This document is a Solicitation for a U.S. Navy construction project at NAS Patuxent River, Maryland. The project secures site development and construction services for a Sonobuoy Storage Building, an Air Ops Storage Building, and a Hazmat Storage Building. It includes an option CLIN for Furniture, Fixtures, and Equipment (FF&E). The project is being competed under the NAVFAC Washington Small Business Blue Multiple Award Construction Contract (SB Blue MACC). Proposals are due by July 31, 2024, with the Government intending to evaluate proposals and award without discussions. The estimated price range for this project is greater than $10 million. The period of performance is 365 calendar days after award. The basis of award will be low price. The wage determination and required federal clauses are included.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT A - Contractor Base Access Visit Request Form.docx | DOCX document | |
| ATTACHMENT B - RFI Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY2 P691 Phase I, Aircraft Development and Maintenance Facility ACQR No. 6007134 NAS Patuxent River, MD
NAVAL FACILITIES ENGINEERING COMMAND, WASHINGTON
22445 Peary Road, Bldg. 504
Patuxent River, MD 20670-9998
POC: William S. Bryan, William.s.bryan.6.civ@us.navy.mil, 202-549-4800
Blue Small Business Multiple Award Construction Contract
(BLUE SB MACC)
NAVFAC WASHINGTON
PROPOSED TASK ORDER (Project Title):
P691 Phase I, Aircraft Development and Maintenance Facility
NAS Patuxent River, MD
ACQR#: 6007134
Solicitation#: N40080-18-R-0002
DATE OF SOLICITATION: 1 July 2024
ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A PROPOSAL
FOR THIS PROJECT
SB BLUE MACC CONTRACT HOLDERS:
PROPOSAL PREPARATION
All contractors shall propose on each Request for Proposal (RFP) issued under this contract unless a written determination is forwarded to the Contracting Officer/Ordering Officer which documents why a contractor is unable to propose. This written determination will be forwarded to the Contracting Officer/Ordering Officer within 5 days after receipt of the RFP.
GENERAL REQUIREMENTS
(Clauses incorporated in the Base Contract apply to this solicitation)
NAVFAC Project No.: 1737036 NAVFAC ACQR No.: 6007134
Title: P691 Phase 1, Aircraft Development and Maintenance Facility
Location of the Work: NAS Patuxent River, MD
Description of the Work: This project secures site development and construction services of a Sonobuoy Storage Building, an Air Ops Storage Building, and a Hazmat storage building that align with provided drawings and specifications. This project includes a Furniture, Fixtures, and Equipment (FF&E) Option CLIN for the acquisition and placement of various moveable items included in one or more of the constructed buildings.
Estimated Budget Amount or Price Range: In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is greater than $10,000,000.
NAICS CODE: 236220 – Commercial and Institutional Building Construction
Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government desires completion of construction within 365 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance).
Wage Determination: Department of Labor (DoL) General Decision Number MD20240055 14 June 2024 applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated.
Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages – Construction, Liquidated Damages will be assessed in the amount of $2,954.46 for each calendar day of delay.
Utilities: In accordance with FAC 5252.236-9304, Utilities for Construction and Testing (June 1994), the Contractor shall provide all required utilities; the Government will provide no utilities.
Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction, record shop drawings are required. Record drawings shall be provided using AUTOCAD 2004 or later software. Reproducible copies of these record drawings are also required.
Bond Requirements: Bid Bonds are required in accordance with FAR 28.101-4 (for projects over $150,000). An electronic copy of your bid bond must be submitted with your proposal. A hard copy of the bid bond will be requested from the apparent low bidder upon confirmation of their price and must be submitted to the PCO office within one (1) business day from time of request.
Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed non-responsive and your proposal removed from consideration.
In accordance with FAR 52.228-15 Performance and Payment Bond – Construction, Performance and Payment Bonds are required from the awardee and shall be submitted for approval to the Contracting Officer within 10 days after award of the Task Order. Commencement of construction is contingent upon approval of required bonds.
Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.
Site Visit: A site visit is scheduled for 10 July 2024 at 10:00 AM EST at the pavilion behind Bldg. 504. There will only be one Government sponsored site visit. If you do not have access to NAS Patuxent River, MD you will need to fill out the Contractor Base Access Visit Request Form attached to this solicitation and return to William S. Bryan (william.s.bryan6.civ@us.navy.mil) no later than 9 July 2024 at 10:00 AM.
