P29Y1_Junipero_Serra_Park_Paving_100%_Final_Specs_signed.pdf
PDF 10 MB Posted
- Attached to
- Junipero Serra Park Paving Project State and local contract opportunity
- Solicitation number
- E5074
- Issued by
- San Mateo County, California
About this file
This is a Contract Documents and Specifications file for the Junipero Serra Park Paving Project issued by the County of San Mateo, California. The project involves approximately 0.90 miles of park access road and parking lot paving with appurtenant work at Junipero Serra Park. The work consists of resurfacing deteriorated pavement, applying slurry seal and crack treatment to preserve existing pavement, replacing roadway and parking lot striping, and constructing new concrete sidewalk pads for accessible parking stalls across four project areas: a base bid and three additive alternatives (Park Entrance to De Anza Parking Lot, De Anza Parking Lot to Park Ranger Office with associated lots, and Loop Area at the Knoll). Sealed bids are due by 2:00 p.m. on Thursday, July 9, 2026, and will be publicly opened and read aloud. Bidders must register on the OpenGov website or complete a Plan Holder's Affidavit. Questions must be submitted in writing by 5:00 p.m. on July 3, 2026. The contract award is anticipated within sixty days of bid opening to the lowest responsible bidder. The contractor must begin work within ten calendar days of receiving a Notice to Proceed and complete all work within twenty working days (or extended timelines if additive alternatives are awarded). The engineer's estimate of probable construction cost is $945,000 total ($470,000 base bid; $65,000 Alternate 1; $145,000 Alternate 2; $265,000 Alternate 3).
Contractors must be registered with the California Department of Industrial Relations and hold either a Class A or applicable combination of Class C licenses. Prevailing wage rates apply to all work in accordance with California Labor Code sections 1770 and 1810 et seq. The county will retain five percent of all estimated work value and materials until final completion and acceptance as security for contract fulfillment. Contractors must submit a baseline project schedule within five working days of receiving the Notice to Proceed and provide monthly updated schedules. Liquidated damages of $3,500 per calendar day apply for delays beyond the prescribed working days, and task-specific liquidated damages of $500 per day apply for failures in payroll record submission, schedule updates, and Storm Water Pollution Prevention Plan (SWPPP) submission. All contractors must comply with equal employment opportunity requirements, prevailing wage provisions, contractor employee jury service ordinances (for contracts $100,000 or more), and equal benefits compliance ordinances. The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations and includes requirements for water pollution control, construction waste management with specified diversion goals, sanitary sewer monitoring, and traffic control planning.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Junipero_Serra_Park_Paving_Project.pdf | ||
| P29Y1_Junipero_Serra_Park_Paving_100%_Final_Plans_signed.pdf | ||
| P29Y1_Junipero_Serra_Park_Paving_NC.pdf | ||
| Standard_Contract_Template_-_Over_$200K_DRAFT.docx | DOCX document | |
| Standard_Contract_Template_-_Under_$200K_DRAFT.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TitleSht.E5074
Last Updated: June 18, 2026 F:\Users\design\C3D\E5074000_Junipero Serra Parkwide Paving Project\12 Design\100% Final P&S\P29Y1_Junipero Serra Park Paving_100% Final Specs - CLEAN.docx
COUNTY OF SAN MATEO
STATE OF CALIFORNIA
CONTRACT DOCUMENTS
AND
SPECIFICATIONS
FOR
JUNIPERO SERRA PARK PAVING PROJECT
TOTAL PROJECT APPROXIMATELY 0.90 MILES IN LENGTH
WITH APPURTENANT WORK THERETO
IN SAN MATEO COUNTY
COUNTY PROJECT NO. P29Y1
PROJECT FILE NO. E5074
KRZYSZTOF LISAJ
(R.C.E. No. 84003) County Engineer
Department of Public Works
San Mateo County 555 County Center, 5th Floor
Redwood City, California 94063-1665
APPROVED: June 18 , 2026 klisaj Image
TableCon.E5074 i
TABLE OF CONTENTS
NOTICE TO CONTRACTORS
Bid Opening Date Engineer's Estimate General Bidder's Information
SPECIAL PROVISIONS
Section
1. Definitions
2. Bidding 2-1. Plans and Specifications 2-2. In-Use Off-Road Diesel-Fueled Vehicle Fleet Compliance Certification
3. Contract Award and Execution
4. Description of Work
5. Control of Work 5-1. Differing Site Conditions 5-2. Repair of Equipment 5-3. Cooperation 5-4. Permits and Licenses 5-5. Project Appearance 5-6. Preservation of Property 5-7. Air Pollution Control 5-8. Obstructions 5-9. Sound Control 5-10. Public Convenience 5-11. Disposal of Material Outside the Highway Right Of Way 5-12. Sanitary Sewer Monitoring and Reporting Requirements 5-13. Subcontracting
6. Control of Materials 6-1. Certificates of Compliance 6-2. Materials Testing
7. Legal Relations and Responsibility 7-1. Equal Employment Opportunity Program for Minority Employment 7-2. Prevailing Wages 7-2.1. Payroll Records 7-2.2. Contractor Employee Jury Service 7-3. Highway Construction Equipment 7-4. Public Safety
8. Progress of Work and Time of Completion 8-1. Time of Completion 8-2. Liquidated Damages 8-3. Progress Schedule
9. Measurement and Payment 9-1. Force Account Work 9-2. Payments to Contractor ii
TABLE OF CONTENTS (Continued)
SPECIAL PROVISIONS (Continued)
9-3. Payments Withheld from Contractor 9-4. Stop Notices 9-5. Construction Claims 9-6. Prompt Payment Certification
11. Mobilization
12. Maintaining Traffic 12-1. Traffic Control Plan 12-2. Temporary Pavement Delineation
13. Water Pollution Control 13-1. Water Pollution Control Plan
14. Construction Waste Management 14-1. Diversion Goals 14-2. References and Resources 14-3. Waste Management Plan and Daily Transport Report 14-4. Waste Management Plan Implementation
15. Existing Highway Facilities 15-1. Adjust Sanitary Sewer Facilities to Grade 15-2. Remove Existing Asphalt Concrete Dike 15-3. Remove Existing Concrete Curb
17. Clearing and Grubbing
19. Roadway Excavation
21. Erosion and Sediment Control 21-1. Temporary Erosion Control
26. Aggregate Base (Class 2)
37. Bituminous Seals 37-1. Slurry Seal 37-2. Crack Treatment
39. Asphalt Concrete 39-1. Asphalt Concrete (Type A HMA, 1/2” Maximum) 39-2. Compaction Testing 39-3. Asphaltic Emulsion (Tack Coat) 39-4. Place Asphalt Concrete (Miscellaneous Areas) 39-5. Place Asphalt Concrete Dike 39-6. Place Asphalt Concrete Swale 39-7. Pavement Glass Grid 39-8. Sawcut Asphalt Concrete and Portland Cement Concrete 39-9. Plane Asphalt Concrete Pavement (Full Width) 39-10. Pavement Repair (Type A HMA, 3/4” Maximum) 39-11. Header Boards
51. Class 3 Concrete
56. Roadside Signs 56-1. Roadside Signs (American with Disabilities Act (ADA)) iii
SPECIAL PROVISIONS (Continued)
56-2. Install R1-6 (CA) Signs 56-3. Install Type L-1 Roadside Object Marker
78. Incidental Construction 78-1. Parking Bumpers
81. Pavement Markers and Delineators 81-1. Pavement Markers
84. Markings 84-1. Thermoplastic Pavement Markings 84-2. Curb Paint
100. Construction Staking 100-1. As-Built Drawings
Note: Gaps in Section numbering, above, indicate that the Section is either blank or does not apply.
