P21205 Mohawk Paving and ADA Project – Design Plans Summary
This is a set of signed design and construction plans prepared by the City of Springfield Development & Public Works Department for the P21205 Mohawk Paving and ADA Project. The project encompasses approximately 340 linear feet of grind-and-overlay asphalt pavement restoration along Mohawk Boulevard, spanning from Station 10+00 to Station 13+62. The scope includes cold planing and removal of 4 inches of existing pavement, installation of a 4-inch nominal thickness asphalt concrete pavement (ACP) wearing course with fiber reinforcement, upgrades to two corner ADA ramps at the Q Street and Marcola Road intersections, installation of new pedestrian signal pushbuttons, pavement markings, and associated utility coordination. The plans were designed by B. Jabusch and checked by S. Petroff, a registered professional engineer in Oregon (License #70925, expiration 12-31-2026), with final approval dated July 30, 2026. A pre-construction conference is required within 30 calendar days of the notice to proceed, and contractor submission of a project work schedule is mandatory prior to the conference. Night work is required for the roadwork, and a pre-paving conference must be scheduled 24 hours before paving operations commence.
The construction plans specify compaction requirements of 95 percent for subgrade and crushed rock layers and 90-92 percent for asphalt depending on road classification, with concrete compressive strength requirements ranging from 3000 to 4600 PSI depending on use. Concrete testing will be coordinated by Lane County with cylinders collected for three-day, seven-day, and 28-day compressive strength analysis. The contractor is responsible for locating all utilities prior to excavation by contacting the Oregon Utility Notification Center at 800-332-2344 or 811 at least 48 hours before work begins. All wastewater and stormwater connections must be inspected by the contractor and the City's Development and Public Works Operations Department prior to hookup, and television inspection of installed pipes is required after backfill and before final asphalt paving. Erosion control measures must be in place prior to construction start, and the contractor must comply with the Americans with Disabilities Act requirements throughout the project. Street tree plantings must have a minimum trunk caliper of 2 inches measured 6 inches above the root stem.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P21205 - Bid Book 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TH
S T
TH
S T
TH
S T
RDMARCOLA
STPIEDMONT
TH ST
Q ST
TH
S T
ST
S T
ST
T ST
M
ELLO
W O
O D
STT
FIR
ESID
E
MAIA LOOP
R ST
Q S
T
EOP 13+62
VICINITY MAP
BOP 10+00
PROJECT LOCATION
GRIND AND OVERLAY PAVEMENT RESTORATION, ADA RAMP UPGRADES,
PAVEMENT MARKINGS
NOTES
1. TOPO PERFORMED WITH THE TRIMBLE S6
TOTAL STATION AND TRIMBLE R8 GPS/RTK
BETWEEN 6/6/19 & 6/27/19
2. HORIZONTAL DATUM IS NAD 83/91
3. VERTICAL DATUM IS NAVD88
N
N
Pr oject Si te
SHEET INDEX
SHEET NO. DESCRIPTION
A01-A04 TITLE, LEGEND, ABBR., LAYOUT, GEN NOTES
BA01 TYPICAL SECTIONS
BB01-BB02 INTERSECTION OVERVIEW
BC01-BC02 SIDEWALK CONSTRUCTION NOTES
BD01-BD02 ADA RAMP CONSTRUCTION DETAILS
C01 CONSTRUCTION DETAILS
E01-E12 TEMPORARY TRAFFIC CONTROL PLAN
F01-F02 EROSION CONTROL DETAILS
M01-M06 INTERSECTION SIGNAL DETAILS
Q01-Q02 PAVEMENT MARKING PLAN
STANDARD DRAWINGS
DWG NO. DESCRIPTION
4-1A MAINTENANCE HOLE ADJUSTMENT
5-26 UTILITY VALVE CONCRETE COLLAR DETAIL
RD1010 INLET PROTECTION TYPE 2, 3, 6, 7, 10 & 11
TM457 PEDESTAL FOUNDATION AND TRAFFIC SIGNAL ASSEMBLY
TM467 PEDESTRIAN SIGNAL MOUNT AND PEDESTRIAN PUSHBUTTON
DETAILS
TM500 PAVEMENT MARKING STANDARD DETAILS
TM501 PAVEMENT MARKING STANDARD DETAILS
TM502 PAVEMENT MARKING STANDARD DETAILS
TM503 PAVEMENT MARKING STANDARD DETAILS
TM515 PAVEMENT MARKERS
TM530 INTERSECTION PAVEMENT MARKINGS
TM702 GENERAL JUNCTION BOX INSTALLATION
TM820 TEMPORARY BARRICADES
TM821 TEMPORARY SIGN SUPPORTS
TM844 TEMPORARY PEDESTRIAN ACCESSIBLE ROUTES
TM845 TEMPORARY SIDEWALK RAMPS
Project P21205 Mohawk Blvd Paving and ADA Project
CITY OF SPRINGFIELD
DEVELOPMENT & PUBLIC WORKS
NOT TO SCALE
TITLE SHEET
A01B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 A Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
Stanley A Petroff Digitally signed by Stanley A Petroff Date: 2026.08.07 15:17:05-07'00'
R O
W R
O W
R O
W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWROWROW
ROW
R O
W R
O W
R O
W R
O W
RO
W
ROW
ROW
ROW
ROW
ROW ROW ROW
14+30
10+00
11+00 12+0013+0014+00
START OF
PROJECT
STA 10+00
(BEGIN AT EXISTING
PAVEMENT TRANSITION)
END OF
PROJECT
STA 13+62
M
AR
C O
LA
R
D
19TH ST
Q ST
MOHAWK BLVD
1" = 50'
PROJECT PLAN OVERVIEW
A02B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
ADA RAMP UPGRADE
ADA RAMP UPGRADE
ACP LIMITS
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Design Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
Date: 2026.08.07 15:17:45-07'00'
LEGEND
GAS LINE (DIA SHOWN)
SEE SHEET
XX##
MATCH LINE
STA ##+##
COMMUNICATION LINE(S)
SECTION, MATCHLINE, AND DETAIL DESIGNATIONS
OVERHEAD LINES
POWER LINE
PROPERTY LINE
STORMWATER DRAINAGE
RIGHT OF WAY (ROW) LINE
SANITARY LINE
TV LINE
TRAFFIC SIGNAL LINE
TRAFFIC DETECTION LOOP
WATER LINE (DIA SHOWN)
CATCH BASIN
COMMUNICATION BOX
FIRE HYDRANT
GAS VALVE
JUNCTION BOX
POLE
POWER POLE/LIGHT
SIGN
STORM DRAIN
SANITARY MANHOLE
TREE/BUSH/SHRUB
TRUNCATED DOME
UTILITY VAULT
WATER VALVE
WATER METER
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
XX##
XX##
ABBREVIATIONS
NO SCALE
LEGENDS AND ABBREVIATIONS
A03
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 A Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
POWER VAULT
Date: 2026.08.07 15:18:00-07'00'
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
NO SCALE
GENERAL CONSTRUCTION NOTES:
GENERAL NOTES
A04
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 A Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
A. ALL MATERIALS AND WORKMANSHIP WITHIN THE PUBLIC RIGHT-OF-WAY OR PUBLIC EASEMENTS SHALL MEET THE OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION, AS SPECIFIED IN PART 00100 OF THE CITY OF SPRINGFIELD SPECIAL PROVISIONS IN ADDITION TO ALL OTHER SPECIFICATIONS REFERENCED
OR INCLUDED, AND IN ADDITION TO THESE PLANS.