Request for Information (RFIs): All inquiries must be made in writing and shall be submitted via email to William S. Bryan at William.s.bryan6.civ@us.navy.mil no later than 17 July 2024 by 3:00 PM EST using the RFI form attached to this solicitation. For question(s) asked, include Page, Section, & Paragraph references. Questions offered absent this information may not be accepted. Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment.
Proposal Due Date: 31 July 2024 no later than 2:00 PM EST. LATE PROPOSALS WILL
NOT BE CONSIDERED.
The Proposal shall be addressed to the office listed below:
Naval Facilities Engineering Command (NAVFAC), NAS Patuxent River, MD Attn: William S. Bryan, william.s.bryan6.civ@us.navy.mil.
The proposal must be submitted via email to the POC email(s) listed above. Subject line should contain the ACQR number, Project Title, and contractor information.
All amendments, drawings, and specifications will be distributed to the POCs listed on the front page via Sam.gov.
Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not restated in this RFP package or the task order award document. For clarification on any clause or other contractual issue please contact William S.
Bryan,william.s.bryan6.civ@us.navy.mil.
NOTE THE FOLLOWING:
The Government intends to evaluate proposals and issue a task order without discussions.
Therefore, each initial offer should contain the offeror’s best terms from a price standpoint.
However, the Government reserves the right to conduct discussions if later determine by the Contracting Officer to be necessary.
Any changes to the scope of work, technical specifications, or drawings will be issued on a Standard Form (SF) 30.
This request does not constitute a notice to proceed nor shall it be considered as a commitment on the part of the Government.
Any costs incurred prior to issuance of a task order cannot be reimbursed. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation.
Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation.
If funding becomes available, the successful Offeror will be issued a task order under their contract, as set forth in DFARS 252.216-7006, Ordering.
Basis for Award:
1. This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The basis for award will be low price. For this order, the best value is expected to result from selection of the proposal with the lowest evaluated price.
2. Submittal Requirements and Basis of Evaluation.
Price:
(1) Solicitation Submittal Requirements – Offeror shall submit the following:
Cover page that includes:
- Solicitation Number & Title
- Prime Contractor Name, Address, Phone Number, DUNS, and
Cage Code
- Point of Contact Name, Phone Number, and Email
Price Proposal Form Amendments Acknowledged (if applicable) Bid Guarantee
(2) Basis of Evaluation – The Government will evaluate price based on the total price.
Total price consists of the basic requirements (CLINs 0001 and 0002) and all option items (CLINs 0003 and 0004). Only the HAR will be considered for CLIN 0004. The Government intends to evaluate all options in accordance with FAR 52.217-5, Evaluation of Options (JUL 1990). In accordance with FAR 52.217-5, Evaluation of Options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
i. Comparison of proposed prices received in response to the RFP.
ii. Comparison of proposed prices with the IGCE.
iii. Comparison of proposed prices with available historical information.
iv. Comparison of market survey results
ATTACHMENTS:
ATTACHMENT A – Contractor Base Access Visit Request Form (separate form) ATTACHMENT B – RFI Form (separate form) ATTACHMENT C – BLDG-P691-AOP-1290140-V2 (separate form) ATTACHMENT D – BLDG-P691-Civil-1290140-V1 (separate form) ATTACHMENT E – BLDG-P691-HSF-1290140-V3 (separate form)
ATTACHMENT F – BLDG-P691-SSF-1290140-V4 (separate form) ATTACHMENT G – P691 SAT TO Submission – Specs (separate form) ATTACHMENT H – Price Schedule and Clause Acknowledgement Form ATTACHMENT I – Wage Determination
ATTACHMENT H – Price Schedule and Clause Acknowledgement Form
PRICE SCHEDULE
Solicitation: N40080-18-R-0002
P691 Phase I, Aircraft Development and Maintenance Facility, The contractor shall provide all labor, materials, equipment, and supervision to perform “P691 Phase I, Aircraft Development and Maintenance Facility” in accordance with technical specifications and drawings. The period of performance is 365 calendar days.
ITEM DESCRIPTION
CLIN 0001 Site Development and Construction of Sonobuoy Storage Building
Sitework and construction of a Sonobuoy Storage Building that meets requirements defined in the specifications and drawings.