APPENDIX A
County of San Mateo Waste Management Plan Form Waste Management Daily Transport Report
APPENDIX B
Sanitary Sewer Monitoring and Reporting Requirements:
State Water Resources Control Board Order No. WQ 2013-0058-EXEC
APPENDIX C
Sample “Payment Bond” Form Sample “Performance Bond” Form
APPENDIX D
Daily Personnel and Equipment Log
APPENDIX E
Construction Claims:
Public Contract Code Sections 9204 and 20104 et seq.
APPENDIX F
County of San Mateo Memo B-33 for Senate Bill 1383 Compost, Mulch, and Renewable Natural Gas Procurement Reporting Form
APPENDIX G
Quality Assurance Program July, 2025 (QAP)
APPENDIX H
Exhibit 9-P: Prompt Payment Certification iv
PROPOSAL
Contractor’s Check-Off List Name and Address of Bidder Contractor Declaration Statement Bid Schedules Acknowledgement Of Site Visit Bidder's Bond Signature of Bidder Subcontractors San Mateo County Equal Employment Opportunity Program Equal Benefits Compliance Ordinance No. 04026 (Title 2, Chapter 2.84, San Mateo County Ordinance Code) Equal Benefits Compliance Declaration Form Contractor Employee Jury Service Ordinance No. 04269 (Title 2, Chapter 2.85, San Mateo County Ordinance Code) Contractor Employee Jury Service Compliance Declaration Form Non-Collusion Declaration Form In-Use Off-Road Diesel-Fueled Vehicle Fleet Acknowledgement Form
AGREEMENT
Signature Sheet
NC.E5074
NOTICE TO CONTRACTORS
NOTICE IS HEREBY GIVEN, that
Sealed bids will be received either by mail to the office of the County Executive’s Office, or hand-delivered to the County of San Mateo at 500 County Center, 5th Floor, Redwood City, California, 94063 until the hour of
2:00 p.m., Thursday, July 9, 2026 where the bids will be publicly opened and read aloud for the following project in accordance with the specifications therefore and to which special reference is made as follows:
Bids are required for the entire work described herein.
Bidders are further advised of the following:
1. Contractor should be placed on a Plan Holders List for bidding. To be placed on the Plan Holders List, the Contractor shall either:
a. Bidder shall register and create an account on the OpenGov website to download all bidding documents including forms of proposal and contract, directly from https://procurement.opengov.com/portal/smcgov/projects/277456
Project’s OpenGov Reference:
RFP – P29Y1 – JUNIPERO SERRA PARK PAVING PROJECT –
Project ID: E5074
b. If bidding documents are obtained through a source other than those outlined in 1a above, complete and sign the following Plan Holder’s Affidavit and return to the County by PDF via email to adeguzman@smcgov.org and azhang@smcgov.org.
https://procurement.opengov.com/portal/smcgov/projects/277456 mailto:adeguzman@smcgov.org mailto:azhang@smcgov.org
Plan Holder’s Affidavit
Project Title Junipero Serra Park Paving Project
Project No. P29Y1 Project Engineer: Atkins De Guzman
Project Manager: Alex Zhang
Bid Open Date and Time: 2:00 p.m., Thursday, July 9, 2026
Company Name:
Mailing Address:
Phone Number: Fax Number:
E-mail Address:
(Name and Title of Authorized Representative of Bidder)
(Signature of Authorized Representative of Bidder)
2. The Plan Holders List will be posted to the County of San Mateo’s Public
Works website two (2) working days prior to the bid open date.
3. Questions regarding the Contract Documents concerning items such as discrepancies, conflicts, omissions, doubts as to meanings, or regarding scope of bid items shall be referred to the Engineer. Inquiries must be received in writing via email, to adeguzman@smcgov.org and azhang@smcgov.org, by 5 PM on July 3, 2026. Inquiries will be answered in writing via email response if written clarification is warranted, in the opinion of the Engineer, then inquiries and responses will be posted to the Project’s page on the County of San Mateo’s Public Works website. It will be the Contractor’s sole responsibility to ensure that they receive responses, if any. The County will not be responsible for oral clarifications.
4. It will be the Contractor’s sole responsibility to ensure that they have received addendums, if any, which will be posted to the County of San Mateo’s Public Works website on the same day issued. Said addendums will also be sent to all current plan holders and made available during purchase of Plans and Specifications.
