About this file
This is an architectural drawing and project specification document prepared by the California Department of Fish and Wildlife for siding replacement at the Baldwin Lake Ecological Reserve Office in San Bernardino County. The project requires all labor, tools, equipment, materials, permits, and taxes necessary to replace the building's siding, sheathing, and exterior painting. The Baldwin Lake office is a single-story, Type V-B construction building constructed in 1960 with a building area of 1,600 square feet, occupancy classification of B, actual building height of 14 feet 10 inches, and an occupant load of 10 persons. The contractor must replace all building siding with new Hardie Plank lap siding, provide new building paper on the entire structure, and install new Hardie trim around doors, windows, vents, and other wall penetrations. The contractor is also responsible for inspecting existing sheathing and replacing damaged sections, with an assumption of 30 percent of entire building wall sheathing replacement to be included in the bid. The project location is at 44865 North Shore Drive, Big Bear City, California 92314. The bid due date is February 24, 2026, no later than 2:00 p.m.
The new Hardie siding and trim must come pre-colored, and the contractor shall paint all existing exterior components including fascia, rake, exposed rafters, soffit, doors, and door frames to match the new siding and trim. The site manager will select up to two colors for the painting of the office exterior. The project must conform to applicable 2022 California Building Code provisions, California Fire Code, California Energy Code, California Green Building Standards Code, and other referenced standards including NFPA standards. The structure is located in a high fire hazard zone and requires a fire alarm system. The drawing identifies all applicable building codes, accessibility requirements under the Americans with Disabilities Act, and Cal/OSHA safety regulations that govern the work. Contractors are required to read and verify all dimensions and field conditions prior to bidding, and the contractor is responsible for any construction deviations from the plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P2560014_Bid_Documents_2nd.pdf | ||
| P2560014_Instr_to_Bidders_2nd_signed.pdf | ||
| P2560014_Cmplt_Agrmt_Sample_2nd.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
67'-5"
30'-1"6'-6"6'-6"4'-91 2"19'-61
2"
'-9
'-0
'-0
'-0
'-8
'-1
'-6
52'-4"
9'-0" 5'-6" 4'-6" 3'-0" 12'-93 4" 6'-61
4" 3'-53 4" 6'-61
4" 1'-0"
'-9
15'-1"
5'-5" 3'-8" 6'-0"
'-0
26'-6"
13'-3"
'-1
'-4
'-0
26'-6"
1'-0" 3'-0"
1'-0" 3'-8"2'-1"15'-9"
'-6
'-8
'-1
13'-3"
'-6
'-1
'-4
52'-4"
19'-61 2"4'-91
2"6'-6"6'-6"15'-0"
15'-1"
'-6
'-1
'-0
'-9
1 2
'-9
1 2
West Elevation
'-0
10'-0" 5'-6" 4'-6" 3'-0" 12'-93 4" 6'-61
4" 2'-53 4" 6'-61
4" 1'-0"
5'-5" 3'-8" 6'-0"
'-6
'-1
'-5
'-5
"4 '-5
1 2
'-8
V1
California Department of Fish and Wildlife Land and Facilities Engineering Branch
The Natural Resources Agency
State of California
APPROVED:
CHECKED BY:
Scott Murata
CHIEF ENGINEER DATE
6/10/2025
Patrick Luster C65221
Exp. 9/30/25
DATENO. APPROVED BY DESCRIPTION
P2560014
E10-2025-001
Sheet 01 of 01
C25-14
Drawing Number:
Baldwin Lake Ecological Reserve
San Bernardino County
Inland Deserts Region (Region 6)
Baldwin Lake Office Siding ReplacementC93263 Exp. 3/31/2026
PROJECT DESCRIPTION:
THE PROJECT CONSISTS OF SIDING REPLACEMENT ON THE BALDWIN LAKE ECOLOGICAL RESERVE
OFFICE AND OTHER MISCELLANEOUS IMPROVEMENTS.
