M
Pa
M Pa
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SU
BM
IT
TE
D
BY
CH
EC
KE
D
BY
SI
ZE
IS
O A1
IS
SU
E
DA
TE
CO
NT
RA
CT
N O.
SO
LIC
IT
AT
IO
N
NO
SHEET ID
a
FI
LE
B.
F
IS
HE
R
B.
F
IS
HE
R
B.
F
IS
HE
R
S.
S
CH
NE
ID
ER
JU
LY
, 2
W
2H V2
1F
-P
S-001
BLDG P810
IN
TE
RM
ED
IA
TE
D
ES
IG
N
SU
BM
IT
TA
L 0 7/2
5/2
ST
RU
CT
UR
AL
G
EN
ER
AL
N
OT
ES
CODES AND STANDARDS
1. ACI 318-14M, BUILDING CODES REQUIREMENTS FOR STRUCTURAL CONCRETE (2014)
2. AISC 360-16, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS (2016)
3. ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDING AND OTHER STRUCTURES (2016)
4. IBC, 2018 INTERNATIONAL BUILDING CODE (2018)
5. JASS 5, JAPANESE ARCHITECTURAL STANDARD SPECIFICATION FOR REINFORCED CONCRETE
WORK, ARCHITECTURAL INSTITUTE OF JAPAN (2018)
6. JASS 7, JAPANESE ARCHITECTURAL STANDARD SPECIFICATION FOR MASONRY
CONSTRUCTION, ARCHITECTURAL INSTITUTE OF JAPAN (2009)
7. MLIT COMMON BUILDING CONSTRUCTION STANDARD SPECIFICATONS, 2019 (HEISEI 31) WITH
2020 (REIWA 2) AND 2021 (REIWA 3) REVISIONS
8. TMS 605, SPECIFICATION FOR MASONRY STRUCTURES, THE MASONRY SOCIETY (2016)
9. UFC-1-200-01, DoD BUILDING CODE, CHANGE 1, 1 OCTBOER 2020
10. UFC 3-301-01, STRUCTURAL ENGINEERING, 1 OCTOBER 2019, CHANGE 1, 4 FEBRUARY 2022
11. UFC 4-010-01, DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12 DECEMBER 2018
12. UFC 4-023-03, DESIGN OF BUILDINGS TO RESIST PROGRESSIVE COLLAPSE, CHANGE 3, 1
NOVEMBER 2016
GENERAL
1. CONTRACTOR SHALL BE RESPONSIBLE FOR THE MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES REQUIRED TO PERFORM THIS WORK.
2. THE CONTRACT DOCUMENT REPRESENT THE COMPLETED STRUCTURE AND DO NOT
NECESSARILY INCLUDE THE MEANS OR METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL
PROVIDE MEASURES NECESSARY TO PROTECT THE STRUCTURE AND ENSURE IT IS SAFE AND
STABLE UNTIL COMPLETION. MEASURES INCLUDE, BUT ARE NOT LIMITED TO BRACING AND
SHORING FOR LOADS FROM CONSTRUCTION EQUIPMENT, TEMPORARY STRUCTURES AND
PARTIALLY COMPLETED WORK.
3. THE CONTRACTOR SHALL DESIGN AND INSTALL SHORING TO SUPPORT CONSTRUCTION
(VERTICALLY AND LATERALLY) UNTIL STRUCTURAL COMPONENTS HAVE BEEN CONNECTED AS
SHOWN ON THE STRUCTURAL DRAWINGS. THE CONTRACTOR SHALL SUBMIT SHORING
DRAWINGS AND CALCULATIONS STAMPED AND SIGNED BY LICENSED STUCTURAL ENGINEER.
DRAWINGS SHALL SHOW THE SIZE, LAYOUT, CONNECTIONS, MATERIAL DESIGNATION, METHOD
OF INSTALLATION, AND ACCESSORIES OF SHORING MEMBERS.
4. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS BEFORE COMMENCING ANY
DEMOLITION. THE CONTRACTOR SHALL VERIFY THE EXTENT AND LOCATION OF THE SITE
UTILITIES. LOCATIONS OF EXISTING STRUCTURES, FOUNDATIONS AND UTILITIES KNOWN TO THE
STRUCTURAL ENGINEER ARE INDICATED ON THE DRAWINGS. REPORT ANY DISCREPANCIES OR
ENCOUNTERED OBSTRUCTIONS TO THE CONTRACTING OFFICER.
5. CONTRACTOR-INITIATED CHANGES REQUIRE APPROVAL BY THE CONTRACTING OFFICER AND
SHALL BE SUBMITTED IN WRITING TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO
FABRICATION OR CONSTRUCTION.
6. DIMENSIONS AND DETAILS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO FABRICATION
AND CONSTRUCTION. THIS INCLUDES, BUT IS NOT LIMITED TO, COORDINATING WITH THE
CONTRACT DOCUMENTS OF THE SIZE AND LOCATION OF THE OPENINGS THROUGH CONCRETE,
VERIFYING SIZE AND LOCATION OF THE MECHANICAL AND ELECTRICAL OPENINGS WITH THE
RESPECTIVE SUBCONTRACTOR, AS WELL AS COORDINATING INSERTS AND ATTACHMENTS FOR
THE USE OF OTHER TRADES.
7. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. TYPICAL DETAILS
AND NOTES SHOWN ON DRAWINGS SHALL APPLY UNLESS NOTED OTHERWISE. TYPICAL DETAILS
MAY NOT NECESSARILY BE INDICATED ON THE PLANS BUT SHALL STILL APPLY AS SHOWN OR
DESCRIBED IN THE DETAILS. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO CHOOSE THE
APPROPRIATE TYPICAL DETAIL FROM THOSE PROVIDED. THE CONTRACTOR SHALL SUBMIT
PROPOSED ALTERNATIVE DETAILS TO THOSE PROVIDED WITH RELATED CALCULATIONS TO THE
CONTRACTING OFFICER FOR APPROVAL PRIOR TO DETAILING OR USE.
8. CONFLICTS OR OMISSIONS WITHIN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER PRIOR TO PROCEEDING WITH THE WORK INVOLVED.
9. PENETRATIONS FOR PIPES, DUCTS, CHASES, ETC., ARE NOT PERMITTED IN STRUCTURAL
BEAMS, BRACES, FOUNDATIONS, COLUMNS OR OTHER STRUCTURAL ELEMENTS, UNLESS NOTED
OTHERWISE IN THESE DRAWINGS. THE CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FROM
THE STRUCTURAL ENGINEER OF RECORD BEFORE CUTTING, PENETRATING, OR OTHERWISE
MODIFYING STRUCTURAL MEMBERS IN ORDER TO ACCOMMODATE PIPES, DUCTS, CHASES, ETC.
10. DETAILS OF CONCRETE ELEMENTS MANY NOT SHOW ALL REINFORCEMENT THAT OCCURS
WITHIN THE SECTION SHOWN, WHEN NECESSARY FOR CLARITY OR TO HIGHLIGHT SPECIFIC
REINFORCEMENT REQUIREMENTS. WHERE REINFORCEMENT IS NOT SHOWN, IT DOES NOT
ALLEVIATE THE CONTRACTOR FROM FURNISHING THE REINFORCEMENT REQUIRED BY OTHER
DETAILS OR NOTES PER THESE DRAWINGS.
FOUNDATIONS
1. FOUNDATION DESIGN IS BASED ON THE FINAL PDA SUBMITTAL GEOTECHNICAL REPORT BY OYO
CORPORATION, DATED 20 JUNE 2022, OYO JOB NUMBER 212001.
2. SPECIAL INSPECTION SHALL BE PERFORMED DURING SITE EXCAVATION TO CONFIRM THAT
EXISTING CONDITIONS COMPLY WITH CONDITIONS IN THE GEOTECHNICAL REPORT.
3. DESIGN SOIL PROPERTIES:
4. DEGREE OF COMPACTION, AS SPECIFIED IN THESE DOCUMENTS BY PERCENT RELATIVE DENSITY, SHALL BE PER ASTM D1557 OR JIS A1210. UNLESS NOTED OTHERWISE, STRUCTURAL FILL AND
COMPETENT NATIVE SOIL SHALL BE COMPACTED TO 95% RELATIVE DENSITY.
5. EXCAVATIONS SHALL BE KEPT FREE OF LOOSE MATERIAL AND STANDING WATER. MAINTAIN
SUBGRADE AND FILL MOISTURE CONTENT UNTIL FOUNDATION ARE PLACED. MAINTAIN POSITIVE
DRAINAGE AWAY FROM THE SITE DURING CONSTRUCTION TO ENSURE SURFACE RUNOFF AWAY
FROM THE STRUCTURES AND TO PREVENT PONDING OF SURFACE RUNOFF NEAR THE
STRUCTURE. KEEP OPEN EXCAVATIONS AROUND THE STRUCTURE DRY. PUMP WATER OUT OF
EXCAVATIONS IF FLOODING OCCURS PRIOR TO BACKFILL AND COMPACTION. EXCESS SOILS
FROM EXCAVATIONS MAY NOT BE REUSED AS BACKFILL UNDERNEATH STRUCTURES, AND
THEREFORE WILL NEED TO BE DISPOSED/WASTED. OVEREXCAVATION OF IN-SITU ELASTIC SILTS
AND CONSEQUENT REPLACEMENT WITH ENGINEERED GRANULAR FILL OR LEAN CONCRETE MAY
REQUIRE TEMPORARY SHORING SYSTEMS IF SLOWED EXCAVATIONS ARE NOT FEASIBLE.
