PA phase 2 drawings (Color).pdf
PDF 1 MB Posted
- Attached to
- Swartz Cree Comm Schools Paging System-Phase 2
- Solicitation number
- RFP SWTZ 210000000607 1
- Issued by
- Genesee County, Michigan
About this file
This file contains technical design drawings for a paging system upgrade project for the Swartz Creek School District, prepared by Convergent Technology Partners. The project encompasses four school facilities: Syring Elementary, Middle School, and two floors of the High School. The drawings detail the replacement and reuse of paging system components across multiple buildings, including ceiling speakers, wall speakers, horn speakers, call buttons, handsets, and volume controls. The project requires demolition of existing equipment as indicated on the plans, installation of new speakers in specified locations, rewiring of speakers to the nearest Intermediate Distribution Frame (IDF) or Main Distribution Frame (MDF), and preservation of existing basement infrastructure where applicable. New additions at the elementary school include an office with one ceiling speaker and a maker space with one wall speaker, along with a new IDF housed in the office. The drawings are dated January 6, 2021, and were prepared for the bidding phase under project identifier SCCS-PA.
The technical specifications require contractors to pretest existing speakers and wiring before installation at the middle and high schools, with required repairs performed using unit pricing. All handsets, call buttons, volume controls, and associated raceways are to be demolished and removed. The paging head-end equipment will be located in the MDF cabinet at the high school. For clock/speaker in-wall combination units requiring replacement, contractors must add new surface-mount wall speakers and disconnect wiring from existing units. The project includes basement work at all facilities, with existing speakers and wiring to be reused and supplemented with new equipment as indicated on the plans. The drawings provide detailed legends distinguishing between equipment to be reused, replaced with new components, demolished, and newly added across all four school locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PA phase 2 drawings (BW).pdf | ||
| SCCS Paging RFP - phase 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
AL
L
ETBR
W
ALL
ETBRW
AL
L
ETBR
W
AL
L
ETBRW
AL
L
ETBRW
AL
L
ETBRW
AL
L
ETBRW
AL
L
ETBRW
AL
L
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
W
ALL
ETBR
S
D
EM
O
S
D
EM
O
S
D
EM
O
S
N
EW
S
N
EW
S
N
EW
S
N
EW
S
N
EW S
N
EW S
N
EW S
N
EW S
N
EW S
N
EW S
N
EW S
N
EW
S
N
EW S
N
EW
S
DEMO
S
NEW
S
ETBR
HO
RN
ETBR
HO
RN
NEW
S
ETBR
EXISTING TO REUSE
EXISTING TO BE REPLACED WITH NEW
CEILING SPEAKER
NEW CEILING SPEAKER
DEMO EXISTING ABOVE CEILING SPEAKER
EXISTING WALL SPEAKER TO BE REPLACED
WITH NEW WALL SPEAKER
EXISTING IN-WALL SPEAKER TO BE
REPLACED WITH NEW WALL SPEAKER
EXISTING 12"X24" TILE SPEAKER REPLACED
WITH NEW CEILING SPEAKER
EXISTING HORN SPEAKER TO BE REPLACED
NEW HORN SPEAKER
WALL
ETBR
WALL
ETBR
LEGEND
S
ETR
SWARTZ CREEK
SCHOOL DISTRICT
SYRING ELEMENTARY
PAGING SYSTEM
SCCS-PA1
1/6/2021 BIDDING EGH
DATE ISSUE AUTHOR
C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473
Phone: 810.720.3820 www.ctpartners.net
T E C H N O L O G Y P A R T N E R S
TECHNOLOGY DESIGN I CONSULTING I PLANNING
EXISTING MDF
NEW ADDITION - INCLUDE
OFFICE (1 CEILING SPEAKER),
MAKER SPACE (1 WALL SPEAKER).
NEW OFFICE WILL HAVE AN
IDF THAT WILL HOUSE THE HEAD-END
GENERAL NOTES:
1. CABLE SPEAKERS BACK TO
NEAREST IDF OR MDF
2. DEMO ALL EXISITNG CABLE, CALL
BUTTONS, ETC. AND SPEAKERS AS
SHOWN
3. BASEMENT: REUSE EXISTING
HORNS AND CABLING
4. SHADED AREA DENOTES
BASEMENT
NOTE: BASEMENT IS NOT SHOWN,
BUT IS INCLUDED IN PROJECT.
