P17PS00176

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

KEFJ 18463804/07/2017000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/10/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Raymond Prazak

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Legacy Doc #: NPS

Rehabilitate Visitor Center, Kenai Fjords National Park

KEFJ 184638

Please see attached amendment that revises specifications and drawings and answers questions received.

Period of Performance: 06/01/2017 to 04/13/2018

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation P17PS00176 Amendment Three

In order to update the project specifications and drawings and answer questions received, the above numbered solicitation is hereby amended as follows:

1. The following changes are made to the project Specifications:

a. Replace Specification 01 50 00 - Temporary Facilities and Controls, in its entirety with attached Specification 01 50 00 with revision date of 4/7/2017.

b. Specification 07 41 13.6 – 1.10 Warranty – Paragraph B (1.10.B.3):

• Add subsection “3. Note that product finish requirements under 2.2 are minimum finish types, and high build, or other similar coating may be required for 20 year warranty. The 20 year warranty requirement will not be waived.”

c. Specification 08 71 00 – 3.6 Door Hardware Schedule:

• Add “Door 203” to Door Hardware Set No. 12 on page 08 71 00 – 16.

d. Add Specification Section 08 14 16 – Flush Wood Doors.

e. Specification 23 31 00 – 2.3.C Duct Coating.

• Delete “C. Duct Coating: Polyvinyl chloride plastic, 4 mil Thick on Temperature range: minus 30°F to 200°F”.

• Replace with: “C. Temperature Range: minus 30°F to 200°F”.

f. Replace Specification 23 09 00 – HVAC Instrumentation, in its entirety with attached

Specification 23 09 00 with revision date of 4/7/2017.

g. Replace Specification 23 09 93 – Sequence of Operations for HVAC Controls, in its entirety with attached Specification 23 09 93 with revision date of 4/7/2017.

h. Replace Specification 23 21 16 – Hydronic Specialties, in its entirety with attached

Specification 23 09 93 with revision date of 4/7/2017.

2. The following changes are made to the project drawings:

a. Drawing Sheet AD101

• Demo Plan General Notes, #12: Delete “DEMOLISH ALL EXISTING CEILINGS

ON FIRST FLOOR EXCEPT IN ROOM 112 SERAC STORAGE, AND 101A

MAIN EXHIBIT SPACE.”

• Add revised Note #12: “DEMOLISH ALL EXISTING CEILINGS ON FIRST

FLOOR EXCEPT UNLESS OTHERWISE NOTED. DO NOT DEMOLISH

EXISTING CEILING IN ROOM 112 SERAC STORAGE, ROOM 109 THEATER,

AND 101A MAIN EXHIBIT SPACE.”

b. Drawing Sheet A106

• RCP Legend: Delete text “20” x 24”’ from Attic Access Hatch label.

c. Drawing Sheet S401 – Detail 4/S401:

• Add dimension of 16” wide and 10” tall to bottom footing.

3. The following questions regarding the solicitation have been received and answers provided:

Q18. Section 230993 paragraph 3.10 lists PHC-1, 2 and HC-1, 2 for a total of four heating coils, but drawing M002 only lists HC-1 and throughout the drawings no other heating coils are shown. Please clarify the number of heating coils?

A18: HC-1 is the only heating coil and it is to be controlled as described in 230993 paragraph 3.10 C.2. See revised Specification 23 09 93.

Q19. Section 230993 paragraph 3.4 has a sequence for a heating coil associated with the vent fan (VF-1), but no heating coil is shown on the drawings. Pllease clarify if there is a heating coil associated with VF-1?

A19: There is not a heating coil associated with VF-1. The heating coil and return air damper references in 230993 3.4 do not apply. See revised Specification 23 09 93.

Q20. Section 230993 paragraph 3.1 has a sequence for a boiler loop mixing valve, but detail 1 and 5 on M401 do not show a mixing valve. Please clarify the mixing valve location for sizing.

A20: The boiler mixing valve comes packaged with the specified boiler and is controlled by the boiler's on-board controls. It is not a device that requires programming by the contractor. See revised Specification 23 09 93.

Q21. Section 230993 paragraph 3.3 lists CP-1 as providing the heating water to the generator, but according to the drawings it looks like it should be CP-4. Please clarify?

A21: CP-1 and CP-4 run in conjunction to supply heating water for the hot water generator. These functions are controlled by the boiler's on-board controls. See revised Specification 23 09 93.

Q22. Is there a sequence for CP-3 or will it be manually enabled?