6. DO NOT BACKFILL AGAINST STRUCTURAL CONCRETE ELEMENTS UNTIL CONCRETE HAS REACHED
A MINIMUM OF 75% OF THE SPECIFIED 28-DAY MINIMUM COMPRESSION STRENGTH.
7. PIPES AND CONDUITS RUNNING THROUGH SLABS ON GRADE AND SUBGRADE WALLS SHALL BE
PROTECTED WITH 13 mm EXPANSION MATERIAL.
8. FORM SIDES OF FOOTINGS, TIE BEAMS, PILE CAPS, ETC., TO BE STRAIGHT, PLUMB AND IN
ACCORDANCE WITH THE SPECIFIED DIMENSIONS. EARTH FORMS ARE PROHIBITED.
9. SLAB-ON-GRADE BASE COURSE SHALL BE PREPARED AS ILLUSTRATED PER SHEET S-101A AND S-101B. CONCRETE SLABS MUST BE UNDERLAIN WITH 300 mm OF IMPORTED GRANULAR FILL
COMPACTED TO A MINIMUM OF 95% MAXIMUM DRY DENSITY BASED ON JIS A 1210 OR ASTM
D-1557. THE TOP 150 mm OF SUBGRADE SOILS OR FILL UNDERNEATH THE IMPORTED GRANULAR FILL YALER MUST BE COMPACTED TO A MINIMUM OF 95% IN THE CASE OF GRANULAR SOILS OR
90% IN THE CASE OF COHESIVE SOILS.
10. PROVIDE 0.38 mm VAPOR BARRIER AT THE TOP OF THE BASE COURSE BELOW SLABS-ON-GRADE.
OVERLAP SHEET EDGES BY 300 mm MINIMUM.
11. STEEL WING PILE PROPERTIES (PER PILE):
12. PILES MUST EXTEND TO THE ACCEPTABLE BEARING LAYER, APPROXIMATELY 13 m BELOW
EXISTING GRADE. BEARING LAYER IS ASSUMED TO HAVE AN AVERAGE N-VALUE NAVG ≥ 40.
13. CENTER TO CENTER DISTANCE BETWEEN PILES IN A GROUP MUST BE SPACED A DISTANCE OF 1-
WING DIAMETER PLUS ONE PILE DIAMETER.
STRUCTURAL CONCRETE
1. CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF ACI 301, SPECIFICATION FOR STRUCTURAL
CONCRETE.
2. DESIGN MIXES FOR THE FOLLOWING CLASSES OF CONCRETE SHALL BE PROPORTIONED TO PROVIDE THE FOLLOWING MININIMUM COMPRESSIVE STRENGTH AT 28-DAYS, f'c (MPa). THE MIX MUST INCLUDE THE STRENGTH CORRECTION FACTOR AND TEMPERATURE CORRECTION FACTOR AS REQUIRED PER JASS 5 AND MLIT "PROPORTIONING" TO ENSURE THE AS-CAST CONCRETE STRENGTH MEETS OR EXCEEDS THE SPECIFIED MINIMUM COMPRESSION STRENGTH AT 28-DAYS. REF. JASS 5, SEC. 5 OR MLIT STD SPEC. SEC.
6.3.2.
3. STEEL REINFORCEMENT SHALL CONFORM TO THE FOLLOWING STANDARDS AND SPECIFIED STRENGTH:
4. TYPICAL DETAILS FOR REINFORCEMENT SUCH AS HOOKS, BEND DIAMETERS, ETC. SHALL BE IN ACCORDANCE WITH ACI SP-66, "ACI DETAILING MANUAL". REFER TO DETAIL SHEETS FOR ADDITIONAL
INFORMATION.
REINFORCEMENT
DEFORMED BARS
• D16 AND SMALLER
DEFORMED BARS (WELDABLE)
• D19 THROUGH D25
• D29 AND LARGER
5. REINFORCEMENT MARKED "CONT" (CONTINUOUS) SHALL BE SPLICED BY LAPPING OR MECHANICAL CONNECTORS OR GAS PRESSURE WELDING (CONFORMING WITH JASS 5). BAR SIZES D25 AND LARGER
MUST BE SPLICED WITH MECHANICAL CONNECTORS OR GAS PRESSURE WELDING.
LAP LENGTH NOTES:
A. SEE DEVELOPMENT AND LAP SPLICE LENGTH SCHEDULE FOR REINFORCED CONCRETE.
B. MECHANICAL CONNECTORS SHALL HAVE A MINIMUM CAPACITY OF 1.25x THE YIELD STRENGTH OF
THE BAR.
C. IN MEMBERS DESIGNATED AS PART OF THE SEISMIC-FORCE-RESISTING-SYSTEM, MECHANICAL CONNECTORS SHALL HAVE A MINIMUM CAPACITY EQUAL TO THE TENSILE STRENGTH OF THE BAR.
6. MECHANICAL REBAR ANCHORS (TERMINATORS) SHALL BE THREADED DEVICES WITH A CAPACITY
GREATER THAN THE YIELD STRENGTH OF THE BAR.
7. REFER TO THE ARCHITECTURAL, ELECTRICAL, MECHANICAL AND STRUCTURAL DRAWINGS FOR SURFACE FEATURES AND INSERTS, TO BE CAST IN CONCRETE AND FOR LOCATIONS OF PENETRATIONS
FOR PIPES, DUCTS, CONDUITS, ETC.
8. CONCRETE COVER FOR REINFORCEMENT STEEL SHALL BE AS FOLLOWS PER ACI 318 TABLE 20.6.1.3.1, UNLESS NOTED OTHERWISE:
CONCRETE EXPOSURE
CAST AGAINST AND
PERMANENTLY IN
CONTACT WITH GROUND
EXPOSED TO WEATHER
OR IN CONTACT WITH
GROUND
NOT EXPOSED TO
WEATHER OR IN
CONTACT WITH GROUND
MEMBER
ALL
ALL
SLABS, JOISTS
AND WALLS
BEAMS, COLUMNS,
PEDESTALS, AND
TENSION TIES
REINFORCEMENT
ALL
D19 THROUGH D51 BARS
D16 BAR AND SMALLER
D38 AND LARGER
D35 BAR AND SMALLER
PRIMARY REINF,
STIRRUPS, TIES,
SPIRALS AND HOOPS
SPECIFIED
COVER (mm)
MIN. YIELD STRENGTH
Fy (MPa)
NON-SHRINK GROUT
1. NON-SHRINK GROUT SHALL BE CEMENTITIOUS HIGH PRECISION, NATURAL AGGREGATE, NON-
METALLIC, NON-STAINING, NON-SHRINKABLE GROUP CONFORMING TO ASTM C1107 AND CRD-C
621, CORPS OF ENGINEERS "SPECIFICATION FOR NON-SHRINK GROUT." GROUT SHALL HAVE A
SPECIFIED MINIMUM COMPRESSIVE STRENGTH SHOW IN THE FOLLOWING TABLE.
2. DRY PACKING OF GROUT OF BASE PLATES SHALL NOT BE PERMITTED.
DESIGN LOADING
1. THE STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH UFC 3-301-01, THE
INTERNATIONAL BUILDING CODE, IBC, AND THE ASCE 7, AS REFERENCED IN THE "CODES
AND STANDARDS" SECTION OF THIS SHEET.
2. DEAD LOADING
WEIGHT OF MATERIALS OF CONSTRUCTION AND PERMANENTLY INSTALLED EQUIPMENT.
3. LIVE LOADING
REFER TO LIVE LOAD MAPS ON SHEET S-010.
4. ROOF LIVE LOADING
UNIFORM ROOF LIVE LOAD
SPECIFICATION
JIS G 3112 SD295A
JIS G 3112 SD345
JIS G 3112 SD390
9. REINFORCING BARS SHALL BE SECURELY TIED AND IN POSITION PRIOR TO THE PLACEMENT OF
CONCRETE. REINFORCEMENT, INCLUDING DOWELS SHALL NOT BE "WET-SET".
10. FIELD BENDING OF REBAR THAT HAS BEEN PARTIALLY EMBEDDED IN A PREVIOUSLY CAST MEMBER IS
PROHIBITED.
11. A SINGLE FIELD BEND PER LOCATIONS UP TO A MAXIMUM OF 90° ARE PERMITTED FOR REINFORCEMENT THAT HAS NOT PARTIALLY EMBEDDED IN CONCRETE. BARS LARGER THAN D19 SHALL NOT BE FIELD
BENT. HEATING THE REBAR WITH A TORCH, ETC., IS PROHIBITED.