B. OREGON LAW REQUIRES THE CONTRACTOR TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0100. THE CONTRACTOR MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. NOTE: THE TELEPHONE
NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (800) 332-2344 OR 811.
C. LOCATION AND/OR DEPTH OF EXISTING UTILITIES SHOWN ON PLANS ARE APPROXIMATE. ALL UTILITIES MAY NOT APPEAR ON PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT ALL UTILITY COMPANIES FOR UNDERGROUND LOCATION OF FACILITIES AT LEAST 48 HOURS PRIOR TO EXCAVATING OR
"POTHOLING". THE "ONE-CALL" NUMBER (800) 332-2344 OR 811.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH UTILITY COMPANIES ON THE TIMING OF INSTALLATION OF THEIR FACILITIES.
E. ALL WASTEWATER (SANITARY) AND STORMWATER SEWER CONNECTIONS TO EXISTING CITY OWNED FACILITIES (PIPE, CATCH BASINS, MAINTENANCE HOLES (MANHOLES), ETC.) SHALL BE INSPECTED BY THE CONTRACTOR AND THE CITY'S DEVELOPMENT AND PUBLIC WORKS OPERATIONS DEPARTMENT PRIOR TO HOOK UP. CONTACT OPERATIONS AT (541-726-3761) OR CITY CONSTRUCTION INSPECTOR NO LESS THAN 48 HOURS PRIOR TO DESIRED INSPECTION TIME.
F. WHERE CONNECTING TO AN EXISTING PIPE, THE CONTRACTOR SHALL EXPOSE THE END OF THE EXISTING PIPE AND ALLOW THE ENGINEER TO VERIFY EXACT LOCATION AND ELEVATION, CONDITION, AND POSITIVE FLOW BEFORE LAYING ANY NEW PIPE.
G. THE PIPE GRADE SHALL BE PER THE PLANS, SPECIFICATIONS, AND WITH THE MINIMUM COVER AS SHOWN ON THE PLANS.
H. THE CONTRACTOR SHALL INTERNALLY TELEVISION INSPECT THE PIPE AFTER ALL BACKFILL AND BEFORE THE FINAL LIFT OF ASPHALT PAVING. THE CONTRACTOR SHALL SUPPLY THE CITY WITH AN ELECTRONIC COPY OF THE TELEVISION REPORT AND VIDEO FOR CITY APPROVAL AT LEAST TWO (2) WORKING DAYS
BEFORE THE PRE-PAVING MEETING.
I. CONTRACTOR TO SCHEDULE A PRE-PAVING CONFERENCE 24 HOURS PRIOR TO PAVING. CONTACT THE CONSTRUCTION INSPECTOR.
J. COMPACTION REQUIREMENTS:
LAYER RATE TEST
SUBGRADE 95% T99
CRUSHED ROCK 95% T180
ASPHALT (LOCAL) 90% RICE
ASPHALT (COLLECTOR/ARTERIAL) 92% RICE
K. CONCRETE COMPRESSIVE STRENGTH REQUIREMENTS (PSI):
CONCRETE USE FIELD LABORATORY
SIDEWALK/ADA RAMPS 3000 3450
CURBS/GUTTERS 3500 4025
DRIVEWAYS 3500 4025
PAVEMENT 4000 4600
L. CONCRETE TESTING TO BE PERFORMED BY AND COORDINATED WITH LANE COUNTY. FOUR (4) SETS OF CONCRETE CYLINDERS WILL BE COLLECTED FOR EACH POUR AS DETERMINED BY THE ENGINEER. TYPICALLY, TESTING WILL BE PERFORMED TO DETERMINE THREE (3)-DAY, SEVEN (7)-DAY, AND 28-DAY COMPRESSIVE STRENGTH OF CONCRETE SAMPLES; SCHEDULE MAY BE ALTERED BY THE ENGINEER. TESTING TO BE PERFORMED PER APWA STANDARD SPECIFICATIONS.
M.THIS PROJECT SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) REQUIREMENTS SUCH AS INCORPORATION OF DESIGN CRITERIA FOR RAMPS, MAXIMUM PROFILE AND CROSS SECTION SLOPES FOR SIDEWALKS, UPGRADING EXISTING FACILITIES WHERE MAJOR CONSTRUCTION IS OCCURRING, AND BUILDING WARNING FOR OBJECTS IN SIDEWALK SUCH AS CURBING OR LANDSCAPING AROUND MAILBOXES.
N. CONTRACTOR IS RESPONSIBLE TO OBTAIN APPLICABLE PERMITS FROM OTHER AGENCIES WITH JURISDICTIONS SUCH AS LANE COUNTY, OREGON DEPARTMENT OF TRANSPORTATION (ODOT), OREGON DEPARTMENT OF STATE LANDS (DSL), OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ), OR ARMY
CORPS OF ENGINEERS (USACE).
O. ALL IMPROVEMENTS THAT WILL BE PRIVATELY OWNED AND MAINTAINED WILL BE BOUND BY THE CURRENT REQUIREMENTS OF THE OREGON STRUCTURAL SPECIALTY CODE (OSSC), PLUMBING SPECIALTY CODE, AND/OR CITY OF SPRINGFIELD BUILDING DIVISION REQUIREMENTS. CONTRACTOR IS RESPONSIBLE TO OBTAIN APPLICABLE PERMITS FROM OTHER CITY DEPARTMENTS PRIOR TO PERFORMING PRIVATE WORK.
P. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE START OF CONSTRUCTION. SEE EROSION CONTROL PLAN.
Q.STREET TREES: ONLY STREET TREES WITH A MINIMUM TRUNK CALIPER OF TWO (2) INCHES MEASURED SIX (6) INCHES ABOVE THE ROOT STEM SHALL BE SELECTED FOR PLANTING.