THE PROJECT SHALL CONFORM TO THE APPLICABLE STATE AND FEDERAL CODES AS SHOWN
BELOW:
1. 2022 CALIFORNIA CODE OF REGULATIONS (CCR)
2. 2022 CALIFORNIA ADMINISTRATIVE CODE (CAR), (CCR, TITLE 24, PART 1)
3. 2022 CALIFORNIA BUILDING CODE (CBC), VOLUMES 1, AND 2, (CCR, TITLE 24, PART 2)
(BASED ON 2021 INTERNATIONAL BUILDING CODE)
4. 2022 CALIFORNIA RESIDENTIAL CODE (CRC), (CCR, TITLE 24, PART 2.5), (BASED ON 2021
INTERNATIONAL RESIDENTIAL CODE)
5. 2022 CALIFORNIA ELECTRICAL CODE (CEC), (CCR, TITLE 24, PART 3) (2020 NATIONAL
ELECTRIC CODE (NEC))
6. 2022 CALIFORNIA MECHANICAL CODE (CMC), (CCR, TITLE 24, PART 4) (BASED ON 2021
UNIFORM MECHANICAL CODE)
7. 2022 CALIFORNIA PLUMBING CODE (CPC), (CCR, TITLE 24, PART 5) (BASED ON 2021
UNIFORM PLUMBING CODE)
8. 2022 CALIFORNIA ENERGY CODE, (CCR, TITLE 24, PART 6)
9. 2022 CALIFORNIA HISTORICAL BUILDING CODE, (CCR, TITLE 24, PART 8)
10. 2022 CALIFORNIA FIRE CODE (CFC), (CCR, TITLE 24, PART 9) (BASED ON 2021
INTERNATIONAL FIRE CODE)
11. 2022 CALIFORNIA EXISTING BUILDING CODE, (CCR, TITLE 24, PART 10) (BASED ON THE 2021
INTERNATIONAL EXISTING BUILDING CODE)
12. 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE, (CCR, TITLE 24, PART 11).
13. 2022 CALIFORNIA REFERENCED STANDARDS CODE, (CCR, TITLE 24, PART 12);
NFPA 13 - AUTOMATIC SPRINKLER SYSTEMS W/ CA AMENDMENTS 2022 EDITION
NFPA 14 - STANDPIPE SYSTEMS W/ CA AMENDMENTS 2019 EDITION
NFPA17A - WET CHEMICAL SYSTEMS 2021 EDITION
NFPA 20 - STATIONARY PUMPS 2022 EDITION
NFPA 24 - PRIVATE FIRE MAINS W/ CA AMENDMENTS 2022 EDITION
NFPA 72 - NATIONAL FIRE ALARM CODE W/ CA AMENDMENTS 2022 EDITION
NFPA 2001 - CLEAN AGENT FIRE EXTINGUISHING SYSTEMS 2022 EDITION
W/ CA AMENDMENTS
REFERENCE CODE SECTION FOR NFPA STANDARDS ARE IN 2022 CBC CHAPTER 35 OR
2022 CFC CHAPTER 80.
14. REFERENCE CODE SECTIONS FOR APPLICABLE STANDARDS;
2022 CBC, CHAPTER 35
2022 CFC, CHAPTER 80
15. TITLE 8 CALIFORNIA CODE OF REGULATIONS (CCR), CAL/OSHA REGULATIONS-SAFETY ORDERS
ISSUED BY DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA
16. TITLE 19 C.C.R., PUBLIC SAFETY, SFM REGULATIONS, LIST OF FEDERAL CODES & STANDARDS
(IF APPLICABLE)
17. AMERICAN WITH DISABILITIES ACT (ADA), TITLE II OR TITLE III
18. 2022 CALIFORNIA ACCESS COMPLIANCE ADVISORY REFERENCE MANUAL (AS PREPARED BY
THE DIVISION OF THE STATE ARCHITECT OFFICE, PUBLISHED ON JANUARY 1, 2021 EFFECTIVE
JULY 1, 2021)
19. DOT STANDARD SPECIFICATIONS AND/OR PLANS; STATE OF CALIFORNIA, DOT, 2022
20. UNDERWRITERS LABORATORIES, INC. (UL STANDARDS)
GENERAL NOTES:
1. CONTRACTOR SHALL READ AND BE FAMILIAR WITH ALL FACETS OF THE PLANS AND
SPECIFICATIONS.
2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO
BIDDING/COMMENCEMENT OF WORK.
3. THESE PLANS ARE FOR GENERAL CONSTRUCTION PURPOSES ONLY. THEY ARE NOT FULLY
SPECIFIED.
4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SELECT, VERIFY, RESOLVE, AND INSTALL
ALL MATERIALS AND EQUIPMENT WITH COMPLIANCE TO CODES AND /OR ORDINANCES.