CLIN 0001 $
CLIN 0002 Site Development and Construction of Air Ops Storage Building
Sitework and construction of an Air Ops Storage Building
CLIN 0002 $
CLIN 0003 Site Development and Construction of Hazmat Storage Building
Sitework and construction of a Hazmat Storage Building
CLIN 0003 $
CLIN 0004 FIXTURES, FURNITURE AND EQUIPMENT (FF&E)
--OPTION--
FF&E Handling and Administrative rate (HAR): See
NOTES (FF&E) below.
0003a FF&E Government Estimate (est.): $26,497.09
0003b HAR (NTE 5%) %
TOTAL CLIN 0004
($26,497.09 (est.) x HAR %): $
CLIN 0004 $
TOTAL: $
NOTES:
1. Offers must be submitted on all items. Failure to propose on all items may result in the proposal being rejected as non-responsive.
A firm fixed price is required for each item and no provision will be made for economic adjustments.
2. Design and construction must be in accordance with the base engineering standards, construction policies, and the latest edition of UFCs and national codes and standards.
NOTES (FF&E):
1. The total estimated budget amount for FF&E has been identified, to provide offerors with the projected magnitude of effort for FF&E. The FF&E Budget Amount is only an estimated amount including freight, installation charges and all fees by furniture provider.
The contractor shall determine the final amount for the FF&E, during the post-award design phase of the FF&E.
2. Offerors shall propose a Handling and Administration Rate (HAR) for the FF&E not to exceed (NTE) 5%. The HAR fee should account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract/task order award and will not be adjusted regardless of fluctuations from the estimated budget amount for FF&E. The proposed HAR is a fixed rate. The dollar amount of the HAR will change based on the actual, final amount for the FF&E determined during the post-award design phase of the FF&E.
3. If awarded, option item will be funded separately after completion of the FF&E design review by the Government, acceptance of FF&E package by the Government, and receipt of appropriate funding by the Government. The design effort and the development of the FF&E packages are performed by the Contractor under the Base Bid. See specification 12 00 01.00 20 for details.
4. The Government is not obligated to award the FF&E Option. Should the Government choose to award the FF&E; the Option will be awarded as a planned Modification to the contract/task order, approximately six months prior to Building Occupancy Date (BOD).
The contractor’s proposed HAR will be applied to all vendor/supplier costs for the FF&E.
5. It is the contractor responsibility to purchase, deliver, and install the FF&E without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the FF&E as a modification. No schedule extensions will be granted.
ACKNOWLEDGMENT OF CLAUSES: Clause 52.204-24, 52.204-25 and 52.225-7059, the offeror acknowledges reading full Clause in the solicitation by checking the appropriate highlighted boxes below and adding the date acknowledged in the chart below.
Clause 52.204-24 52.204-27 252.225-7059
Acknowledgment Date
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT.
(1) It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that— It □ does, □ does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION
(a) Definitions. As used in this clause—
Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.
Information technology, as defined in 40 U.S.C. 11101(6)—
(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—
(i) Of that equipment; or
(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;
(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but
(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.
(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L.
117-328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M-23-13, dated February 27, 2023, “No TikTok on Government Devices” Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M-23-13.
(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.
(End of clause)
252.225-7059 PROHIBITION ON CERTAIN PROCUREMENTS FROM THE XINJIANG
UYGHUR AUTONOMOUS REGION - CERTIFICATION (DEC 2022)
(a) Definitions. Forced labor, person, and XUAR, as used in this provision, have the meaning given in the 252.225-7060, Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region, clause of this solicitation.
(b) Prohibition. DoD may not knowingly procure any products mined, produced, or manufactured wholly or in part by forced labor from XUAR or from an entity that has used labor from within or transferred from XUAR as part of any forced labor programs, as specified in paragraph (b) of the 252.225-7060, Prohibition on certain procurements from the Xinjiang Uyghur Autonomous Region, clause of this solicitation.
(c) Certification.
(1) The Offeror does [ ] does not [ ] certify that the Offeror has made a good faith effort to determine that forced labor from XUAR was not or will not be used in the performance of a contract resulting from this solicitation.
(2) Offerors who do not certify having made a good faith effort will not be eligible for award.
(End of provision)
ACKNOWLEDGMENT OF AMENDMENTS (The bidder acknowledges receipt of amendments to the solicitation -- give number and date of each)
Amendments No.
