CODE ANALYSIS
The following information shall be used as reference for determining the projects general conformance to the below listed codes. No deviation is allowed unless approved by the Architect in writing. The following Codes were used:
International Building Code 2012 Edition International Mechanical Code 2009 Edition International Energy Conservation Code (IECC) 2006 Edition [Climate Zone 7 ] Uniform Plumbing Code 2009 Edition International Fire Code 2009 Edition National Electrical Code 2011 Edition Architectural Barriers Act 2004 Edition Accessible and Usable Buildings and Facilities (ICC/ANSI A117.1) 2009 Edition
All requirements will be met of the Energy Conservation Requirements per the IECC Section 502 and IECC Tables 502.2(1) and 502.3 Climate Zone 7, including local amendments
Location: 2100 Seward Highway Seward, AK 99664 Zone:
International Building Code (IBC) 2012 Edition Chapter 3 – USE AND OCCUPANCY CLASSIFICATION Section 302.1 - General This building has been designated to include the following occupancy groups:
1. Assembly: Group A-3
2. Business: Group B
Section 303.4 – Assembly Group A-3 The Lecture Hall and Exhibition Space will be considered as A-3
Section 304.1 – Business Group B All offices, miscellaneous storage, mechanical, and their respective support spaces will be designated as B occupancies
Chapter 4 – SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY There are no requirements within this Chapter that apply
Chapter 5 – GENERAL BUILDING HEIGHTS AND AREAS Section 503.1 - General (Table 503- Type VB, fully sprinklered) The type of construction for all applicable occupancies as well as their corresponding tabular areas per floor are as defined on sheet G001 in the set of drawings.
The maximum area allowed will be based on the tabular values of 503 as follows:
1. Type VB, Group A3- 1 Story with 6000 sq.ft
2. Type VB, Group B2- 2 Story with 9000 sq.ft
Section 504.2 – Automatic Sprinkler system increase This building will be equipped throughout with an approved automatic sprinkler system in accordance with Section 903.3.11 and therefore the maximum building height per Table 503 is increased by 20 feet and the maximum number of stories is increased by one- the values are as follows:
1. Type VB, Group A3- 2 Story with 6000 sq.ft
2. Type VB, Group B2- 3 Story with 9000 sq.ft
These increases are permitted in addition to the building area increase in accordance with Section
506.2 and 506.3.
Section 505 Mezzanines There are no requirements within this section that apply
Section 506.1 General Maximum Allowable Areas per Occupancy is as Follows:
Group A3: {6,000 + [6,000 x .75] + [6,000 x 2]} = 22,500 allowable sq ft per floor Group B2: {9,000 + [9,000 x .75] + [9,000 x 2]} = 33,750 allowable sq ft per floor
Actual Area First Floor = 2,870 sf Actual Area Second Floor = 1,387 sf Total = 4,257 sf
Section 506.2 Frontage Increase Minimum distance to a property lines is 20'-0". This building has 100% of its perimeter on a public way or open space having a minimum width of 20 feet.
If = .75 [equation 5-2].
506.3 Automatic Sprinkler System Increase
The building is being equipped throughout with an approved automatic sprinkler system in accordance to with Section 903.3.1.1 and therefore the building area limitation in Table 503 is permitted to be increased an additional 200%.
These increases are permitted in addition to the height and story increases in accordance with Section 504.2
The Is = 200 at the building’s two story construction.
Section 507 Unlimited Area Buildings There are no requirements within this section that apply
Section 508 Mixed Use and Occupancy Section 508.1 General Each portion of the building will be individually classified in accordance to Section 302.1. This building contains more than one occupancy group (Assembly-A3 and Business- B), the building or portion thereof shall comply with the provisions of Section 508.2 and 508.3
Section 508.2 Accessory occupancies Accessory occupancies are those occupancies that are ancillary to the main occupancy of the building or portion thereof. The portion of this building that is classified as a Business Occupancy (B) will be considered an accessory occupancy and will comply with the provisions of Sections 508.2.1 through 508.2.5.3
Section 508.3 Non-separated occupancies Buildings or portions of buildings that comply with the provisions of this section shall be considered as non-separated occupancies.
Section 508.3.1 Occupancy classification Non-separated occupancies shall be individually classified in accordance with Section 302.1. The requirements of this code shall apply to each portion of the building based on the occupancy classification of that space. In addition....to the total non-separated occupancy area.
Section 508.3.2 Allowable building area and height The allowable building area and height of the building or portion thereof shall be based on the most restrictive allowances for the occupancy groups (Occupancy Group A3- 2 story, 22,500 sf) under consideration for the type of construction of the building in accordance with Section 503.1
Section 508.3.3 Separation No separation is required between occupancies
Section 509 Special Provisions There are no requirements within this section that apply
Chapter 6 – TYPES OF CONSTRUCTION Section 602.1 – General Construction (Table 601 and Table 602) This building will be designated as: Type VB (Non- Rated) construction, fully sprinklered throughout Table 601 – Fire Resistance Rating Requirements for Building Elements
Structural Frame 0 HR Exterior Bearing Walls 0 HR Interior Bearing Walls 0 HR Interior Non Bearing Walls 0 HR Floor Construction 0 HR Roof Construction 0 HR
Based on the proposed site parameters with frontage clearance greater than 30 feet on all open sides the exterior walls (Table 602) require no fire resistance ratings.
X>30 = 0 HR for all Types
Chapter 7 – FIRE AND SMOKE PROTECTION FEATURES Section 704 – Fire-Resistance Rating of Structural Members
Section 708.5 EXTERIOR WALLS Where exterior walls serve as a part of a required fire resistance rated shaft or exit enclosure, or separation, such walls shall comply with the requirements of Section 705 for exterior walls and the fire-resistance-rated enclosure or separation requirements shall not apply.
Section 713 SHAFT ENCLOSURES Section 713.4 Fire Resistance rating Shaft enclosures shall have a fire resistance rating of not less than 2 hours where connecting four stories or more, and not less than 1 hour where connecting less than four stories.
Section 713.14.1 ELEVATOR LOBBY.
Exception 4 Enclosed elevator lobbies are not required where the building is protected by an automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2
Chapter 9 – FIRE PROTECTION SYSTEMS
Section 906.1 Where required Portable fire extinguishers shall be installed in the following locations. Within 75' of travel distance.
Chapter 10 – MEANS OF EGRESS (And Table 1003.2.2.2 and 1003.2.3)
Section 1003.2 – Ceiling Height The means of egress shall have a ceiling height of not less than 7 feet 6 inches
Section 1003.6 – Means of egress continuity Continuity: the path of egress travel along a means of egress shall not be interrupted by any building element other than a means of egress component.
Section 1003.7 – Elevators, escalators, and moving walks Elevators: Elevators shall not be used as a component of a required means of egress from any other part of the building
Section 1004.1.1 – Areas without fixed seating The number of occupants shall be computed at the rate of one occupant per unit of area as prescribed in Table 1004.1.1
Accessory storage areas, mechanical equipment rooms……………..…300 gross Business areas and workroom……………………………………….…….100 gross Assembly without fixed seats
Concentrated (chairs only- not fixed)................................................7 net Assembly
Exhibit Gallery and Museum...........................................................30 net
Occupant Loads:
First Floor Business: = 5 occ First Floor Exhibit Gallery: = 58 occ First Floor Assembly without fixed seats: = 59 occ First Floor Storage/Mechanical: = 5 occ
First Floor Total = 127 occ
Second Floor Business: = 10 occ Second Floor Storage/Mechanical = 1 occ
Second Floor Total = 11 occ
Total Building Occupancy = 138 occ
Section 1007.1 Accessible means of egress required Accessible means of egress shall comply with this section. Accessible spaces shall be provided with not less than one accessible means of egress. Where more than one means of egress are required by Section 1015.1 or 1021.1 from any accessible space, each accessible portion of the space shall be served by not less than two accessible means of egress
Exception 1 Applies: Accessible means of egress are not required in alterations to existing buildings
Section 1009.2.1 Interior Exit Stairs Interior exit stairways shall lead directly to the exterior of the building or shall be extended to the exterior of the building with an exit passage way conforming to the requirements of Section 1023, except as permitted in Section 1027.1
Section 1009.3.1.2 Fire-resistive rating Exist access stairway enclosures shall have a fire-resistive rating of not less than 2 hours where connecting four stories or more, and not less than 1 hour where connecting less than four stories. The number of stories connected by the exit access stairway enclosures shall include any basements, but not any mezzanines. Exit access stairway enclosures shall have a fire resistive rating not less than the floor assembly penetrated, but need not exceed 2 hours.
