PA027 Farrell A2 CSS 5003 Pictures Paint the OMS ceiling and convert the tool storage room int.pptx

PPTX presentation 5 MB Posted

Attached to
Replace Doors at OMS and Training Bldg/Paint OMS Ceiling; Farrell, PA
Solicitation number
W15QKN-20-Q-5363
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Floor Plan of the OMS Work Bay 1, Work Bay 2, and the tool storage room

The OMS ceiling, trusses, and beams to be prepped and painted.

The tool storage room to be converted into office space

Existing electrical outlet to remain Existing spigot to be capped and made flush with the wall Items in the tool storage room Existing overhead lights to remain Existing exhaust fan cover needs to be removed and a blank cover installed.

This is the office next to the tool storage room that has an example of the split ductless ac/heater system and the VCT that will need to be installed in the converted tool storage office.

Wall mounted Ac/heater inverter Condenser unit mounted on the wall outside the office of the tool storage room Sample of the VCT for the new office image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg

File details come from the government source that posted it. Updated .