Date
Name & Address of Firm Submitting Offer:
Signature:
Phone:
Email:
ATTACHMENT I – Wage Determination (Next Page)
"General Decision Number: MD20240055 06/14/2024 Superseded General Decision Number: MD20230055 State: Maryland Construction Type: Building County: St Mary's County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |· Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |· The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|· Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |· The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2024. | The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/12/2024 2 02/02/2024 3 02/23/2024 4 04/05/2024 5 05/10/2024 6 05/17/2024 7 06/14/2024
ASBE0024-004 10/01/2023
Rates Fringes
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical
System Insulation)...............$ 40.02 19.67
BRDC0001-003 04/28/2024
Rates Fringes
STONE FINISHER...................$ 28.09 12.29
BRDC0001-004 04/28/2024
Rates Fringes
TILE FINISHER....................$ 28.09 12.29
BRDC0001-006 04/28/2024
Rates Fringes
TILE SETTER......................$ 33.41 13.94
BRDC0001-007 04/28/2024
Rates Fringes
MASON - STONE....................$ 44.30 20.92
CARP0251-006 05/01/2024
Rates Fringes SOFT FLOOR LAYER (Includes Carpet, Vinyl and Resilient).....$ 34.12 14.64
CARP0474-001 05/01/2022
Rates Fringes
PILEDRIVER PERSON................$ 34.62 13.45
ELEC0026-002 06/05/2023
Rates Fringes
ELECTRICIAN......................$ 53.00 21.35
ELEV0010-002 01/01/2024
Rates Fringes ELEVATOR MECHANIC................$ 54.77 37.885+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
* ENGI0037-006 04/01/2024
Rates Fringes
POWER EQUIPMENT OPERATOR
Bobcat/Skid Steer/Skid Loader......................$ 32.23 14.50 Bulldozer...................$ 34.18 14.50 Crane.......................$ 38.74 14.50 Paver (Asphalt, Aggregate and Concrete)...............$ 34.18 14.50 Roller......................$ 34.18 14.50
IRON0568-001 05/01/2024
Rates Fringes
IRONWORKER, REINFORCING..........$ 30.69 24.15
LABO0616-001 05/01/2023
Rates Fringes LABORER (Pipelayer)..............$ 23.24 22.10
LABO0710-001 04/01/2024
Rates Fringes LABORER (Mason Tender - Brick)...$ 22.17 6.73
PAIN0051-002 06/01/2023
Rates Fringes
GLAZIER..........................$ 34.76 13.85
PAIN0051-003 06/01/2023
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 27.46 11.56
PAIN0051-006 06/01/2023
Rates Fringes
PAINTER..........................$ 27.46 11.56
PLUM0005-002 08/01/2023
Rates Fringes
PLUMBER..........................$ 49.00 22.21
PLUM0602-001 08/01/2023
Rates Fringes PIPEFITTER (Includes HVAC Pipe and Unit Installation)......$ 50.27 23.32
ROOF0030-003 07/01/2023
Rates Fringes
ROOFER...........................$ 34.56 14.71
SFMD0669-002 04/01/2024
Rates Fringes
SPRINKLER FITTER.................$ 42.32 25.80
SHEE0100-005 11/01/2021
Rates Fringes SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 44.37 21.33
TEAM0639-002 06/01/2023
Rates Fringes
TRUCK DRIVER (DUMP TRUCK)........$ 29.25 6.30
* UAVG-MD-0001 01/01/2024
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 31.51 24.53
* UAVG-MD-0002 01/01/2024
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 31.41 24.46
* UAVG-MD-0003 06/12/2023
Rates Fringes
SHEET METAL WORKER...............$ 33.59 23.15
SUMD2023-012 05/30/2023
Rates Fringes
BRICKLAYER.......................$ 29.32 10.51
CARPENTER, Includes Drywall Hanging, and Form Work...........$ 23.40 10.17
CEMENT MASON/CONCRETE FINISHER...$ 27.23 7.18
LABORER: Common or General......$ 19.60 5.51
LABORER: Mason Tender - Cement/Concrete..................$ 19.56 5.77
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 28.36 11.83
OPERATOR: Forklift..............$ 23.72 4.47
OPERATOR: Loader................$ 27.75 11.64 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
File details come from the government source that posted it. Updated .