Section 1009.4 Width The width of the stairways shall be determined as specified in Section 1005.1, but such width shall not be less than 44 inches
Exception 1 Applies: Stairways serving and occupant load of less than 50 shall have a width not less than 36 inches
Section 1021.2 Exits from stories Two exits, or exit access stairway or ramps providing access to exits, from any story or occupied roof shall be provided where one of the following conditions exists:
Condition 2 Applies: The exit access travel distance exceeds that specified in Table 1021.2 (1) or 1021.2
(2) as determined in accordance with the provisions of Section 1016.1
The building does not exceed Second Story- Occupancy B- Maximum occupants 29 and 75'-0" feet maximum exit travel distance, therefore only (1) exit is required from the second floor. Three exits are provided from the first floor.
Chapter 29 – Plumbing Systems
Section 2902.1 – Minimum number of fixtures Plumbing fixtures shall be provided for the type of occupancy and in the minimum number shown in Table 2902.1
Assembly (A3)- Water Closets: For male: 1 per 125
For female: 1 per 65 127/2 = 64 occupants for male and female
For male and female: 1 required, 1 water closets provided
Lavatories: For male and female: 1 per 200 127/2 = 64 occupants for male and female
For male and female: 1 required, 1 provided
Drinking Fountains: 1 per 500 1 required, 2 provided
Other: 1 service sink 1 required
Business (B)- Water Closets: For male and female: 1 per 25 for the first 50 and 1 per 50 for the remainder exceeding 50 separate facilities not required when serving an occupant load of 15 or less IBC 2902.2
1 unisex provided
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
TR/MCL
MCL
G002
DRAWING INDEX AND
CODE ANALYSIS
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
The Seward Visitor Center is to be renovated as shown in the following documents to accommodate the new Exhibit Space on the first floor and rehabilitate the center for accessibility. The scope of the work on the interior will include the following:
• reorganization of the existing spaces to meet the needs of the visitors of the building and the employees of the National Park Service
• an elevator addition that also includes additional storage space that is accessed from the exterior only
• new mechanical space with access from the exterior of the building
• a remodeled theater space
• new mens and womens bathrooms, janitor closet and storage
• new floor and wall finishes throughout the floor
• new siding on the exterior of the building
• new metal roof
BID OPTIONS:
Bid Option 1: The replacement of all existing windows with new fiberglass windows
PROJECT SUMMARY and BID OPTIONS
SHEET
NO
SUB
SHEET NO SHEET NAME
60 E102 POWER & SIGNAL DEMOLITION PLAN - FIRST
FLOOR
61 E103 LIGHTING DEMOLITION PLAN - SECOND FLOOR
62 E104 POWER & SIGNAL DEMOLITION PLAN - SECOND
FLOOR
63 E201 LIGHTING REMODEL PLAN - FIRST FLOOR AND
EXHIBIT SCHEDULE
64 E202 LIGHTING REMODEL PLAN - SECOND FLOOR
65 E301 POWER REMODEL PLAN - FIRST FLOOR
66 E302 POWER REMODEL PLAN - SECOND FLOOR
67 E401 SIGNAL REMODEL PLAN - FIRST FLOOR
68 E402 SIGNAL REMODEL PLAN - SECOND FLOOR
69 E501 ENLARGED POWER & SIGNAL REMODEL PLAN -
FIRST FLOOR
70 E601 ELECTRICAL ONE-LINE DIAGRAMS
71 E602 FIRE ALARM & SECURITY ONE-LINE DIAGRAMS
72 E701 DETAILS
73 E801 PANEL SCHEDULES
SHEET
NO
SUB
SHEET NO SHEET NAME
47 M201 FIRST FLOOR UNDER FLOOR PLUMBING
REMODEL PLAN
48 M202 FIRST FLOOR ABOVE FLOOR PLUMBING
REMODEL PLAN
49 M203 SECOND FLOOR ABOVE FLOOR PLUMBING
REMODEL PLAN
50 M301 FIRST FLOOR HVAC REMODEL PLAN
51 M302 SECOND FLOOR HVAC REMODEL PLAN
52 M401 MECHANICAL PLANS AND SCHEMATICS
53 M501 MECHANICAL DETAILS
54 M502 MECHANICAL DETAILS
55 F101 FIRST FLOOR FIRE PROTECTION PLAN
56 F102 SECOND FLOOR FIRE PROTECTION PLAN
57 E001 LEGEND
58 E002 SCHEDULES
59 E101 LIGHTING DEMOLITION PLAN - FIRST FLOOR
SHEET
NO
SUB
SHEET NO SHEET NAME
30 S002 STATEMENT OF SPECIAL INSPECTIONS
31 S100 FOUNDATION PLAN
32 S101 FIRST FLOOR FRAMING PLAN
33 S102 SECOND FLOOR FRAMING PLAN
34 S103 ROOF FRAMING PLAN
35 S201 BUILDING SECTIONS
36 S301 ELEVATOR DETAILS
37 S401 FOUNDATION DETAILS
38 S501 FRAMING DETAILS
39 S502 FRAMING DETAILS
40 M001 LEGEND ABBREVIATIONS AND SCHEDULES
41 M002 SCHEDULES
42 M101 CRAWL SPACE DEMOLITION PLAN
43 M102 FIRST FLOOR PLUMBING DEMOLITION PLAN
44 M103 SECOND FLOOR PLUMBING DEMOLITION PLAN
45 M104 FIRST FLOOR HVAC DEMOLITION PLAN
46 M105 SECOND FLOOR HVAC DEMOLITION PLAN
SHEET
NO
SUB
SHEET NO SHEET NAME
14 A106 REFLECTED CEILING PLAN - SECOND FLOOR
15 A107 ROOF PLAN
16 A201 EXTERIOR ELEVATIONS
17 A202 EXTERIOR ELEVATIONS
18 A301 BUILDING SECTIONS
19 A302 WALL SECTIONS
20 A303 WALL SECTIONS
21 A304 ELEVATOR SECTIONS
22 A401 ENLARGED PLANS
23 A402 INTERIOR ELEVATIONS
24 A501 OPENING DETAILS
25 A502 DETAILS
26 A503 DETAILS
27 A601 DOOR SCHEDULE
28 A602 FINISH SCHEDULE
29 S001 GENERAL NOTES
SHEET
NO
SUB
SHEET NO SHEET NAME
1 G001 COVER SHEET
2 G002 DRAWING INDEX AND CODE ANALYSIS
3 G003 LIFE SAFETY PLANS
4 G004 ACCESSIBILTY COMPLIANCE AND MOUNTING
HEIGHTS
5 A001 ABBREVIATIONS AND SYMBOLS LEGEND
6 A002 PARTITION TYPES
7 AD101 DEMO FLOOR PLANS - FIRST FLOOR
8 AD102 DEMO FLOOR PLANS - SECOND FLOOR
9 A101 FLOOR PLANS- FIRST FLOOR
10 A102 FLOOR PLANS- SECOND FLOOR
11 A103 FLOOR FINISH PLAN - FIRST FLOOR
12 A104 FLOOR FINISH PLAN - SECOND FLOOR
13 A105 REFLECTED CEILING PLAN - FIRST FLOOR
DRAWING INDEX
UP
129B
SERAC
STORAGE
77S2
MECHANICAL
411A3.1
THEATER
49B
AK GEO
191B
EDUCATION
836A3.2 101A
MAIN
EXHIBIT
SPACE
37S2
JANITOR
37S2
STORAGE
49S2
STORAGE
56S2
STORAGE
1 HOUR STAIR
ENCLOSURE
A B C D
1.1
4.9
48B
WOMEN'S
RESTROOM
MEN'S
RESTROOM
HALLWAY
EGRESS PATH 1
EGRESS PATH 2
E
4' 8' 16'0"
F.
E.
F.E.
175B
CONFERENCE
44S2
LOCKERS
158B
OFFICE
203B
OFFICE
155B
OFFICE
118B
OFFICE
82S2
STORAGE
OPEN TO BELOW
UNOCCUPIED ATTIC SPACE
FIRE RATED 1 HOUR
STAIR ENCLOSURE
A B C D
1.1
4.9
39B
RESTROOM
STAIR EGRESS PATH 3
302B
CIRCULATION
STORAGE
B 1
E
4' 8' 16'0"
DN
1 HOUR FIRE RATED
SHAFT ENCLOSURE
F.E.