12. PROVIDE VERTICAL DOWELS FROM THE FOUNDATION TO MATCH THE SIZE AND SPACING OF THE WALL OR COLUMN REINFORCEMENT. AT A MINIMUM, DOWELS SHALL BE SIDED TO PROVIDE FULL TENSION
DEVELOPMENT LENGTH ON BOTH SIDES OF THE COLD-JOINT.
5. SNOW LOADING
GROUND SNOW LOAD
FROST PENETRATION DEPTH
6. WIND LOADING
ULTIMATE DESIGN WIND SPEED (3-SEC GUST)
RISK CATEGORY
WIND EXPOSURE CATEGORY
ENCLOSURE CLASSIFICATION
INTERNAL PRESSURE COEFFICIENT
COMPONENTS AND CLADDING PRESSURES
7. RAIN LOAD
1-HR INTENSITY (NAHA)
10-MIN INTENSITY (NAHA)
NOT APPLICABLE
NOT APPLICABLE
283 kph (78.6 m/s)
II
C
ENCLOSED
GCpi = ±0.18
SEE SHEET S-011
110.5 mm
29.5 mm
SOIL PROPERTY
ALLOWABLE BEARING PRESSURE
• STATIC LOAD CASES
• TRANSIENT LOAD CASES
MODULUS OF SUBGRADE REACTION
COEFFICIENT OF FRICTION
LATERAL EARTH PRESSURE
• AT-REST CONDITIONS
• ACTIVE CONDITIONS
• PASSIVE CONDITIONS
REPORTED VALUE
100 kN/m2
133 kN/m2
27 MN/m3
0.40
9 kN/m3
6 kN/m3 kN/m3
MINIMUM COMPRESSIVE STRENGTH
AT 5-DAYS (MPa)
STRUCTURAL CONCRETE (CONTINUED)
WATERSTOPS
1. PROVIDE NONMETALIC WATER STOPS FOR USE WITH CONCRETE JOINTS AT THE BASE OF
THE ELEVATOR PIT WALL.
2. PVC WATERSTOPS SHALL MEET CORPS OF ENGINEERS SPECIFICATION CRD-C 572-74 OR
JIS K 6773.
3. FOLLOW APPROVED WATERSTOP MANUFACTURER RECOMMENDATIONS.
4. LOCATE WATERSTOPS CENTERED AT JOINT, COORDINATE LOCATION TO AVOID CONTACT
WITH REINFORCEMENT.
SUBMITTALS
1. BY SUBMITTING THE SHOP DRAWINGS, THE CONTRACTOR HAS DETERMINED AND
VERIFIED MATERIALS, FIELD MEASUREMENTS, AND RELATED FIELD CONSTRUCTION
CRITERIA (MEANS, METHODS, TECHNIQUES, SEQUENCES, OPERATIONS OF
CONSTRUCTION, SAFETY PRECAUTIONS AND PROGRAMS INCIDENTAL THERETO), AND
THAT THE CONTRACTOR HAS CHECKED AND COORDINATED THE INFORMATION
CONTAINED WITHIN THE SUBMITTAL WITH THE REQUIREMENTS OF THE WORK AND THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL REVIEW ALL SUBCONTRACTOR SUBMITTALS PRIOR TO
SUBMITTING TO THE GOVERNMENT CONTRACTING OFFICER.
3. REVIEW BY THE ENGINEER OF RECORD SHALL NOT RELIEVE THE CONTRACTOR FROM
FULL RESPONSIBILITY FOR THE ACCURACY OF DIMENSIONS AND DETAILS. SUCH REVIEW
SHALL NOT CONSTITUTE ACCEPTANCE BY THE ENGINEER OF RECORD FOR THE
CORRECTNESS OR ADEQUACY OF SUCH SUBMITTALS, NOR A WARRANTY THAT THE
SUBMITTALS SATISFY THE REQUIREMENTS OF THE CONTRACT.
4. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS SHOWING SIZE, WEIGHT,
ANCHORAGE, LOCATIONS OF EQUIPMENT NOT INDICATED ON THESE STRUCTURAL
DRAWINGS PRIOR TO ORDERING TO BE REVIEWED BY THE GOVERNMENT AND
STRUCTURAL ENGINEER OF RECORD TO DETERMINED THE ADEQUACY OF THE
STRUCTURE TO SUPPORT SUCH LOADING.
5. CONTRACTOR DESIGNED ELEMENTS SHALL BE DESIGNED, SEALED AND SIGNED BY A
LICENSED PROFESSIONAL ENGINEER. THE CONTRACTOR SHALL SUBMIT SHOP
DRAWINGS, DESIGN LOAD DATA, SUPPORT REACTIONS, AND A CERTIFICATION THAT THE
ELEMENTS WERE DESIGNED FOR LOADS SPECIFIED IN THE CONTRACT DOCUMENTS OR
DESIGN CODES REFERENCED THEREIN. IF CRITERIA INDICATED ARE INSUFFICIENT,
CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR INFORMATION TO THE
CONTRACTING OFFICER.
ELEMENT
PILE CAPS
GRADE BEAMS, BEAMS,
COLUMNS, SLABS-ON-GRADE,
SLABS, AND WALLS
MIN. 28-DAY COMPRESSION STRENGTH (f'c)
36 MPa
36 MPa
1 kN/m2
PILE
LENGTH
(m)
PILE
DIAM
(mm)
406.4
WING DIAMETER
x PL THICKNESS
(mm x mm)
1,000 x 32
BEARING
CAPACITY
(kN)
1,639
UPLIFT
CAPACITY
(kN)
SHEAR
CAPACITY
(kN)
PILE
GRADE
STK 590
DESIGN LOADING (CONT'D)
6. SEISMIC LOADING
SITE LATITUDE & LONGITUDE
RISK CATEGORY
SEISMIC IMPORTANCE FACTOR
SOIL SITE CLASS
MAPPED SPECTRAL RESPONSE ACCELERATION FACTORS
SHORT PERIOD
1-SEC PERIOD
DESIGN SPECTRAL RESPONSE ACCELERATION FACTORS
SHORT PERIOD
1-SEC PERIOD
SEISMIC DESIGN CATEGORY
SEISMIC LATERAL FORCE RESISTING SYSTEM (SEE TABLE BELOW)
RESPONSE MODIFICATION COEFFICIENT
OVERSTRENGTH FACTOR
AMPLIFICATION FACTOR
ANALYSIS PROCEDURE
FUNDAMENTAL PERIOD (FROM MODAL ANALYSIS)
RESPONSE COEFFICIENT
DESIGN SEISMIC FORCE
LONGITUDINAL DIRECTION
TRANSVERSE DIRECTION
26.3408° N, 127.778° E
II
1.0 D
Ss = 1.73g S1 = 0.93g
Sds = 1.153g Sd1 = 1.054g
E (IBC 1613.2.5)
R = SEE TABLE
Ωo = SEE TABLE Cd = SEE TABLE
MODAL RSA (ASCE 7, Sec. 12.9)
T = SEE TABLE
Cs = SEE TABLE
V = 31,851 kN V = 36,791 kN
7. NON-STRUCTURAL COMPONENT ANCHORAGE, AS DESIGNED BY OTHERS IN ACCORDANCE WITH
ASCE 7 CHAPTER 13, AND MUST BE DESIGNED CONSIDERING THE ABOVE SEISMIC PARAMETERS
AND THOSE LISTED IN CHAPTER 11 OF ASCE 7, AS APPLICABLE.
DIRECTION
LONGITUDINAL
TRANSVERSE
SYSTEM (ASCE 7 TABLE 12.2-1)
D3. DUAL SYSTEM WITH SPECIAL
CONC SHEAR WALLS AND
MOMENT FRAMES
B4. SPECIAL CONCRETE SHEAR
WALL (BUILDING FRAME)
R
Ω0
2.5
2.5
Cd
5.5
Cs
16.4%
19.0%
T
0.447 s
0.451 s
13. PROVIDE CORNER BARS TO MATCH THE SIZE AND SPACING OF THE HORIZONTAL REINFORCEMENT AT CORNERS AND INTERSECTIONS. EACH LEG OF THE CORNER BAR SHALL BE THE TENSION LAP
SPLICE LENGTH, MINIMUM, PAST THE FACE OF THE PERPENDICULAR WALL.
14. PROVIDE CONSTRUCTION OR CONTROL JOINTS IN SLAB-ON-GRADE AS INDICATED IN THE
STUCTURAL DRAWINGS. IF JOINT PATTERN IS NOT INDICATED, PROVIDE JOINTS AT 4 METERS (±1000 MM) IN BOTH DIRECTIONS. JOINTS SHALL BE LOCATED TO CONFORM TO BAY SPACING WHEREVER
POSSIBLE (AT COLUMN CENTERLINES, HALF-BAYS, ETC.)
15. CONSTRUCTION JOINTS FOR JOISTS, BEAMS, GIRDERS AND ELEVATED SLABS SHALL BE AVOIDED WHERE POSSIBLE, BUT WHERE NECESSARY SHALL BE LOCATED IN THE MIDDLE 1/3 OF THE SPAN.