5. Proposals in which the prices obviously are unbalanced may be rejected.
mailto:adeguzman@smcgov.org mailto:azhang@smcgov.org
6. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
For bids and contract updates, the Department of Public Works website will be updated as needed and can be accessed under the Department’s tab found on the
County of San Mateo website https://www.smcgov.org/publicworks/Junipero-Serra-
Park-Paving-Project-Bid.
https://www.smcgov.org/publicworks/Junipero-Serra-Park-Paving-Project-Bid https://www.smcgov.org/publicworks/Junipero-Serra-Park-Paving-Project-Bid
ENGINEER’S ESTIMATE
Bid Additive Alternate No. Bid Additive Alternate Description Engineer’s Estimate of Costs1
Base Park Access Road from Park Ranger Office to End of Park Access Road;
Parking Lots at Buckeye Picnic Area, Meadow View Picnic Area, and Bay View
Picnic Shelter Area
$470,000
1 Park Access Road from Park Entrance to De Anza Parking Lot Area
$65,000
2 Park Access Road from De Anza Parking Lot Area to Park Ranger Office; Parking Lots at De Anza Picnic Area and Willow
Picnic Shelter Area
$145,000
3 Loop Area at the Knoll $265,000
1 Total Engineer’s Estimate is provided. The estimated quantities by individual bid item number specific to each Bid Additive Alternate number are provided below. Contractor shall utilize these estimated quantities to complete the Proposal Bid Schedules.
ENGINEER’S ESTIMATE OF PROBABLE CONSTRUCTION COST
For Base Bid and Bid Additive Alternates: $945,000
The following Bid Tables are for all work indicated on project drawings as County responsibility for all the Bid Additives.
Engineer’s Estimate Continued on Next Page
Engineer’s Estimate Continued from Previous Page
BASE BID:
Park Access Road from Park Ranger Office to End of Park Access Road;
Parking Lots at Buckeye Picnic Area, Meadow View Picnic Area, And Bayview Picnic Shelter Area
Item No.
Section No.
Estimated Quantity
Unit of Measure
Item Description
1 10 1 LS Develop and Apply Water
2 11 1 LS Mobilization
3 12 1 LS Maintaining Traffic
4 13 1 LS Water Pollution Control
5 14 1 LS Construction Waste Management
6 15-1 1 EA Adjust Sanitary Sewer Manhole to Grade
7 15-1 2 EA Adjust Sanitary Sewer Cleanout to Grade
8 15-2 55 LF Remove Existing Asphalt Concrete Dike
9 15-3 60 LF Remove Existing Concrete Curb
10 17 1 LS Clearing and Grubbing
11 19 35 CY Roadway Excavation
12 26 15 CY Aggregate Base (Class 2)
13 37-1 2,050 SY Slurry Seal
14 37-2 1 LS Crack Treatment
15 39-1 900 TON Asphalt Concrete (Type A HMA, 1/2" Maximum)
16 39-4 75 SY Place Asphalt Concrete (Miscellaneous Area)
17 39-5 90 LF Place Asphalt Concrete Dike
18 39-6 170 LF Place Asphalt Concrete Swale
19 39-7 5,150 SY Pavement Glass Grid
20 39-9 5,150 SY Plane Asphalt Concrete Pavement (Full Width)
21 39-10 15 SY Pavement Repair (Type A HMA, 3/4" Maximum)
BASE BID:
Park Access Road from Park Ranger Office to End of Park Access Road;
Parking Lots at Buckeye Picnic Area, Meadow View Picnic Area, And Bayview Picnic Shelter Area
Item No.
Section No.
Estimated Quantity
Unit of Measure
Item Description
22 51-1 8 CY Class 3 Concrete
23 56-1 2 EA Roadside Signs (ADA Standard Accessible)
24 56-1 3 EA Roadside Signs (ADA Van Accessible)
25 56-3 1 EA Install Type L-1 Roadside Object Marker
26 78-1 10 EA Parking Bumpers
27 81-1 2 EA Pavement Marker (Blue Reflective, Fire Hydrant Markers)
28 84-1 345 SF Thermoplastic Pavement Markings (White)
29 84-1 70 SF Thermoplastic Pavement Markings (Blue)
30 84-1 3,000 LF Thermoplastic Pavement Striping (4” Wide White Stripe)
31 84-1 300 LF Thermoplastic Pavement Striping (4” Wide Blue Stripe)
32 84-1 120 LF Thermoplastic Pavement Striping (6” Wide White Stripe)
33 84-1 240 LF Thermoplastic Pavement Striping (Detail 2)
34 84-1 510 LF Thermoplastic Pavement Striping (Detail 22)
35 84-2 20 LF Curb Paint (Blue)
36 84-2 20 LF Curb Paint (Red)
37 100 1 LS Construction Staking and Layout
BID ADDITIVE ALTERNATE 1:
Park Access Road from Park Entrance to De Anza Parking Lot Area
Item No.
Section No.
Estimated Quantity
Unit of Measure
Item Description
1 10 1 LS Develop and Apply Water
2 11 1 LS Mobilization
3 12 1 LS Maintaining Traffic
4 13 1 LS Water Pollution Control
5 14 1 LS Construction Waste Management
6 15-2 50 LF Remove Existing Asphalt Concrete Dike
7 17 1 LS Clearing and Grubbing
8 39-1 145 TON Asphalt Concrete (Type A HMA, 1/2" Maximum)
9 39-5 50 LF Place Asphalt Concrete Dike
10 39-7 815 SY Pavement Glass Grid
11 39-9 815 SY Plane Asphalt Concrete Pavement (Full Width)
12 84-1 310 LF Thermoplastic Pavement Striping (Detail 22)
13 100 1 LS Construction Staking and Layout
BID ADDITIVE ALTERNATE 2:
Park Access Road from De Anza Parking Lot Area to Park Ranger Office;
Parking Lots at De Anza Picnic Area and Willow Picnic Shelter Area
Item No.
Section No.