1 HOUR FIRE WALL
DOOR WITH PANIC HARDWARE
FIRE EXTINGUISHER LOCATION
LIFE SAFETY PLAN GENERAL NOTESLIFE SAFETY PLAN LEGEND
RM NO
ROOM NAME
XXXXXX XXXX
X
NET SF
NUMBER OF OCCUPANTS
NUMBER OF EXITS REQUIRED
IBC OCCUPANCY CLASSIFICATION
42 OCCUPANT LOAD THRU EXIT
1. REFERENCE CODES: ALL WORK SHALL CONFORM TO ALL APPLICABLE BUILDING
CODES, STANDARDS, REGULATIONS, AND OTHER SUPPLEMENTAL
AMENDMENTS RELATED TO THE JURISDICTIONS OF THE PROJECT, IN THEIR
LATEST AND MOST RECENT ADOPTED EDITIONS, AND EFFECTIVE DATES.
EGRESS PATH TRAVEL DISTANCES
EXISTING WALL CONSTRUCTION TO REMAIN- REFER TO
PARTITION TYPES SHEET A002 FOR ADDITIONAL INFORMATION
NEW CONSTRUCTION - REFER TO PARTITION TYPES SHEET
A002 FOR ADDITIONAL INFORMATION
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
JED/MCL
MCL
G003
LIFE SAFETY PLANS
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
LIFE SAFETY PLAN- FIRST FLOORLIFE SAFETY PLAN- SECOND FLOOR
EGRESS PATH NAME EGRESS PATH- TOTAL DISTANCE
1 98' - 2" 2 117' - 0" 3 62' - 6"
PLAN
NORTH
PLAN
NORTH
GENERAL PROJECT NOTES:
1. CONTRACT DOCUMENTS: THE CONTRACT DOCUMENTS FOR THIS PROJECT , TITLED KENAI FJORDS VISITOR CENTER, DATED 09.20.2016. CONSIST OF THE DRAWINGS AND SPECIFICATIONS FROM
ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL. ALL INFORMATION HEREIN SHALL BE TREATED EQUALLY, WITHOUT ANY HIERARCHY, AND/OR ORDER OF PRECEDENCE, UNLESS OTHERWISE
NOTED.
2. ELECTRONIC MEDIA : THE CONSTRUCTION DOCUMENTS HAVE BEEN PREPARED UTILIZING ELECTRONIC DRAFTING FORMATS OF AUTODESK REVIT VERSION 2015.
THE AVAILABILITY OF ELECTRONIC BASE FLOOR PLANS , AND/OR ANY OTHER RELATED DOCUMENT FOR USE BY THE GENERAL CONTRACTOR FOR USE ON THIS SPECIFIC PROJECT IS CONDITIONALLY GRANTED
THROUGH PERMISSION OF THE CONTRACTING OFFICER.
3. VERIFY CONDITIONS: THE CONTRACTOR SHALL VERIFY ALL PROJECT- RELATED NEW AND/OR EXISTING CONDITIONS INCLUDING DIMENSIONS PRIOR TO THE COMMENCEMENT OF WORK PROMPTLY NOTIFY THE CONTRACTING OFFICER IN WRITING OF DISCREPANCIES AND/OR UNKNOWN CONDITIONS OBSERVED.
4. DRAWING FORMAT: THESE CONSTRUCTION DOCUMENTS HAVE BEEN PRODUCED AT DRAWING SCALES THAT RELATE TO THEIR FULL SIZE FORMAT 22"x34" ANY DEVIATIONS TO THIS FORMAT SIZE WILL PRODUCE DRAWINGS OUTSIDE OF THE SCALE LIMITS INDICATED DRAWING REPRODUCTIONS AT ANY FORMAT SHOULD NOT BE SCALED FOR DIMENSIONAL ACCURACY USE GRAPHIC SCALES ACCORDINGLY.
5. PREPARATION OF DOCUMENTS: THESE CONTRACT DOCUMENTS HAVE BEEN PREPARED FROM CONSTRUCTION DOCUMENTS DATED 06/85 PROVIDED BY THE CONTRACTING OFFICER ANY DEVIATION FROM THESE CONDITIONS SHOULD BE BROUGHT TO THE ATTENTION OF THE DEPARTMENT FOR RESOLUTION.
6. SELECTIVE DEMOLITION:THIS PROJECT INVOLVES THE SELECTIVE DEMOLITION OF EXISTING FACILITIES THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL AS MANDATED IN THE DOCUMENTS ALL DEMOLISHED MATERIALS WILL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSITION OF ALL SUCH MATERIALS MUST BE TAKEN INTO CONSIDERATION.
7. HAZARDOUS MATERIALS: IT IS NOT EXPECTED THAT HAZARDOUS MATERIALS WILL BE ENCOUNTERED IN THE WORK, IF SUSPECTED HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB;
IMMEDIATELY NOTIFY DEPARTMENT, HAZARDOUS MATERIALS WILL BE REMOVED BY THE DEPARTMENT UNDER SEPARATE CONTRACT.
8. PROJECT PERMITTING:THE CONTRACTOR SHALL OBTAIN ALL REQUIRED BUILDING PERMITS.
9. SITE SAFETY:CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT RELATED SAFETY MEASURES ON-SITE, DURING THE PROJECTS CONSTRUCTION PERIOD NOTIFY THE GENERAL CONTRACTOR AND/OR THE
DESIGNATED "SAFETY OFFICER" AT ONCE SHOULD ANY SAFETY RELATED CONCERNS BE OBSERVED ON-SITE.
FIG. 404.2.4.1
MANEUVERING CLEARANCE AT SWINGING DOORS
(B) FRONT APPROACH, PUSH SIDE (C) HINGE APPROACH, PULL SIDE (D) HINGE APPROACH, PULL SIDE (E) HINGE APPROACH, PUSH SIDE (G) LATCH APPROACH, PUSH SIDE(F) LATCH APPROACH, PULL SIDE
FIG. 404.2.4.2
MANEUVERING CLEARANCE AT SLIDING AND FOLDING DOORS
(A) FRONT APPROACH (B) POCKET OR HINGE APPROACH (C) STOP OR LATCH APPROACH
FIG. 404.2.6
TWO DOORS IN A SERIES
(A) (B)
(1
0)
(1
5)
(1
5)
(610)
(1370)
(A) FRONT APPROACH, PULL SIDE
DOORS AND DOORWAYS
48" MIN. 48" MIN.54" MIN.
" M
IN
"M
IN
" M
IN
24" MIN.
(A) CIRCULAR (B) T-SHAPED
(A) FORWARD (B) PARALLEL
FIG. 304.3
SIZE OF WHEELCHAIR TURNING SPACE
FIG. 405.5
POSITION OF CLEAR FLOOR OR GROUND SPACE
(1525) (1525)
(305) (915) (305)
(760) (1220)
(9
(1
5)
(7
(1
0)
(A) FORWARD APPROACH (B) PARALLEL APPROACH
FIG. 305.7
MANEUVERING CLEARANCE IN AN ALCOVE
(915) (1525)
(1
0) (7
(X
0)
(X
0)
CLEAR FLOOR SPACE
60" MIN. 60" MIN.
" M
IN
48" MIN.
" M
IN
30" MIN.
" M
IN
" M
IN
12" MIN. 36" MIN. 12" MIN.
" M
IN
36" MIN. 60" MIN.
" M
IN
X > 1
5"
X > 2
4"
(3
(1
0)
FIG. 308.2.1
UNOBSTRUCTED FORWARD REACH
FIG. 308.2.2
OBSTRUCTED HIGH FORWARD REACH
(1
0)
(510) (510-635)
(1
0)
(1
0)
(255)
FIG. 308.3.1
UNOBSTRUCTED SIDE REACH
FIG. 308.3.2
OBSTRUCTED HIGH SIDE REACH
(610)
(1
0)
REACH RANGES
" M
IN
" M
AX
" M
AX
20" MAX.
" M
AX
(1
0)
20" - 25"
" M
AX
" M
AX
10" MAX.
" M
AX
24" MAX.
(1
0)
(405-455)
(1525)
(1
0)
FIG. 604.8.1.1
WHEELCHAIR ACCESSIBLE TOILET COMPARTMENTS
(B) FLOOR-MOUNTED WATER CLOSET(A) WALL-HUNG WATER CLOSET
(1
0)
(1525)
FIG. 604.8.3
TOILET COMPARTMENT DOORS
(100)
(1
5)
FIG. 602.5
DRINKING FOUNTAIN SPOUT LOCATION
(A) PARALLEL APPROACH (B) FORWARD APPROACH
(380)(125)
(90)
FIG. 609.3
SPACING OF GRAB BARS
(38)
(3
FIG. 604.2/604.3.1
WATER CLOSET LOCATION/
SIZE CLEARANCE
(1525)
PLUMBING ELEMENTS AND FACILITIES
16"-18"
60" min.