PLACE JOINTS SO THAT THEY DO NOT COMPROMISE THE STRENGTH OR PERFORMANCE OF THE
STRUCTURE. OFFSET JOINTS AT GIRDERS AT LEAST TWICE THE BEAM WIDTH FROM THE
BEAM/GIRDER INTERSECTION. CONTRACTOR MUST COORDINATE LOCATIONS OF CONSTRUCTION
JOINTS WITH STRUCTURAL DESIGNER OF RECORD.
16. THE SURFACE OF CONSTRUCTION JOINTS SHALL BE ROUGHED TO A FULL AMPLITUDE OF 6 MM. THE SURFACE OF THE CONSTRUCTION JOINTS SHALL BE CLEAN AND FREE OF LAITANCE. IMMEDIATELY
BEFORE NEW CONCRETE IS PLACED, CONSTRUCTION JOINTS SHALL BE WETTED AND STANDING
WATER SHALL BE REMOVED.
17. PROVIDE A COMPRESSIBLE FILLER AND SEALANT IN SLABS-ON-GRADE AND WALL AND COLUMN
INTERFACES THAT ARE NOT REQUIRED TO BE DOWELED TOGETHER PER THESE PLANS.
18. PIPES, CONDUITS, ETC., SHALL NOT BE EMBEDDED IN WALLS, COLUMNS OR BEAMS WITHOUT PRIOR
WRITTEN APPROVAL OF THE CONTRACTING OFFICER AND STRUCTURAL ENGINEER OF RECORD.
19. PROVIDE 100 mm HIGH CONCRETE HOUSEKEEPING PADS UNDER EQUIPMENT. PADS SHALL EXTEND BEYOND EQUIPMENT EXTENTS BY 150 mm (NOMINAL) ON ALL SIDES. APPLY BONDING AGENT TO
PREVIOUSLY CAST CONCRETE SLAB, PRIOR TO PLACING HOUSEKEEPING PAD CONCRETE. REFER
TO CONTRACT DRAWINGS FOR SIZE AND LOCATIONS OF EQUIPMENT.
20. PROVIDE 20 mm CHAMFERS AT ALL EXPOSED CORNERS OF CONCRETE, UNLESS NOTED OTHERWISE
PER ARCHITECTURAL DRAWINGS.
DRAFT
INDICATES STEP IN SLAB
INDICATES SLOPE IN SLAB
INDICATES ELEVATION OR LEVEL
INDICATES NOMINAL SIZE OF
REBAR (e.g. D19) AND CENTER TO CENTER SPACING (e.g. 200 mm)
INDICATES QUANTITY (e.g. 6) AND NOMINAL SIZE OF REBAR (e.g. D16).
BARS ARE TO BE EVENLY SPACED
INDICATES CENTERLINE
D19@200
CL
6-D16
COMMON SYMBOLS
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SU
BM
IT
TE
D
BY
CH
EC
KE
D
BY
SI
ZE
IS
O A1
IS
SU
E
DA
TE
CO
NT
RA
CT
N O.
SO
LIC
IT
AT
IO
N
NO
SHEET ID
a
FI
LE
B.
F
IS
HE
R
B.
F
IS
HE
R
B.
F
IS
HE
R
S.
S
CH
NE
ID
ER
JU
LY
, 2
W
2H V2
1F
-P
S-002
BLDG P810
IN
TE
RM
ED
IA
TE
D
ES
IG
N
SU
BM
IT
TA
L 0 7/2
5/2
ST
RU
CT
UR
AL
G
EN
ER
AL
N
OT
ES
& AND
@ AT
AB ANCHOR BOLT
ABV ABOVE
ADDL, ADDT'L ADDITIONAL
ADJ ADJACENT, ADJOINING, ADJUSTABLE
ALT ALTERNATE
APPROX AND
AVG AVERAGE
BAL BALANCE
BLW BELOW
BM BEAM
BOT BOTTOM
BP BASE PLATE
BRC BRACE, BRACING
BRG BEARING
C CHANNEL
CAM CAMBER
CIP CAST IN PLACE
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION WELD
CL CENTERLINE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
COV COVER
CTR CENTER
db NOMINAL BAR DIAMETER
DBL DOUBLE
DET DETAIL
dHSA DIAMETER OF HEADED STUD ANCHOR
DIA, Ø DIAMETER
DIAG DIAGONAL
DIM DIMENSION
EA EACH
EJ EXPANSION JOINT
EL, ELEV ELEVATION
EMBED EMBEDMENT
EQ EQUAL
EQUIV EQUIVALENT
EW EACH WAY
EXIST EXISTING
EXT EXTERIOR
F FLOOR
f'c COMPRESSIVE STRENGTH OF CONCRETE
FABR FABRICATOR
FDTN FOUNDATION
FF FINISHED FLOOR, FAR FACE
FLG FLANGE
FOS FACE OF STUD, FACE OF STEEL
FOW FACE OF WALL
FS FAR SIDE
FTG FOOTING
Fu STEEL TENSILE STRENGTH Fy STEEL YEILD STRENGTH
GA GAUGE, GAGE
GALV GALVANIZED
GB GRADE BEAM
GR GIRDER
H WIDE FLANGE
H, HORIZ HORIZONTAL
HBR HORIZONTAL BRACE
HSA HEADED STUD ANCHOR
HSS HOLLOW STRUCTURAL SECTIONS (STEEL)
I MOMENT OF INERTIA
ID INSIDE DIAMETER, INSIDE DIMENSION
IN INCH
INT INTERIOR
JT JOINT
kN KILONEWTONS kN-m KILONEWTON-METERS kPa KILOPASCALS
L STEEL ANGLE
LOC LOCATION
LR LOW ROOF
LVL LEVEL
m METER
MAX MAXIMUM
MFR MANUFACTURER
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
mm MILIMETER MPa MEGAPASCALS
LIST OF ABBREVIATIONS
N NORTH, THREADS INCLUDED, NEWTON
N-m NEWTON-METER
N/A NOT APPLICABLE
NEG NEGATIVE
NF NEAR FACE
NO, # NUMBER
NOM NOMINAL
NS NEAR SIDE, NON-SHRINK
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER, OUTSIDE DIMENSION
OPP OPPOSITE
OVS OVERSIZE, OVERSIZED
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION WELD
PL PLATE
POS POSITIVE
PQR PROCEDURE QUALIFICATION RECORD
PROJ PROJECT, PROJECTION
PT PRE-TENSIONED (BOLT)
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QT QUANTITY
RAD, R RADIUS
RBS REDUCED BEAM SECTION
REBAR REINFORCING
RECT RECTANGLE, RECTANGULAR
REF REFERENCE
REINF REINFORCING STEEL
REQD REQUIRED
REV REVISION/REVISED
RND ROUND
S SOUTH, SECTION MODULUS
SC SLIP CRITICAL (BOLT)
SCHED SCHEDULE
SCS SOIL CEMENT SLURRY
SECT SECTION
SF SQUARE FOOT, SAFETY FACTOR
SIM SIMILAR
SMF SPECIAL MOMENT FRAME (SEISMIC LATERAL
FORCE RESISTING SYSTEM)
SPA SPACE, SPACING
SQ SQUARE
SS STAINLESS STEEL
SSLP SHORT SLOT LOAD PARALLEL
SSLT SHORT SLOT LOAD TRANSVERSE
ST SNUG-TIGHT (BOLT)
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUCT STRUCTURE, STRUCTURAL
SYMM SYMMETRICAL
T&B TOP AND BOTTOM
T/ TOP OF
TEMP TEMPORARY
THRU THROUGH
TOC TOP OF CONCRETE
TOF TOF OF FOOTING, FLOOR, FRAME
TOGB TOP OF GRADE BEAM
TOS TOP OF STEEL
TSS TOP OF STRUCTURAL STEEL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
V, VERT VERTICAL
VAR VARIES
VBR VERTICAL BRACE
VOL VOLUME
VRFY VERIFY
W/ WITH
W/O WITHOUT
WG WIND GIRT (BEAM)
WP WORK POINT
WPS WELD PROCEDURE SPECIFICATION
WT WEIGHT
X THREADS EXCLUDED
Z PLASTIC SECTION MODULUS
1. MASONRY WORK SHALL CONFORM TO REQUIREMENTS OF TMS 602, SPECIFICATIONS FOR MASONRY
STRUCTURES, OR JASS 7, MASONRY CONSTRUCTION.
2. PROVIDE LEVEL B QUALITY ASSURANCE AND SPECIAL INSPECTION PER TMS 602.
3. CONCRETE MASONRY: SPECIFIED COMPRESSIVE STRENGTH FOR CONCRETE MASONRY UNIT (CMU) BLOCKS, f’m = 14 MPa AS DETERMINED PER ARTICLE 1.4B OF TMS 602. THE SPECIFIED COMPRESSIVE
STRENGTH SHALL BE VERIFIED PRIOR TO START OF CONSTRUCTION.
4. CONCRETE MASONRY UNITS SHALL BE HOLLOW, LOAD-BEARING, MEDIUM WEIGHT BLOCKS AND HAVE A MINIMUM NET AREA COMPRESSIVE STRENGTH = 14 MPa AS DETERMINED PER ASTM C90.