R. A PRE-CONSTRUCTION CONFERENCE IS REQUIRED BEFORE START OF CONSTRUCTION. UNLESS OTHERWISE APPROVED IN WRITING BY THE ENGINEER, BEFORE ANY WORK IS PERFORMED AND WITHIN 30 CALENDAR DAYS OF THE NOTICE TO PROCEED, THE CONTRACTOR SHALL MEET WITH THE ENGINEER FOR A PRE-CONSTRUCTION CONFERENCE AT A TIME MUTUALLY AGREED UPON. ALL UTILITIES, CONTRACTORS AND CITY REPRESENTATIVES SHALL HAVE RECEIVED THE FINAL APPROVED PLANS AT LEAST FIVE (5) WORKING DAYS PRIOR TO THE PRE-CONSTRUCTION CONFERENCE. AT LEAST 10 CALENDAR DAYS PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER A COPY OF A PROJECT WORK SCHEDULE. THE PRE-CONSTRUCTION CONFERENCE WILL NOT BE HELD UNLESS THE PROJECT WORK SCHEDULE AND PERTINENT SUBMITTALS HAVE BEEN SUBMITTED.
S. THE ENGINEER AND/OR CITY HAVE THE RIGHT TO REQUIRE ADDITIONAL WORK NOT SHOWN HEREIN BUT NECESSARY FOR THE SUCCESSFUL COMPLETION OF THE PROJECT.
T. REQUESTS BY THE CONTRACTOR FOR CHANGES SHALL BE APPROVED BY THE ENGINEER AND THE CITY IN WRITING PRIOR TO IMPLEMENTATION.
U. THE CONTRACTOR SHALL VERIFY EACH EXISTING WASTEWATER (SANITARY) AND STORMWATER CONNECTION.
V. THE CONTRACTOR SHALL LOCATE AND PROTECT SURVEY MONUMENTS AND PROPERTY CORNERS (MARKS) PER PART 00100 OF THE CITY OF SPRINGFIELD SPECIAL PROVISIONS. SEE OREGON REVISED STATUTES CHAPTER 209 FOR NECESSARY INTERFERENCE WITH MONUMENTS AND CORNERS. THE CONTRACTOR SHALL COORDINATE WITH THE CITY SURVEYOR, COUNTY SURVEYOR, AND ENGINEER A MINIMUM OF TWO (2) WEEKS PRIOR TO BEGINNING WORK.
Date: 2026.08.07 15:18:17-07'00'
4.5'
CL
VARIES 3'-12.5'10.5'10.5'
MOHAWK BLVD
BIKE LANE TRAVEL LANE TRAVEL LANE PAINTED MEDIAN/
4.5'10.5' 10.5'
BIKE LANE TRAVEL LANE TRAVEL LANE
ACP WEARING COURSE LEVEL 3, 1/2"
FIBER REINFORCED
NOM. THKN. - 4" (SEE NOTE 1)
+/-61.5'
COLD PLANE PAVEMENT REMOVAL , 4" DEEP
LEFT TURN LANE
EXISTING CURB EXISTING CURB
4.5'
CL
10.5'10.5'10.5'
MOHAWK BLVD
BIKE LANE TRAVEL LANE TRAVEL LANE
4.5'10.5' 10.5'
BIKE LANE TRAVEL LANE TRAVEL LANE
ACP WEARING COURSE LEVEL 3, 1/2"
FIBER REINFORCED
NOM. THKN. - 4" (SEE NOTE 1)
+/-61.5'
COLD PLANE PAVEMENT REMOVAL , 4" DEEP
LEFT TURN LANE
EXISTING CURB EXISTING CURB
NOTE:
1. USE LANE COUNTY APPROVED MIX.
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
NO SCALE
TYPICAL SECTIONS
BA01
BA01
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Design Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
BA01
Date: 2026.08.07 15:18:31-07'00'
TDL
TDL
TDL
TDL
TDL
TDL
TDL
ROW
ROW
ROW
ROW
ROW
ROW
R O
W R
O W
12''SD
12''SD
12''SD
12''SD
12''SD
12''SD
12''SD
0 205 10
N
ADA RAMP SAWCUT LINE - VACUUM
AND PROPERLY DISPOSE SLURRY
M O
H
AW
K
BL
VD
Q ST
PRESERVE AND PROTECT
STORMWATER MAINTENANCE HOLE
PRESERVE AND PROTECT SIGNAL
BOX IN CONC PAD
PRESERVE AND PROTECT TRAFFIC
SIGNAL POLE AND CONCRETE BASE
FURNISH NEW JB3 - SEE SHEET M03
FOR DETAILS
PAVING LIMIT
FURNISH NEW PEDESTRIAN
PUSHBUTTONS - SEE SHEET M03
COLD PLANING AND ACP, SEE
TYPICAL SECTIONS ON SHEET BA01
SEE SHEET BD01 FOR RAMP
CONSTRUCTION DETAILS
1" = 10'
SW INTERSECTION OVERVIEW
BB01B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
PRESERVE AND PROTECT TRAFFIC
LOOP DETECTION SIGNAL JUNCTION
INTERSECTION CONSTRUCTION NOTES:
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Design Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
MINOR ADJUSTMENT OF CATCH BASIN
- SEE STD DWG 4-1A
PRESERVE AND PROTECT DARI MART SIGN
PRESERVE AND PROTECT LIGHT POLE
APPROX DEPTH: 3.8'
Date: 2026.08.07 15:18:45-07'00'
TDL
TDL
TDL
TDL
TDL
TDL
R O
W R
O W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
0 205 10
N
M O
H
AW
K
BL
VD
19TH ST
ADA RAMP SAWCUT LINE - VACUUM
AND PROPERLY DISPOSE SLURRY
PRESERVE AND PROTECT UTILITY POLE
PRESERVE AND PROTECT TRAFFIC
SIGNAL POLE AND CONCRETE BASE
PAVING LIMITS
RELOCATE PEDESTRIAN CROSSWALK
PEDESTAL TO BACK OF SIDEWALK. SEE
SHEET BC02 FOR DETAILS.