REUSE ALL EXISTING WIRING AND
SPEAKERS/HORNS IN BASEMENT
WALL
ETR
S
ETR
HORN
ETR
WALL
ETR
WALL
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
IN
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
S
ETR
S
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
S
ETR
S
ETR
S
ETR
S
ETRWALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
HORN
ETR
HORN
ETR
HORN
ETR
HORN
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR HORN
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
WALL
ETR
WALL
ETR
S
ETR
PA
CAB
MDF
IDFIDF
WALL
IN
ETR
WALL
IN
ETR
WALL
IN
ETR
WALL
IN
ETR
WALL
IN
ETR
WALL
IN
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
S
ETR
WALL
IN
ETR
WALL
ETR
WALL
ETR
WALL
ETR
WALL
ETR
S
ETR
S
ETR
S
ETR
S
ETR
IDF
IDF
S
DEMO
S
NEW
S
ETBR
HO
RN
ETBR
HO
RN
NEW
S
ETBR
EXISTING TO REUSE
EXISTING TO BE REPLACED WITH NEW
CEILING SPEAKER
NEW CEILING SPEAKER
DEMO EXISTING TILE SPEAKER
EXISTING WALL SPEAKER TO BE REPLACED
WITH NEW CEILING SPEAKER
EXISTING IN-WALL SPEAKER TO BE
REPLACED WITH NEW CEILING SPEAKER
EXISTING 12"X24" TILE SPEAKER REPLACED
WITH NEW CEILING SPEAKER
EXISTING HORN SPEAKER TO BE REPLACED
NEW HORN SPEAKER
WALL
ETBR
WALL
IN
ETBR
LEGEND
S
ETR
1/6/2021 BIDDING EGH
DATE ISSUE AUTHOR
SWARTZ CREEK
SCHOOL DISTRICT
MIDDLE SCHOOL
PAGING SYSTEM
SCCS-PA2
C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473
Phone: 810.720.3820 www.ctpartners.net
T E C H N O L O G Y P A R T N E R S
TECHNOLOGY DESIGN I CONSULTING I PLANNING
GENERAL NOTES:
1. PRETEST EXISTING SPEAKERS AND WIRING
BEFORE INSTALLATION. REQUIRED REPAIRS WILL
BE MADE USING UNIT PRICING
2. REUSE OR ADD NEW SPEAKERS AS SHOWN
3. WIRE SPEAKERS TO NEAREST IDF OR MDF
4. BASEMENT - REUSE EXISTING AND ADD AS SHOWN
OR INDICATED
5. DEMO ALL HANDSETS, CALL BUTTONS, VOLUME
CONTROLS, ETC. AND ASSOCIATED RACEWAY
6. SHADED AREA DENOTES BASEMENT
S
ETBR
S
ETBR
S
DEMO
S
DEMO
S
DEMO
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
ETBR
S
DEMO
S
DEMO
S DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
WALL
IN
ETBR
W
ALL
IN
ETBR
W
AL
L
IN
ETBR
W
ALL
IN
ETBR
W
AL
L
IN
ETBR
W
ALL
IN
ETBR
W
AL
L
IN
ETBR
W
ALL
IN
ETBR
W
AL
L
IN
ETBR
W
AL
L
IN
ETBR
W
AL
L
IN
ETBR
W
AL
L
IN
ETBR
W
ALL
IN
ETBR
W
ALL
IN
ETBR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
WALL
ETBR
WALL
ETBR
WALL
ETBR WALL
ETBR
WALL
ETBR
WALL
ETBR
WALL
ETBR
WALL
ETBR
WALL
ETBR
WALL
ETBR
WALL
ETBR
WALL
ETBR
WALL
ETBR
WALL
IN
ETBR
WALL
ETBR
WALL
ETBR
HO
RN
ETBR
HO
RN
ETBR
HO
RN
ETBR
S
DEMO
S
ETBR
S
DEMO
S
ETBR
S
DEMO
S
ETBR
SDEMO S DEMO S
ETBR
S
DEMO
S
DEMO
S
ETBR
S
ETBR
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
ETBR
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
ETBR
S
DEL
S
DEL
S
DEL
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
WALL
NEW
HORNNEW HORNNEW
WALL
ETBR
S
NEW
S
NEW
WALL
NEW
WALL
NEW
S
NEW
PA
PAGING CABINET
S
NEW
S
NEW
S
ETR
S
ETR
S
ETR
S
ETR S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
S
ETR
WALL
ETBR
PAC IDF
CAFE IDF
SCIENCE IDF
MDF
IDF
S
DEMO
S
NEW
S
ETBR
HO
RN
ETBR
HO
RN
NEW
S
ETBR
EXISTING TO REUSE
EXISTING TO BE REPLACED WITH NEW
CEILING SPEAKER
NEW CEILING SPEAKER
DEMO EXISTING TILE SPEAKER
EXISTING WALL SPEAKER TO BE REPLACED
WITH NEW CEILING SPEAKER
EXISTING IN-WALL SPEAKER TO BE
REPLACED WITH NEW CEILING SPEAKER
EXISTING 12"X24" TILE SPEAKER REPLACED
WITH NEW CEILING SPEAKER
EXISTING HORN SPEAKER TO BE REPLACED
NEW HORN SPEAKER
WALL
ETBR
WALL
IN
ETBR
LEGEND
S
ETR
1/6/2021 BIDDING EGH
DATE ISSUE AUTHOR
SWARTZ CREEK
SCHOOL DISTRICT
HIGH SCHOOL
PAGING SYSTEM
SCCS-PA3
C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473
Phone: 810.720.3820 www.ctpartners.net
T E C H N O L O G Y P A R T N E R S
TECHNOLOGY DESIGN I CONSULTING I PLANNING
GENERAL NOTES:
1. PRETEST EXISTING SPEAKERS AND WIRING THAT
ARE TO BE REUSED BEFORE INSTALLATION.