5. UNITS SHALL BE LAID UP IN RUNNING BOND UNLESS NOTED OTHERWISE. THICKNESS OF BED JOINTS SHALL NOT EXCEED 15 mm. USE BOND BEAM UNITS AT HORIZONTAL REINFORCING.
6. MORTAR SHALL BE TYPE S CONFORMING TO ASTM C270 WITH f’m = 13 – 17 MPa. MASONRY CEMENT
MORTAR SHALL NOT BE USED.
7. CONTINUOUS REINFORCING STEEL SHALL BE LAP SPLICED IN ACCORDANCE WITH THE DEVELOPMENT AND LAP SPLICE LENGTH FOR CMU SCHEDULE. MECHANICAL SPLICES, WHERE NOTED, SHALL BE THREADED COUPLERS FOR TAPERED THREADED OR UPSET THREADED BARS CERTIFIED TO DEVELOP
1.25 x Fy. SIMILARLY, TERMINATORS SHALL BE THREADED DEVICES TO FULLY ANCHOR THE YIELD
STRENGTH OF BAR.
8. CENTER VERTICAL REINFORCING IN WALL UNLESS NOTED OTHERWISE. WHERE REQUIRED, VERTICAL BAR POSITIONERS SHALL BE USED TO SECURE VERTICAL REINFORCING AGAINST DISPLACEMENT
PRIOR TO GROUTING.
9. PROVIDE VERTICAL BARS FULL HEIGHT AT WALL CORNERS, DOORS, WINDOWS AND OTHER OPENINGS.
PROVIDE CONTINUOUS HORIZONTAL REINFORCEMENT AT CORNERS. PROVIDE HORIZONTAL
REINFORCEMENT ABOVE DOOR OPENINGS, ABOVE AND BELOW WINDOWS AND OTHER OPENINGS.
EXTEND REINFORCEMENT Ld BEYOND EACH SIDE OF OPENING UNLESS NOTED OTHERWISE.
OPENINGS FOR DUCTS AND PIPES PENETRATING MASONRY WALLS SHALL BE VERIFIED AND
COORDINATED WITH MECHANICAL AND ELECTRICAL CONTRACTOR'S REQUIREMENTS.
10. GROUT SHALL CONFORM TO ASTM C476, WITH MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 14 MPa. GROUT SLUMP AT TIME OF GROUTING SHALL BE 200 mm TO 280 mm. WATER REDUCING
ADMIXTURES MAY BE ADDED TO ACHIEVE THE DESIRED SLUMP.
11. GROUT ONLY CELLS WITH DEFORMED BAR REINFORCEMENT, WHERE REQUIRED PER PLANS AND
DETAILS.
12. FINE GROUT OR COARSE GROUT SHALL BE SELECTED BASED ON MINIMUM GROUT SPACE
REQUIREMENTS OF TABLE 7 OF TMS 602.
13. HIGH LIFT GROUTING (LIFT HEIGHT GREATER THAN 1,500 mm): ONLY ALLOWED WITH PRIOR WRITTEN
APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD AND THE CONTRACTING OFFICER
REPRESENTATIVE. THE MASONRY CONTRACTOR SHALL REQUEST WRITTEN APPROVAL A MINIMUM OF TEN (10) DAYS PRIOR TO PROCEEDING WITH SITE MOBILIZATION. THE MASONRY CONTRACTOR SHALL SUBMIT QUALIFICATIONS TO PERFORM HIGH LIFT GROUTING ADDRESSING EACH OF THE FOLLOWING
ITEMS AND OTHERS THEY DEEM IMPORTANT WITHIN THE WRITTEN SUBMISSION.
A. REFERENCE: ARTICLE 3.5 OF TMS 602.
B. UNIT AND GROUTING CREWS SHALL HAVE A MINIMUM OF FIVE (5) YEARS SUCCESSFUL
COMMERCIAL OR MILITARY BUILDING EXPERIENCE WITH SIMILAR HIGH LIFT GROUTING
PROJECTS. LIST THREE PROJECTS WITH A CONTACT FOR EACH.
C. A LIFT SHALL NOT EXCEED ONE STORY LEVEL, OR 3,850 mm MAXIMUM.
14. CONTROL JOINTS FOR THE CONCRETE MASONRY WALL MUST BE SPACED NO GREATER THAN 9,000 mm ON CENTER, THREE TIMES THE WALL HEIGHT, OR AS OTHERWISE SHOWN ON THE DRAWINGS.
15. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR THE LOCATION, EXTENT AND ORIENTATION OF
CMU BLOCKS WITH REGARD TO COLOR, FINISH OR ORIENTATION.
16. COLD AND HOT WEATHER CONSTRUCTION SHALL BE IN ACCORDANCE WITH ARTICLE 1.8C AND
ARTICLE 1.8D RESPECTIVELY OF TMS 602.
MASONRY BLOCK
STRUCTURAL STEEL
1. STEEL SHALL CONFORM TO THE FOLLOWING, UNLESS NOTED OTHERWISE:
2. STEEL ANCHORS, TIES AND OTHER MEMBERS EMBEDDED IN CONCRETE SHALL BE LEFT UNPAINTED.
3. HOLES IN STEEL CUT IN THE FIELD SHALL BE DRILLED, NOT BURNED. WRITTEN APPROVAL SHALL BE
REQUIRED PRIOR TO FIELD CUTTING STEEL.
4. ITEMS TO BE HOT-DIPPED GALVANIZED, CONFORMING TO JIS H 8641 (UNLESS NOTED OTHERWISE):
A. CONCRETE ACCESSORIES OF FERROUS MATERIAL INCLUDING: INSERTS, EMBEDS & BRACKETS.
B. PIPE GUARDS, BOLLARDS AND HARDWARE FOR SAME.
C. WHERE NOTED ON DRAWINGS AS "GALV".
SHAPE SPECIFICATION MIN. YIELD (MPa)
CHANNELS & ANGLES JIS G 3101 SS400 235
PLATES DIAPHRAGMS JIS G 3136 SN490C 325
ALL OTHERS JIS G 3136 SN400A 235
PIPE JIS G 3444 STK400 235
CONNECTORS SPECIFICATION MIN. TENSILE STRENGTH (MPa)
ANCHOR BOLTS JIS B 1220 ABR 400
STRUCTURAL STEEL WELDING
1. WELD SIZES SHOWN ON THE DRAWINGS ARE MINIMUM AND EFFECTIVE SIZES. INCREASE WELD SIZE TO
AWS/AISC MINIMUM SIZES AS REQUIRED FOR CONNECTION MATERIAL. THE MINIMUM FILLET WELD SIZE SHALL BE 8 mm (EFFECTIVE).
2. FIELD WELDING SYMBOLS HAVE NOT NECESSARILY BEEN INDICATED ON THE DRAWINGS. WHERE NO FIELD WELDING IS DETAILED ON THE DRAWINGS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE THE USE OF SHOP AND FIELD WELDS.
3. PARTIAL JOINT PENETRATION (PJP) GROOVE WELDS SHOWN ON THE DRAWINGS REFER TO EFFECTIVE
THROAT THICKNESS.
4. COMPLETE JOINT PENETRATION (CJP) WELDS SHALL BE ULTRASONICALLY TESTED (UT) UPON COMPLETION OF THE CONNECTION, EXCEPT PLATE LESS THAN OR EQUAL 8 mm THICK SHALL BE
MAGNETIC PARTICLE TESTED (MT).
5. WELDS SHALL BE MADE USING LOW HYDROGEN ELECTRODES WITH TENSION STRENGTH PER AISC D1.1 AND D1.8, MINIMUM 480 MPa. ALL WELDS AT SMF GIRDER TO SMF COLUMN CONNECTIONS SHALL MEET
THE REQUIREMENTS OF "DEMAND CRITICAL" WELDS PER AISC 341.
6. WELDING SHALL BE PERFORMED IN STRICT ADHERENCE TO THE WRITTEN WELDING PROCEDURE
SPECIFICATION (WPS) PER AWS D1.1. WELDING PROCEDURES SHALL BE SUBMITTED TO THE
STRUCTURAL ENGINEER OF RECORD FOR REVIEW BEFORE STARTING FABRICATION OR ERECTION.
COPIES OF THE WPS SHALL BE ON SITE AND AVAILABLE TO WELDERS AND THE SPECIAL INSPECTOR.
WHERE NOT INDICATED, THE WELD PROCESS AND POSITION SHALL BE DETERMINED BY THE
CONTRACTOR TO ACHIEVE THE REQUIRED WELD SHOWN IN THESE DRAWINGS THAT MEETS THE
REQUIREMENTS OF THE AISC AND AWS STANDARDS CITED.
7. WELDS THAT ARE PART OF THE SEISMIC-FORCE-RESISTING SYSTEM SHALL HAVE A MINIMUM CHARPY V-NOTCH TOUGHNESS OF 27 N-m AT -18 DEGREES CELSIUS.