COORDINATE WITH UTILITY TO
PROTECT AND RETAIN GUY LINE
ANCHOR IN PROPOSED CONCRETE
SEE SHEET BD02 FOR RAMP
CONSTRUCTION DETAILS
COLD PLANING AND ACP, SEE
TYPICAL SECTIONS
1" = 10'
SE INTERSECTION OVERVIEW
BB02B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
PRESERVE AND PROTECT TRAFFIC
LOOP DETECTION SIGNAL JUNCTION
INTERSECTION CONSTRUCTION NOTES:
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Design Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
RELOCATE IRRIGATION COMPONENT
TO OUTSIDE NEW SIDEWALK
FURNISH NEW JB3 - SEE SHEET M05
FOR DETAILS
Date: 2026.08.07 15:18:58-07'00'
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWN
1" = 5'
SW ADA RAMP OVERVIEW
BC01B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
0 10'2.5' 5'
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Design Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
PAY LIMIT LEGEND:
4" CONCRETE SIDEWALK/TRANSITION PANEL PAY LIMIT BOUNDARY
CONCRETE ADA RAMP PAY LIMIT BOUNDARY
CONCRETE CURB AND GUTTER PAY LIMIT BOUNDARY
LEVEL 3 12" DENSE ASPHALT CONCRETE PAVEMENT (ACP)
CATCH BASIN ADJUSTMENT
SAWCUT BOUNDARY
NOTE: VERIFY LOCATION IN-FIELD;
SEE STD DWG 3-8
TRUNCATED
DOME 5'X2'
RAMP
TRANSITION
PANEL(S)
EXIST.
SIDEWALK
RAMP
LEVEL
LANDING
LEVEL
LANDING
LEVEL
LANDING
RAMP
LEVEL
LANDING
TRANSITION
PANEL(S)
TRUNCATED DOMES (INCIDENTAL TO ADA RAMP)
TRUNCATED
DOME 5'X2'
TOPSOIL AND SEEDING
ADJUST BOX:
BID ITEM 7
Q ST AND MOHAWK BLVD
Date: 2026.08.07 15:19:11-07'00'
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
N
MARCOLA RD AND MOHAWK BLVD 1" = 5'
SE ADA RAMP OVERVIEW
BC02B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Design Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
0 10'2.5' 5'
TRANSITION
PANEL(S)
LEVEL
LANDING
RAMP
RAMP
TRANSITION
PANEL(S)
LEVEL
LANDING
LEVEL
LANDING
SAWCUT BOUNDARY
NOTE: VERIFY LOCATION IN-FIELD;
SEE STD DWG 3-8
TRUNCATED
DOME 10'X2'
LEVEL
LANDING
TRANSITION
PANEL(S)
TRUNCATED
DOME 10'X2'
PAY LIMIT LEGEND:
4" CONCRETE SIDEWALK/TRANSITION PANEL PAY LIMIT BOUNDARY
CONCRETE ADA RAMP BOUNDARY
CONCRETE CURB AND GUTTER PAY LIMIT BOUNDARY
LEVEL 3 12" DENSE ASPHALT CONCRETE PAVEMENT (ACP)
CATCH BASIN ADJUSTMENT
TOP SOIL AND SEEDING
TRUNCATED DOMES (INCIDENTAL TO ADA RAMP)
ADJUST BOX:
BID ITEM 7
Date: 2026.08.07 15:19:25-07'00'
ROW
ROW
ROW
ROW
ROW
ROW
ROW
N
N
1" = 5'
SW ADA RAMP DETAILS
BD01
0 10'2.5' 5'
Q ST AND MOHAWK BLVD
SOUTHWEST CORNER
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Ramp Design Final.2.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
FULL HEIGHT CURB
MAINTAIN EXISTING
JBOX LOCATION-
SEE M SHEETS
TAPER 6-INCH
CURB TO FG
TAPER 6-INCH
CURB TO FG
GAP FOR EXISTING
SIGNAL POLE
B. JABUSCH
B. JABUSCH
S. PETROFF
OREGON
EXP DATE: 12-31-2026
70925PEREG
IST ER ED P R O FESS IONA LENG INEER
S T A N L E Y A . P E T R O F F
Date: 2026.08.07 15:19:39-07'00'
ROW
ROW
ROW
ROW
4' MIN CLEAR WIDTH
N
N
RELOCATE CROSSWALK PEDESTAL
TO BACK OF SIDEWALK - SEE M
SHEETS
1" = 5'
SE ADA RAMP DETAILS
BD02
0 10'2.5' 5'
MARCOLA RD AND MOHAWK BLVD
SOUTHEAST CORNER
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Ramp Design Final.2.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
APPROX 7' CLEAR WIDTH
MAINTAIN EXISTING
JBOX LOCATION-
SEE M SHEETS
4-INCH CURB REVEAL
TAPER 6-INCH
CURB TO FG
6-INCH CURB
B. JABUSCH
B. JABUSCH
S. PETROFF
OREGON
EXP DATE: 12-31-2026
70925PEREG
IST ER ED P R O FESS IONA LENG INEER
S T A N L E Y A . P E T R O F F
COORDINATE WITH
UTILITY TO PROTECT
GUY LINE ANCHOR
TAPER 6-INCH
CURB TO FG
Date: 2026.08.07 15:19:54-07'00'
W R
O W
R O
W
RO
W
RO
W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWROWROW
ROW
R O
W R
O W
R O
W R
O W
RO
W
ROW
ROW
ROW
ROW
ROW
ROW ROW ROW
14+30
10+00
11+00 12+0013+0014+00
CONSTRUCTION NOTES:
M
AR
C O
LA
R
D
19TH ST
Q ST
MOHAWK BLVD
1" = 50'
CONSTRUCTION NOTES
C01B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
0 100'25' 50'
N
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Design Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
Date: 2026.08.07 15:20:08-07'00'
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEETNO SCALE
E01
TCP GENERAL NOTES
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
GENERAL TEMPORARY TRAFFIC CONTROL NOTES:
1. PRIOR TO ANY WORK, TRAFFIC CONTROL SIGNS AND DEVICES SHALL BE IN PLACE
AND APPROVED BY THE ENGINEER.
2. MAINTAIN 11 FT MINIMUM TRAVEL LANE WIDTH.
3. USE FLUORESCENT ORANGE SHEETING FOR THE BACKGROUND OF ALL TEMPORARY
WARNING SIGNS.
4. WHEN NECESSARY, SIGN SPACING MAY BE REDUCED BY 30% OF THE "A" DIMENSION
FOR ALL SPEEDS.
5. SIGNING AND OTHER TRAFFIC CONTROL DEVICES (TCD) SHOWN TO BE INSTALLED IN
CONJUNCTION WITH THE WORK AREAS, SHALL MOVE WITH THE WORK AREAS.
6. TO DETERMINE TAPER LENGTH "L" AND "BUFFER" LENGTH SHOWN ON EACH TRAFFIC
CONTROL PLAN, USE "THE MINIMUM LENGTHS TABLE".
7. TO DETERMINE SIGN SPACING A, B AND C, USE "TRAFFIC CONTROL DEVICE (TCD)
SPACING TABLE".