5. CONSTRUCTION SHALL BE OF THE HIGHEST QUALITY OF WORKMANSHIP. ALL CONNECTIONS
SHALL BE MADE SECURE ACCORDING TO ACCEPTED CONSTRUCTION PRACTICES OR AS
SPECIFIED HEREIN OR PER CURRENT BUILDING CODES.
6. CONTRACTOR IS RESPONSIBLE FOR ANY CONSTRUCTION WHICH IS IN DEVIATION FROM
THESE PLANS.
N
N
STRUCTURE CODE DATA
BALDWIN LAKE ECOLOGICAL RESERVE OFFICE
1. OCCUPANCY CLASSIFICATION AND USE: B
2. BUILDING CONSTRUCTION TYPE: TYPE V-B
3. NUMBER OF STORIES: 1
4. ACTUAL BUILDING HEIGHT (FT) 14'-10"
5. BUILDING AREA (SF) 1,600
6. AREA OF PROJECT (SF) 1,600
7. SEPARATED OR NOT-SEPARATE USE NONE SEPARATE
8. ALLOWABLE AREA PER C.B.C (SF) 5,500
9. AREA INCREASE NONE
10. HEIGHT INCREASE NO
11. FIRE SPRINKLERS NO
12. FIRE ALARM YES
13. OTHER FIRE PROTECTION SYSTEMS NONE
14. SMOKE CONTROL SYSTEM NO
15. OCCUPANT LOAD 10
16. YEAR STRUCTURE CONSTRUCTED 1960
17. IS STRUCTURE LOCATED IN A HIGH FIRE HAZ ZONE YES
18. SEISMIC JOINTS NO
19. FIRST RESPONDER RADIO COVERAGE YES
DOOR MINIMUM CLEAR WIDTH IS 32",
32"/0.2 = MAXIMUM 160 OCCUPANTS,
MAXIMUM 160 OCCUPANTS > 10
BUILDING OCCUPANTS, TYP 2 DOORS
DOOR MINIMUM CLEAR WIDTH IS 32",
32"/0.2 = MAXIMUM 160 OCCUPANTS,
MAXIMUM 160 OCCUPANTS > 10
BUILDING OCCUPANTS, TYP 2 DOORS
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text K
AutoCAD SHX Text
%%UNORTH ELEVATION
AutoCAD SHX Text
SCALE:1" = 5'
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
REF.
AutoCAD SHX Text
%%USOUTH ELEVATION
AutoCAD SHX Text
SCALE:1" = 5'
AutoCAD SHX Text
%%UBALDWIN LAKE ECOLOGICAL RESERVE OFFICE PLAN
AutoCAD SHX Text
SCALE:1" = 5'
AutoCAD SHX Text
AutoCAD SHX Text 2.5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UEAST ELEVATION
AutoCAD SHX Text
SCALE:1" = 5'
AutoCAD SHX Text
%%UWEST ELEVATION
AutoCAD SHX Text
SCALE:1" = 5'
AutoCAD SHX Text
BALDWIN LAKE ECOLOGICAL RESERVE OFFICE (PROJECT LOCATION)
AutoCAD SHX Text
44865 NORTH SHORE DRIVE
AutoCAD SHX Text
BIG BEAR CITY, CA 92314
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
NORTH SHORE DRIVE
AutoCAD SHX Text
BALDWIN LAKE
AutoCAD SHX Text
HARDIE TRIM AROUND ALL WINDOWS, TYP
AutoCAD SHX Text
HARDIE PLANK LAP SIDING
AutoCAD SHX Text
HARDIE PLANK LAP SIDING
AutoCAD SHX Text
HARDIE PLANK LAP SIDING
AutoCAD SHX Text
HARDIE PLANK LAP SIDING
AutoCAD SHX Text
HARDIE TRIM AROUND ALL WINDOWS, TYP
AutoCAD SHX Text
HARDIE TRIM AROUND ALL WINDOWS, TYP
AutoCAD SHX Text
EXISTING GABLE VENT TO REMAIN, PROVIDE NEW HARDIE TRIM
AutoCAD SHX Text
EXISTING GABLE VENT TO REMAIN, PROVIDE NEW HARDIE TRIM
AutoCAD SHX Text
HARDIE TRIM AROUND ALL DOORS, TYP
AutoCAD SHX Text
HARDIE TRIM AROUND ALL DOORS, TYP