6685 6950 6950 6950 6950 6950 6950
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
W C3
EWC30
EWC30 EWC30
EWC30
EWC30
EWC30 EWC30 EWC30 EWC30
EWC30EWC30EWC30
W C1
WM15
W M1
W M1
WM15
W M1
W M1
WM15
W M1
W M1
WM15
W M1
W M1
WM15
W M1
W M1
WM15
W M1
W M1
WM15
W M1
W M1
WC19
WC19
WC19
WC19 WC19
WC19WC19
WM15
W M1
W M1
WC19
W M1
W M1
W M1
W
M1
W M1
W M1
W M1
W M1
W M1
W
M1
W M1
WM15
WM15
WM15
WM15
WM15
WM15
WM15
WM15
W M1
W M1
WC19
WM15
W M1
W M1
WC19
W
M1
W M1
EWC30
C2
C2
C2
C2
C2 C2 C2 C2 C2 C2 C2
C2 C2 C2 C2 C2 C2 C2
C2 C2 C2 C2 C1 C1 C1
C2 C2 C2 C2 C2 C2 C1
WC19 WC19
S150 TOC = 0
TYP AT
STAIR
TYP AT
STAIR
NOTES:
1. WALLS PER SCHEDULE, REFER TO
2. COLUMNS (C) PER COLUMN SCHEDULE
3. INDICATES A GIRDER OR BEAM (BELOW)
4. INDICATES SLAB REGION.
5. UNLESS NOTED OTHERWISE, COLUMNS AND BEAMS ARE CENTERED AT
GRID LINES AND GRID INTERSECTIONS.
6. INDICATES STEP IN SLAB (ELEVATION AS INDICATED
PER PLAN AND DETAILS).
7. EXTERIOR STAIR PER
1 S-504
1 S-505
S175
SLAB TYPE LABEL. REFER TO SCHEDULE
B10
BEAM TYPE LABEL. REFER TO SCHEDULE
3 S-504
4 S-504
1 S-560
1 6 7 12
D
A
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SU
BM
IT
TE
D
BY
CH
EC
KE
D
BY
SI
ZE
IS
O A1
IS
SU
E
DA
TE
CO
NT
RA
CT
N O.
SO
LIC
IT
AT
IO
N
NO
SHEET ID
a
FI
LE
B.
F
IS
HE
R
B.
F
IS
HE
R
B.
F
IS
HE
R
S.
S
CH
NE
ID
ER
JU
LY
, 2
W
2H V2
1F
-P
S-101A
BLDG P810
IN
TE
RM
ED
IA
TE
D
ES
IG
N
SU
BM
IT
TA
L 0 7/2
5/2
1S T
FL
OO
R
PL
AN
AR
EA
A
1ST FLOOR PLAN - AREA A
6950 6950 6950 6950 6950 6950 6685
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EWC30
EWC30
EWC30
EWC30
EWC30
EWC30
EWC30EWC30
EWC30EWC30
W C1
EW
C3
WM15
W M1
W M1
WM15
W M1
W M1
WM15
W M1
W M1
WC19
WC19 WC19
W M1
W M1
W M1
W M1
W M1
W M1
W
M1
W M1
W M1
W M1
W M1
5WM15 WM15
WM15
WM15
WM15
WM15
WM15
WM15
WM15
EWC30 EWC30
C2 C2 C2 C2 C2 C2 C2 C2
C2 C2 C2 C2 C1 C1 C2 C2
C2 C1 C1 C1 C1 C2 C1 C1
C2 C2 C2 C1 C2 C2 C2 C2
WC19 WC19 WC19 WC19 WC19 WC19
WC19
S150TOC = 0
TYP AT
STAIR
TYP AT
STAIR
NOTES:
1. WALLS PER SCHEDULE, REFER TO
2. COLUMNS (C) PER COLUMN SCHEDULE
3. INDICATES A GIRDER OR BEAM (BELOW)
4. INDICATES SLAB REGION.
5. UNLESS NOTED OTHERWISE, COLUMNS AND BEAMS ARE CENTERED AT
GRID LINES AND GRID INTERSECTIONS.
6. INDICATES STEP IN SLAB (ELEVATION AS INDICATED
PER PLAN AND DETAILS).
7. EXTERIOR STAIR PER
1 S-504
1 S-505
S175
SLAB TYPE LABEL. REFER TO SCHEDULE
B10
BEAM TYPE LABEL. REFER TO SCHEDULE
3 S-504
4 S-504
1 S-560
1 6 7 12
D
A
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SU
BM
IT
TE
D
BY
CH
EC
KE
D
BY
SI
ZE
IS
O A1
IS
SU
E
DA
TE
CO
NT
RA
CT
N O.
SO
LIC
IT
AT
IO
N
NO
SHEET ID
a
FI
LE
B.
F
IS
HE
R
B.
F
IS
HE
R
B.
F
IS
HE
R
S.
S
CH
NE
ID
ER
JU
LY
, 2
W
2H V2
1F
-P
S-101B
BLDG P810
IN
TE
RM
ED
IA
TE
D
ES
IG
N
SU
BM
IT
TA
L 0 7/2
5/2
1S T
FL
OO
R
PL
AN
AR
EA
B
1ST FLOOR PLAN - AREA B
6685 6950 6950 6950 6950 6950 6950
S150
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C3
WM15
W M1
W M1
WC19
WM15
W M1
W M1
WC19
WM15
W M1
W
M1
WC19
WM15
W M1
W
M1
WC19
WM15
W M1
W M1
WC19
WM15
W M1
W M1
WC19
WM15
W M1
W
M1
WC19
WM15
W M1
W
M1
WC19
W M1
W
M1
W M1
W
M1
W M1
W
M1
W M1
W
M1
EWC30EWC30
EWC30 EWC30
EWC30
EWC30
EWC30
EWC30
EWC30
EWC30
EWC30 EWC30 EWC30
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C2
C1
C2
C2
C2
C1
C2
C2
C2
C1
C1
C2 C2 C2 C2 C2 C2 C2
C2 C2 C2 C2 C2 C2 C2
C2 C2 C2 C2 C1 C1 C1
C2 C2 C2 C2 C2 C2 C1
WM15
W M1
W
M1
WC19
WM15
W M1
W
M1
WC19
W
M1
W M1
W C2
WM15
WM15
WC19
W C1
WC19
B1
B1 B1
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2 B2 B2
B2 B2
B2 B2
B1 B1 B1 B1 B1 B1 B1
B1 B1 B1 B1 B1 B1 B1
B1 B1 B1 B1 B1 B1 B1
B1 B1 B1 B1 B1 B1 B1
B3 B3 B3 B3 B3
B3 B3 B3 B3 B3 B3 B3
B3
B3
TYP BETWEEN
NUMBERED
GRIDS
TYP AT
NUMBERED
GRIDS
TOC = 0
TYP AT
STAIR
TYP AT
STAIR
NOTES:
1. WALLS PER SCHEDULE, REFER TO
2. COLUMNS (C) PER COLUMN SCHEDULE
3. INDICATES A GIRDER OR BEAM (BELOW)
4. INDICATES SLAB REGION.
5. UNLESS NOTED OTHERWISE, COLUMNS AND BEAMS ARE CENTERED AT
GRID LINES AND GRID INTERSECTIONS.
6. INDICATES STEP IN SLAB (ELEVATION AS INDICATED
PER PLAN AND DETAILS).
7. EXTERIOR STAIR PER
1 S-504
1 S-505
S175
SLAB TYPE LABEL. REFER TO SCHEDULE
B10
BEAM TYPE LABEL. REFER TO SCHEDULE
3 S-504
4 S-504
1 S-560
1 6 7 12
D
A
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SU
BM
IT
TE
D
BY
CH
EC
KE
D
BY
SI
ZE
IS
O A1
IS
SU
E
DA
TE
CO
NT
RA
CT
N O.
SO
LIC
IT
AT
IO
N
NO
SHEET ID
a
FI
LE
B.
F
IS
HE
R
B.
F
IS
HE
R
B.
F
IS
HE
R
S.
S
CH
NE
ID
ER
JU
LY
, 2
W
2H V2
1F
-P
S-102A
BLDG P810
IN
TE
RM
ED
IA
TE
D
ES
IG
N
SU
BM
IT
TA
L 0 7/2
5/2
2N D-
6T H
FL
OO
R
PL
AN
AR
EA
A
2ND - 6TH FLOOR PLAN - AREA A
6950 6950 6950 6950 6950 6950 6685
S150
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C2
EW
C3
WM15
W M1
W
M1
WC19
WM15
W M1
W
M1
WC19
WM15
W M1
W M1
WC19
WM15
W M1
W M1
WC19
WM15
W M1
W
M1
WC19
WM15
W M1
W M1
WC19
WM15
W M1
W
M1
WC19
W M1
W
M1
W M1
W
M1
W M1
W M1
W M1
W M1
W M1
EWC30
EWC30
EWC30
EWC30EWC30 EWC30 EWC30 EWC30EWC30
EWC30 EWC30EWC30
C2
C2
C2
C2
C2
C2
C1
C2
C2
C2
C1
C2
C2
C2
C1
C1
C2
C1
C1
C2
C2
C1
C2
C2
C2
C2
C1
C2
C2
C2
C1
C2
C2 C2 C2 C2 C2 C2 C2 C2
C2 C2 C2 C2 C1 C1 C2 C2
C2 C1 C1 C1 C1 C2 C1 C1
C2 C2 C2 C1 C2 C2 C2 C2
WM15
W M1
W M1
WC19
WM15
W M1
W M1
WC19
W M1
W
M1
W C2
WM15
WM15
WC19
W C1
WC19 WC19
B2
B2 B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B1 B1
B1
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2 B2
B2
B2
B2
B2B2 B2
B2 B2
B2 B2
B1 B1 B1 B1 B1 B1 B1
B1 B1 B1 B1 B1 B1 B1
B1 B1 B1 B1 B1 B1 B1
B1 B1 B1 B1 B1 B1 B1
B3
B3 B3 B3 B3 B3 B3 B3
B3
B3 B3 B3 B3
TYPI BETWEEN
NUMBERED GRIDS
TYP SECTION AT
NUMBERED GRIDS
TOC = 0
TYP AT
STAIR
TYP AT
STAIR
NOTES:
1. WALLS PER SCHEDULE, REFER TO
2. COLUMNS (C) PER COLUMN SCHEDULE
3. INDICATES A GIRDER OR BEAM (BELOW)
4. INDICATES SLAB REGION.
5. UNLESS NOTED OTHERWISE, COLUMNS AND BEAMS ARE CENTERED AT
GRID LINES AND GRID INTERSECTIONS.