" m in.
" m in.
60" min.
" m in.
60" min.
4" max.
" m in.
15" max.5" max.
3 1/2" max.
" m
in. 1 1/2"
" M
IN
18" MIN 12" MIN 48
" M
IN
36" MIN 60
" M
IN
42" MIN 54
" M
IN
" M
IN
54" MIN
" M
IN
24" MIN
" M
IN
24" MIN
(1220) 4' - 0"
(1220) 4' - 0"
" M
AX
" M
AX
3'
- 2
(SD)
SOAP
DISPENSER
(PTD) & (PTD/TR)
PAPER TOWEL
DISPENSER & PAPER
TOWEL DISPENSER
W/ TRASH
RECEPTACLE
" M
IN
2'
- 0
(TTD)
TOILET TISSUE
DISPENSER
1'
- 3
7" -9"
3' - 6" 1' - 0" 0' - 6" 3' - 0"
16" - 18"
HC
MI
N
0'
- 1
1/ 2"
" M
AX
15" MIN
WATER CLOSET SIDE WALL
1 1/2" DIA. GRAB
BAR WITH 1 1/2"
GAP FROM WALL
WATER CLOSET BACK WALL
TOILET PAPER
MOUNTING
AREA
" S
TD
LAVATORY OR VANITY SINK
" M
IN
OFFSET
WASTE
ACCESSIBLE SINK
BOWL 6 1/2" DEEP
COUNTER
WHERE OCCURS
4'
- 0
(BCS)
BABY CHANGING
STATION
3' - 4"
1'
- 6
3'
- 4
" TRASH RECEPTACLE
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
JED/MCL
MCL
G004
ACCESSIBILTY
COMPLIANCE AND
MOUNTING HEIGHTS
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
ACCESSIBILTY COMPLIANCE
PLUMBING FIXTURE AND TOILET ACCESSORY MOUNTING HEIGHTS
ABBREVIATIONS LEGEND
AB ANCHOR BOLT
ABS ACRYLONITRILE BUTADIENE
STYRENE
ABV ABOVE
A/C AIR CONDITIONING
AC ASPHALTIC CONCRETE
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
ADDL ADDITIONAL
ADF ACCESSIBLE DRINKING FOUNTAIN
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AFS ABOVE FINISH SLAB
AGGR AGGREGATE
ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BBQ BARBEQUE
BCS BABY CHANGING STATION
BD BOARD
BFF BELOW FINISH FLOOR
BKBD BACK BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOD BOTTOM OF DECK
BOT F BOTTOM FACE
BOT BOTTOM
BR BEDROOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CFCI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CG CORNER GUARD
CMPST COMPOSITE
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUE/CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COP COPPER
CORR CORRIDOR
CPT CARPET
CSK COUNTERSINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
CULT CULTURED
CW COLD WATER PIPING
D DEEP/DEPTH
DBL DOUBLE
DEG DEGREE
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
ES EACH SIDE
EQ EQUAL
EQUIP EQUIPMENT
EOS EDGE OF SLAB
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
(E) EXISTING
F FAHRENHEIT
FA FIRE ALARM
FAB FABRICATE
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE, FIXTURES AND EQUIPMENT
FGL FIBERGLASS
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FLR SK FLOOR SINK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIRE PROOF
FR FRAME
FRP FIBERGLASS REINFORCED
PLASTIC
FRT FIRE RETARDANT
FRZ FREEZER
FT FEET
FTD FACIAL TISSUE DISPENSER
FTG FOOTING
FURG FURRING
FUT FUTURE
G NATURAL GAS
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GEN GENERAL
GFGI GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
GFRG GLASSFIBER REINFORCED GYPSUM
GFRC GLASSFIBER REINFORCED CONCRETE
GL GLASS/GLAZING
GLU LAM GLUE LAMINATED WOOD
GPM GALLONS PER MINUTE
GRAN GRANITE
GSB GYPSUM SHEATHING BOARD
GTV GATE VALVE
GWT GLAZED WALL TILE
GYP GYPSUM
GWB GYPSUM WALL BOARD
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HS HAND SINK
HT HEIGHT
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HW HOT WATER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
ID INSIDE DIAMETER
INCL INCLUDED
IMP INSULATED METAL PANEL
IN INCH
INFO INFORMATION
INSUL INSULATION/INSULATED
INT INTERIOR
INV INVERT
IHM INSULATED HOLLOW METAL
J-BOX JUNCTION BOX
JAN JANITOR
JST JOIST
JT JOINT
KD KNOCK DOWN
KIT KITCHEN
KO KNOCK-OUT
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LB POUND
LBF/SF POUNDS PER SQUARE FOOT
LDG LANDING
LF LINEAR FOOT
LH LEFT HAND
LKR LOCKER
LLV LONG LEG VERTICAL
LOC LOCATION
LT LIGHT
LR LIVING ROOM
LVR LOUVER
M METER
M2 SQUARE METERS
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBR MASTER BEDROOM
MC MEDICINE CABINET
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MI MIRROR
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOULDING
MM MILLIMETER
MO MASONRY OPENING
MOD MODULE
MP METAL PANEL
MR MOISTURE RESISTANT
MTD MOUNTED
MTL METAL
MTG MOUNTING
MULL MULLION
MUN MUNTIN
MW MICROWAVE
N NORTH
NFS NON-FROST SUSCEPTIBLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OBS OBSCURE
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED/
OWNER INSTALLED
OFD OVERFLOW DRAIN
OH OVER HANG
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OVHD OVER HEAD
PA PUBLIC ACCESS
PC PIECE
PCC PRECAST CONCRETE
PEND PENDANT
PERIM PERIMETER
PH PENTHOUSE
PLAS PLASTER
PLBG PLUMBING
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PROP PROPERTY
PREFAB PREFABRICATE
PT PAINT
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER
AND RECEPTACLE
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QT QUARRY TILE
R RISER
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RCB RESILIENT COVE BASE
RB HK ROBE HOOK
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFRIGERATOR
REFL REFLECTED
REG REGISTER
REINF REINFORCE
RECS RECOMMENDATIONS
REQD REQUIRED
RESIL RESILIENT
REST REST ROOM
REV REVISION
RTF RUBBER TILE FLOOR
RFG ROOFING
RLG RAILING
RH RIGHT HAND
RND ROUND
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKET
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCD SEAT COVER DISPENSER
SCP SCUPPER
SCR SHOWER CURTAIN ROD
SCRN SCREEN
SD SMOKE DETECTOR
SECT SECTION
SED SEE ELECTRICAL DRAWINGS
SF SQUARE FEET
SHT SHEET
SHR SHOWER
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SL SLOPE
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SND SANITARY NAPKIN DISPENSER
SNR SANITARY NAPKIN RECEPTACLE
SPC SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SSD SEE STRUCTURAL DRAWINGS
SST STAINLESS STEEL
SMD SEE MECHANICAL DRAWINGS
SMLS SEAMLESS
SS SOLID SURFACE
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SURR SURROUND
SUSP SUSPENDED
SVCE SERVICE
SW SWITCH
SYMM SYMMETRICAL
SYS SYSTEM
T TREAD
TB TOWEL BAR
TBD TO BE DETERMINED
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
T&G TONGUE AND GROOVE
THRES THRESHOLD
THRU THROUGH
THK THICKNESS
TK BD TACK BOARD
TMPD TEMPERED
TOC TOP OF CURB
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TS TUBE STEEL
TSH TOWEL SHELF
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
TLT TOILET
UBC UNIFORM BUILDING CODE
UC UNDERCUT
UNGD UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS OTHERWISE NOTED
UR URINAL
VAR VARIES
VB VALVE BOX
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VOL VOLUME
VP VENEER PLASTER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WIDE
W/ WITH
WC WALL COVERING
WCLR WATER COOLER
WD WOOD
WDSP WASTE DISPOSER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
W/O WITHOUT
WP WATERPROOF / WATERPROOFING
WR WATER REPELLENT
WSCT WAINSCOT
WSP WET STAND PIPE
WT WEIGHT
WWF WELDED WIRE FABRIC
A
B
C
D
E
F
M
S
G
H
I
J
K
L
N
O
P
Q
R
T
U
V
W
MATERIALS LEGEND
CONCRETE CMU
SAND, MORTAR, PLASTER,
TILE BACKER BOARD
CLASSIFIED COMPACTED FILL
EARTH, UNCLASSIFIED FILL BATT INSULATION
FINISHED WOOD RIGID INSULATION
METAL
PLYWOOD/MDF
GLASS GYPSUM WALL BOARD
CERAMIC TILE, VCT OR
RESILIENT FLOORING
ACOUSTICAL TILE/PANEL
CARPET
SYMBOLS LEGEND
ROOM DESIGNATION WALL TYPE
DOOR DESIGNATION GRIDLINE
EQUIPMENT DESIGNATION
EXTERIOR ELEVATION DESIGNATION
OPENING DESIGNATION
DETAIL DESIGNATION
REVISION DESIGNATION
BUILDING SECTION DESIGNATION
PLAN KEYNOTE
INTERIOR ELEVATION DESIGNATION
BREAK LINE
MATCHLINE
PLAN NORTH/NORTH
DATUM DESIGNATION
TITLE DESIGNATION
XX
NORTH
XX
1 VIEW NAME 1
A101
A101
A101
AFFX'XX" CEILING HEIGHT DESIGNATION
XXXX
RM NO
ROOM NAME
XXXX
FURNITURE DESIGNATION
XXx
WALL SECTION DESIGNATION
XX
DET_NO
SHT_NO
SIM
DET_NO
SHT_NO
SIM
DET_NO
SHT_NO
SIM
Name Elevation
0' 2' 12' 18'4' 8'
GRAPHIC SCALE
XXXX
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
TR/MCL
MCL
A001
ABBREVIATIONS AND
SYMBOLS LEGEND
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
(N) ENGINEERED WOOD SIDING
(N) WEATHER BARRIER W/ DRAINAGE
MAT
(E) 1/2" PLYWOOD SHEATHING
(E) 2X6 WOOD STUDS W/
BATT INSULATION
(E) 1/2" PLYWOOD SHEATHING
(E) VAPOR RETARDER
(E) 5/8" GWB
ENGINEERED WOOD SIDING
1/2" PLYWOOD SHEATHING
2X6 WOOD STUDS W/
BATT INSULATION
1/2" PLYWOOD SHEATHING
VAPOR RETARDER
5/8" GWB
WEATHER BARRIER W/ DRAINAGE MAT
WALL ASSEMBLY: TYPE 1 WALL ASSEMBLY: TYPE 2
1. PARTITION TYPES ARE NOTED ON THE ENLARGED FLOOR PLANS. REFER TO
THE A001 SERIES FOR LOCATION AND EXTENT OR LIMITS OF RATED PARTIONS.