REQUIRED REPAIRS WILL BE MADE USING UNIT
PRICING
2. REUSE OR ADD NEW SPEAKERS AS SHOWN
3. RE-WIRE SPEAKERS TO NEAREST IDF OR MDF
4. BASEMENT - REUSE EXISTING AND ADD AS SHOWN
OR INDICATED
5. DEMO ALL HANDSETS, CALL BUTTONS, VOLUME
CONTROLS, ETC. AND ASSOCIATED RACEWAY
6. NEW PAGING HEAD-END LOCATION IN MDF
CABINET
7. FOR CLOCK/SPEAKER IN-WALL COMBINATION UNITS
TO BE REPLACED, ADD NEW SURFACE MOUNT
WALL SPEAKER AND DISCONNECT WIRING FROM
OLD
8. SHADED AREA DENOTES BASEMENT
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
DEMO
S
ETBR
S
DEMO
S
DEMO
S
ETBR
S
DEMO
S
DEMO
S
ETBR
S
DEMO
S
DEMO
S
ETBR
S
DEMO
S
DEMO
W
ALL
IN
ETBR
W
AL
L
IN
ETBR
W
ALL
IN
ETBR
W
ALL
IN
ETBR
W
ALL
IN
ETBR
W
ALL
IN
ETBR
W
AL
L
IN
ETBR
W
AL
L
IN
ETBR
W
AL
L
IN
ETBR
W
AL
L
IN
ETBR
IDF4
W
AL
L
IN
ETBR
W
AL
L
IN
ETBR
W
AL
L
IN
ETBR
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
NEW
S
DEMO
S
NEW
S
ETBR
HO
RN
ETBR
HO
RN
NEW
S
ETBR
EXISTING TO REUSE
EXISTING TO BE REPLACED WITH NEW
CEILING SPEAKER
NEW CEILING SPEAKER
DEMO EXISTING TILE SPEAKER
EXISTING WALL SPEAKER TO BE REPLACED
WITH NEW CEILING SPEAKER
EXISTING IN-WALL SPEAKER TO BE
REPLACED WITH NEW CEILING SPEAKER
EXISTING 12"X24" TILE SPEAKER REPLACED
WITH NEW CEILING SPEAKER
EXISTING HORN SPEAKER TO BE REPLACED
NEW HORN SPEAKER
WALL
ETBR
WALL
IN
ETBR
LEGEND
S
ETR
SWARTZ CREEK
SCHOOL DISTRICT
HIGH SCHOOL
PAGING SYSTEM
SCCS-PA4
1/6/2021 BIDDING EGH
DATE ISSUE AUTHOR
C O N V E R G E N T 6197 Miller Road Suite 4 Swartz Creek, MI 48473
Phone: 810.720.3820 www.ctpartners.net
T E C H N O L O G Y P A R T N E R S
TECHNOLOGY DESIGN I CONSULTING I PLANNING
GENERAL NOTES:
1. PRETEST EXISTING SPEAKERS AND WIRING THAT
ARE TO BE REUSED BEFORE INSTALLATION.
REQUIRED REPAIRS WILL BE MADE USING UNIT
PRICING
2. REUSE OR ADD NEW SPEAKERS AS SHOWN
3. RE-WIRE SPEAKERS TO NEAREST IDF OR MDF
4. BASEMENT - REUSE EXISTING AND ADD AS SHOWN
OR INDICATED
5. DEMO ALL HANDSETS, CALL BUTTONS, VOLUME
CONTROLS, ETC. AND ASSOCIATED RACEWAY
6. NEW PAGING HEAD-END LOCATION IN MDF
CABINET
7. FOR CLOCK/SPEAKER IN-WALL COMBINATION UNITS
TO BE REPLACED, ADD NEW SURFACE MOUNT
WALL SPEAKER AND DISCONNECT WIRING FROM
OLD
| Sheets and Views |
| SYRING ELEMENTARY-SYRING ELEMENTARY |
| Sheets and Views |
| SCCS MIDDLE SCHOOL-SCCS MS |
| Sheets and Views |
| SCCS HIGH SCHOOL r1-SCCS HS 1ST FLOOR |
| Sheets and Views |
| SCCS HIGH SCHOOL r1-SCCS HS 2ND FLOOR |
File details come from the government source that posted it. Updated .