8. CHANNELIZATION DEVICES MAY BE PLACED AT 10' SPACING AROUND THE WORK AREA
FOR EMPHASIS IF THE AREA IS EXPOSED TO TRAFFIC BOTH SIDES SIMULTANEOUSLY.
9. DO NOT LOCATE SIGNS IN AREAS DESIGNATED FOR BICYCLE OR PEDESTRIAN
TRAFFIC.
10. ADJUSTMENTS TO TEMPORARY TRAFFIC CONTROL MAY BE REQUIRED TO
ACCOMODATE EXISTING FIELD CONDITIONS. LOCATIONS OF ALL TEMPORARY TRAFFIC
CONTROL DEVICES SHALL BE APPROVED BY THE ENGINEER.
11. EXISTING GUIDE SIGNS THAT CONFLICT WITH CONSTRUCTION GUIDE SIGNAGE SHALL
BE COVERED. UNCOVER EXISTING GUIDE SIGNS AS CONFLICTING CONSTRUCTION
SIGNAGE IS REMOVED.
12. SEE SHEETS Q01-Q02 FOR PERMANENT PAVEMENT MARKING PLANS.
13. SEE STANDARD DRAWINGS TM800, TM820, TM821, TM822, TM841, TM842, TM844, TM845, AND TM850 FOR PEDESTRIAN TRAFFIC CONTROL DURING RAMP RECONSTRUCTION, SHOULDER CLOSURES, AND TRAFFIC CONTROL DETAILS NOT SHOWN.
TAPER TYPES & FORMULAS
TAPER FORMULA
MERGING (LANE CLOSURE) "L"
SHIFTING "L"/2 OR 1/2"L"
SHOULDER CLOSURE "L"/3 OR 1/3"L"
FLAGGING 50' - 100'
DOWNSTREAM (TERMINATION) VARIES
MINIMUM LENGTHS TABLE
SPEED
(MPH)
"L" VALUE FOR TAPERS (FT)
Buffer
(FT)
W=Lane or Shoulder Width being closed or shifted
W <_ 10 W = 12 W = 14 W = 16
25 105 125 145 165 75
30 150 180 210 240 100 35 205 245 285 325 125
40 265 320 375 430 150
45 450 540 630 720 180
50 500 600 700 800 210
55 550 660 770 880 250
60 600 720 840 960 285
65 650 780 910 1000 325
70 700 840 980 1000 365
FREEWAYS
55 1000 1000 1000 1000 250
60 1000 1000 1000 1000 285
65 1000 1000 1000 1000 325
70 1000 1000 1000 1000 365
TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE
SPEED
(MPH)
SIGN SPACING (FT) MAX. CHANNELIZING
DEVICE SPACING (FT)
A B C 20 - 30 100 100 100 20 35 - 40 350 350 350 20 45 - 55 500 500 500 40 60 - 70 700 700 700 40
FREEWAY 100 1500 2640 40
Date: 2026.08.07 15:20:23-07'00'
PCMS
See Special Provisions for PCMS Messages and Deployment Schedule - See Sheet E10 for PCMS plan
DETOUR SIGNAGE LEGEND
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEETNO SCALE
E02
DETOUR SIGNAGE LEGEND
24"X18"
END
DETOUR
M4-8a
24"x24" R3-2
9 11
12 13
1 42 6
DETOUR
AHEAD
36x36 W20-2
DETOUR
24"X12" M4-8
19th St Mohawk Blvd
DETOUR
24"X12" M4-8
21"X15" M6-2 21"X15" M6-2
DETOUR
24"X12" M4-8
19th St Mohawk Blvd
DETOUR
24"X12" M4-8
21"X15" M6-221"X15" M6-2
DETOUR
24"X12" M4-8
19th St
21"X15" M6-3
Mohawk Blvd
DETOUR
24"X12" M4-8
21"X15" M6-3
Mohawk Blvd
DETOUR
24"X12" M4-8
21"X15" M6-1
DETOUR
24"X12" M4-8
19th St
21"X15" M6-1
Mohawk Blvd
DETOUR
24"X12" M4-8
21"X15" M6-1
6"
6" 6" C1'
-6
4'-3"
6"
6" 6" C1'
-6
4'-3"
6"
6" 6" C1'
-6
4'-3"
6"
6" 6" C1'
-6
4'-3"
6"
6" 6" C1'
-6
4'-3"
6"
6" 6" C1'
-6
4'-3"
6"
6" 6" C1'
-6
4'-3"
6"
6" 6" C1'
-6
4'-3"
6"
6" 6" C1'
-6
4'-3"
Mohawk Blvd
DETOUR
24"X12" M4-8
21"X15" M6-3
6"
6" 6" C1'
-6
4'-3"
Mohawk Blvd
DETOUR
24"X12" M4-8
21"X15" M6-3
6"
6" 6" C1'
-6
4'-3"
24"X24" R3-1
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
19th St 6"
6" 6" C1'
-6
4'-3"
14A
Mohawk Blvd 6"
6" 6" C1'
-6
4'-3"
24"X18"
END
DETOUR
M4-8a
14B
ROAD
WORK
AHEAD
36"x36" W20-1
Mohawk Blvd
DETOUR
24"X12" M4-8
21"X15" M6-3
6"
6" 6" C1'
-6
4'-3"
8B
24"X24" R3-1
Date: 2026.08.07 15:20:37-07'00'
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
ROAD
CLOSED
48"X30" R11-2
TYPE III
BARRICADE
24"X24" R3-1
36"x36" W20-3
ROAD
CLOSED
AHEAD
ROAD
WORK
AHEAD
36"x36" W20-1
36"x36" W4-2R
36"x36" W20-5a
RIGHT
TWO LANES
CLOSED
AHEAD
36"x36" W20-3
ROAD
CLOSED
AHEAD
36"x36"
CW23-12
LEFT
TURN LANE
CLOSED
AHEAD
24"x24" R3-2
36"x36" W20-3
ROAD
CLOSED
AHEAD
ROAD
WORK
AHEAD
36"x36" W20-1
1" = 200'
E03
CLOSURE ADVANCED WARNING
PLAN
WORK ZONE CLOSURE PLAN
· FOR DETOUR DETAILS SEE SHEETS E05-E07
· NIGHT WORK ONLY
· COVER OR REMOVE SIGNAGE WHEN WORK ZONE IS OPEN TO DAYTIME
TRAFFIC
· COORDINATE WITH VILLAGE INN AND KIRIN CITY RESTAURANT FOR ACCESS
DURING ACTIVE CLOSURE TIMES.
