P232268 B37 Zenith ATS Replacement SOW.pdf

PDF 139 KB Posted

Attached to
Replace Automatic Transfer Switch (ATS) Building 37 Federal contract opportunity
Solicitation number
W50S7X-23-B-0001
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Replace Automatic Transfer Switch (ATS) Building 37, newest first.
File Type Posted
Abstract B37 ATS Replacement - signed.pdf PDF
Site Visit Minutes B37 Repalce ATS.pdf PDF
Site Visit Info B37 ATS Replacement.pdf PDF
ABB Zenith ZTE ZBTE Series OM Manual.pdf PDF
W50S7X-23-B-0001.pdf PDF
Bldg 37 Elect One Line Riser Diagram.pdf PDF
B37 ATS Specs.pdf PDF
Davis Bacon Wage Rate.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

BUILDING 37 Zenith Automatic Transfer Switch Replacement

MCCONNELL AFB, WICHITA, KS (KANSAS ANG)

PROJECT PRQE 232268

21 December 2022

SW-1 LOCATION: Building 37 at McConnell AFB, Wichita, Kansas. Arrangements for entrance onto McConnell AFB must be made by contacting CE Operations at (316) 759-7490 between the hours of 7:00 a.m. and 4:00 p.m., Monday through Friday. ACCESS IS RESTRICTED, ESCORTS SHALL BE

PROVIDED BY THE BUILDING OCCUPANTS

SW-2 SCOPE OF WORK: The work covered in this contract consists of furnishing all labor, expertise, equipment, materials, facilities, transportation, and appliances necessary to perform operations in connection with the work described in paragraph SW-3. It is the intent of the government for the contractor to provide a complete and useable system. Any relevant details required for a complete system that are omitted in the contract plans and specifications will be provided by the Contractor at no cost to the government.

SW-3 SUMMARY OF WORK: Work shall consist of but is not limited to the following:

Remove and replace the Automatic Transfer Switch (ATS) outside of Bldg 37 with new ATS of the same type, rating and size (see characteristics below). Contractor will dispose of the removed ATS.

Functionally test the ATS after installation per the B37 ATS Specifications. See attached drawing and specifications for more details. Temporary power to the building will be required during the ATS replacement. The ATS and connected switchgear are all outside.

ATS Requirements– 480V 2500A, 4 Pole, 65,000 A.I.C., NEMA 3R with Maintenance Bypass. The new ATS will have a manual actuation handle in addition to the automatic function.

Current ATS: Zenith ZTE series. See attached O+M Manual

SW-4 CODES & STANDARDS: All work performed under this contract shall be in accordance with federal, state and local codes & standards, as well as widely accepted industry standards, including but not limited to: American Institute of Architects, American Concrete Institute, American Institute of Electrical Engineers, American Institute of Steel Construction, American National Standards Institute, American Society of Heating, Refrigerating and Air-Conditioning Engineers, American Society of Mechanical Engineers, American Society of Testing Materials, National Bureau of Standards, National Electric Code, American Welding Society, Brick Institute of America, Building Officials and Code Administrators, Federal Aviation Administration, National Fire Protection Association, National Electric Code, Occupational Safety & Health Administration, Rubber Manufacturers Association, Underwriters Laboratories, and the Kansas DOT standard specification. Additionally, all requirements of the Kansas Department of Health must be satisfied in their entirety for any work performed or materials bought under this contract. Failure to comply with any of the aforementioned codes and standards shall be considered as a failure to comply to contract specifications.

SW-5 UTILITIES: Contractors shall coordinate with all local utilities having jurisdiction.

SW-6 CALL BEFORE YOU DIG: All contractors shall be responsible for locating any or all utilities for any excavations or penetrations into the ground greater than 12” deep.

SW-7 CONFINED SPACE: The Contractor shall provide a confined space entry permit to the Base Engineers Office prior to any entry into a permit-required confined space. The following steps shall be accomplished to acquire authorization to open or enter a confined space:

1. The Contractor shall provide written notice to the Contracting Office Technical Representative, (COTR) defining exact location of space requiring entry.

2. A KANG Confined Space Supervisor shall brief the Contractor on the following:

a. The contents of the space and known hazards that make the space permit required.

b. The precautions and procedures that have been implemented by the organization to protect KANG personnel.

c. Emergency rescue responsibilities to determine whether the Contractor supplies the rescue team or if the installation fire department is expected to supply a rescue function.

d. It is the Contractor’s responsibility to contact the Fire Chief on the installation if the

Contractor is planning to use the installation fire department as a rescue function.

e. Standard procedures if the project requires a combined effort involving both KANG and contracted personnel to access the space at the same time.

f. Contractor shall follow Air Force Occupational Safety and Health Standard 91-25 and

Occupational Safety and Health Administration 29 CFR 1910.146.

3. A written record of the briefing shall be signed by the Contractor and Confined Space

Supervisor and kept on file in the project folder.

4. The Contractor accepts full responsibility at this point to initiate and maintain the permit and supply all material, equipment and labor to test, monitor, enter and exit the space in a safe manner.

5. The Contractor’s Confined Space Entry Permit shall be kept on site during entry to the space.

A copy of the Contractor’s Permit shall be returned to the COTR at the completion of the project.

SW-8 MATERIALS: The materials shall conform to specifications, applicable industry codes and standards and the manufacturer's recommendations, whichever is more stringent. Certificates of compliance and Technical Data Sheets are required for all materials supplied.

SW-9 SITE INSPECTION: The Contractor is required to acknowledge, at time of Bid Opening that said contractor has inspected and is fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition(s) which was(were) existing at the time of the site visit.

SW-10 BASE ACCESS: The contractor shall be granted access to McConnell Air Force Base to complete this project. All other areas are off limits. The Government reserves the right to deny access to any person, with no consequence to the contract.

Contractors will be provided a Base Access Form that must be filled out for any individual requiring access to the Base for this project. The completed forms must be e-mailed to the POC who will forward them to Security to be processed. The security check process usually takes a minimum of five days. Individuals must provide Real ID form of identification and if driving they will need a valid driver’s license, auto registration and proof of insurance at the time they pick up their Base Passes or Badges at the Visitor Center located at the East Gate off Rock Road. After Contractors have their Pass or Badge they should enter the Base through the Inspection Area at the West Gate. Access is limited to travel from the Gate to the job site. All other areas are off limits. Vehicle Passes are not transferable to other vehicles. The Government reserves the right to deny access to any person, with no consequence to the contract.

Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DOD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and

Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

SW-11 SAFETY: Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the commercial contractor. Government employees must comply with AFOSH. All contractors and employees will attend a pre-construction meeting prior to project work beginning.

SW-12 CLEAN-UP: Clean-up and remove debris generated by this contract to an approved off-base location. Two (2) copies of the receiving (tipping or dumping) tickets, with a cover letter from the Prime Contractor stating the full name and address of the location to which debris was taken.

SW-13 GOVERNMENT RESOURCES: No Government resources shall be made available to the contractor, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the Contractors actions. Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel and facilities.

SW-14 SUPPLEMENTAL ATTACHMENTS:

1. B37 Elect One Line Riser Diagram

2. B37 ATS Specs

3. Zenith ZTE Series Operation and Maintenance Manual

STATEMENT OF WORK
PROJECT PRQE 232268
21 December 2022