AutoCAD SHX Text NOTES: 1. CONTRACTOR SHALL REPLACE ALL BUILDING SIDING WITH NEW HARDIE PLANK LAP SIDING CONTRACTOR SHALL REPLACE ALL BUILDING SIDING WITH NEW HARDIE PLANK LAP SIDING 2. CONTRACTOR SHALL PROVIDE NEW BUILDING PAPER ON ENTIRE STRUCTURE CONTRACTOR SHALL PROVIDE NEW BUILDING PAPER ON ENTIRE STRUCTURE 3. CONTRACTOR SHALL PROVIDE NEW HARDIE TRIM AROUND DOORS, WINDOWS, VENTS, OTHER MISCELLANEOUS WALL PENETRATIONS CONTRACTOR SHALL PROVIDE NEW HARDIE TRIM AROUND DOORS, WINDOWS, VENTS, OTHER MISCELLANEOUS WALL PENETRATIONS 4. NOT ALL WALL PENETRATIONS ARE SHOWN ON THE PLANS, CONTRACTOR SHALL NOTE ANY NOT SHOWN DURING THE PER-BID JOBWALK NOT ALL WALL PENETRATIONS ARE SHOWN ON THE PLANS, CONTRACTOR SHALL NOTE ANY NOT SHOWN DURING THE PER-BID JOBWALK 5. CONTRACTOR SHALL INSPECT EXISTING SHEATHING AND REPLACE IT IF DAMAGED. PRIOR TO REPLACING SHEATHING, CONTRACTOR MUST REVEICE CONTRACTOR SHALL INSPECT EXISTING SHEATHING AND REPLACE IT IF DAMAGED. PRIOR TO REPLACING SHEATHING, CONTRACTOR MUST REVEICE APPROVAL FROM CDFW CONTRACT MANAGER. 6. CONTRACTOR SHALL INCLUDE REPLACEMENT OF 30% OF THE ENTIRE BUILDING WALL SHEATHING IN THEIR BID, ASSUME " PLYWOOD, MATCH CONTRACTOR SHALL INCLUDE REPLACEMENT OF 30% OF THE ENTIRE BUILDING WALL SHEATHING IN THEIR BID, ASSUME " PLYWOOD, MATCH 12" PLYWOOD, MATCH PLYWOOD, MATCH EXISTING SIZE AND NAILING, ADDITIONAL SHEATHING OVER THE 30% REPLACEMENT SHALL BE PAID OUT OF CONTINGENCY, IF LESS THAN 30% OF THE SHEATHING IS REPLACED, CONTRACTOR SHALL BE PAID FOR ACTUAL AMOUNT OF SHEATHING REPLACEMENT. 7. NEW HARDIE SIDING AND TRIM SHALL COME PRE-COLORED, SEE EXHIBIT A FOR COLOR NEW HARDIE SIDING AND TRIM SHALL COME PRE-COLORED, SEE EXHIBIT A FOR COLOR 8. CONTRACTOR SHALL PAINT EXISTING EXTERIOR COMPONETS TO MATCH NEW SIDING AND TRIM INCLUDING FASCIA/RAKE, EXPOSED RAFTERS, CONTRACTOR SHALL PAINT EXISTING EXTERIOR COMPONETS TO MATCH NEW SIDING AND TRIM INCLUDING FASCIA/RAKE, EXPOSED RAFTERS, SOFFIT, DOORS AND DOOR FRAMES 9. SITE MANAGER SHALL SELECT UP TO TWO COLORS FOR THE PAINTING OF THE OFFICE EXTERIOR SITE MANAGER SHALL SELECT UP TO TWO COLORS FOR THE PAINTING OF THE OFFICE EXTERIOR 10. CONTRACTOR IS RESPONSIBLE FOR ADDING TRIM AROUND ANY ADDITIONAL WALL PENETRATIONS NOT SHOWN ON PLANSCONTRACTOR IS RESPONSIBLE FOR ADDING TRIM AROUND ANY ADDITIONAL WALL PENETRATIONS NOT SHOWN ON PLANS
AutoCAD SHX Text
EXISTING ELECTRICAL PANEL, PROVIDE NEW HARDIE TRIM
AutoCAD SHX Text
TOP OF EXTERIOR WALL
AutoCAD SHX Text
ROOF OVERHANG
AutoCAD SHX Text
TOP OF EXTERIOR WALL
AutoCAD SHX Text
ROOF OVERHANG
AutoCAD SHX Text
EXISTING METAL ROOF
AutoCAD SHX Text
EXISTING METAL ROOF
| Sheets and Views |
| P2560014 Baldwind Lake ER Office Siding-36 x 24 Sheet |
File details come from the government source that posted it. Updated .