2. REFER TO EXTERIOR WALL SECTIONS AND DETAILS FOR ADDITIONAL
WALL/PARTITION FRAMING NOT SPECIFICALLY IDENTIFIED ON FLOOR PLANS.
3. ALL FIRE RATED ASSEMBLIES ARE BASED ON IBC, UL OR GYPSUM
ASSOCIATION FIRE RESISTANCE DESIGN MANUAL. FIRE RATED PARTITIONS ARE
TO BE CONSTRUCTED IN ACCORDANCE TO THE REQUIREMENTS OF THE
TESTING AGENCY(IES) LISTED. REFER TO SPECIFIC TEST REPORTS FOR
REQUIRED COMPONENTS AND ASSEMBLY.
4. ALL ACOUSTIC ASSEMBLIES ARE BASED ON ASTM E 90 TEST PROCEDURES.
ACOUSTIC RATED PARTITIONS ARE TO BE CONSTRUCTED IN ACCORDANCE
WITH THE REQUIREMENTS OF THE APPROVED TESTING AGENCY(IES). REFER TO
SPECIFIC TEST REPORTS FOR REQUIRED COMPONENTS AND ASSEMBLY.
5. ALL OTHER (NON-STRUCTURAL) PARTITIONS ARE TO BE CONSTRUCTED IN
ACCORDANCE WITH THE SPECIFICATIONS, MATERIALS MANUFACTERER, AND
INDUSTRY STANDARDS.
6. INTERIOR STUDS ARE NON-LOAD BEARING OR SHEAR WALL UNO.
7. ALL GYPSUM BOARD IS TO BE 5/8" THICK, TYPE 'X'- UNO
PARTITION TYPE GENERAL NOTES
ONE HOUR FIRE AND/ OR SMOKE WALL - PRIORITY 3
NON-RATED WALL - PRIORITY 5 (LOWEST)
NOTE: ALL PARTITION TYPES INDICATED, MAY NOT BE USED. REFER TO
PLANS FOR ADDITIONAL INFORMATION.
WALL PRIORITY LEGEND
A
5/8" GWB
2X4 WOOD STUD
5/8" GWB
5/8" GWB
2X6 WOOD STUD
5/8" GWB
5/8" GWB
2X8 WOOD STUD
5/8" GWB
5/8" GWB
2X4 WOOD STUD W/
SOUND BATT INSULATION
B C DWALL TYPE " A" WALL TYPE " B1/B2" WALL TYPE " C" WALL TYPE " D1"/"D2"1 HOUR
U.L. #U314
1/2" RESILIENT CHANNEL
U.L. #U327
STC - 50 E WALL TYPE " E"
5/8" GWB
(E) 2X4 WOOD
STUD
(E) 5/8" GWB
2" METAL "Z" -
FURRING CHANNEL
D2:
2X6 WOOD STUD W/
SOUND BATT INSULATION
OMIT RESILIENT CHANNEL
B2:
ADD (1) LAYER 1/2"
PLYWOOD SHEATHING
U.L. #U314
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
TR/MCL
MCL
A002
PARTITION TYPES
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
EXTERIOR WALL ASSEMBLIES
PARTITION TYPES
A B C D
1.1
4.9
PLAN
NORTH
0" 2' 4' 8'
A A A
A
A
A
A
B
B
B
B
C
B
B
B
B
C
B
C
C
C
D
E
E
D
F
B
G
C
H
J
K
D
D
D
L
M
N
N
N
P
O
G
B
S
T
U
X
(ABOVE)
E01
E07
E0
E1
E11
E13
E14
E15
E1
E17
D
F
V
E0
EXISTING TO REMAIN
DEMOLITION LEGEND
ITEMS TO BE DEMOLISHED- REFER TO SHEET NOTES FOR ADDITIONAL
INFORMATION
EXISTING DOOR NUMBER FOR RELOCATION IDENTIFICATION- REFER TO
DOOR SCHEDULE ON SHEET A602 FOR WHERE TO REINSTALL
EXX
ROOFING AND UNDERLAYMENTS TO BE DEMOLISHED- EXISITNG
SHEATHING TO REMAIN
DEMO PLAN GENERAL NOTES
1. REFER TO SHEET G001 FOR GENERAL PROJECT NOTES
2. REFER TO SHEET G002 AND G003 FOR CODE ANALYSIS AND ADDITIONAL LIFE SAFETY
GENERAL NOTES
3. DIMENSIONING GUIDE: ALL DIMENSIONS ARE TAKEN TO/FROM GRID LINE, FACE OF
CONCRETE AND MASONRY, AND FACE OF METAL/WOOD STUD PARTITION, UNLESS
OTHERWISE NOTED. CLEAR DIMENSIONS BETWEEN SURFACES WILL BE NOTED WHERE
APPLICABLE FROM MATERIAL FINISHES. ALL DIMENSIONS REFERENCED HEREIN ARE
IMPERIAL STANDARDS, UNLESS OTHERWISE NOTED. FOR THE PURPOSE OF THIS
PROJECT, ALL DIMENSIONS HEREIN SHALL BE TREATED EQUALLY, WITHOUT ANY
HIERARCHY, AND/OR ORDER OF PRECEDENCE, UNLESS OTHERWISE NOTED
4. REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN CORRESPOND TO
REFERENCE ELEVATION 0’-0” AS THE EXISTING FIRST FLOOR LEVEL. DEVIATIONS AND
VARIANCES IN THIS ELEVATION MAY EXIST, AS INDICATED. UPPER FLOOR ELEVATIONS TO
BE NOTED ACCORDINGLY. NOTE: THIS ASSISTS AND ESTABLISHES NOTED VERTICAL
CONTROL AT ALL FLOOR PLANS, REGARDLESS TO FLOOR LEVEL.
5. DOOR OPENINGS: ALL DOOR OPENINGS (INCLUDING DOOR, FRAME AND HARDWARE)
THAT ARE BEING SHOWN AS DEMOLISHED ARE TO REUSED AND REINSTALLED AS
SHOWN ON THE FLOOR PLAN- REFER TO SHEETS A101, A102, AND OPENING SCHEDULE
ON SHEET A601
6. ROOM FINISHES: ALL FLOOR FINISHES ARE TO BE DEMOLISHED, EXISTING FIRST FLOOR
WALL BASE IS TO BE SALVAGED, PAINTED AND REINSTALLED. CONTRACTOR HAS THE
OPTION TO LEAVE IN PLACE OR REMOVE AND REINSTALL- REFER TO SHEETS A103 AND
A104 FOR NEW FINISHES.