Estimated Quantity
Unit of Measure
Item Description
1 10 1 LS Develop and Apply Water
2 11 1 LS Mobilization
3 12 1 LS Maintaining Traffic
4 13 1 LS Water Pollution Control
5 14 1 LS Construction Waste Management
6 15-2 600 LF Remove Existing Asphalt Concrete Dike
7 17 1 LS Clearing and Grubbing
8 19 35 CY Roadway Excavation
9 26 15 CY Aggregate Base (Class 2)
10 37-1 5,450 SY Slurry Seal
11 37-2 1 LS Crack Treatment
12 39-4 170 SY Place Asphalt Concrete (Miscellaneous Area)
13 39-5 700 LF Place Asphalt Concrete Dike
14 39-6 60 LF Place Asphalt Concrete Swale
15 39-10 430 SY Pavement Repair (HMA Type A, 3/4” Maximum)
16 39-11 360 LF Header Boards
17 51-1 5 CY Class 3 Concrete
18 56-1 2 EA Roadside Signs (ADA Standard Accessible)
19 56-1 2 EA Roadside Signs (ADA Van Accessible)
20 56-2 2 EA Install R1-6 (CA) Signs
21 78-1 4 EA Parking Bumpers
22 84-1 340 SF Thermoplastic Pavement Markings and Legends (White)
BID ADDITIVE ALTERNATE 2:
Park Access Road from De Anza Parking Lot Area to Park Ranger Office;
Parking Lots at De Anza Picnic Area and Willow Picnic Shelter Area
Item No.
Section No.
Estimated Quantity
Unit of Measure
Item Description
23 84-1 70 SF Thermoplastic Pavement Markings and Legends (Blue)
24 84-1 1,100 LF Thermoplastic Pavement Striping (4” Wide White Stripe)
25 84-1 180 LF Thermoplastic Pavement Striping (4” Wide Blue Stripe)
26 84-1 75 LF Thermoplastic Pavement Striping (Detail 2)
27 84-1 1,170 LF Thermoplastic Pavement Striping (Detail 22)
28 84-2 40 LF Curb Paint (Blue)
29 84-2 60 LF Curb Paint (Red)
30 100 1 LS Construction Staking and Layout
BID ADDITIVE ALTERNATE 3:
Loop Area at the Knoll
Item No.
Section No.
Estimated Quantity
Unit of Measure
Item Description
1 10 1 LS Develop and Apply Water
2 11 1 LS Mobilization
3 12 1 LS Maintaining Traffic
4 13 1 LS Water Pollution Control
5 14 1 LS Construction Waste Management
6 17 1 LS Clearing and Grubbing
7 39-1 615 TON Asphalt Concrete (Type A HMA, 1/2" Maximum)
8 39-7 3,600 SY Pavement Glass Grid
9 39-9 3,600 SY Plane Asphalt Concrete Pavement (Full Width)
10 81-1 1 EA Pavement Marker (Blue Reflective, Fire Hydrant Markers)
11 84-1 335 SF Thermoplastic Pavement Markings and Legends (White)
12 84-1 400 LF Thermoplastic Pavement Striping (6” Wide Red Stripe)
13 100 1 LS Construction Staking and Layout
(F) Final Pay Quantities - See Section 9-1.02C, “Final Pay Item Quantities,” of the Standard Specifications.
(Note: Gaps in section numbering, above, indicate the Section is blank or does not apply.)
The foregoing quantities are approximate only, being given as a basis for the comparison of bids, and the County of San Mateo does not, expressly or by implication, agree that the actual amount of work will correspond herewith, but reserves the right to increase or decrease the amount of any class or portion of the work, or to omit any portion of the work, as may be deemed necessary or expedient by the Engineer.
Payment to the Contractor for materials furnished and work completed shall be made by the County in accordance with Section 9 of the “Special Provisions” portion of these Contract Documents. Pursuant to Section 22300 of the Public Contract Code, Contractor may, upon his request and at Contractor's expense, substitute equivalent securities for any moneys retained from such payment for the fulfillment of the Contract.
When applicable, both Contractor and Subcontractor hereby agrees to pay not less than prevailing rates of wages and be responsible for compliance with all the provisions of the California Labor Code, Article 2-Wages, Chapter 1, Part 7, Division 2, Section 1770 et seq and Section 1810 et seq. A copy of the prevailing wage scale established by the Department of Industrial Relations is on file in the office of the Director of Public Works, and available at www.dir.ca.gov/DLSR or by phone at 415-703-4774. California Labor Code Section 1776(a) requires each contractor and subcontractor keep accurate payroll records of trades workers on all public works projects and to submit copies of certified payroll records upon request.
Additionally, pursuant to State Senate Bill SB 854 (Stat. 2014, chapter 28), effective January 1, 2015:
(1) No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
(2) No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
(3) This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
Wage rates for overtime shall be paid at not less than one and one-half (1-1/2) times the above rates. Wage rates for Sundays and holidays shall be paid at not less than two (2) times the above rates.
The holidays upon which such rates shall be paid shall be all holidays recognized in the collective bargaining agreement applicable to the particular craft, classification, or type of worker employed on the Project.
It is the policy of the County that Contractors on public projects employ their workers and craftsmen from the local labor market whenever possible. “Local Labor Market” is defined as the labor market within the geographical confines of the County of San Mateo, State of California. Consistent with this policy, the Contractor is requested to employ craftsmen and other workers from the local labor market whenever possible to do so.
Each bidder shall submit with the bid, Certificates of Compliance and Intent on a form provided in the “Proposal” section of these Contract Documents, a certificate that bidder is in compliance with the provisions of the Equal Employment Opportunity Requirement of the Title VII of the Civil Rights Act of 1964, the California Fair Employment and Housing Act and any other federal, State and local laws and regulations relating to equal employment opportunity. With the execution of said certificates, bidder also agrees that bidder will maintain or develop and implement, during the course of the work concerned, a program of hiring and employment, conducted without regard to race, religion, color, national origin, ancestry, sexual orientation, or sex of the applicants. With this certification, bidder shall submit any and all information that may be required by the County in connection with the particular project.