6. INDICATES STEP IN SLAB (ELEVATION AS INDICATED
PER PLAN AND DETAILS).
7. EXTERIOR STAIR PER
1 S-504
1 S-505
S175
SLAB TYPE LABEL. REFER TO SCHEDULE
B10
BEAM TYPE LABEL. REFER TO SCHEDULE
3 S-504
4 S-504
1 S-560
1 6 7 12
D
A
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SU
BM
IT
TE
D
BY
CH
EC
KE
D
BY
SI
ZE
IS
O A1
IS
SU
E
DA
TE
CO
NT
RA
CT
N O.
SO
LIC
IT
AT
IO
N
NO
SHEET ID
a
FI
LE
B.
F
IS
HE
R
B.
F
IS
HE
R
B.
F
IS
HE
R
S.
S
CH
NE
ID
ER
JU
LY
, 2
W
2H V2
1F
-P
S-102B
BLDG P810
IN
TE
RM
ED
IA
TE
D
ES
IG
N
SU
BM
IT
TA
L 0 7/2
5/2
2N D-
6T H
FL
OO
R
PL
AN
AR
EA
B
2ND - 6TH FLOOR PLAN - AREA B
NOTES:
1. LONG BAR SPLICE RESTRICTED TO CENTER HALF OF COLUMN CLEAR LENGTH.
2. REINF AT BEAMS NOT SHOWN FOR CLARITY.
3. CLOSED HOOPS REQUIRED AT COLUMNS. CROSS-TIES REQUIRED PER
SCHEDULE.
HCOL
EN
D
RE
GI
ON
EN
D
RE
GI
ON
MI
DD
LE
R
EG
IO
N
HOOPS, PER
SCHED, AT
MIDDLE REGION
LONG BAR TENSION LAP
SPLICE RESTRICTED TO
CENTER HALF OF THE
COLUMN LENGTH. HOOPS
MUST BE AT "END REGION"
SPACING THROUGH FULL
LENGTH OF SPLICE.CO
LU
MN
C
LE
AR
LE
NG
TH
HOOPS, PER
SCHED, AT
END REGION
HOOPS CONTINUE
THROUGH BEAM-COLUMN
JOINT AT "END REGION"
OF COLUMN BELOW, TYP
BEAM PER PLAN
(REINF NOT SHOWN
FOR CLARITY)
LONG BARS
HOOPS
TIES
24-D29
D13 - - @150
4-D13
LABEL
SE
CO
ND
, T
HI
RD
S
TO
RY
C1
SCHEDULE NOTES:
1. COLUMN CENTERED AT GRID INTERSECTIONS, PER PLAN.
2. 20 mm CHAMFER AT COLUMN CORNERS, TYPICAL.
3. PENETRATIONS AT COLUMNS PROHIBITED.
LONG BARS
HOOPS
TIES
20-D29
D13 - - @150
4-D13
LABEL
FO
UR
TH
SI
XT
H
ST
OR
Y
C1
LABEL C2
LABEL C2
LONG BARS
HOOPS
TIES
32-D29
D13 - - @150
4-D13
LABEL
FI
RS
T
ST
OR
Y
C1
FO
UR
TH
SI
XT
H
ST
OR
Y
LONG BARS
HOOPS
TIES
24-D29
D13 - - @150
4-D13
LONG BARS
HOOPS
TIES
20-D29
D13 - - @150
4-D13
LONG BARS
HOOPS
TIES
24-D29
D13 - - @150
4-D13
SE
CO
ND
, T
HI
RD
S
TO
RY
FI
RS
T
ST
OR
Y
LABEL
CR
OS
S-
SE
CT
IO
N
VERTICAL
HORIZONTAL
TIES
MATERIAL
WM12
D10@1200
D10@1200
CMU
WM15
D13@1200
D13@1200
CMU
WC20
D10@200
D10@200
D10@1200
CONCRETE
EWC25
D16@200
D16@200
D13@600
CONCRETE
EWC30
D16@200
D16@200
D10@600
CONCRETE
120 150 200 250
NOTES:
1. REFER TO SHEET S-510 FOR CONCRETE WALL DETAILS.
2. REFER TO SHEET S-550 FOR ADDITIONAL CMU DETAILS.
WC30
2-D10@200
2-D10@200
D10@1200
CONCRETE
300 300
WC19
D10@200
D10@200
D10@1200
CONCRETE
LOCTHICKNESSSYMBOL
END-SPAN MID-SPAN INTERIOR-SPAN END-SPAN MID-SPAN INTERIOR-SPAN
SHORT-DIRECTION (PRIMARY) LONG-DIRECTION (SECONDARY)
TOP
BOT
TOP
BOT
TOP
BOT
S1 150 D13 @ 200
D13 @ 200
D13 @ 200
D13 @ 200
SCHEDULE NOTES:
1. TYPICAL SLAB REINFORCEMENT SPECIFIED PER THIS SCHEDULE. WHERE OTHER
DETAILS SPECIFIED OTHER REINFORCEMENT IT SHALL BE PROVIDED IN
ADDITION TO THE TYPICAL REINFORCEMENT PER THIS SCHEDULE.
2. REINFORCEMENT MUST BE PLACED WITH REBAR POSITIONERS AND BE
SECURED PRIOR TO POURING CONCRETE, TO ENSURE PROPER POSITIONING.
3. MINIMUM CONCRETE COVER PER TYPICAL REBAR DETAILS.
4. DEFINITIONS PER SCHEMATIC DETAIL TO THE RIGHT.
5. THE WIDTH OF THE END AND INTERIOR SPANS IS DETERMINED AS THE SHORT
DIRECTION LENGTH DIVIDED BY 4 AND APPLIED TO BOTH DIRECTIONS.
6. AT CANTILEVERED SLABS, THE PRIMARY DIRECTION IS THE CANTILEVERED
DIRECTION. THE MINIMUM CUTOFF DISTANCE FOR TOP AND BOTTOM BARS
SHALL BE DETERMINED AS THE 1/4 X THE CLEAR SPAN OF THE ADJACENT SLAB,
BUT NO LESS THAN Ld OF THE REINFORCEMENT, MEASURED FROM THE INSIDE
FACE OF THE SUPPORT. REINFORCEMENT FROM THE ADJANCENT SLAB MUST
CONTINUE SUCH THAT IS IT FULLY DEVELOPED AT THE INTERIOR FACE OF THE
SUPPORT.
S2 150 D13 @ 200
D13 @ 200
D13 @ 200
D13 @ 200
FREE EDGE
FREE EDGE
SLAB CONTINUOUS
OVER SUPPORT
SLAB
CONTINUOUS
OVER SUPPORT
REGION
END
SPAN
MID
SPAN
INTERIOR
(SECONDARY)
LONG DIRECTION
SP
AN
EN
D
SP
AN
MI
D
SP
AN
IN
T.
SECONDARY BAR
(P
RI
MA
R Y
SH
OR
T
DI
RE
CT
IO
N
PRIMARY BAR
PLAN VIEW OF SLAB REGIONS
CANTILEVER
INTERIOR FACE OF
SUPPORT CONDITION
CUT OFF
DIST TO
ANCHORAGE OF PRIMARY
REINFORCEMENT AT CANTILEVERS
ADJACENT
SPAN REINF.
ADJ. SPAN
Ld, MIN
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SU
BM
IT
TE
D
BY
CH
EC
KE
D
BY
SI
ZE
IS
O A1
IS
SU
E
DA
TE
CO
NT
RA
CT
N O.
SO
LIC
IT
AT
IO
N
NO
SHEET ID
a
FI
LE
B.
F
IS
HE
R
B.
F
IS
HE
R
B.
F
IS
HE
R
S.