A22: CP-3 is specified to be provided with a 24-hour timer and aquastat. The intent is to enable the pump during occupied hours and utilize the aquastat to cycle the pump as needed to maintain the recirculation water temperature, recommended to be set at 115 deg. F (adjustable). See revised Specification 23 09 93.

Q23. Referencing specification section 23.31.00-5 HVAC Ducts and Casings, 2.3-C Single Wall Spiral Round Ducts. Will we be required to provide and install spiral duct work with a 4 MIL polyvinyl chloride (PVC) plastic coating?

A23: No, PVC coating is not required. See Specification changes, above, where 23 31 00 2.3.C is revised accordingly.

Q24. Please clarify the wood door requirements / specifications for the project.

A24: Specification section 08 14 16 – Flush Wood Doors has been added. See Changes to Specifications, above.

Q25. Section 08 71 00 – para 3.6. This indicates a note to reuse existing hardware on new doors- denoted by an asterisk. Where is this hardware provided? Are we to utilize existing hardware on new doors?

A25: Yes, where noted existing hardware is to be utilized on new doors. See A601 as well for “source” door and frame information listed in the Schedule.

Q26. Detail 10/S301. How many of these assemblies are required?

A26: Per detail, locations are per the elevator manufacturer’s requirements in order to provide manufacturer and code compliant installation.

Q27. The area bound by BL - C to D and 2.3 to 3. The exterior deck in this area needs to be removed for the new footing? What is to happen to the deck that is indicated to remain since it will be affected by the installation of the new footing in this area? Also, what happens to the existing exterior soffit in this area?

A27: See AD101 for demolition notes. See A101 and A201 for plans and elevations of the completed areas, showing (for example) extents of deck re-installation.

Q28. Drawing AD101 – note 12 indicates demolish all ceilings on first floor… and room 109 has a coffered ceiling. Is this ceiling structure to be also removed?

A28: Ceiling structure is not to be removed U.O.N. In addition, Note #12 is revised to indicate ceiling in Room 109 is to remain per Drawing A105 and A106 indications of ceiling changes. See “Changes to Drawings” above.

Q29. Drawing A201 east elevation, BL 1.1 to 2, indicates a new window 04. The demo and rebuild floor plans do not indicate anything at this location. Please clarify.

A29: This question does not appear to be accurate. Drawings A101 and AD101 show windows in Room 112 Serac Storage. A101 indicates dimensions for window as well.

Q30. Drawing A502 indicates various soffit details with a note for “New wood T&G vee grooved soffit…” Please clarify this product?

A30: See Specification 06 20 13 – Exterior Finish Carpentry: 2.2 Lumber Soffits.

Q31. Detail 7S502 indicates to cut and replace sheathing for an installation of a new GLB but A102 indicates an existing wall above in this location. Please clarify.

A31: This question is best handled as an RFI after Contract Award. Contractor may present alternate installation method for structural members, if desired, to avoid replacing sheathing above floor plate in order to avoid temporary removal and patching of wall above.

Q32. Section 07 41 13.16 – para 1.10.B.2 – 20 year warranty. One of the suppliers/ subcontractors had the following statement / concern: “We have been told, the specified panel paint system will not be eligible for the 20 year finish warranty. Because of the close proximity to the ocean, the panels and trim will require a special high build coastal paint system to be able to receive the 20 year finish warranty.” Please clarify this warranty item?

A32: Note that Standards under 2.2.b.2 for coating are "minimums" and Contractor's may be required to supply material exceeding these standards in order to provide the required warranty of 20 years. Warranty requirement will not be waived. See revision to Specification 07 41 13.16, in Changes to Specifications.

Q33. S401, Detail 4: What is the dimension of the footer?

A33: 16” wide x 10” tall, reinforced per the 4/S401 detail. See Changes to Drawings to above.

Q34. Openings 107A, 108 and 210 are shown on the door schedule (Sheet A601) as wood doors. We cannot find the spec for the wood doors. Please advise?

A34: Specification section 08 14 16 – Flush Wood Doors has been added. See Changes to Specifications, above.

Q35. S001, Deferred Submittals, #1; S102, HRV-1 Support: In drawing S001 it shows that the contractor is supposed to get engineering for all seismic anchorage of equipment for electrical and mechanical. On drawing S102 it calls out for the structural support for the HRV unit. Does this mean that the contractor is only to get design on items already not specifically called out in the drawings?

A35: Contractor must verify design on S102 is compatible and appropriate if HRV-1 does not match the Basis of Design HRV-1 unit described on Sheet M002, or if Contractor changes mounting provisions in any other way. Otherwise, anchorage may be performed via the seismic support shown on S102. For all other seismic anchorage contractor is responsible for engineered seismic drawings/design.