Each bidder is hereby notified of Section 9204 and Section 20104 et seq. of the Public Contract Code as those Sections (attached hereto as Appendix E) relate to resolution of construction claims, and to Section 3186 of the Civil Code, as amended
January 1, 1999 with regard to stop notices and public entity’s rights to retain monies in order to provide for that entity’s reasonable cost of litigation. The bidder is further notified that all provisions of Section 9204 and Section 20104 et seq. of the Public Contract Code and Section 3186 of the Civil Code, as outlined above shall be considered as incorporated into and become an integral part of these specifications.
Questions relating to equal employment should be directed to the San Mateo County Department of Public Works, Equal Employment Opportunity Program, 555 County Center, 5th Floor, Redwood City, CA 94063-1665, telephone (650) 363-4100.
Additional technical questions should be directed to the Department of Public Works, 555 County Center, Redwood City, California, 94063-1665, telephone
(650) 363-4100.
The Contractor shall possess either a Class A License or a combination of Class C licenses that are applicable for the majority of the work at the time this contract is awarded. No Contract will be awarded to a Bidder who is not licensed as required by laws of the State of California.
The County of San Mateo reserves the right to reject any or all bids and/or waive any informalities or irregularities in any bid received.
Bidders may not withdraw their bid for a period of FORTY-FIVE (45) DAYS after the date set from the opening thereof.
BY ORDER OF THE
BOARD OF SUPERVISORS
DATE: June 18 , 2026
Michael Callagy, County Executive/ Clerk of the Board of Supervisors
SP.E5074
SPECIAL PROVISIONS
FOR
DATE: _____June 18____, 2026
SECTION 1.
DEFINITIONS OF TERMS TO BE USED IN THE SPECIAL PROVISIONS,
NOTICE TO CONTRACTORS, PROPOSAL, AGREEMENT OR
OTHER CONTRACT DOCUMENTS
Except as specifically stated herein, the definitions contained in the Standard
Specifications of the State of California, Department of Transportation, as set forth per Section 2-1, “Plans and Specifications,” of these Special Provisions and hereafter referred to as “Standard Specifications,” shall be applicable with the understanding that where said definitions specifically refer to the State of California, a department or division of the State or an official, officer or employee of the State, said definition shall be interpreted to refer to the County of San Mateo, the Department of Public Works, the Parks Department, or other appropriate department, division, official, officer or employee of the County of San Mateo.
Definition 7-1.02L, “Public Contract Code,” of the Standard Specifications shall not be interpreted to include the provisions of Article 7.1 of Division 2, Part 2, Chapter 1 of the Public Contract Code.
END OF SECTION
SECTION 2.
BIDDING
The Bidder’s attention is directed to all the provisions of Section 2, “Bidding,” of the Standard Specifications and these Special Provisions. The County will accept a Bidder’s Bond in the form issued by an admitted surety insurer in lieu of the sample forms provided herein in Appendix C of these Special Provisions. The County will not be responsible for any oral interpretations to Bidders with respect to any of the work embraced herein.
Failure of the bidder to fulfill the requirements of the Special Provisions for submittals required to be furnished after bid opening, including but not limited to escrowed bid documents, where applicable, may subject the bidder to a determination of the bidder's responsibility in the event it is the apparent low bidder on a future public works contract.
All proposals must be made upon the blank form contained herein.
2-1. Plans and Specifications Subject to the exceptions stated herein, the work embraced herein shall be done in accordance with the Standard Plans and Specifications as adopted by the County of San Mateo insofar as the same may apply, and in accordance with the following Special Provisions.
As set forth in Resolution No. 077227 of the Board of Supervisors of the
County of San Mateo, adopted February 11, 2020, which approved and adopted the 2018 Standard Plans and Standard Specifications of the State of California, Department of Transportation as the Standard Plans and Standard Specifications of the County of San Mateo, State of California.
In the event that a discrepancy arises between the project Plans, these
Special Provisions, the Standard Plans and the Standard Specifications, the provisions of Section 5-1.02, “Contract Components,” of the Standard Specifications shall apply.
2-2. In-Use Off-Road Diesel-Fueled Vehicle Fleet Compliance Certification
In conformance with Title 13 CCR § 2449 et seq., bidders must submit the In-Use Off-Road Diesel-Fueled Vehicle Fleet Acknowledgement Form. A copy of a valid and unexpired Certificate of Reported Compliance Off-Road Diesel Vehicle Regulation for all fleets meeting this criteria must be submitted with the bid or within three (3) business days from bid opening. Failure to submit the valid and unexpired Certificate of Reported Compliance Off-Road Diesel Vehicle Regulation may result in a non-responsive bid.
SECTION 3.
CONTRACT AWARD AND EXECUTION
The bidder's attention is directed to the provisions in Section 3, “Contract Award and Execution,” of the Standard Specifications and these Special Provisions for the requirements and conditions concerning award and execution of contracts.
However, the following supersedes the second paragraph in Section 3-1.04, “Contract Award,” of the Standard Specifications:
“The award of contract, if awarded, will be made to the lowest responsible bidder within SIXTY (60) DAYS after the opening of the proposals. If the lowest responsible bidder refuses or fails to execute the contract, the County may award the contract to the second lowest responsible bidder. If the second lowest responsible bidder refuses or fails to execute the contract, the County may award the contract to the third responsible bidder. The period of time after that specified above within which the award of the contract may be made shall be subject to extension for such further period as may be agreed upon, in writing, between the County and the bidder concerned.”
Bidders who wish to lodge a protest for consideration as to the bidding process or the award of a contract to the lowest responsible bidder must do so as follows:
(1) Protests based upon alleged improprieties in a solicitation, which are apparent prior to bid opening, shall be filed two (2) business days prior to bid opening.
(2) Protests other than those covered by paragraph 1, above, shall be filed no later than ten (10) calendar days after the bid opening.
(3) All protests shall be delivered to:
Director of Public Works County of San Mateo 555 County Center, 5th Floor Redwood City, CA 94063
Untimely protests, which do not meet the deadline requirements specified above, will not be accepted or considered.
Bid protests must be submitted in writing to the addressee and address listed above. Bid protests must at a minimum include the following:
• Project Name
• Project File Number
• A complete statement describing the basis for the bid protest, which includes a detailed statement of all legal and factual grounds for the protest
• Documentation supporting the protestor's grounds for the protest
• The type of relief requested and the legal basis for such relief
If a valid protest is filed timely, the Department will investigate the bid protest.