S
CH
NE
ID
ER
JU
LY
, 2
W
2H V2
1F
-P
S-504
BLDG P810
IN
TE
RM
ED
IA
TE
D
ES
IG
N
SU
BM
IT
TA
L 0 7/2
5/2
CO
LU
MN
, W
AL
L A
ND
S
LA
B
SC
HE
DU
LE
S
NTS
TYPICAL COLUMN REINFORCING
NTS
COLUMN SCHEDULE
NTS
WALL SCHEDULE
NTS
SLAB SCHEDULE
TERMINATE HORIZ REINF
50 mm FROM CJ TYP UNO
VERT REINF EA
SIDE OF JOINT
NOTE
1. ALIGN BOND BEAM CONTROL JOINTS WITH WALL CONTROL JOINTS
BOND BEAM REINF
PENETRATES CJ
BACKER ROD &
SEALANT AT VERT CJ
PROVIDE CLOSED END
BLOCKS AT CJ, TYP
TYPICAL BOND BEAM
BOND BEAM ADJACENT FLOOR AND ROOF
PREMOLDED
JOINT FILLER
CJ
CJ
CONC WALL OR
COLUMN
BREAK SHELL FOR
FLOW OF GROUT
16 GA DOVETAIL
ANCHOR @ 400 mm OC
VERT @
INTERSECTIONS
VERT @ CORNERS
AT FREE END AT INTERSECTION AT CORNER
VERT AT FREE END
CORNER BAR TO
MATCH HORIZ
REINF TYP
Ld
ALTERNATE HOOK
DIRECTIONS
Ld
VERT BAR
POSITIONER
19 cm CMU
NOTE:
VERTICAL BAR POSITIONERS REQUIRED WHEN
REINFORCEMENT IS AT FACE OF WALL OR IN TWO LAYERS
15 cm CMU
NOTES:
1. REINFORCEMENT SPACING PER
WALL SCHEDULE, REF.
2. SOLID GROUT REINFORCED CELLS.
3. CMU MUST BE LAID IN RUNNING
(COMMON) BOND. STACK BOND IS
PROHIBITED.
4. REFER TO ARCH DRAWINGS FOR
CMU ELEVATIONS.
5. PROVIDE REINF AROUND
OPENINGS PER
6. PROVIDE REINF AT WALL
CORNERS, INTERSECTIONS, AND
FREE ENDS PER
7. PROVIDE BAR POSITIONERS
WHERE TWO LAYERS OF VERTICAL
REINF REQUIRED AT CMU WALL
PER
8. HORIZONTAL REINF MUST BE
PLACED IN BOND BEAMS, EXCEPT
OVER OPENINGS WHERE
HORIZONTAL REINF MUST BE
PLACED IN LINTEL BLOCK. REFER
TO
Ld h M
IN
Ld M
IN
BOTTOM COURSE MUST
BE BOND BEAM, TYP
TYPICAL BOND BEAM, LOCATE
PER SCHEDULE
FLOOR BELOW
SUPPORT BEAM
BELOW
WHERE 90° HOOK NOT PRACTICAL,
180° AS SHOWN IS PERMITTED. ADD
REBAR (MIN. LENGTH OF 2 Ld, CENTERED) AT INSIDE OF RADIUS, TYPICAL
VERTICAL REINF PER
SCHEDULE
DOWEL TO SUPPORT BEAM MUST MATCH
SIZE AND SPACING OF VERTICAL REINF
AT WALL
TOC EL
PER PLAN
HOLD TOP OF EA GROUT LIFT 50 mm
BELOW TOP OF BLOCK TO CREATE KEY
FOR NEXT LIFT. USE LOW LIFT METHOD
OF GROUND. LIFT HEIGHT NOT TO
EXCEED 1600 mm.
TOP COURSE MUST BE BOND BEAM,
TYP. TOP SUPPORT CONDITION NOT
SHOWN FOR CLARITY. AT BEAM
CONDITION REFER TO AND
M
AX
NOTE: Ld AND Ldh PER TYPICAL
REINFORCEMENT DETAILS
SCHEDULE, REF. SHEET S-501.
3 S-504
2 S-550
3 S-550
6 S-5505 S-550
6 S-550
LINTEL BEAM REINF PER
SCHED
TYP VERT WALL REINF UNO W/ STD
HOOK INTO LINTEL
JAMB REINF IN CELL
ADJACENT TO
OPENING
DOWELS TO MATCH VERT
REINF TYP
TYP
PER ARCH
HORIZ REINF W/ HOOK WHERE Ld (MIN
600) EXTENSION NOT POSSIBLE
Ld
Ld
Ld
TOC EL
PER PLAN
NOTE: SOLID GRAY PATTERN SCHEMATICALLY INDICATES REGIONS THAT ARE GROUTED (TYPICAL WALL REINFORCEMENT GROUTING NOT SHOWN). EXTENT OF GROUT MAY BE MORE OR LESS BASED ON THE REQUIREMENTS OF THE DETAILS AND
SPECIFIC OPENINGS CONDITIONS. CONTRACTOR TO COORDINATE.
VERTICAL STIRRUPS W/ 180° STD
HOOK EA END PER SCHEDULED.
ALTERNATE DIRECTION, TYPICAL.
BOTTOM REINF PER
SCHED
MAX CLEAR
SPAN
BOTTOM
REINF
2-D16
2-D16
2-D16
CMU LINTEL SCHEDULE
MARK
ML1
ML2
ML3
LINTEL BLOCK(S
EE
S
CH
ED
D
DEPTH
(D)
STIRRUPS
D13 @ 400
D13 @ 400
D13 @ 200
NOTES:
1. SPLICING HORIZONTAL REINF OVER OPENINGS PROHIBITED.
2. WHERE BOND BEAM OCCURS WITHIN LINTEL DEPTH, RUN BOND BEAM
REINFORCEMENT CONTINUOUS ACROSS OPENING.
TOP REINF PER SCHED
SECTION AT LINTEL
TO OPNG PER
ARCH
AT OPENING UP
TO 2400
HORIZ REINF W/ STD
180° HOOK. ROTATE
AS NECESSARY
HORIZ HOOKED BAR SIZE TO
MATCH VERT CMU WALL REINF.
PROVIDE (2) VERT BARS AT CELL
ADJACENT TO OPENING
400400
AT OPENING UP
TO 1200
CELLS WITH VERT REINF
MUST BE FULLY
GROUTED, FULL HEIGHT
PLAN AT JAMB
AT OPENING UP
TO 3000
BLOCKS ABOVE LINTEL
ONLY GROUTED WHEN
REQUIRED PER PLANS
AND DETAILS
TOP
REINF
2-D16
2-D16
2-D16
NOTE: PROVIDE ADDT'L VERTICAL BARS,
CUMULATIVELY, BASED ON SIZE OF OPENING
ADDT'L
VERTICAL BAR,
EA SIDE OF
JAMB, TYP
CMU PARTITION
BELOW
BOND BEAM AT
TOP OF WALL
115 MIN EMBED
M16 ABR CAST INTO
BEAM @ 600 OC, EA
FACE OF WALL
CONT L100x100x13 STEEL
ANGLE WITH STD SIZE
HOLES. WELDED STIFF PL12
AT EA END AND AT 600 mm
OC, MIN. 2 PER ANGLE
20 mm GAP TO TOW
BEAM AND SLAB AT
FLOOR ABOVE (REINF
NOT SHOW FOR
CLARITY)
WALL MUST BE
CENTERED AT
BEAMS ABOVE AND
BELOW
WALL MUST BE
CENTERED AT
BEAMS ABOVE
AND BELOW
BEAM AND SLAB AT
FLOOR ABOVE (REINF
NOT SHOW FOR
CLARITY)
TYPICAL MASONRY WALL TOP CONDITION
MASONRY TOP CONDITION AT EXT BEAM
M16 ABR CAST INTO
BEAM @ 600 OC, EA
FACE OF WALL
20 mm GAP TO TOW
115 MIN EMBED
CONT L100x100x13 WITH STD
SIZE HOLES. WELDED STIFF
PL12 AT EA END AND AT 600
mm OC, MIN. 2 PER ANGLE
MAX 5 mm GAP TO
FACE OF WALL
ADD'T D10 @ 200
NTS
CMU WALL CONTROL JOINTS
1 NTS
TYP CMU WALL HORIZ REINF
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
G
DE
SI
GN
ED
B Y:
DR
AW
N
BY
SU
BM
IT
TE
D
BY
CH
EC
KE
D
BY
SI
ZE
IS
O A1
IS
SU
E
DA
TE
CO
NT
RA
CT
N O.
SO
LIC
IT
AT
IO
N
NO
SHEET ID
a
FI
LE
B.
F
IS
HE
R
B.
F
IS
HE
R
B.
F
IS
HE
R
S.
S
CH
NE
ID
ER
JU
LY
, 2
W
2H V2
1F
-P
S-550
BLDG P810
IN
TE
RM
ED
IA
TE
D
ES
IG
N
SU
BM
IT
TA
L 0 7/2
5/2
CM
U
DE
TA
ILS
NTS
VERT REINF BAR POSITIONER
NTS
TYP CMU WALL SECTION
4 NTS
CMU WALL OPENING REINF
6NTS
CMU TOP OF WALL SUPPORT