accordance with the ASTM D 1557 (modified proctor) test method. Structural fill should be compacted to the following criteria:
■ Structural fill placed below structures and around foundations should be compacted to 95 percent of the MDD estimated in general accordance with ASTM D 1557.
■ Structural fill placed below new pavement, pavers, or hardscape areas, including utility trench backfill, should be compacted to 90 percent of the MDD estimated in general accordance with ASTM D 1557, except that the upper 2 feet of fill below final subgrade should be compacted to at least 95 percent of
MDD.
■ Nonstructural fill, such as fill placed below landscape areas, should be compacted to at least 90 percent of the MDD estimated in general accordance with ASTM D 1557.
5.6.9 Slopes
5.6.9.1 TEMPORARY SLOPES
All temporary soil cuts associated with site excavations (greater than 4 feet in depth) should be adequately sloped back to prevent sloughing and collapse, in accordance with applicable Occupational Safety and Health Administration (OSHA) and state guidelines.
Temporary cut slopes should not exceed a gradient appropriate for the soil type being excavated. Existing fill soils are best classified as OSHA Type C with a maximum cut slope steepness of 1.5H:1V for cuts greater than 4 feet. However, because of the variables involved, actual slope angles required for stability in temporary cut areas can only be estimated before construction.
The stability and safety of cut slopes depend on a number of factors, including:
■ The type and density of the soil.
■ The presence and amount of any seepage.
■ Depth of cut.
■ Proximity and magnitude of the cut to any surcharge loads, such as stockpiled material, traffic loads, or structures.
■ Duration of the open excavation.
■ Care and methods used by the contractor.
MacKay Sposito, LLC | April 24, 2026 Page 15
We recommend that stability of the temporary slopes used for construction be the responsibility of the contractor, since the contractor is in control of the construction operation and is continuously at the site to observe the nature and condition of the subsurface. If groundwater seepage is encountered within the excavation slopes, the cut slope inclination may have to be flatter than 1.5H:1V. However, appropriate inclinations will ultimately depend on the actual soil and groundwater seepage conditions exposed in the cuts at the time of construction.
This is the start of the file's text. The full file is on GovTribe.