The protested bidder shall have three (3) business days to respond to the Department and to provide any information requested by the Department. The Department shall respond to the protesting party, stating its findings. The Department Director shall make a recommendation to the San Mateo County Board of Supervisors regarding the bid protest.
Bid protests are to be delivered to the following address: 555 County
Center, 5th Floor Redwood City, CA 94063.
The award of the contract, if it is awarded, will be to the lowest responsible bidder whose proposal complies with all the requirements prescribed.
The contract shall be executed by the successful bidder and shall be returned, together with the contract bonds, to the County so that it is received within ten (10) days, not including Saturdays, Sundays and legal holidays, after the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty. The executed contract documents shall be delivered to the following address:
555 County Center, 5th Floor Redwood City, CA 94063.
SECTION 4.
DESCRIPTION OF WORK
The location of the project is generally along the following areas in Junipero Serra Park:
1. Base Bid Area – Park access road from the west office driveway to the end of access road before the loop at the knoll, including office driveway and parking areas, Buckeye Picnic parking lot area, Meadow View Picnic parking lot area, Bay View Picnic Shelter parking lot area, and driveway to residence.
2. Additive Alternative Areas
a. Additive Alternative 1 – Park access road from 40’ south of Park entrance booth, to approximately 310’ along the access road.
b. Additive Alternative 2 – Park access road from De Anza parking lot area, to approximately 1,170’ along the access road, including Willow Picnic Shelter parking lot area.
c. Additive Alternative 3 – Loop area at the knoll
The work to be done consists, in general, of the following items:
1. Base Bid - resurfacing existing deteriorated pavement of the access road, Meadow View Picnic, and Bay View Picnic Shelter parking lot areas, preserving the existing pavement of the Buckeye Picnic parking lot area by applying crack seal and slurry seal, replacing in kind existing roadway striping and parking lot striping, and constructing new concrete sidewalk pad for accessible parking stalls.
2. Additive Alternatives
a. Additive Alternative 1 – resurfacing existing deteriorated pavement of the access road and replacing in kind existing roadway striping.
b. Additive Alternative 2 – preserving the existing pavement of the access road, and De Anza and Willow Picnic Shelter parking lot areas by applying crack seal and slurry seal, replacing in kind existing roadway striping and parking lot striping, and constructing new concrete sidewalk pad for accessible parking stalls.
c. Additive Alternative 3 – resurfacing existing deteriorated pavement of the access road and replacing in kind existing roadway striping.
Additionally, other items and details not mentioned above, but required by the Project Plans, Standard Specifications and these Special Provisions, and the directions of the Engineer. The additive alternative work is dependent upon availability of funding and may or may not be awarded as part of the contract.
The County reserves the right to award the Base Bid only, or together with one or more additive alternatives, at its sole discretion.
SECTION 5.
CONTROL OF WORK
Attention is directed to the provisions of Section 5, “Control of Work,” of the Standard Specifications, except as herein provided, and to Section 2-1, “Plans and Specifications,” of these Special Provisions.
5-1. Differing Site Conditions
This section shall be used in lieu of Section 4-1.06, “Differing Site Conditions (23 CFR 635.109),” of the Standard Specifications. Section 4-1.06 of the Standard Specifications shall not apply.
The following shall apply to digging trenches or other excavations that extend deeper than four feet (4') below the surface:
A. The Contractor shall promptly, and before the following conditions are disturbed, notify the Engineer, in writing, of any:
(1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, II, or III disposal site in accordance with provisions of existing law.
(2) Subsurface or latent physical conditions at the site differing from those indicated.
(3) Unknown physical conditions at the site of any unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
B. The Engineer shall promptly investigate the conditions, and if he finds that the conditions do materially differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor's cost of, or the time required for, performance of any part of the work, shall issue a change order, excluding loss of anticipated profits, under the procedures described in the contract. No contract adjustment that results in a benefit to the Contractor will be allowed unless the Contractor has provided the required written notice.
C. In the event that a dispute arises between the Engineer and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the contractor's cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. The Contractor shall retain any and all rights provided either by contract or by law that pertain to the resolution of disputes and protests between the contracting parties.
D. In the event conditions materially differ from those indicated, the
Contractor shall have no claim for construction delays, unless said conditions are determined by the Engineer to impact the controlling item of work.
5-2. Repair of Equipment
The work of installing, assembling, repairing or reconditioning, or other work of any nature on machinery, equipment or tools used in or upon the work shall be considered a part of the work to be performed under the contract and any laborers, workers or mechanics working on the machinery, equipment or tools, unless employed by bona fide commercial repair shops, garages, blacksmith shops or machine shops, which have been established and operating on a commercial basis for a period of at least 2 months prior to the award of the contract, shall be subject to all the requirements relating to labor set forth in these specifications and in the special provisions.
5-3. Cooperation
Attention is directed to Sections 5-1.20, “Coordination with Other Entities,” and 5-1.36, “Property and Facility Preservation,” of the Standard Specifications, and to these Special Provisions. The utility companies may be rearranging their facilities within the project area and it is expected that they will cooperate with the Contractor to the end that the work may be handled in an efficient manner.
The Contractor shall contact USA North811 (USA) service alert a minimum of forty-eight (48) hours in advance of any excavation or trenching work. USA may be contacted either on-line at usanorth811.org or by phone by dialing (800) 642-2444 or 811.
5-4. Permits and Licenses
Attention is directed to Section 5-1.20B, “Permits, Licenses, Agreements, and Certifications,” of the Standard Specifications and these Special Provisions.
The Contractor shall have at least two employees trained in confined space entry regulations CAL/OSHA Confined Space Regulations, Title 8 CCR GISO 5156, 5157, and 5158 at the site whenever there are open trenches or underground work going on. It is understood that all fall protection, retrieval and atmospheric monitoring equipment shall be furnished and maintained by the Contractor at the Contractor’s expense. This shall include but not be limited to cost associated with compliance with Confined Space Entry Regulations shall be at the expense of the Contractor.
