Q_&_A_Amendment_0002.pdf

PDF 17 KB Posted

Attached to
ACAD Duck Pier Replacement Federal contract opportunity
Solicitation number
P17PS00107
Issued by
Department of the Interior National Park Service

About this file

Q & A Part 2

View the file

Other files for this federal contract opportunity

Other files attached to ACAD Duck Pier Replacement, newest first.
File Type Posted
Q&A_Amendment_0003_(Final).pdf PDF
Sol_P17PS00107_Amd_000003.pdf PDF
General_Decision_Number.pdf PDF
Pre-Bid_Sign_in_Sheet.pdf PDF
P17PS00107_-_Amendment_0002.pdf PDF
Wage_Decision_(Heavy_Dredging)_ME170001_(01-16-2017).pdf PDF
Wage_Decision_(Heavy)_ME170008_(01-16-2017).pdf PDF
Wage_Decision_(Heavy_Dredging)_ME170004_(01-16-2017).pdf PDF
Amendment_0001_-_Q&A.pdf PDF
P17PS00107_-_Amendment_0001.pdf PDF
7_SF_24_BidBond.pdf PDF
4_ProposedEquals.doc DOC document
ACAD_163552B_DHP_DRAWINGS.pdf PDF
ACAD_163552B_DHP_SPECS.pdf PDF
1_Experience_Questionnaire.docx DOCX document
P17PS00107.pdf PDF
5_HazMat.doc DOC document
3_Key_Personnel_Qualifications.docx DOCX document
8_GeneralReferences.doc DOC document
2_Subcontractor_Reference.doc DOC document
6_Past_Performance_Questionnaire.doc DOC document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q3. In paragraph D, page 10, you state that the contractor cannot camp there.

I wish to point out that the project is extremely remote; time spent transporting men to and from there will be extensive (and expensive) Stonington, Vinalhaven, and Rockland are quite a distance.

I urge you to reconsider your position on this matter, even if you find it necessary to charge the contractor $2500 to use the nearest campsite, and require a $5000 cash cleanup bond.

A3. Section 01 11 00 Para. 1.3D is included to prevent "Out of Bounds camping" which is not permitted in the Park. Acadia National Park resource Protection Rangers were consulted and due to the remoteness of the site and since there will be no rangers on the island before April 16 and only one until May 15 they declined to waive this policy.

As far as use of the campground is concerned it does not open until May 15th. Prior to that date there is no maintenance personnel present on that end of the island to maintain the facilities and/or assure proper behavior. While open for use after May 15, reservations are taken at the beginning of April and it is generally fully booked and there are length of stay, and back country use limitations protecting that experience.

Proposers may seek to provide quarters afloat, arrange for use of housing in the village near the town landing or private seasonal homes on the island, arrange to camp/RV on private lands on the island, or commute from the mainland.

Q4. The design calls for the installation of a 2” x 8” nailer. (See sheet S4). As it’s name implies, this is usually specified when the structure on top is somehow fastened (Nailed…) to it.

A4. Only the timber floorbeams at railing posts (6ft spacing max) are connected with the z-clips. The three timber floorbeams in between (at 1.5ft spacing) are not connected with z-clips. Designs anticipated that the Contractor would toe-nail (using stainless steel nails or screws) the intermediate floorbeams to the nailers to hold the floorbeams in place while the composite deck is installed. Although not explicitly called out in the Contract Plans it was implied by labeling the timber on top of the steel beams a “nailer”.

Q5. In this case, you have specified stainless “Z” clips, attaching the 6’ x 6” floorbeams (S4), which is a superior design, and eliminates the need for the “nailer”.

A5. The timber nailers on top of the steel stingers serve as spacers that provided the needed vertical clearance to use the W6x25 steel beams shown on sheet S8 that support the davit crane platform and the gangway platform. with out them plans would have to use 8x8 floorbeams throughout all spans to achieve the same needed vertical clearance that is provided by using the nailers. It is estimated that it is more cost-effective to use the timber nailers than it would have been to use 8x8 floorbeams everywhere.

Q6. The three Davis Bacon Wage Decisions included in Amendment 0001 were for Heavy, Dredging and Hopper Dredging. Since there is no dredging anticipated under the proposed contract, we want to confirm that proposal pricing should be based on the Heavy wage rate decision.

A6. No dredging in this project. Heavy yes. Although for Knox County, Solicitation has Hancock which is incorrect.

Q7. Would you be able to email a copy of the attendance list for the Site Visit and is the visit mandatory?

A7. Amendment 0002 attachment includes a scanned copy of the pre-bid sign in sheet.