Q36. Opening 203 is not assigned to any hardware group. Please advise.

A36: Door 203 is intended to be in Hardware Set #12, all items reused except for Wall Stop. See Changes to Specifications, above.

Q37. What is the size of the existing hinges being reused for opening 101A in hardware group 1?

A37: Contractor to verify existing conditions per Specification 08 71 00 – Door Hardware, Paragraph 1.3.B Coordination, Existing Openings. Contractor to submit RFI during construction if additional information needed.

Q38. Are the existing locks being reused a) cylindrical or b) mortise? This will affect preps on new doors and frames?

A38: Existing locks being reused are mortise. Contractor is to verify existing conditions per Specification 08 71 00 – Door Hardware, Paragraph 1.3.B Coordination, Existing Openings, for further information.

Q39. Spec 01 50 00, 2.3, B: This spec says that the contractor is only able to use the HVAC for heating if approved by owner. If not approved we will would have to heat with an external heater. This could cause cost to be much higher. Please specify if the current heating system in the building will be available to contractor for heating of the space?

A39: The current (existing) system is permitted to be used for duration of construction. The intent of this Specification section is to limit and/or prohibit use of the NEW HVAC equipment during construction. See Changes to Specifications, above for revised Specification 01 50 00.

Q40. AD102. At the entrance to the second floor from the stairs located by Grid Line –A there is a window overlooking the entry prior to the corner which has three windows currently. There is also one on the other side reciprocating the first window. Are these two windows supposed to be demoed or do they remain like the other three? Please advise?

A40: This question is best handled as an RFI after contract award. Assume windows are to remain, for bidding purposes.

Q41. On AD101 & AD102 I see 20each “TYPE A” windows. Demo sheet note “A” says to bid option one to replace with new. Are these the Fiberglass windows? And what are the sizes and configurations because there is no schedule and I see multiple configurations on the two demo sheets. There are some windows with 1 section, some with 2 sections and some with 3 sections. Please clarify?

A41: Bid option replacement windows utilize the Fiberglass windows; see A302 for example call out. Sizes to be field verified by Contractor.

Q42. Regarding the reused wood windows, I see 4ea on A201 that are being replaced and 1ea on A202 that are being replaced. Are all the other windows being reused?

A42: Windows remain unless otherwise noted.

Q43. Regarding access hatches. The schedule on A106 calls out 20” x 24” and the description in Stair 100 calls out 22” x 36”. Please clarify?

A43: Remove 20”x24” description from the Legend such that the symbol identifies an access hatch (but does not identify a specific dimension). See Changes to Drawings, above.

4. All other terms and conditions, including the solicitation due date, remain unchanged.

KEFJ - 184638 01 50 00 - 1

091015 TEMPORARY FACILITIES AND CONTROLS

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

1.2 DEFINITIONS

A. Permanent Enclosure: As determined by Contracting Officer, permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight; and all openings are closed with permanent construction or substantial temporary closures.

1.3 USE CHARGES

A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.

B. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs..

C. Electric Power Service: Electric power from existing system is available for use with metering and with payment of use charges. Provide connections and extensions of services as required for construction operations with any additional permit costs.

1.4 QUALITY ASSURANCE

A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

B. Environmental Protection: Provide environmental protection as required by agency(ies) with jurisdiction and as indicated in the Contract Documents. Coordinate with requirements of the following:

1. Regulatory Requirements.

2. Indoor Air Quality (IAQ) Management.

3. Noise & Acoustics Management.

4. Environmental Management.

5. Construction Waste Management.

Revised 4/7/17, PAS Amendment #3

KEFJ - 184638 01 50 00 - 2

1.5 PROJECT CONDITIONS

A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before NPS acceptance, regardless of previously assigned responsibilities.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Temporary materials may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.

B. Safety Barrier Fence: Orange plastic fence, minimum height, 4 feet.

C. Barrier Tape: Yellow tape Imprinted with "CAUTION: CONSTRUCTION AREA", manufactured by Reef Industries, Inc., Houston, Texas, or approved equal.

2.2 TEMPORARY FACILITIES

A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.

B. Storage and Fabrication Sheds: Temporary weather tight sheds or other covered facilities for storage of materials subject to weather damage. Number and size of structures shall be subject to Contracting Officer's approval.

C. Toilets: Sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible, sturdy enclosures with privacy locks.

2.3 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

B. HVAC Equipment: Contractor is permitted to utilize the existing HVAC equipment, prior to its demolition and replacement, at its discretion. Unless Contracting Officer authorizes use of NEW permanent HVAC system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.

1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited.

2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to agency(ies) with jurisdiction, and marked for intended use.

3. Existing HVAC System: Contractor may use all existing HVAC equipment slated for demolition to condition the building during construction.

Revised 4/7/17, PAS

Revised, Amendment #3

KEFJ - 184638 01 50 00 - 3

4. NEW Permanent HVAC System: If Contracting Officer authorizes use of permanent HVAC system for temporary use during construction, provide filter with MERV of 8 at each return air grille in system and remove at end of construction.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

1. Locate facilities to limit site disturbance and as directed by the Contracting Officer.

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service.

1. Arrange with utility company, NPS, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services. Acquire all necessary permits.

B. Potable water is available on site. Make connections to existing facilities as needed. Facilities must be cleaned and maintained in a condition acceptable to the NPS. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Sanitary Facilities: Provide temporary toilets, and wash facilities for use by construction personnel.

1. Place in approved locations secluded from public observation and convenient to work stations. Relocate as work progress requires.

2. Maintain and clean toilet facilities at least weekly.

3. Completely remove sanitary facilities on completion of work.

D. Heating: Provide temporary heating required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed.

1. Use of permanent heating system will not be allowed without written authorization from Contracting Officer. When the permanent heating system is approved for use as temporary heating, pay all costs until final acceptance. Permanent heating system must be sufficiently complete, including controls, to permit safe operation

2. Provide and maintain adequate approved facilities, as required for safety and construction requirements, during the progress of the work. Provide ample clearance around stoves

Revised 4/7/17, PAS

Revised, Amendment #3

KEFJ - 184638 01 50 00 - 4

and heaters and all chimney and vent connections to prevent ignition of combustible material

3. Install and maintain temporary filters when air handing equipment is used for temporary heating. Install new filters before final acceptance in addition to any extra sets of filters required. Clean coils as determined by Contracting Officer.

4. Warranties for equipment used for temporary heating shall start on date of Final Acceptance.

E. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption.

F. Electric Power Service: Use of existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to the NPS.

1. When temporary connections are removed, restore existing utility services to their original condition.

G. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.

1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system.

H. Telephone Service: No telephone service is available on site for Contractor's use. Make arrangements with Telephone Company and pay all costs.

3.3 SUPPORT FACILITIES INSTALLATION

A. General: Comply with the following:

1. Provide incombustible construction for offices, shops, and sheds located within construction area or within 50 feet of building lines. Comply with NFPA 241.

2. Maintain support facilities until near Substantial Completion. Remove structures, equipment, and furnishings, and terminate services after punch list is 100 percent completed or when directed by Contracting Officer. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to Contracting Officer.

B. Traffic Controls: Erect and maintain barricades, lights, danger signals, and warning signs in accordance with Manual on Uniform Traffic Control Devices (MUTCD), Part IV, latest edition.

1. Protect existing site improvements to remain including curbs, pavement, and utilities.

2. Maintain access for fire-fighting equipment and access to fire hydrants.

3. Illuminate barricades and obstructions at night; keep safety lights burning from sunset to sunrise.

4. Adequately barricade and post open cuts in or adjacent to thoroughfares.

5. Protect pedestrian traffic by guardrails or fences.

KEFJ - 184638 01 50 00 - 5

6. When pedestrian traffic is detoured onto a roadway, provide temporary walkways with protection as required at ends and overhead. For walkways, use lumber running parallel to direction of traffic movement and provide ramps at changes of elevation.

7. Cover pipes, hoses, and power lines crossing sidewalks and walkways with troughs using beveled edge boards.

8. Install Barrier Tape where directed by Contracting Officer. Keep a minimum of two rolls on site at all times

C. Parking: Use areas of existing parking areas within project limits for construction personnel.

D. Dewatering Facilities and Drains: Comply with requirements of the agency(ies) with jurisdiction. Maintain Project site, excavations, and construction free of water.

1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining properties nor endanger permanent Work or temporary facilities.

2. Remove snow and ice as required to minimize accumulations.

E. Temporary Signs: Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.

1. Provide temporary, directional signs for construction personnel and visitors.

2. Maintain and touchup signs so they are legible at all times.

3. Erect and maintain sufficient detour signs at road closures and along detour routes.

F. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of agency(ies) with jurisdiction.

G. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.

1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.

H. Existing Stair Usage: Use of existing stairs will be permitted, as long as stairs are cleaned and maintained in a condition acceptable to Contracting Officer. At Substantial Completion, restore stairs to condition existing before initial use.

1. Provide protective coverings, barriers, devices, signs, or other procedures to protect stairs and to maintain means of egress. If, despite such protection, stairs become damaged, restore damaged areas so no evidence remains of correction work.

I. Temporary Use of Permanent Stairs: Cover finished, permanent stairs with protective covering of plywood or similar material so finishes will be undamaged at time of acceptance.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

KEFJ - 184638 01 50 00 - 6

B. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

C. Temporary Erosion and Sedimentation Control: Refer to Section 01 57 23 “Temporary Storm Water Pollution Prevention”.

D. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion. Perform control operations lawfully, using environmentally safe materials.

E. Site Enclosure Fence: When excavation begins, furnish and install appropriate barriers in a manner that will prevent people and animals from easily entering site except by entrance gates.

1. Extent of Fence: As required to enclose or portion determined sufficient to accommodate construction operations.

2. Locate vehicular gates to avoid interference with traffic on public thoroughfares.

3. Locate pedestrian entrance gates as required to provide controlled personnel entry.

4. Maintain security by limiting number of keys and restricting distribution to authorized personnel.

F. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security.

G. Barricades, Warning Signs, and Lights: Comply with requirements of MUTCD, part IV, 2003 edition for erecting structurally adequate barricades, including warning signs and lighting.

H. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

1. Where heating or cooling is needed and permanent enclosure is not complete, insulate temporary enclosures.

I. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with

NFPA 241.

1. Responsible Person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.

2. Smoking: Smoking within buildings or temporary storage sheds is prohibited.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition according to requirements of NPS and City of Seward.

KEFJ - 184638 01 50 00 - 7

4. Develop and supervise an overall fire-prevention and -protection program for personnel at Project site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information.

5. Provide temporary standpipes and hoses for fire protection. Hang hoses with a warning sign stating that hoses are for fire-protection purposes only and are not to be removed.

Match hose size with outlet size and equip with suitable nozzles.

6. Hazard Control: Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing buildings. Provide adequate ventilation during use of volatile or noxious substances.

7. Spark Arresters: Equip all gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by the USDA Forest Service.

a. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.

8. Buildings: Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof.

a. Travel distance from any work station to the nearest extinguisher shall not exceed 75 feet.

9. Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment.

3.5 OPERATION, TERMINATION, AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.

B. Maintenance: Maintain facilities in good operating condition until removal.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage.

C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.

D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

1. Materials and facilities that constitute temporary facilities are property of Contractor.

NPS reserves right to take possession of Project identification signs.

2. At Substantial Completion, clean and renovate permanent facilities used during construction period.

KEFJ - 184638 01 50 00 - 8

END OF SECTION 01 50 00

KEFJ 184638 08 14 16 - 1

FLUSH WOOD DOORS

SECTION 08 14 16

FLUSH WOOD DOORS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Solid-core doors with wood-veneer faces.

2. Factory finishing flush wood doors.

3. Factory fitting flush wood doors to frames and factory machining for hardware.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of door. Include details of core and edge construction and trim for openings. Include factory-finishing specifications.

B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door;

construction details not covered in Product Data; and the following:

1. Dimensions and locations of blocking.

2. Dimensions and locations of mortises and holes for hardware.

3. Dimensions and locations of cutouts.

4. Undercuts.

5. Requirements for veneer matching.

6. Doors to be factory finished and finish requirements.

7. Fire-protection ratings for fire-rated doors.

C. Samples for Verification:

1. Factory finishes applied to actual door face materials, approximately 8 by 10 inches, for each material and finish. For each wood species and transparent finish, provide set of three Samples showing typical range of color and grain to be expected in finished Work.

1.4 INFORMATIONAL SUBMITTALS

A. Sample Warranty: For special warranty.

Revised 4/7/17

KEFJ 184638 08 14 16 - 2

B. Quality Standard Compliance Certificates: AWI Quality Certification Program certificates.

1.5 QUALITY ASSURANCE

A. Do not store doors in damp or wet areas or in areas where sun may bleach veneers. Break seal on site to permit ventilation. Seal top and bottom of doors with tinted sealer.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Comply with requirements of referenced standard and manufacturer's written instructions.

B. Package doors individually in plastic bags or cardboard cartons.

C. Mark each door on bottom rail with opening number used on Shop Drawings.

1.7 FIELD CONDITIONS

A. Environmental Limitations: Do not deliver or install doors until spaces are enclosed and weathertight, wet work in spaces is complete and dry, and HVAC system is operating and maintaining ambient temperature and humidity conditions at occupancy levels during remainder of construction period.

B. Environmental Limitations: Do not deliver or install doors until spaces are enclosed and weathertight, wet work in spaces is complete and dry, and HVAC system is operating and maintaining temperature between 60 and 90 deg F and relative humidity between 25 and 55 percent during remainder of construction period.

1.8 WARRANTY

A. A. Special Warranty: Manufacturer agrees to repair or replace doors that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Warping (bow, cup, or twist) more than 1/4 inch in a 42-by-84-inch section.

b. Telegraphing of core construction in face veneers exceeding 0.01 inch in a 3-inch span.

2. Warranty shall also include installation and finishing that may be required due to repair or replacement of defective doors.

3. Warranty Period for Solid-Core Interior Doors: Life of installation.

KEFJ 184638 08 14 16 - 3

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. Eggers Industries.

2. Graham Wood Doors; ASSA ABLOY Group company.

3. Vancouver Door Company.

4. VT Industries Inc.

B. Source Limitations: Obtain flush wood doors from single manufacturer.

2.2 FLUSH WOOD DOORS, GENERAL

A. Quality Standard: In addition to requirements specified, comply with AWI's, AWMAC's, and

WI's "Architectural Woodwork Standards."

1. Provide AWI Quality Certification Labels indicating that doors comply with requirements of grades specified.

2. Contract Documents contain selections chosen from options in quality standard and additional requirements beyond those of quality standard. Comply with those selections and requirements in addition to quality standard.

B. WDMA I.S.1-A Performance Grade: Heavy Duty.

C. Fire-Rated Wood Doors: Doors complying with NFPA 80 that are listed and labeled by a qualified testing agency, for fire-protection ratings indicated, based on testing at positive pressure according to NFPA 252 or UL 10C.

1. Temperature-Rise Limit: At vertical exit enclosures, provide doors that have a maximum transmitted temperature end point of not more than 450 deg F (250 deg C) above ambient after 30 minutes of standard fire-test exposure.

2. Cores: Provide core specified or mineral core as needed to provide fire-protection rating indicated.

3. Edge Construction: Provide edge construction with intumescent seals concealed by outer stile. Comply with specified requirements for exposed edges.

D. Smoke- and Draft-Control Door Assemblies: Listed and labeled for smoke and draft control, based on testing according to UL 1784.

E. Particleboard-Core Doors:

1. Particleboard: ANSI A208.1, Grade LD-2.

2. Blocking: Provide wood blocking in particleboard-core doors as needed to eliminate through-bolting hardware.

Revised 4/7/17 Amendment #3 http://www.specagent.com/Lookup?ulid=4 http://www.specagent.com/Lookup?uid=123457006434 http://www.specagent.com/Lookup?uid=123457006428 http://www.specagent.com/Lookup?uid=123457006443 http://www.specagent.com/Lookup?uid=123457006436

KEFJ 184638 08 14 16 - 4

3. Provide doors with structural-composite-lumber cores instead of particleboard cores for doors indicated to receive exit devices.

4. Face Adhesive: Type 1 – Waterproof.

F. Structural-Composite-Lumber-Core Doors:

1. Structural Composite Lumber: WDMA I.S.10.

a. Screw Withdrawal, Face: 700 lbf.

b. Screw Withdrawal, Edge: 400 lbf.

2. Face Adhesive: Type 1 – Waterproof.

G. Mineral-Core Doors:

1. Core: Noncombustible mineral product complying with requirements of referenced quality standard and testing and inspecting agency for fire-protection rating indicated.

2. Blocking: Provide composite blocking with improved screw-holding capability approved for use in doors of fire-protection ratings indicated asneeded to eliminate through-bolting hardware.

3. Face Adhesive: Type 1 – Waterproof.

4. Edge Construction: At hinge stiles, provide laminated-edge construction with improved screw-holding capability and split resistance. Comply with specified requirements for exposed edges.

a. Screw-Holding Capability: 475 lbf per WDMA T.M.-10.

H. Thickness: 1-3/4 inch thick unless noted otherwise

2.3 VENEER-FACED DOORS FOR TRANSPARENT FINISH

A. Interior Solid-Core Doors:

1. Grade: Premium, with Grade A faces.

2. Species: Red oak.

3. Cut: Plain sliced (flat sliced).

4. Match between Veneer Leaves: Book match.

5. Assembly of Veneer Leaves on Door Faces: Center-balance match.

6. Exposed Vertical Edges: Same species as faces or a compatible species - edge Type A.

7. Core: Particleboard.

8. Construction: Five plies. Stiles and rails are bonded to core, then entire unit is abrasive planed before veneering. Faces are bonded to core using a hot press.

KEFJ 184638 08 14 16 - 5

2.4 FABRICATION

A. Factory fit doors to suit frame-opening sizes indicated. Comply with clearance requirements of referenced quality standard for fitting unless otherwise indicated.

1. Comply with NFPA 80 requirements for fire-rated doors.

2. Factory apply labels from testing agencies.

B. Factory machine doors for hardware that is not surface applied. Locate hardware to comply with

DHI-WDHS-3. Comply with final hardware schedules, door frame Shop Drawings, BHMA-

156.115-W, and hardware templates.

1. Coordinate with hardware mortises in metal frames to verify dimensions and alignment before factory machining.

2.5 FACTORY FINISHING

A. General: Comply with referenced quality standard for factory finishing. Complete fabrication, including fitting doors for openings and machining for hardware that is not surface applied, before finishing.

1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be omitted on top and bottom edges, edges of cutouts, and mortises.

B. Factory finish doors.

C. Transparent Finish:

1. Grade: Custom.

2. Finish: AWI's, AWMAC's, and WI's "Architectural Woodwork Standards" System 5, conversion varnish.

3. Staining: Match existing.

4. Effect: Open-grain finish.

5. Sheen: Satin.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine doors and installed door frames, with Installer present, before hanging doors.

1. Verify that installed frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with level heads and plumb jambs.

2. Reject doors with defects.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

KEFJ 184638 08 14 16 - 6

3.2 INSTALLATION

A. Hardware: For installation, see Section 08 71 00 "Door Hardware."

B. Installation Instructions: Install doors to comply with manufacturer's written instructions and referenced quality standard, and as indicated.

1. Install fire-rated doors according to NFPA 80.

2. Install smoke- and draft-control doors according to NFPA 105.

C. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.

D. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at

Project site.

3.3 ADJUSTING

A. Operation: Rehang or replace doors that do not swing or operate freely.

B. Finished Doors: Replace doors that are damaged or that do not comply with requirements.

Doors may be repaired or refinished if Work complies with requirements and shows no evidence of repair or refinishing.

END OF SECTION 08 14 16

KEFJ 184638 23 09 00 - 1

HVAC INSTRUMENTATION

SECTION 23 09 00

Addenda information shown below in bold italics for new items - Thermostats.

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Pressure gauges and pressure gauge taps.

B. Thermometers and thermometer wells.

C. Thermostats.

1.2 PRODUCTS FURNISHED BUT NOT INSTALLED UNDER THIS SECTION

A. Section 23 21 13 - Hydronic Piping: Installation of thermometer wells, pressure gauge tappings.

1.3 RELATED SECTIONS

A. Section 23 09 00 – Direct Digital Controls for HVAC.

B. Section 23 09 93 - Sequence of Operation.

1.4 REFERENCES

A. ASTM E1 - Specification for ASTM Thermometers.

B. ASTM E77 - Verification and Calibration of Liquid-in-Glass Thermometers.

C. AWWA C700 - Cold Water Meters - Displacement Type.

D. AWWA C706 - Direct Reading Remote Registration Systems for Cold Water Meters.

1.5 SUBMITTALS

A. Submit under provisions of Division 01.

B. Product Data: Include list which indicates use, operating range, total range and location for manufactured components.

C. Submit manufacturer's installation instructions under provisions of Division 01.

Revision Date 4/7/17

KEFJ 184638 23 09 00 - 2

1.6 PROJECT RECORD DOCUMENTS

A. Submit documents under provisions of Division 01.

B. Accurately record actual locations of instrumentation.

1.7 ENVIRONMENTAL REQUIREMENTS

A. Do not install instrumentation when areas are under construction, except for required rough-in, taps, supports and test plugs.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Dwyer.

B. Trerice.

C. Marshaltown.

D. Ashcroft.

E. Enerpac.

F. Sisco.

G. Petersen.

H. Substitutions: In accordance with Division 01.

2.2 PRESSURE GAUGES

A. 4-1/2 inch diameter cast aluminum case, phosphor bronze bourbon tube, rotary bronze movement, brass socket, black figures on white background, one percent mid-scale accuracy, scale calibrated in psi. Model 600C as manufactured by Trerice.

2.3 PRESSURE GAUGE TAPS

A. Gauge Isolation Valve: Lever handle ball valve, forged brass body, chrome plated brass ball, viton o-rings for maximum 150 psig. Model Mini T-82-M as manufactured by Jomar.

B. Needle Valve: Brass for maximum 150 psig. Model 735 as manufactured by Trerice.

C. Pulsation Damper: Pressure snubber, brass with 1/4 inch connections. Series 870 as manufactured by Trerice.

KEFJ 184638 23 09 00 - 3

D. Coil Siphon: Brass, ¼”, male pipe thread each end. 885 series.

2.4 STEM TYPE THERMOMETERS

A. 9 inch scale, universal adjustable angle, red appearing mercury, lens front tube, cast aluminum case with blueblack metallic finish and clear Lexan window, extended brass stem, cast aluminum adjustable joint with positive locking device, 2 percent of scale accuracy to ASTM

E77, scale calibrated in both degrees F and degrees C. BX9 series as manufactured by Trerice.

2.5 SOLAR DIGITAL THERMOMETERS

A. Hi-impact ABS case; -50/300°F switchable range; 1/2" LCD digits, wide ambient formula display; 1% accuracy; 1/10°F between -19.9/199.9°F resolution; 10 Lux (one foot-candle) LUX rating; 10 second update rate; -30/140°F ambient operating range; Glass passivated thermistor –

NTC sensor. Model Digital Vari-angle as manufactured by Weiss Products.

2.6 THERMOMETER SUPPORTS

A. Socket: Brass separable sockets for thermometer stems with or without extensions as required, and with cap and chain.

B. Flange: 3 inch outside diameter reversible flange, designed to fasten to sheet metal air ducts, with brass perforated stem.

2.7 TEST PLUGS

A. Test Plug: 1/4 inch or 1/2 inch brass fitting and cap for receiving 1/8 inch outside diameter pressure or temperature probe with Nordel or Viton core for temperatures up to 350 degrees F.

B. Test Kit: Carrying case, internally padded and fitted containing one 2-1/2 inch diameter pressure gauge, two gauge adapters with 1/8 inch probes, two 1-1/2 inch dial thermometers.

2.8 STATIC PRESSURE GAUGES

A. 4 inch diameter dial in cast aluminum case, magnehelic differential pressure gauge, black figures on white background, front recalibration adjustment with tubing, static pressure tips, adjustable signal flag. Series 2000 as manufactured by Dwyer.

2.9 MANUFACTURERS - THERMOSTATS

A. Honeywell.

B. Siemens.

C. Johnson Controls.

KEFJ 184638 23 09 00 - 4

D. Substitutions: In accordance with Division 01.

2.10 THERMOSTATS

A. Programmable Thermostats: Digital, single stage heating only, programmable for 7 day or

24 hour schedules, programmable for 2 to 4 temperatures per day, 3 hour override, programming shall not be effected by power outages, 2"x 4" box mounting adapter.

Contractor shall provide initial programming based on end user input. Rehau model 236457 or approved equal.

B. Non-programmable Thermostats for the project shall be as follows: Fahrenheit scale, single temperature, gradual-acting, adjustable sensitivity. Provide covers with exposed set point adjustment, set point indication, with thermometer. Differential not to exceed 2.7 degrees F with minimum 11.7 degrees F set point adjustment. Honeywell series 451 or approved equal.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Install positive displacement meters with isolating valves on inlet and outlet. Provide full line size valved bypass with globe valve for liquid service meters.

C. Provide two pressure gauges per pump, installing taps [before strainers and] on suction and discharge of pump. Pipe to gauge with isolation valve to each tapping.

D. Install pressure gauges with pulsation dampers. Provide needle valve or gauge isolation valve to isolate each gauge. Provide coil siphon for all pressure gauges installed on steam and condensate systems.

E. Install thermometers in piping systems in sockets in short couplings Enlarge pipes smaller than

2-1/2 inch for installation of thermometer sockets. Select bulb length to reach centerline of pipe.

F. Install thermometers in air duct systems on flanges.

G. Install thermometer sockets adjacent to controls system thermostat, transmitter, or sensor sockets.

H. Locate duct mounted thermometers minimum 10 feet downstream of mixing dampers, coils, or other devices causing air turbulence or provide with averaging bulb.

I. Provide instruments with scale ranges selected according to service with largest appropriate scale.

KEFJ 184638 23 09 00 - 5

J. Install gauges and thermometers in locations where they are easily read from normal operating level.

3.2 PRESSURE GAUGE SCHEDULE

LOCATION SCALE RANGE

Pumps less than 40' TDH 0 - 30 PSIG

Pumps more than 40' TDH 0 - 60 PSIG

Heating water system 0 - 30 PSIG

Others As applicable

3.3 STEM TYPE THERMOMETER SCHEDULE

LOCATION SCALE RANGE

Heating water system 0 - 200° F

Others As applicable

END OF SECTION 23 09 00

KEFJ 184638 23 09 93 - 1

SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION 23 09 93

Addenda information shown below in bold italics for new items and strike through for removed…