5-5. Project Appearance
The Contractor shall maintain a neat appearance to the work. Full compensation for conforming to the provisions in this section, not otherwise provided for, shall be considered as included in the unit prices paid for the various Contract items of work involved, and no additional compensation will be allowed therefore.
5-6. Preservation of Property
The Contractor's attention is directed to Section 5-1.36, “Property and Facility Preservation,” of the Standard Specifications.
5-7. Air Pollution Control Air pollution control shall conform to the provisions of Section 14-9.02, “Air
Pollution Control,” of the Standard Specifications.
5-8 Obstructions Attention is directed to the provisions in Sections 5-1.36C, “ Nonhighway
Facilities,” 15, “Existing Facilities,” and 51-1.03E(9), “Utility Facilities,” of the Standard Specifications.
5-9. Sound Control
Sound control shall conform to the provisions in Section 14-8.02, “Noise Control,” of the Standard Specifications.
5-10. Public Convenience
Public Convenience shall conform to the provisions in Section 7-1.03, “Public Convenience,” of the Standard Specifications and to these Special Provisions.
5-11. Disposal of Material Outside the Highway Right of Way Disposal of Material Outside the Highway Right Of Way shall conform to the provisions of Sections 5-1.20B(4), “Contractor-Property Owner Agreement,” and 14-10, “Solid Waste Disposal and Recycling,” of the Standard Specifications, and Section 14, “Construction Waste Management,” of these Special Provisions.
The Contractor’s attention is further directed to Appendix “A”, “Construction Waste Management Plan,” of these Special Provisions.
5-12. Sanitary Sewer Monitoring and Reporting Requirements
The Contractor’s attention is directed to Appendix B for sanitary sewer monitoring and reporting requirements.
5-13. Subcontracting
Attention is directed to the provisions in Section 5-1.13, “Subcontracting,” of the Standard Specifications.
SECTION 6.
CONTROL OF MATERIALS
Attention is directed to Section 6, “Control of Materials,” of the Standard
Specifications and these Special Provisions.
The Contractor shall furnish all materials required to complete the work under this Contract.
6-1. Certificates of Compliance Certificates of Compliance, conforming to the provisions in Section 6-
2.03C, “Certificates of Compliance,” of the Standard Specifications shall be furnished for all manufactured products, unless otherwise waived by the Engineer.
6-2. Materials Testing
Whenever the specifications require compliance with specified values for the following applicable properties, tests will be made as indicated:
Material
To Be Tested Property
Being Tested Acceptable
Test Method(s) Description
Aggregate Base Relative Compaction CT 216/CT 231
Determines field densities using a nuclear gage.
Asphalt Concrete Relative Compaction
CT 375 or
ASTM D2950
Determines field densities using a nuclear gage.
Portland Cement Concrete
Compressive Strength
CT 521
Determines compressive strength of Portland cement concrete samples by compression testing machine.
Any costs to the County for testing layers which fail the compaction requirements may be deducted from any progress payment due to the Contractor when, in the opinion of the Engineer, such failure results from the Contractor's lack of diligence in pursuing compaction effort. In the event that a test fails, any testing after the first shall be at the Contractor’s expense.
SECTION 7.
LEGAL RELATIONS AND RESPONSIBILITY
Attention is directed to the provisions of Section 7, “Legal Relations and
Responsibility to the Public,” of the Standard Specifications, these Special Provisions, and to the provisions of paragraph VIII, “Insurance,” of the Agreement (AG) portion of the Contract Documents for insurance requirements
7-1. Equal Employment Opportunity Program for Minority Employment
It is the intent of the Board of Supervisors of the County of San Mateo to prohibit and eliminate employment discrimination and to further the opportunities for minority persons to be gainfully employed in the performance of County construction contracts. Award of a contract to a low bidder will not be made until such bidder has complied with the provisions of Section 2.50.040 of Title 2, Chapter 2.50, as amended, of the San Mateo County Ordinance Code and with these guidelines.
7-1.1. Definitions
EQUAL EMPLOYMENT OPPORTUNITY PROGRAM: An Equal Employment Opportunity Program (EEOP) is a set of specific and result oriented procedures to which a Contractor commits himself in order to achieve equal employment opportunity.
COMPLIANCE OFFICER: The Compliance Officer (CO) means the
County official designated by the County Executive to represent him in the administration of these guidelines and in the enforcement of the provisions of Sections 2.50.040 and 2.50.050 of Title 2, Chapter 2.50.
7-1.2. Certifications of Compliance and Intent
Every bidder will submit with his bid, as required by Section 2.50.050 of Title 2, Chapter 2.50, a Certification of Compliance with the laws prohibiting discrimination and a Certification of Intent to implement an equal employment opportunity program on the form furnished in the Proposal section of these Specifications.
7-1.3. Equal Employment Opportunity Program
In addition to furnishing the Certifications of Compliance and Intent, each bidder will submit his equal employment opportunity program with his bid proposal. The EEOP shall contain the following information:
A. Analysis of current work force
(1) Total number of employees;
(2) Numerical racial breakdown of employees by job classification;
(3) Information on apprentices.
These figures will provide the base by which the low bidder's EEOP will be evaluated. Factors to be considered both in the original statistics and in any plans for future employment will include the percentage of minority population in San Mateo County, the availability of minority construction workers and the present minority representation in the various construction trades.
B. The affirmative actions the bidder has taken and will take to ensure equal employment opportunity. These shall include:
(1) Recruiting and hiring minority persons. If non-union personnel are employed, this would involve employment advertising through sources serving the minority population. These include local minority newspapers, referral agencies, high schools, vocational schools and community groups. Specific information on these sources may be obtained from the Compliance Officer. Union employees will be recruited in accordance with applicable labor agreements. The bidder will seek to have included or will reaffirm clauses in all labor agreements prohibiting discrimination based on race, religion, color, national origin, age, disability, ancestry, sexual orientation, or sex. It is also suggested that bidders assist in admitting minority workers who are over the traditional apprenticeship entry age to the various craft training programs.