ROAD
CLOSED
48"X30" R11-2
TYPE III
BARRICADE
HWY 126MOH
AW
K
BL
VD
MARCOLA RD
TH
S T
Q S
T
CLOSED TO TRAFFIC
TEMPORARY SIGN ON
TEMPORARY SUPPORT
TUBULAR MARKERS
TYPE 3 BARRICADE
36"x36" W20-3
ROAD
CLOSED
AHEAD
200100 4000 B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
PLASTIC DRUM
W9-5a 36x36
MERGE
SEE SHEET
E04
MATCH LINE
TH
S T
350'
ROAD
WORK
AHEAD
36"x36" W20-1
ROAD
WORK
AHEAD
36"x36" W20-1
36"x36" W20-3
ROAD
CLOSED
AHEAD
Date: 2026.08.07 15:21:00-07'00'
1" = 200'
E04
CLOSURE ADVANCE WARNING PLAN
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
OLYMPIC ST
MOH
AW
K
BL
VD
TH
S T
CLOSED TO TRAFFIC
TEMPORARY SIGN ON
TEMPORARY SUPPORT
TUBULAR MARKERS
TYPE 3 BARRICADE
200100 4000
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
PLASTIC DRUM
ROAD
WORK
AHEAD
36"x36" W20-1
ROAD
WORK
AHEAD
36"x36" W20-1
WORK ZONE CLOSURE PLAN
· FOR DETOUR DETAILS SEE SHEETS E5-E7
· NIGHT WORK ONLY
· COVER OR REMOVE SIGNAGE WHEN WORK ZONE IS OPEN TO DAYTIME
TRAFFIC
SEE SHEET
E03
MATCH LINE
TH
S T
TH
S T
C A
R
TE
R L
N
M ST
Date: 2026.08.07 15:21:59-07'00'
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
HWY 126
MARCOLA RD
N
D S
T
MOH
AW
K
BL
VD
TH
S T
OLYMPIC ST
1" = 800'
E05
TRAFFIC CONTROL
ADVANCE WARNING
CLOSURE-
NIGHT WORK
ONLY
MOHAWK BLVD NORTHBOUND TRAFFIC - DETOUR PLAN
· MOHAWK NORTHBOUND TRAFFIC - ALL PHASES
· NIGHT WORK ONLY
· COVER OR REMOVE DETOUR SIGNAGE WHEN WORK ZONE IS OPEN TO
DAYTIME TRAFFIC
TH
S T
Q ST
800'400' 1600'0
DETOUR ROUTE
# SIGNING DETAIL
See Sheet E01
CLOSED TO TRAFFIC
TEMPORARY SIGN ON
TEMPORARY SUPPORT -
REFER TO STD DWG
TM821 and TM822
M ST
th
S T st
S T
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
14A
BONNIE LN
LOMOND AVE
HAYDEN BRIDGE RD
Date: 2026.08.07 15:22:14-07'00'
CLOSURE-
NIGHT WORK
ONLY
PCMS
x 2
Location and Message to be determined
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
HWY 126
MARCOLA RD
N
D S
T
TH
S T
OLYMPIC ST
1" = 800'
E06
TRAFFIC CONTROL
ADVANCE WARNING
Q ST
MOH
AW
K
BL
VD
19TH ST and Q ST TRAFFIC - DETOUR PLAN
· 19TH ST SOUTHBOUND AND Q ST EASTBOUND TRAFFIC - ALL PHASES
· NIGHT WORK ONLY
· COVER OR REMOVE DETOUR SIGNAGE WHEN WORK ZONE IS OPEN
TO DAYTIME TRAFFIC
800400 16000
DETOUR ROUTE
# SIGNING DETAIL
See Sheet E02
CLOSED TO TRAFFIC
TEMPORARY SIGN ON
TEMPORARY SUPPORT -
REFER TO STD DWG
TM821 and TM822
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
14B
BONNIE LN
LOMOND AVE
HAYDEN BRIDGE RD
8B
Date: 2026.08.07 15:22:27-07'00'
MARCOLA RD WB TRAFFIC - DETOUR PLAN
· MARCOLA RD WESTBOUND TRAFFIC - ALL PHASES
· COVER OR REMOVE DETOUR SIGNAGE WHEN WORK ZONE
IS OPEN TO DAYTIME TRAFFIC
· NIGHT WORK ONLY
CLOSURE-
NIGHT WORK
ONLY
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
1" = 800'
E07
TRAFFIC CONTROL
ADVANCE WARNING
MOH
AW
K
BL
VD
Q ST
TH
S T
PIO
NEER PKW
Y MARCOLA RD
HWY 126
DETOUR ROUTE
# SIGNING DETAIL
See Sheet E01
CLOSED TO TRAFFIC
TEMPORARY SIGN ON
TEMPORARY SUPPORT -
REFER TO STD DWG
TM821 and TM822
5T H
S T
HWY 126
800400 16000
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
14B
BONNIE LN
LOMOND AVE
HAYDEN BRIDGE RD
Date: 2026.08.07 15:22:42-07'00'
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
M O
H
AW
K
BL
VD
MARCOLA RD
TH
S T
Q S
T
1" = 100'
E08
SW CORNER TCP
0 20025 50 100
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
SEE TPAR NOTE 1
WORK ZONE
TUBULAR MARKERS
TPAR Notes:
1. CLOSE CROSSWALK AND DETOUR PEDESTRIANS AROUND WORK ZONE. SEE
SHEET E11 FOR TPAR DETAILS.
GEN NOTES:
1. PROVIDE 11' MIN. TRAVEL LANE AND 4' MIN. TPAR AT ALL TIMES.
2. LIMIT WORK TO ONE CORNER AT A TIME.
3. CONSTRUCTION WORK ON ADA RAMPS SHALL NOT BE DONE CONCURRENT
WITH THE GRIND/INLAY CONSTRUCTION PROCESS.
4. FOR TEMPORARY CURB RAMP DETAILS, SEE TM845.
5. DURING CORNER RECONSTRUCTION, THE EXISTING PUSHBUTTON WIRING
MUST BE SPLICED, EXTENDED, OR ROUTED THROUGH TEMPORARY CONDUIT
TO A TEMPORARY WOOD OR STEEL POST.
6. ADJUSTMENTS TO TEMPORARY TRAFFIC CONTROL MAY BE REQUIRED TO
ACCOMMODATE EXISTING FIELD CONDITIONS. LOCATIONS OF ALL TEMPORARY
TRAFFIC CONTROL DEVICES SHALL BE APPROVED BY THE ENGINEER.
7. EXISTING GUIDE SIGNS THAT CONFLICT WITH CONSTRUCTION GUIDE SIGNAGE
SHALL BE COVERED. UNCOVER EXISTING GUIDE SIGNS AS CONFLICTING
CONSTRUCTION SIGNAGE IS REMOVED.
8. SEE SHEETS Q01-Q02 FOR PERMANENT PAVEMENT MARKING PLANS.
9. REFER TO ODOT STANDARD DRAWINGS TM821 AND TM822 FOR TEMPORARY
SIGN SUPPORT DETAILS.
Date: 2026.08.07 15:22:56-07'00'
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
M O
H
AW
K
BL
VD
MARCOLA RD
TH
S T
Q S
T
1" = 100'
E09
SE CORNER TCP
WORK ZONE
TUBULAR MARKERS
0 20025 50 100
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
TPAR Notes:
1. CLOSE CROSSWALK AND DETOUR PEDESTRIANS AROUND WORK ZONE. SEE
SHEET E11 FOR TPAR DETAILS.
GEN NOTES:
1. PROVIDE 11' MIN. TRAVEL LANE AND 4' MIN. TPAR AT ALL TIMES.
2. LIMIT WORK TO ONE CORNER AT A TIME.
3. CONSTRUCTION WORK ON ADA RAMPS SHALL NOT BE DONE CONCURRENT
WITH THE GRIND/INLAY CONSTRUCTION PROCESS.
4. FOR TEMPORARY CURB RAMP DETAILS, SEE TM845.
5. DURING CORNER RECONSTRUCTION, THE EXISTING PUSHBUTTON WIRING
MUST BE SPLICED, EXTENDED, OR ROUTED THROUGH TEMPORARY CONDUIT
TO A TEMPORARY WOOD OR STEEL POST.
6. ADJUSTMENTS TO TEMPORARY TRAFFIC CONTROL MAY BE REQUIRED TO
ACCOMMODATE EXISTING FIELD CONDITIONS. LOCATIONS OF ALL TEMPORARY
TRAFFIC CONTROL DEVICES SHALL BE APPROVED BY THE ENGINEER.
7. EXISTING GUIDE SIGNS THAT CONFLICT WITH CONSTRUCTION GUIDE SIGNAGE
SHALL BE COVERED. UNCOVER EXISTING GUIDE SIGNS AS CONFLICTING
CONSTRUCTION SIGNAGE IS REMOVED.
8. SEE SHEETS Q01-Q02 FOR PERMANENT PAVEMENT MARKING PLANS.
9. REFER TO ODOT STANDARD DRAWINGS TM821 AND TM822 FOR TEMPORARY
SIGN SUPPORT DETAILS.
SEE TPAR NOTE 1
Date: 2026.08.07 15:23:10-07'00'
800'400' 1600'0
Portable Changable Message Sign - See Special Provisions for Message and Deployment Schedule
CLOSED TO TRAFFIC
M ST
th S
T st
S T
PCMS
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
1" = 800'
E10
PCMS
ADVANCE WARNING PLAN
MOH
AW
K
BL
VD
OLYMPIC ST
TH
S T
MARCOLA RD
HWY 126
TH
S T
Q ST
PCMS
PCMS
PCMS
# See PCMS Note
PCMS Notes:
1. Deploy within Public Right-of-Way behind sidewalk at corner of Q St & Mohawk Blvd.
2. Deploy within Public Right-of-Way; grassy area behind sidewalk off Mohawk Blvd, and between accesses for Kirin City Restaurant and Oregon Community Credit Union.
3. Deploy within grassy shoulder of WB HWY 126, approx 500' before Mohawk Blvd off ramp.
4. Deploy within right shoulder of EB lanes, just west of the guardrail, approx 34 miles before the Mohawk Blvd overpass.
B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
PCMS
Date: 2026.08.07 15:23:26-07'00'
1" = 100'
E11
PRIVATE PROPERTY TEMP ACCESS
PLAN
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
N
B. JABUSCH
B. JABUSCH
S. PETROFF
BID ITEM 23: REMOVE AND REBUILD FENCE
REMOVE AND SALVAGE EXISTING TRASH
ENCLOSURE FENCING MATERIALS, AND
INCORPORATE INTO REBUILT FENCE WHEN
ROADWORK ACTIVITIES COMPLETE AND
NORMAL TRAFFIC ON MOHAWK BLVD IS
RESTORED.
COORDINATE WITH SANIPAC FOR TEMPORARY
RECEPTACLE RELOCATION FOR DURATION OF
ROADWORK ACTIVITIES.
CONTRACTOR IS RESPONSIBLE FOR
SECURING AND STORAGE OF FENCING
MATERIAL.
VILLAGE INN
APARTMENTS
VILLAGE INN HOTEL
ROAD
CLOSED
48"X30" R11-2
TYPE III
BARRICADE
KIRIN CITY RESTAURANT
0 20025 50 100
TEMPORARY ACCESS ROUTE FOR VILLAGE INN MOTEL AND
KIRIN CITY RESTAURANT
CLOSED TO TRAFFIC
TYPE 3 BARRICADE
PLASTIC DRUM
TEMPORARY ACCESS ROUTE
TO VILLAGE INN MOTEL AND
KIRIN CITY RESTAURANT
Date: 2026.08.07 15:23:41-07'00'
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 E Sheets Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
NO SCALE
E12
TPAR DETAILS
CONSTRUCTION SEQUENCE:
1. INSTALL ALL DEVICES REQUIRED BY THE TRAFFIC CONTROL PLAN.
2. INSTALL TPAR DEVICES PRIOR TO CURB, GUTTER AND SIDEWALK REMOVAL.
3. ENSURE ALL PEDESTRIAN DETOUR SIGNS AND DEVICES ARE IN PLACE
BEFORE COVERING THE PEDESTRIAN SIGNALS AND CLOSING THE CROSSING.
4. INSTALL CURB, GUTTER AND SIDEWALK.
5. FOLLOWING THE COMPLETION OF CURB, GUTTER AND CONCRETE SIDEWALK,
ENSURE MEASURES ARE IN PLACE TO PROTECT THE PUBLIC FROM ALL
CONSTRUCTION HAZARDS.
TEMPORARY CROSSWALK DETOUR DETAIL
panelStyle:regulatory.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36_24_18
PCD
48" MIN.
48", M
IN
PCD
(CLOSURE DETAIL)
ON
ROADWAY
CROSSING
ROADWAY
SIDEWALK
CLOSED
24X12 R9-9
(MOUNT ON TSS)
SIDEWALK CLOSED
AHEAD
CROSS HERE
24X18
CROSSING
ROADWAY
SIDEWALK CLOSED
AHEAD
CROSS HERE
24X18
DETOUR
30X24 M4-9B
TYPE II BARRICADE
SIDEWALK
CLOSED
24X18 R9-9
TYPE II BARRICADE
DETOUR
30X24 M4-9B
TYPE II BARRICADE
ON
ROADWAY
CROSSING
ROADWAY
SHOULDER
CLOSED
AHEAD
SHOULDER
CLOSED
AHEAD
INSTALL TEMPORARY STAGGERED
CONTINENTAL CROSSWALK.
SEE DWG. NO. TM503
INSTALL TEMPORARY STAGGERED
CONTINENTAL CROSSWALK.
SEE DWG. NO. TM503
NOTES:
1. SEE SHEET E01 FOR GENERAL TCP NOTES.
CROSSING
ROADWAY
48X48
CW11-2A
(MOUNT ON TSS)
48X48
CW11-2A
(MOUNT ON TSS)
48X48
CW11-1
(MOUNT ON TSS)
48X48 21-5B
(MOUNT ON TSS)
48X48
CW11-2A
(MOUNT ON TSS)
48X48
CW11-1
(MOUNT ON TSS)
48X48 W21-5B
(MOUNT ON TSS)
R9-11
TYPE II
BARRICADE
R9-11
TYP2 BARRICADE
48X48
CW11-2A
(MOUNT ON TSS)
DETOUR
30X24 M4-9B
TYPE II BARRICADE
DETOUR
panelStyle:regulatory.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36_24_18
30X24 M4-9B
TYPE II BARRICADE
DETOUR
panelStyle:regulatory.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1 marginAlign:9panelRoundCorners:0 panelSizes:constructPanelMode:0constructPanels:36_24_18
30X24 M4-9B
DETOUR
30X24 M4-9B
TYPE II BARRICADE
DETOUR
panelStyle:regulatory.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36_24_18
30X24 M4-9B
TYPE II BARRICADE
DETOUR
30X24 M4-9B
(MOUNT ON TSS)
TUBULAR MARKERS ON 20' MAX. SPACING
UNDER CONSTRUCTION
TSS (TEMP. SIGN SUPPORT)
TEMPORARY CURB RAMP
LEGEND
SIGN ON TYPE II BARRICADE
CBAL/3"B"
C B A L/3 "B"
"B"
L/3
A L/
"B
A
L/
"B
USE TEMPORARY CROSSWALKS (TAPE) AND
CORRESPONDING SIGNS ON INTERSECTING
ROADS ONLY AS NEEDED IN LOCATIONS
WITHOUT EXISTING ACCESSIBLE CURB RAMPS
FOR PEDESTRIAN CROSSING
TEMPORARY PEDESTRIAN ACCESS ROUTE
B. JABUSCH
B. JABUSCH
S. PETROFF
TYPE II
BARRICADE
Date: 2026.08.07 15:23:54-07'00'
EROSION CONTROL
F01B. JABUSCH
B. JABUSCH
S. PETROFF
REG
IST ER ED PR O FESSIONA LENG INEER
OREGON
EXP DATE: 12-31-2026
70925PE
S T A N L E Y A . P E T R O F FJUNE 14 , 2 0 07
No. Revision/Issue Date
July 30, 2026
Know what's below.
before you dig.Call
R
UTILITY LOCATIONS ARE APPROXIMATE. THE
CONTRACTOR SHALL BE RESPONSIBLE
FOR DETERMINING UTILITY LOCATIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
THESE PLANS MAY NOT SHOW ALL UTILITIES OR
THE CORRECT LOCATIONS.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
C:\Users\bjabusch\OneDrive - City Of Springfield, OR\Projects Folders\STREETS\P21205 - Mohawk Paving And ADA Project\02-Design\DRAWING\Final\DWG\P21205 Design Final.dwg
P ro je c t
P
M o h a w k B lv d
P a vi n g a n d
A D
A P ro je c t
C ity o f S pr in gf ie ld P
U B
L
IC
W O
R K
S
E N
G
IN
E E
R
IN
G
FI
FT
H
S
TR
EE
T, S
PR
IN
G
FI
EL
D , O
R
PH
O
N E
(5
) 7
-3
F
AX
(5
) 7
-3
IN
TE
R N
ET
w w w
.s pr in gf ie ld
-o r.g ov
SHEET
GENERAL NOTES:
NOTES:
EROSION CONTROL STANDARD NOTES:
A. Approval of this Erosion and Sedimentation Control Plan (ESCP) does not constitute an approval of permanent road or drainage design (e.g., size and location of roads, pipes, restrictors, channels, retention facilities, utilities, etc.).
B. Approval of this ESCP does not relieve the permit holder and or the contractor from all other permitting requirements. Prior to beginning construction activities, all other necessary approvals shall be obtained.
C. An inspection of the erosion control measures by City LDAP staff is required prior to any ground disturbance on the site.
D. The erosion and sediment control measures shown on the plan are the minimum requirements for anticipated site conditions. During the construction period, these measures shall be upgraded as needed for unexpected storm events and to ensure that sediment and sediment-laden water does not leave the site.
E. The implementation of the ESCP and the construction, maintenance, replacement, and upgrading of the erosion and sediment control measures is the responsibility of the permit holder and or the contractor until all construction is completed and accepted by the City and vegetation/landscaping is established per the required warranty period.
F. In the event the ESC facilities identified on the ESCP are not functioning properly, the contractor is responsible for immediately implementing changes to the ESCP as directed by the ESCP engineer or their inspector. The engineer, their inspector or the City may stop all construction activity on site until the erosion problem is corrected and all ESC facilities are functioning properly. If the contractor does not immediately implement changes to the ESCP identified by the ESCP engineer or their inspector, the City may implement the necessary changes and require payment from the contractor prior to project acceptance by the City.
G. The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field by the engineer prior to construction. During the construction period, no disturbance beyond the flagged clearing limits shall be permitted. The flagging shall be maintained by the permit holder and or the contractor for the duration of construction.
H. The erosion and sediment control measures on active sites shall be inspected and maintained daily and within the 24 hours after any storm event of greater than 0.5 inches of rain per 24 hour period. Measures shall be inspected by the permit holder and or the contractor after each rainfall and at least daily during prolonged rainfall. Any required repairs or adjustments shall be made immediately. The erosion and sediment control measures on inactive sites shall be inspected a minimum of once every two (2) weeks or within 48 hours following a storm event. Written records shall be kept of weekly reviews of the ESC facilities during the wet season (October 1 to April 30) and of monthly reviews during the dry season (May1 to September 30).
I. All erosion and sediment control measures shall be protected from damage at all times. Control measures shall remain in place until permanent or temporary re-vegetation has been stabilized.
Any measure that is damaged or destroyed shall be repaired or replaced immediately.
J. Any areas of exposed soils, including roadway embankments, that will not be disturbed for two days during the wet season (October 1 to April 30) or seven…