7. REFLECTED CEILING PLAN: REFER TO SHEET A105 AND A106 FOR THE CORRESPONDING
RCP FOR THIS AREA.
8. ALL EXTERIOR SIDING AND EXISTING WEATHER BARRIER TO BE REMOVED- EXISTING
SHEATHING TO REMAIN.
9. ALL ROOFING AND UNDERLAYMENTS TO BE REMOVED TO THE SHEATHING- EXISTING
SUBSTRATE SHEATHING TO REMAIN.
10. THE GOVERNMENT WILL BE RESPONSIBLE FOR THE REMOVAL OF ALL STORED ITEMS IN
CRAWL SPACE, ATTIC, AND ELSEWHERE, AS WELL AS ALL SHELVING AND FURNITURE ON
THE PREMISES.
11. ALL EXISTING COLUMNS IN DEMOLISHED WALLS TO REMAIN UNLESS NOTED OTHERWISE.
12. DEMOLISH ALL EXISTING CEILINGS ON FIRST FLOOR EXCEPT IN ROOM 112 SERAC
STORAGE AND 101A MAIN EXHIBIT SPACE.
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
TR/MCL
MCL
AD101
DEMO FLOOR PLANS -
FIRST FLOOR
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
1/4" = 1'-0"AD101
1 FLOOR PLAN- DEMO FIRST FLOOR
XSHOWN IN PLAN ASDEMOLITION SHEET NOTES
A EXISTING OPENING TO REMAIN- BID OPTION 1 TO REPLACE THESE OPENINGS WITH NEW
B EXISTING DOOR, FRAME AND HARDWARE TO BE REMOVED AND REINSTALLED
C DOOR, DOOR FRAME AND HARDWARE TO BE DEMOLISHED
D DEMOLISH PORTION OF WALL TO CREATE NEW OPENING- REFER TO FLOOR PLANS FOR
ADDITIONAL INFORMATION
E DEMOLISH FLOOR AND STRUCTURE BELOW- REFER TO STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
F REMOVE 4x12 DECK BOARDS TO INSTALL NEW SIDING. REINSTALL WHEN DECK BOARD SIDIING
WORK IS COMPLETED.
G EXISITNG SIDELIGHT TO BE REMOVED , SALVAGE FOR REINSTALLATION
H DEMOLISH STAIRS, FRAMING, HANDRAILS AND ACCESSORIES
J DEMOLISH DECK
K REMOVE WALL INFILL
L DEMOLISH EXISTING WINDOW, SILL AND TRIM- INFILL WITH WALL TYPE "2"
M DEMOLISH RAISED FLOOR AND STAIRS
N DEMOLISH CARPET OR WOOD PANELING - PREPARE SURFACE TO RECIEVE NEW FINISH. REFER
TO SHEETS A103&A104 FOR ADDITIONAL INFORMATION
O DEMOLISH COLUMN - REFER TO STRUCTURAL DRAWINGS
P DEMOLISH BENCH
R EXISITING CASEWORK- TO BE REMOVED BY THE NATIONAL PARK SERVICE
S REMOVE WATER COOLER AND BOTTLE FILLER STATION, SALVAGE FOR REINSTALLATION IN NEW
PLAN- REFER TO DETAIL 1/A401 FOR LOCATION
T EXISTING FLOOR ACCESS HATCH TO REMAIN REFER TO SHEET A101 FOR LOCATION
U DEMOLISH EXISTING HANDRAILS
V DEMOLISH GYPSUM BOARD WALLS OR TOP OF STRINGER TO UNDERSIDE OF STRUCTURE.
DEMOLISH EXISITNG CEILING. PLYWOOD SHEATHING IS TO REMAIN
W DEMOLISH OF GYPSUM BOARD TO STUDS
X DEMOLISH EXISTING WINDOW, SILL AND TRIM- INFILL WITH WALL TYPE "B"
OPEN TO BELOW
1.1
4.9
PLAN
NORTH
0" 2' 4' 8'
A
C
C
A A A
A A
A
H
C
R
A
A
A
A
A
A
DN
L
C
UVV
W
L
EXISTING TO REMAIN
DEMOLITION LEGEND
ITEMS TO BE DEMOLISHED- REFER TO SHEET NOTES FOR ADDITIONAL
INFORMATION
EXISTING DOOR NUMBER FOR RELOCATION IDENTIFICATION- REFER TO
DOOR SCHEDULE ON SHEET A602 FOR WHERE TO REINSTALL
EXX
ROOFING AND UNDERLAYMENTS TO BE DEMOLISHED- EXISITNG
SHEATHING TO REMAIN
DEMO PLAN GENERAL NOTES
1. REFER TO SHEET G001 FOR GENERAL PROJECT NOTES
2. REFER TO SHEET G002 AND G003 FOR CODE ANALYSIS AND ADDITIONAL LIFE SAFETY
GENERAL NOTES
3. DIMENSIONING GUIDE: ALL DIMENSIONS ARE TAKEN TO/FROM GRID LINE, FACE OF
CONCRETE AND MASONRY, AND FACE OF METAL/WOOD STUD PARTITION, UNLESS
OTHERWISE NOTED. CLEAR DIMENSIONS BETWEEN SURFACES WILL BE NOTED WHERE
APPLICABLE FROM MATERIAL FINISHES. ALL DIMENSIONS REFERENCED HEREIN ARE
IMPERIAL STANDARDS, UNLESS OTHERWISE NOTED. FOR THE PURPOSE OF THIS
PROJECT, ALL DIMENSIONS HEREIN SHALL BE TREATED EQUALLY, WITHOUT ANY
HIERARCHY, AND/OR ORDER OF PRECEDENCE, UNLESS OTHERWISE NOTED
4. REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN CORRESPOND TO
REFERENCE ELEVATION 0’-0” AS THE EXISTING FIRST FLOOR LEVEL. DEVIATIONS AND
VARIANCES IN THIS ELEVATION MAY EXIST, AS INDICATED. UPPER FLOOR ELEVATIONS TO
BE NOTED ACCORDINGLY. NOTE: THIS ASSISTS AND ESTABLISHES NOTED VERTICAL
CONTROL AT ALL FLOOR PLANS, REGARDLESS TO FLOOR LEVEL.
5. DOOR OPENINGS: ALL DOOR OPENINGS (INCLUDING DOOR, FRAME AND HARDWARE)
THAT ARE BEING SHOWN AS DEMOLISHED ARE TO REUSED AND REINSTALLED AS
SHOWN ON THE FLOOR PLAN- REFER TO SHEETS A101, A102, AND OPENING SCHEDULE
ON SHEET A601
6. ROOM FINISHES: ALL FLOOR FINISHES ARE TO BE DEMOLISHED, EXISTING FIRST FLOOR
WALL BASE IS TO BE SALVAGED, PAINTED AND REINSTALLED. CONTRACTOR HAS THE
OPTION TO LEAVE IN PLACE OR REMOVE AND REINSTALL- REFER TO SHEETS A103 AND
A104 FOR NEW FINISHES.
7. REFLECTED CEILING PLAN: REFER TO SHEET A105 AND A106 FOR THE CORRESPONDING
RCP FOR THIS AREA.
8. ALL EXTERIOR SIDING AND EXISTING WEATHER BARRIER TO BE REMOVED- EXISTING
SHEATHING TO REMAIN.
9. ALL ROOFING AND UNDERLAYMENTS TO BE REMOVED TO THE SHEATHING- EXISTING
SUBSTRATE SHEATHING TO REMAIN.
10. THE GOVERNMENT WILL BE RESPONSIBLE FOR THE REMOVAL OF ALL STORED ITEMS IN
CRAWL SPACE, ATTIC, AND ELSEWHERE, AS WELL AS ALL SHELVING AND FURNITURE ON
THE PREMISES.
11. ALL EXISTING COLUMNS IN DEMOLISHED WALLS TO REMAIN UNLESS NOTED OTHERWISE.
12. DEMOLISH ALL EXISTING CEILINGS ON FIRST FLOOR EXCEPT IN ROOM 112 SERAC
STORAGE AND 101A MAIN EXHIBIT SPACE.
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
TR/MCL
MCL
AD102
DEMO FLOOR PLANS -
SECOND FLOOR
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
1/4" = 1'-0"AD102
1 FLOOR PLAN- DEMO SECOND FLOOR
SHOWN IN PLAN ASDEMOLITION SHEET NOTES
A EXISTING OPENING TO REMAIN- BID OPTION 1 TO REPLACE THESE OPENINGS WITH NEW
B EXISTING DOOR, FRAME AND HARDWARE TO BE REMOVED AND REINSTALLED
C DOOR, DOOR FRAME AND HARDWARE TO BE DEMOLISHED
D DEMOLISH PORTION OF WALL TO CREATE NEW OPENING- REFER TO FLOOR PLANS FOR
ADDITIONAL INFORMATION
E DEMOLISH FLOOR AND STRUCTURE BELOW- REFER TO STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
F REMOVE 4x12 DECK BOARDS TO INSTALL NEW SIDING. REINSTALL WHEN DECK BOARD SIDIING
WORK IS COMPLETED.
G EXISITNG SIDELIGHT TO BE REMOVED , SALVAGE FOR REINSTALLATION
H DEMOLISH STAIRS, FRAMING, HANDRAILS AND ACCESSORIES
J DEMOLISH DECK
K REMOVE WALL INFILL
L DEMOLISH EXISTING WINDOW, SILL AND TRIM- INFILL WITH WALL TYPE "2"
M DEMOLISH RAISED FLOOR AND STAIRS
N DEMOLISH CARPET OR WOOD PANELING - PREPARE SURFACE TO RECIEVE NEW FINISH. REFER
TO SHEETS A103&A104 FOR ADDITIONAL INFORMATION
O DEMOLISH COLUMN - REFER TO STRUCTURAL DRAWINGS
P DEMOLISH BENCH
R EXISITING CASEWORK- TO BE REMOVED BY THE NATIONAL PARK SERVICE
S REMOVE WATER COOLER AND BOTTLE FILLER STATION, SALVAGE FOR REINSTALLATION IN NEW
PLAN- REFER TO DETAIL 1/A401 FOR LOCATION
T EXISTING FLOOR ACCESS HATCH TO REMAIN REFER TO SHEET A101 FOR LOCATION
U DEMOLISH EXISTING HANDRAILS
V DEMOLISH GYPSUM BOARD WALLS OR TOP OF STRINGER TO UNDERSIDE OF STRUCTURE.
DEMOLISH EXISITNG CEILING. PLYWOOD SHEATHING IS TO REMAIN
W DEMOLISH OF GYPSUM BOARD TO STUDS
X DEMOLISH EXISTING WINDOW, SILL AND TRIM- INFILL WITH WALL TYPE "B"
X
A301
A301
SERAC STORAGE
MECHANICAL
THEATER
AK GEO
EDUCATION
101A
MAIN EXHIBIT SPACE
A
A
ALIGN FINISH FACE OF WALL WITH EXISTING
12' - 4 1/4" +/- 4' - 5"
0'
- 3
6'
- 3 3/
4"
10' - 6 1/2"
D1
A
A
A
JANITOR
STORAGE
WOMEN'S
RESTROOM
MEN'S RESTROOM 113
STORAGE
STORAGE
VEST
STAIR
A
ELEV
B1 A
2' - 0" 8' - 0" 2' - 0"
A401
A40213
A402
113A
107B
107A
B
HALLWAY
A302
A B C D
1.1
4.9
3'
- 4
7'
- 4 1/
2"
101B
A
4' - 0" 50' - 3"
0'
- 4
9'
- 1
0" 3'
- 4
0'
- 9
3/ 4"
0'
- 4
1/ 4"
3'
- 5
1'
- 3
3'
- 0
1/ 2"
8'
- 0
1/ 4"
0'
- 2
3/ 4"
0'
- 5
3'
- 2
5'
- 3
0'
- 4
1' - 0" 12' - 8 1/2"
0' - 10"
0' - 6"
FROM FACE OF EXIST
5' - 9 1/4" +/-
EXISTING FLOOR
HATCH TO REMAIN
A503
A503
A503
101C
EAST HALL
101B
SOUTH HALL
4' - 4 1/2"
1'
- 7
4'
- 1
0" 1'
- 8
3'
- 4
3'
- 0 1/
2"
E
A
3B
C C
C
8"
9 1
/2" 7'
- 4
7'
- 6
1/ 2"
3"
4'
- 0
10' - 6 1/2"50' - 3"
12' - 0"10' - 1 1/2"25' - 8"2' - 5 1/2"4' - 0"
8"
3 1
/2"
3/ 4"
1"
2'
- 2
3/ 4"
101A
2'
- 0
0' - 8" W
AL
L T
O
AL
IG
N
W
IT
H
EX
IS
TI
NG
5'
- 5
3'
- 4
0'
- 8
1/ 2"
B2
A
C
B1
A
A
E
0' - 8" FROM FOF
3'
- 9
1/ 4"
3'
- 9
1/ 4"
G
7' - 11"
F.E.
F.E.
FLOOR DRAIN
ANTENNA TOWER
FOUNDATION.
SEE STRUCTURAL
TYP
TYP
F
F
F
F
F
F
F
3' - 5 1/4" 5' - 11"19' - 5" 3' - 5 1/4" 14' - 7 1/2" 3' - 5"
H
H
F
G
J
EXISTING WALL CONSTRUCTION TO REMAIN
NEW CONSTRUCTION - REFER TO PARTITION TYPES SHEET
A002 FOR ADDITIONAL INFORMATION
FLOOR PLAN LEGEND
FLOOR PLAN GENERAL NOTES
1. REFER TO SHEET G001 FOR GENERAL PROJECT NOTES
2. REFER TO SHEET G002 AND G003 FOR CODE ANALYSIS AND ADDITIONAL LIFE SAFETY
GENERAL NOTES
3. DIMENSIONING GUIDE: ALL DIMENSIONS ARE TAKEN TO/FROM GRID LINE, FACE OF
CONCRETE AND MASONRY, AND FACE OF METAL/WOOD STUD PARTITION, UNLESS
OTHERWISE NOTED. CLEAR DIMENSIONS BETWEEN SURFACES WILL BE NOTED WHERE
APPLICABLE FROM MATERIAL FINISHES. ALL DIMENSIONS REFERENCED HEREIN ARE
IMPERIAL STANDARDS, UNLESS OTHERWISE NOTED. FOR THE PURPOSE OF THIS PROJECT,
ALL DIMENSIONS HEREIN SHALL BE TREATED EQUALLY, WITHOUT ANY HIERARCHY, AND/OR
ORDER OF PRECEDENCE, UNLESS OTHERWISE NOTED
4. REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN CORRESPOND TO
REFERENCE ELEVATION 0’-0” AS THE EXISTING FIRST FLOOR LEVEL. DEVIATIONS AND
VARIANCES IN THIS ELEVATION MAY EXIST, AS INDICATED. UPPER FLOOR ELEVATIONS TO
BE NOTED ACCORDINGLY. NOTE: THIS ASSISTS AND ESTABLISHES NOTED VERTICAL
CONTROL AT ALL FLOOR PLANS, REGARDLESS TO FLOOR LEVEL.
5. MOUNTING HEIGHTS: REFER TO SHEET G004 FOR TYPICAL MOUNTING HEIGHTS FOR
FIXTURES, ACCESSORY ITEMS,AND MISCELLANEOUS DEVICES.
6. ALL PENETRATIONS THROUGH INTERIOR PARTITIONS AND CEILING AROUND MECHANICAL
110 SHALL RECEIVE FIRESTOPPING.
1/4" = 1'-0"A101
1 FLOOR PLAN- FIRST FLOOR
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
TR/MCL
MCL
A101
FLOOR PLANS- FIRST
FLOOR
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
0" 2' 4' 8'1'
PLAN
NORTH
XSHOWN IN PLAN ASFLOOR PLAN SHEET NOTES
A INFILL WALL ABOVE WITH WALL TYPE 'B'
B EXISTING CASEWORK/SHELVING TO REMAIN
C ADA ACTUATOR
D RELOCATED DRINKING FOUNTAIN AND BOTTLE FILLING STATION
E FIRE RATED ACCESS DOOR
F FIN TUBE COVER - REFER TO MECHANICAL
G REINSTALL SALVAGED WINDOW
H OPEN - REFER TO STRUCTURAL DRAWINGS AND EXHIBIT DRAWINGS
J INSTALL (1) LAYER OF NEW 5/8" GYPSUM BOARD ON EXISTING STUD
FRAMING
DN
A301
A301
CONFERENCE
LOCKERS
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
CIRCULATION
RESTROOM
A
ELEV
STAIR
A402
A401
A401
B
A302
A B C D
1.1
4.9
E
STORAGE
HALL
E
B
B
101A
MAIN EXHIBIT SPACE
(SPACE OPEN TO BELOW)
9'
- 1
0 3 /4"
3'
- 0
1/ 2"
1'
- 0
1/ 2"
0'
- 4
1/ 4"
A
A
4'
- 0
8"
3 1 /2"
F.E.
3/
4"
1"
2'
- 2
3/ 4"
B
B
0'
- 4
J
EXISTING WALL CONSTRUCTION TO REMAIN
NEW CONSTRUCTION - REFER TO PARTITION TYPES SHEET
A002 FOR ADDITIONAL INFORMATION
FLOOR PLAN LEGEND
FLOOR PLAN GENERAL NOTES
1. REFER TO SHEET G001 FOR GENERAL PROJECT NOTES
2. REFER TO SHEET G002 AND G003 FOR CODE ANALYSIS AND ADDITIONAL LIFE SAFETY
GENERAL NOTES
3. DIMENSIONING GUIDE: ALL DIMENSIONS ARE TAKEN TO/FROM GRID LINE, FACE OF
CONCRETE AND MASONRY, AND FACE OF METAL/WOOD STUD PARTITION, UNLESS
OTHERWISE NOTED. CLEAR DIMENSIONS BETWEEN SURFACES WILL BE NOTED WHERE
APPLICABLE FROM MATERIAL FINISHES. ALL DIMENSIONS REFERENCED HEREIN ARE
IMPERIAL STANDARDS, UNLESS OTHERWISE NOTED. FOR THE PURPOSE OF THIS PROJECT,
ALL DIMENSIONS HEREIN SHALL BE TREATED EQUALLY, WITHOUT ANY HIERARCHY, AND/OR
ORDER OF PRECEDENCE, UNLESS OTHERWISE NOTED
4. REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN CORRESPOND TO
REFERENCE ELEVATION 0’-0” AS THE EXISTING FIRST FLOOR LEVEL. DEVIATIONS AND
VARIANCES IN THIS ELEVATION MAY EXIST, AS INDICATED. UPPER FLOOR ELEVATIONS TO
BE NOTED ACCORDINGLY. NOTE: THIS ASSISTS AND ESTABLISHES NOTED VERTICAL
CONTROL AT ALL FLOOR PLANS, REGARDLESS TO FLOOR LEVEL.
5. MOUNTING HEIGHTS: REFER TO SHEET G004 FOR TYPICAL MOUNTING HEIGHTS FOR
FIXTURES, ACCESSORY ITEMS,AND MISCELLANEOUS DEVICES.
6. ALL PENETRATIONS THROUGH INTERIOR PARTITIONS AND CEILING AROUND MECHANICAL
110 SHALL RECEIVE FIRESTOPPING.
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
MCG
TR/MCL
MCL
A102
FLOOR PLANS- SECOND
FLOOR
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
1/4" = 1'-0"A102
1 FLOOR PLAN- SECOND FLOOR
0" 2' 4' 8'1'
PLAN
NORTH
SHOWN IN PLAN AS
XFLOOR PLAN SHEET NOTES
A INFILL WALL ABOVE WITH WALL TYPE 'B'
B EXISTING CASEWORK/SHELVING TO REMAIN
C ADA ACTUATOR
D RELOCATED DRINKING FOUNTAIN AND BOTTLE FILLING STATION
E FIRE RATED ACCESS DOOR
F FIN TUBE COVER - REFER TO MECHANICAL
G REINSTALL SALVAGED WINDOW
H OPEN - REFER TO STRUCTURAL DRAWINGS AND EXHIBIT DRAWINGS
J INSTALL (1) LAYER OF NEW 5/8" GYPSUM BOARD ON EXISTING STUD
FRAMING
SERAC STORAGE
MECHANICAL
THEATER
AK GEO
EDUCATION
101A
MAIN EXHIBIT SPACE
PLAN
NORTH
0" 2' 4' 8'
JANITOR
STORAGE
WOMEN'S
RESTROOM
MEN'S RESTROOM
STORAGE
STORAGE
VEST
STAIR
A
ELEV
A B C D
1.1
4.9
GL
AS
S
FL
OO
R
PA
NE
LS
N
.I.C
GLASS FLOOR
PANELS N.I.C.
E
HALLWAY
101C
EAST HALL
101B
SOUTH HALL
P-3 IS TO BE APPLIED TO FACE OF SOFFIT ONLY
P-3 I
S TO BE APPLIE
D TO FACE OF SOFFIT ONLYAL
IG
N
AC
CE
NT
C
PT
T O
FA
CE
O F
W
AL
L
3'
- 0
2'
- 0
0" 15' - 0"
AL
IG
N W
IT
H
ED
GE
O F
SO
FF
IT
AP
PR
OX
1'
9"
APPROX
1' - 9"
ALIGN WITH EDGE OF SOFFIT
APPROX 1' - 9"
13' - 9"
5'
- 0
5'
- 0
"R 8' -
16' - 0 1/4"
P- 3 I
S
TO
B E
AP
PL
IE
D
TO
F
AC
E
O F
SO
FF
IT
O
NL
Y-
B
OT
H
SI
DE
S
9' - 8" 13' - 10"
.0
0°
LEVEL 5 FINISH ON WALL
LEVEL 5 FINISH ON WALL
LE
VE
L 5 F
IN
IS
H
ON
W
AL
L
CPT-1
FLOOR FINISH PLAN GENERAL NOTES
1. ALL INTERIOR WALLS TO RECEIVE PAINTED FINISH, UNO.
2. ALL FLOORING TRANSITIONS OCCUR AT CENTERLINE OF DOOR OR OPENING, UNO.
3. INDICATES WALLS THAT ARE NOT TO HAVE MECHANICAL OR ELECTRICAL DEVICES,
I.E. THERMOSTATS, STROBES, EMERGENCY LIGHTS, ETC. DUE TO CONFLICT WITH
SPECIAL FINISHES.
4. ALL FLOORS TO RECEIVE NEW FLOORING FINISH W/ NEW WALL BASE UNO.
INTERIOR FINISH LEGEND
RESIL-1
SLIP RESISTANT RUBBER
FLOORING
CPT-2
RESILIENT TILE
EXISTING WALL CONSTRUCTION TO REMAIN
NEW CONSTRUCTION - REFER TO PARTITION TYPES SHEET A002
FOR ADDITIONAL INFORMATION
WALL TO RECEIVE CARPET TO 4'-0" A.F.F W/ CHAIR RAIL -
PAINTED BLACK
PAINT 1'-0" BAND ON WALL FROM 7'-0" AFF TO 8'-0" AFF/UNDERSIDE OF
CEILING (FIELD VERIFY)- P3
PAINT WALL FROM GRID CEILING TO UNDER SIDE OF EXISTING
CEILING BLACK, APPROXIMATELY 1'-0"- P-3
CPT-3
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. A-7941
James E. Dougherty
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,040
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
RIM ARCHITECTS
645 G STREET ,SUITE 400 ANCHORAGE ,AK 99501 (907)-258-7777
PALMER 111WEST EVERGREEN AVE. PALMER,AK 99645 (907)-258-7777
CORPORATE NO. AECL1227.
Author
TR/MCL
Designer
A103
FLOOR FINISH PLAN -
FIRST FLOOR
SEWARD VISITOR CENTER REHAB
KENAI FJORDS NATIONAL PARK2016.09.28
184638
1/4" = 1'-0"A103
1 FLOOR FINISH PLAN- FIRST FLOOR
CONFERENCE
LOCKERS
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
PLAN
NORTH
0" 2' 4' 8'
CIRCULATION
RESTROOM
A
ELEV
STAIR
OPEN
TO
BELOW
A B C D
1.1
4.9
STORAGE
E
ALIGN WITH
JAMB
ALIGN WITH
JAMB
ALIGN WITH FACE OF WALL
ALIGN WITH
JAMB
ALIGN WITH
JAMB
ALIGN WITH FACE OF WALL
HALL
CPT-1
FLOOR FINISH PLAN GENERAL NOTES
1. ALL INTERIOR WALLS TO RECEIVE PAINTED FINISH, UNO.
2. ALL FLOORING TRANSITIONS OCCUR AT CENTERLINE OF DOOR OR OPENING, UNO.
3. INDICATES WALLS THAT ARE NOT TO HAVE MECHANICAL OR ELECTRICAL DEVICES,
I.E. THERMOSTATS, STROBES, EMERGENCY LIGHTS, ETC. DUE TO CONFLICT WITH
SPECIAL FINISHES.
4. ALL FLOORS TO RECEIVE NEW FLOORING FINISH W/ NEW WALL BASE UNO.
INTERIOR FINISH LEGEND
RESIL-1
SLIP RESISTANT RUBBER