(2) Providing adequate opportunity for the upgrading or further training of all employees to insure equal opportunity in advancement and promotion. This might include a counseling service, information and assistance with night classes, or special career-directed program information.
(3) Appointing an Equal Employment Opportunity Coordinator, full time or as an additional duty. This person will have the responsibility of administering an active program, informing company personnel and union representatives of company policy, and advising all subcontractors of their obligation to this program.
(4) Establishing or maintaining an apprenticeship/training program designed to ensure hiring of additional minority employees in the journeyman and skilled classes. Each bidder is urged to support or develop and implement an Apprenticeship Program for his trade.
(5) Selecting minority subcontractors or subcontractors who are known for their ongoing programs of apprenticeship for minorities. This includes advising minority Contractor associations of opportunities for subcontracts. Joint ventures with minority sub-contractors are encouraged.
C. The EEOP should state any previous experience the bidder has had with similar plans and the results of that effort. Current affirmative action plans should be described in detail.
7-1.4. Equal Employment Opportunity Program Evaluation
A. The Compliance Officer (CO) will review the EEOP submitted by the low bidder in order to determine whether the program submitted complies with the provisions of Section 2.50.040 of Title 2, Chapter 2.50, as amended, of the San Mateo County Ordinance Code, and these guidelines. If deficiencies are indicated, CO may request additional information from the bidder or suggest appropriate remedies. The CO will be available to answer questions relative to the guidelines and to advise those seeking assistance of other sources. CO will not be responsible for the service or lack of service rendered by the consultant recommended, nor will the CO develop an EEOP or serve as a recruiter for any bidder.
The low bidder may withdraw his EEOP for revision after consultation with the CO; however, the revised program must be resubmitted by a date not later than fifteen (15) calendar days after the opening of bids.
B. All subcontractors listed in the low bidder's proposal shall be required to file completed Certificates of Compliance and Intent and their EEOP with the Bidder for submission to the County. The EEOP of each subcontractor will be evaluated by criteria established for the low bidder's
EEOP.
C. The CO, upon conclusion of the EEOP review, will report his findings and recommendation to the Director of Public Works. The CO will keep acceptable EEOP’s on file for six (6) months. During this time period, if the bidder or subcontractors bid for other County contracts, they may refer to the EEOP on file and state any changes, but will not be required, unless specifically requested, to re-file their program.
7-1.5. Inclusion of EEOP and Certificates
Upon award of the Contract by the Board of Supervisors, the EEOP and certifications for the bidder and all subcontractors, which have been approved and accepted by the County, will become an integral part of the Contract and subject to the provisions thereof.
7-1.6. Compliance of Contractor
A. The Contractor will post, in conspicuous places available to employees and applicants for employment, notices, provided by the County, stating that the Contractor is obliged to comply with the provisions of these guidelines and the provisions of Section
2.050.040 of Title 2, Chapter 2.50, as amended, of the San Mateo County Ordinance Code. These notices will also be sent to all unions, employee organizations and other recruiting sources providing employees to the Contractor.
B. All announcements of job openings will include the statement, “An Equal Opportunity Employer.”
C. The Contractor will make written progress reports on a form provided by the County to illustrate the effectiveness of his EEOP at intervals established by the County.
D. The CO will monitor the Contractor's EEOP until completion of the Contract and will report non-compliance of the Contractor in adhering to his EEOP to the Director of Public Works.
E. The Contractor will permit, during Contractor's normal business hours and at Contractor's place of business, access by the County to his records of employment, employment advertisements, application forms and other data and records pertaining to Contractor's employment practices, for the purpose of determining whether Contractor is complying with the non-discrimination and equal employment opportunity rules of the County.
7-1.7. Compliance of Subcontractor
All subcontractors listed by the bidder are subject to all the provisions of these guidelines and the provisions of Section 2.050.040 of Title 2, Chapter 2.50, as amended, of the San Mateo County Ordinance Code.
7-1.8. Penalties for Non-Compliance
The penalties for non-compliance are listed in Title 2, Chapter 2.50, Section 2.50.050, which states:
a. “Every public works contract shall provide that a contractor who, within the time specified in the contract, does not submit an equal employment plan and make the certifications required in this chapter shall be in breach of the contract.”
“If, after an award is made, the contractor is found by the County or by a Federal or State agency empowered to make such findings to be in substantial or material violation of the Fair Employment Practices Act of the State of California, the Equal Employment Opportunity Requirement of the Title VII of the Civil Rights Act of 1964, or of the provisions of this chapter or of the Board-established guidelines implementing them, he may be found to be in material breach of contract, and the County shall have the power to cancel the contract in whole or in part, or alternatively, to deduct for each working day during which the contractor is found to have been in such non-compliance, two percent (2%) of the total amount payable to the contractor.”
7-1.9. Waiver of Compliance
In the event that any of the requirements of Sections 2.050.040 and
2.050.050 of Title 2, Chapter 2.50, as amended, of the San Mateo County Ordinance Code, are found to result in an undue hardship upon a low bidder, bidder may submit evidence of hardship and a petition for waiver of such requirements to the Director of Public Works for recommendation to the Board of Supervisors. Such a waiver may only be granted by the Board and, if approved, shall become an integral part of the contract.
7-1.10 Employee Benefits
All Contractors with contracts with the County of $5,000 or more shall comply with the provisions of Title 2, Chapter 2.84, as amended, of the San Mateo County Ordinance Code with respect to the provisions on employee benefits. As set forth in the ordinance, such contractors are prohibited from discriminating in the provisions of employee benefits between an employee with a domestic partner and an employee with a spouse. A copy of the Ordinance and Compliance form is attached to the Proposal Section of these Specifications.
In the event it is determined, by the County, that any portion of the County
Ordinance Code regarding employee benefits conflict with Federal or State regulations, the Federal or State regulations shall take precedence over the County Ordinance Code.
7-1.11 Non-Discrimination
No person shall be excluded from participation in, denied benefits of, or be subject to discrimination under this Agreement on the basis of their race, color, religion, national origin, age, sex, sexual orientation,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .