PA027-Farrell-A2-CSS 17022-SOO-Repair doors.docx

DOCX document 28 KB Posted

Attached to
Replace Doors at OMS and Training Bldg/Paint OMS Ceiling; Farrell, PA Federal contract opportunity
Solicitation number
W15QKN-20-Q-5363
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Replace Doors at OMS and Training Bldg/Paint OMS Ceiling; Farrell, PA, newest first.
File Type Posted
PA027-Farrell-A2-CSS 17022-SOW-Replace doors at OMS and Training Bldg.docx DOCX document
PA027-Farrell-A2-CSS 17022-Farrell Motor Pool Door.jpg JPG image
PA027 Farrell A2 CSS 5003 SOW Paint OMS ceilings V4 10 25 2019.DOCX DOCX document
PA027 Farrell A2 CSS 5003 Floor Plan Paint OMS Ceilings .pdf PDF
PA027 Farrell A2 CSS 5003 SOO Paint OMS ceilings 10 25 2019.DOCX DOCX document
PA027 Farrell A2 CSS 5003 Pictures Paint the OMS ceiling and convert the tool storage room int.pptx PPTX presentation

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives

99th Readiness Division Directorate of Public Works Fort Dix, New Jersey 08640

The Statement of Objectives (SOO) identifies the broad, basic, top-level objectives of an acquisition/procurement.

Date:
June 6, 2019
Title:
PA027- Replacement of Doors – Training Center and Motor Pool
CSS#
17022
RFOS:
Scott Kawski
Center:
PA027 - Pendel-Caminiti USARC
Field Eng. Tech.:
John Daley
Address:
950 Sharon New Castle Rd., Farrell, PA 16121
AFOS:
Cindy Croyle
BLDG MGR:
John Cidila
Other POC:
Gary Shadowens

Other POC:

1. Overall Objective:

Replace 2 man doors and 1 hazmat door on the Motor Pool Building. Covert 2 single office doors to Dutch doors with shelves. Convert one double and one single door in supply with Dutch doors.

2. General Requirements:

Replace doors, frames, hardware and thresh holds

3. Impact of Deficiency:

Doors are all rusting through and Dutch doors are request for supplies

4. Rough Estimate(s):

35,000

5. Expected Results of Completed Project:

New Doors

6. Attachments:

Picture image1.png image2.png