The document provided is a sketch sheet related to a state and local contract opportunity for the Pacific Power-Rocky Mountain Power utility company. The sketch sheet outlines the electric service requirements for a customer location, including the installation of 3" conduit, fiberglass and PVC sweeps, and the removal of an existing utility pole. The document also includes instructions for the customer on the steps to get power, such as scheduling inspections and informing the utility company when the trench is ready for backfill and the meter base has passed inspection.
The related state and local contract opportunity is an Invitation to Bid (ITB) issued by Jackson County, Oregon for the CPSD Land Lab Restroom Building Site Preparation project. The County is seeking bids from qualified contractors to provide sitework, infrastructure, and utilities for the installation of a prefabricated restroom building at the Central Point Land Lab site. The project includes site preparation, sidewalks, boot wash, and RV pad with utility connections. The mandatory pre-bid meeting is scheduled for May 22, 2024, and bids are due by June 6, 2024. The County plans to award the contract by June 12, 2024 and issue a notice to proceed by June 19, 2024, with the project expected to be substantially completed by August 30, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pacific Power | Rocky Mountain Power
Customer Location: Request #
PPL Trench Requirements: 4” buffer of ¾"- (max) non-native material around conduit, Caution tape required in trenches.
T.Maier P#37303
Pacifiorp Customer Signature Date
ELECTRIC SERVICE REQUIREMENTS AGREEMENT SKETCH SHEET 2 (page 3)
5150 Upton Road, Central Point 7209511
Refer to Sheet 1 for installation requirements
STEPS TO GET POWER:
1)Call for PPL inspection after you have an open trench/conduit ready for inspection. Call 800-469-3981.
2)After your trench has been inspected by PPL inspector (usually within a few days), he will give you the OK to backfill.
3)Once you complete backfill of the trench, after given OK, call 800-469-3981 and inform them you are “backfilled and ready for re-inspection.” The inspector will visit your site again.
4)At any point in these steps, once the meter base has passed city/county inspection, call 800-469-3981 and let them know your meter base has been
“green-tagged and ready for inspection.” We will once again send an inspector to verify this.
5)Once all these have been inspected and verified with an OK to proceed, and you have returned the contract with payment (if required), the job will get automatically scheduled with the crew.
***After signing and returning the signed ESRA(s) to Pacific Power, you can start trenching***
Form NC05 Revision date: 9/26/12
Pacific Power pole # 349101 to be removed.
Customer's 400A Meter base Manual link bypass required 120/240V 1 phase
AIC: 7,680A
-Install (1) 3" 90° 36" fiberglass sweep
-Install (1) run of 3" conduit Pacific Power Pole# 349100 -Install (1) 3" 90° 36" PVC sweep as shown in picture below.
Location where Pacific Power crew will install an above grade pedestal. See attached diagram for proper sweep placement.
-Install (3) sweeps at staked location as shown in diagram. Use correct sweep material for designated run.
*** QR codes for construction manuals. *** p37303 Oval p37303 Oval p37303 Polygonal Line p37303 Polygonal Line p37303 Polygonal Line p37303 Rectangle p37303 Rectangle p37303 Line p37303 Line p37303 Text Box Customer's 400A Meter base Manual link bypass required 120/240V 1 phase
AIC: 7,240A
-Install (1) 3" 90° 36" PVC sweep p37303 Line p37303 Text Box -Install (1) run of 3" conduit p37303 Line p37303 Line p37303 Text Box -Install 3" 45° 36" PVC sweep p37303 Line p37303 Line p37303 Line p37303 Text Box This conduit run requires fiberglass sweeps p37303 Line p37303 Text Box These conduit runs require PVC sweeps.
p37303 Line p37303 Line p37303 Line